CN111910793A - A kind of anti-crack and anti-leakage building wall panel and installation method for easy and quick installation - Google Patents

A kind of anti-crack and anti-leakage building wall panel and installation method for easy and quick installation Download PDF

Info

Publication number
CN111910793A
CN111910793A CN202010803707.1A CN202010803707A CN111910793A CN 111910793 A CN111910793 A CN 111910793A CN 202010803707 A CN202010803707 A CN 202010803707A CN 111910793 A CN111910793 A CN 111910793A
Authority
CN
China
Prior art keywords
plate
fixed shaft
panel
clamping seat
resistant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010803707.1A
Other languages
Chinese (zh)
Inventor
王昊
陈晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Dinglu Construction Co ltd
Original Assignee
Shandong Dinglu Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Dinglu Construction Co ltd filed Critical Shandong Dinglu Construction Co ltd
Priority to CN202010803707.1A priority Critical patent/CN111910793A/en
Publication of CN111910793A publication Critical patent/CN111910793A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • E04B1/6108Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together
    • E04B1/612Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces
    • E04B1/6125Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces with protrusions on the one frontal surface co-operating with recesses in the other frontal surface
    • E04B1/6137Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces with protrusions on the one frontal surface co-operating with recesses in the other frontal surface the connection made by formlocking
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/30Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Finishing Walls (AREA)

Abstract

The invention discloses an anti-cracking and anti-leakage building wallboard convenient to mount quickly and a mounting method, comprising a supporting seat, a bolt, a fixing shaft, a first plate, a second plate, a third plate and a fourth plate, wherein the fixing shaft is fixedly mounted at the upper end of the supporting seat, the supporting seat is in threaded connection with the fixing shaft through a plurality of bolts, the first plate, the second plate, the third plate and the fourth plate are detachably mounted on the outer wall of the fixing shaft, a first shaft hole is formed in the upper end of the first plate, and the first plate is detachably connected with the fixing shaft through the first shaft hole. The installation is comparatively simple, has solved the poor problem of traditional building wallboard installation performance.

Description

一种便于快速安装的抗裂防渗漏建筑墙板及安装方法A kind of anti-crack and anti-leakage building wall panel and installation method for easy and quick installation

技术领域technical field

本发明涉及一种建筑墙板,特别涉及一种便于快速安装的抗裂防渗漏建筑墙板及安装方法,属于建筑墙板技术领域。The invention relates to a building wall panel, in particular to a crack-resistant and anti-leakage building wall panel that is convenient for quick installation and an installation method, and belongs to the technical field of building wall panels.

背景技术Background technique

随着生产业的飞速发展,厂房的数量也越来越多,建造厂房需要用到大量的建筑墙板,因此对建筑墙板的需求也越来越大,传统的建筑墙板通常使用砖块和混凝土通过砖混结构建造,或者使用泡沫和铁片通过框架结构建造。With the rapid development of the production industry, the number of workshops is also increasing. The construction of workshops requires a large number of building wall panels, so the demand for building wall panels is also increasing. Traditional building wall panels usually use bricks. and concrete through brick-concrete construction, or through frame construction using foam and iron sheets.

但是目前的漏建筑墙板存在三个方面问题,首先,传统的建筑墙板通常使用混凝土或者连接胶连接,安装时需要预配混凝土或者连接胶,拆卸后也不方便重复使用,安装较为麻烦;其次,传统的建筑墙板大多使用砖块、泡沫和铁片等材料构成,其材料抗老化性能不是很好,建筑墙板长期使用后易产生裂纹;最后,传统的建筑墙板结构之间存在空隙,建筑墙板老化后下雨时雨水可能会随空隙进入墙板内,造成雨水渗漏至室内。However, there are three problems in the current leaky building wall panels. First, the traditional building wall panels are usually connected by concrete or connecting glue, which requires pre-prepared concrete or connecting glue during installation. Secondly, most of the traditional building wall panels are made of bricks, foam, iron sheets and other materials, and the anti-aging properties of the materials are not very good, and the building wall panels are prone to cracks after long-term use; When it rains after the aging of the building wall panel, the rainwater may enter the wall panel with the gap, causing the rainwater to leak into the room.

发明内容SUMMARY OF THE INVENTION

本发明的目的在于提供一种便于快速安装的抗裂防渗漏建筑墙板及安装方法,以解决上述背景技术中提出的安装性能差、抗裂性能差和防渗漏性能差的问题。The purpose of the present invention is to provide a crack-resistant and anti-leakage building wall panel and an installation method that is easy to install quickly, so as to solve the problems of poor installation performance, poor crack resistance and poor anti-leakage performance proposed in the above-mentioned background art.

为实现上述目的,本发明提供如下技术方案:To achieve the above object, the present invention provides the following technical solutions:

一种便于快速安装的抗裂防渗漏建筑墙板,包括支撑座、螺栓、固定轴、第一板材、第二板材、第三板材和第四板材,所述支撑座上端固定安装有固定轴,所述支撑座与固定轴通过若干个螺栓螺纹连接,所述固定轴外壁可拆卸安装有第一板材、第二板材、第三板材和第四板材,所述第一板材上端设置为方形凸起状,所述第一板材上端开设有第一轴孔,所述第一板材通过第一轴孔与固定轴可拆卸连接,所述第一板材远离固定轴一端设置为H形凸起状,所述第一板材远离固定轴另一端开设有第一H形凹槽,所述第一板材下端内部开设有第一内腔。An anti-cracking and anti-leakage building wall panel that is convenient for quick installation, comprising a support seat, a bolt, a fixed shaft, a first plate, a second plate, a third plate and a fourth plate, and a fixed shaft is fixedly installed on the upper end of the support seat , the support base and the fixed shaft are threadedly connected by several bolts, the outer wall of the fixed shaft is detachably mounted with a first plate, a second plate, a third plate and a fourth plate, and the upper end of the first plate is set as a square convex The upper end of the first plate is provided with a first shaft hole, the first plate is detachably connected to the fixed shaft through the first shaft hole, and the end of the first plate away from the fixed shaft is arranged in an H-shaped convex shape, A first H-shaped groove is formed at the other end of the first plate away from the fixed shaft, and a first inner cavity is formed inside the lower end of the first plate.

作为本发明的一种优选技术方案,所述第三板材和第四板材上端可拆卸安装有固定板,所述固定板下端开设有凹槽,所述固定板通过凹槽与保护板滑动连接。As a preferred technical solution of the present invention, a fixing plate is detachably installed on the upper ends of the third plate and the fourth plate, a groove is formed at the lower end of the fixing plate, and the fixing plate is slidably connected to the protection plate through the groove.

作为本发明的一种优选技术方案,所述支撑座上端开设有若干个第一凹槽,所述第一凹槽内壁开设有四个螺孔,所述支撑座通过螺孔与螺栓螺纹连接,所述支撑座上端开设有第二凹槽,所述支撑座通过第二凹槽与保护板滑动连接。As a preferred technical solution of the present invention, the upper end of the support seat is provided with a plurality of first grooves, the inner wall of the first groove is provided with four screw holes, and the support seat is threadedly connected with the bolts through the screw holes, The upper end of the support seat is provided with a second groove, and the support seat is slidably connected with the protection plate through the second groove.

作为本发明的一种优选技术方案,所述第二板材包括上卡座和下卡座,所述上卡座和下卡座之间活动连接,所述下卡座的内部设置有限位槽,所述限位槽的内部设置有弹簧,所述弹簧的内部套设有上卡座的下部,所述下卡座的侧壁设置有两个卡柱,且所述卡柱位于所述弹簧的顶部,且所述卡柱和弹簧相抵接,所述弹簧的底部固定在下卡座的底部。As a preferred technical solution of the present invention, the second plate includes an upper card seat and a lower card seat, the upper card seat and the lower card seat are movably connected, and the lower card seat is provided with a limiting groove inside, The inside of the limiting slot is provided with a spring, the inside of the spring is sleeved with the lower part of the upper clamp, the side wall of the lower clamp is provided with two clamps, and the clamps are located at the bottom of the spring. the top, and the clamping column is in contact with the spring, and the bottom of the spring is fixed on the bottom of the lower clamping seat.

作为本发明的一种优选技术方案,所述上卡座上端开设有第二轴孔,所述上卡座通过第二轴孔与固定轴连接,所述下卡座远离固定轴一端设置为H形凸起状,所述下卡座远离固定轴另一端开设有第二H形凹槽。As a preferred technical solution of the present invention, the upper end of the upper clamp is provided with a second shaft hole, the upper clamp is connected to the fixed shaft through the second shaft hole, and the end of the lower clamp away from the fixed shaft is set as H In the shape of a convex shape, a second H-shaped groove is formed at the other end of the lower clamping seat away from the fixed shaft.

作为本发明的一种优选技术方案,所述第三板材内部开设有第二内腔,所述第三板材通过第二内腔与固定板可拆卸连接,所述第三板材远离固定轴一端设置为H形凸起状,所述第三板材远离固定轴另一端开设有第三H形凹槽。As a preferred technical solution of the present invention, a second inner cavity is opened inside the third plate, the third plate is detachably connected to the fixing plate through the second inner cavity, and the third plate is arranged at one end away from the fixing shaft In the shape of an H-shaped protrusion, the other end of the third plate away from the fixed shaft is provided with a third H-shaped groove.

作为本发明的一种优选技术方案,所述第四板材内部开设有第三内腔,所述第四板材通过第三内腔与固定板可拆卸连接,所述第四板材远离固定轴一端设置为H形凸起状,所述第四板材远离固定轴另一端开设有第四H形凹槽。As a preferred technical solution of the present invention, a third inner cavity is opened inside the fourth plate, the fourth plate is detachably connected to the fixing plate through the third inner cavity, and the fourth plate is disposed at one end away from the fixing shaft In the shape of an H-shaped protrusion, the other end of the fourth plate away from the fixed shaft is provided with a fourth H-shaped groove.

一种便于快速安装的抗裂防渗漏建筑墙板的安装方法,包括以下步骤:An installation method for crack-resistant and anti-leakage building wall panels that is convenient for quick installation, comprising the following steps:

S1、将支撑座固定安装在准备好的地基上,使用螺栓将固定轴固定在支撑座上,将一个第一板材套在最外端的固定轴上;S1. Fix the support base on the prepared foundation, use bolts to fix the fixed shaft on the support base, and put a first plate on the outermost fixed shaft;

S2、将一个第三板材套在相邻的固定轴上,再将一个第一板材套在相邻的固定轴上,以此类推交替安装第一板材和第三板材完成第一层墙体的安装,所有板材的H形凹槽与H形凸起与水平相邻板材固定连接,所有板材的方形凸起与方形凹槽与垂直相邻板材固定连接,并按照上述顺序依次完成到次顶层的安装;S2. Put a third plate on the adjacent fixed shaft, and then put a first plate on the adjacent fixed shaft, and so on, install the first plate and the third plate alternately to complete the first layer of the wall. For installation, the H-shaped grooves and H-shaped protrusions of all boards are fixedly connected to the horizontal adjacent boards, and the square protrusions and square grooves of all boards are fixedly connected to the vertically adjacent boards, and the steps to the sub-top layer are completed in the above order. Install;

S4、在安装最顶层时,通过设置的弹簧能够在安装的时候便于上卡座向下移动,当上卡座向下移动的时候会压缩弹簧,从而将第二板材和第四板材分别安装在次顶层设置的第一板材和第三板材上,实现顶层高度一致;S4. When installing the topmost layer, the spring can be used to facilitate the downward movement of the upper card seat during installation. When the upper card seat moves downward, the spring will be compressed, so that the second plate and the fourth plate are respectively installed on the On the first board and the third board set on the sub-top layer, the height of the top layer is the same;

S5、将固定板通过板材上的凹槽固定安装在墙体顶部,最后将若干个保护板卡在固定板上的凹槽和支撑座上的第一凹槽内完成保护板的安装。S5. The fixing plate is fixedly installed on the top of the wall through the grooves on the plate, and finally several protection plates are clamped in the grooves on the fixing plate and the first groove on the support seat to complete the installation of the protection plates.

与现有技术相比,本发明的有益效果是:Compared with the prior art, the beneficial effects of the present invention are:

首先,本发明主墙体包括第一板材、第二板材、第三板材和第四板材,全部板材通过固定轴固定在支撑座上方,垂直相邻板材之间通过方形凸起结构和凹槽固定连接,水平相邻板材通过H形凸起结构和H形凹槽固定连接,不需要使用其他的粘合物质,安装过程较为简单,解决了传统建筑墙板安装性能差的问题;First of all, the main wall of the present invention includes a first plate, a second plate, a third plate and a fourth plate, all the plates are fixed above the support seat by a fixed shaft, and the vertical adjacent plates are fixed by a square convex structure and a groove Connection, the horizontal adjacent panels are fixedly connected through the H-shaped raised structure and the H-shaped groove, no other bonding substances are required, the installation process is relatively simple, and the problem of poor installation performance of traditional building wall panels is solved;

另外,本发明的第一板材、第二板材、第三板材和第四板材呈交替安装且连接口为H形,雨水较难通过连接缝进入墙体,且支撑座上安装有保护板,可以将大部分的雨水挡住,减少了进入墙体的雨水的数量,解决了传统建筑墙板防渗漏性能差的问题。In addition, the first plate, the second plate, the third plate and the fourth plate of the present invention are alternately installed, and the connection port is H-shaped, so it is difficult for rainwater to enter the wall through the connection seam, and the support seat is installed with a protective plate, which can prevent rainwater from entering the wall. Most of the rainwater is blocked, the amount of rainwater entering the wall is reduced, and the problem of poor anti-leakage performance of traditional building wall panels is solved.

附图说明Description of drawings

图1为本发明整体结构示意图;Fig. 1 is the overall structure schematic diagram of the present invention;

图2为本发明的支撑座结构示意图;Figure 2 is a schematic diagram of the structure of the support seat of the present invention;

图3为本发明的第一板材结构示意图;Fig. 3 is the first plate structure schematic diagram of the present invention;

图4为本发明的第二板材结构示意图;4 is a schematic diagram of the second plate structure of the present invention;

图5为发明的上卡座和下卡座的连接结构示意图;5 is a schematic diagram of the connection structure of the upper card seat and the lower card seat of the invention;

图6为本发明的第三板材结构示意图;FIG. 6 is a schematic structural diagram of a third plate of the present invention;

图7为本发明的第四板材结构示意图。FIG. 7 is a schematic diagram of the structure of the fourth plate of the present invention.

图中:1、支撑座;2、螺栓;3、固定轴;4、第一板材;5、第二板材;6、第三板材;7、第四板材;8、固定板;9、保护板;11、第一凹槽;12、螺孔;13、第二凹槽;41、第一轴孔;42、第一H形凹槽;43、第一内腔;51、第二轴孔;52、第二H形凹槽;53、上卡座;54、下卡座;55、限位槽;56、卡柱;57、弹簧;61、第三H形凹槽;62、第二内腔;71、第四H形凹槽;72、第三内腔。In the figure: 1. Support seat; 2. Bolt; 3. Fixed shaft; 4. First plate; 5. Second plate; 6. Third plate; 7. Fourth plate; 8. Fixed plate; 9. Protection plate ; 11, the first groove; 12, the screw hole; 13, the second groove; 41, the first shaft hole; 42, the first H-shaped groove; 43, the first inner cavity; 51, the second shaft hole; 52, the second H-shaped groove; 53, the upper card seat; 54, the lower card seat; 55, the limit groove; 56, the clamping column; 57, the spring; 61, the third H-shaped groove; cavity; 71, the fourth H-shaped groove; 72, the third inner cavity.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

请参阅图1-7所示,本发明一种便于快速安装的抗裂防渗漏建筑墙板及安装方法,包括支撑座1、螺栓2、固定轴3、第一板材4、第二板材5、第三板材6和第四板材7,所述支撑座1上端固定安装有固定轴3,所述支撑座1与固定轴3通过若干个螺栓2螺纹连接,所述固定轴3外壁可拆卸安装有第一板材4、第二板材5、第三板材6和第四板材7,所有的板材逐个套在固定轴3上,第一板材4上端设置为方形凸起状,第一板材4上端开设有第一轴孔41,第一板材4通过第一轴孔41与固定轴3可拆卸连接,使第一板材4套在固定轴3上,第一板材4远离固定轴3一端设置为H形凸起状,第一板材4远离固定轴3另一端开设有第一H形凹槽42,第一板材4下端内部开设有第一内腔43。Please refer to FIGS. 1-7 , a crack-resistant and anti-leakage building wall panel and an installation method for easy and quick installation of the present invention, including a support base 1 , a bolt 2 , a fixed shaft 3 , a first plate 4 , and a second plate 5 , the third plate 6 and the fourth plate 7, the upper end of the support base 1 is fixedly installed with a fixed shaft 3, the support base 1 and the fixed shaft 3 are threadedly connected by a number of bolts 2, and the outer wall of the fixed shaft 3 can be detachably installed There are a first plate 4, a second plate 5, a third plate 6 and a fourth plate 7, all the plates are sleeved on the fixed shaft 3 one by one, the upper end of the first plate 4 is set as a square convex shape, and the upper end of the first plate 4 is opened There is a first shaft hole 41, the first plate 4 is detachably connected to the fixed shaft 3 through the first shaft hole 41, so that the first plate 4 is sleeved on the fixed shaft 3, and the end of the first plate 4 away from the fixed shaft 3 is set in an H shape In a convex shape, the other end of the first plate 4 away from the fixed shaft 3 is provided with a first H-shaped groove 42 , and the lower end of the first plate 4 is provided with a first inner cavity 43 .

具体的,第三板材6和第四板材7上端可拆卸安装有固定板8,固定板8通过下端凸起结构卡在板材上端的凹槽内,固定板8下端开设有凹槽,固定板8通过凹槽与保护板9滑动连接,保护板9厚度与凹槽宽度一致,正好卡在凹槽里。Specifically, the upper ends of the third plate 6 and the fourth plate 7 are detachably installed with a fixing plate 8, the fixing plate 8 is stuck in the groove on the upper end of the plate through the lower end protruding structure, the lower end of the fixing plate 8 is provided with a groove, and the fixing plate 8 The groove is slidably connected to the protection plate 9, and the thickness of the protection plate 9 is the same as the width of the groove, and is just stuck in the groove.

具体的,支撑座1上端开设有若干个第一凹槽11,第一凹槽11内壁开设有四个螺孔12,支撑座1通过螺孔12与螺栓2螺纹连接,支撑座1上端开设有第二凹槽13,支撑座1通过第二凹槽13与保护板9滑动连接,保护板9厚度与凹槽宽度一致,正好卡在凹槽里,再受到保护板9上端的固定板8限制其上下移动。Specifically, the upper end of the support base 1 is provided with a plurality of first grooves 11, the inner wall of the first groove 11 is provided with four screw holes 12, the support base 1 is threadedly connected with the bolts 2 through the screw holes 12, and the upper end of the support base 1 is provided with The second groove 13, the support base 1 is slidably connected to the protection plate 9 through the second groove 13, the thickness of the protection plate 9 is consistent with the width of the groove, just stuck in the groove, and then restricted by the fixing plate 8 on the upper end of the protection plate 9 It moves up and down.

具体的,作为本发明的一种优选技术方案,所述第二板材5包括上卡座53和下卡座54,所述上卡座53和下卡座54之间活动连接,所述下卡座54的内部设置有限位槽55,所述限位槽55的内部设置有弹簧57,所述弹簧57的内部套设有上卡座53的下部,所述下卡座54的侧壁设置有两个卡柱56,且所述卡柱56位于所述弹簧57的顶部,且所述卡柱56和弹簧57相抵接,所述弹簧57的底部固定在下卡座54的底部。通过设置的弹簧57能够在安装的时候便于上卡座53向下移动,当上卡座53向下移动的时候会压缩弹簧57,从而便于对第二板材5进行安装。Specifically, as a preferred technical solution of the present invention, the second plate 5 includes an upper card seat 53 and a lower card seat 54, the upper card seat 53 and the lower card seat 54 are movably connected, and the lower card seat 54 is movably connected. The seat 54 is provided with a limiting slot 55 inside, a spring 57 is arranged inside the limiting slot 55, the inner part of the spring 57 is sleeved with the lower part of the upper clip 53, and the side wall of the lower clip 54 is provided with a There are two clamping posts 56 , the clamping posts 56 are located on the top of the spring 57 , the clamping posts 56 and the spring 57 abut, and the bottom of the spring 57 is fixed on the bottom of the lower clamping seat 54 . The provided spring 57 can facilitate the downward movement of the upper clip 53 during installation, and the spring 57 is compressed when the upper clip 53 moves downward, thereby facilitating the installation of the second plate 5 .

具体的,所述上卡座53上端开设有第二轴孔51,所述上卡座53通过第二轴孔51与固定轴3连接,所述下卡座54远离固定轴3一端设置为H形凸起状,所述下卡座54远离固定轴3另一端开设有第二H形凹槽52。Specifically, the upper end of the upper clamp 53 is provided with a second shaft hole 51 , the upper clamp 53 is connected to the fixed shaft 3 through the second shaft hole 51 , and the end of the lower clamp 54 away from the fixed shaft 3 is set as H In a convex shape, a second H-shaped groove 52 is formed at the other end of the lower clamping seat 54 away from the fixed shaft 3 .

具体的,第三板材6内部开设有第二内腔62,第三板材6通过第二内腔62与固定板8可拆卸连接,使第三板材6套在固定轴3上,第三板材6远离固定轴3一端设置为H形凸起状,第三板材6远离固定轴3另一端开设有第三H形凹槽61。Specifically, a second inner cavity 62 is opened inside the third plate 6, and the third plate 6 is detachably connected to the fixing plate 8 through the second inner cavity 62, so that the third plate 6 is sleeved on the fixed shaft 3, and the third plate 6 One end away from the fixed shaft 3 is set in an H-shaped convex shape, and the other end of the third plate 6 away from the fixed shaft 3 is provided with a third H-shaped groove 61 .

具体的,第四板材7内部开设有第三内腔72,第四板材7通过第三内腔72与固定板8可拆卸连接,使第四板材套7在固定轴3上,第四板材7远离固定轴3一端设置为H形凸起状,第四板材7远离固定轴3另一端开设有第四H形凹槽71。Specifically, the fourth plate 7 is provided with a third inner cavity 72, and the fourth plate 7 is detachably connected to the fixing plate 8 through the third inner cavity 72, so that the fourth plate 7 is sleeved on the fixed shaft 3, and the fourth plate 7 One end away from the fixed shaft 3 is set in an H-shaped convex shape, and the other end of the fourth plate 7 away from the fixed shaft 3 is provided with a fourth H-shaped groove 71 .

本发明的安装方法如下:The installation method of the present invention is as follows:

将支撑座1固定安装在准备好的地基上,使用螺栓2将固定轴3固定在支撑座1上,将一个第一板材4套在最外端的固定轴3上;将一个第三板材6套在相邻的固定轴3上,再将一个第一板材4套在相邻的固定轴3上,以此类推交替安装第一板材4和第三板材6完成第一层墙体的安装,所有板材的H形凹槽与H形凸起与水平相邻板材固定连接,所有板材的方形凸起与方形凹槽与垂直相邻板材固定连接,并按照上述顺序依次完成到次顶层的安装;在安装最顶层时,通过设置的弹簧57能够在安装的时候便于上卡座53向下移动,当上卡座53向下移动的时候会压缩弹簧57,从而将第二板材5和第四板材7分别安装在次顶层设置的第一板材5和第三板材7上,实现顶层高度一致;将固定板8通过板材上的凹槽固定安装在墙体顶部,最后将若干个保护板9卡在固定板8上的凹槽和支撑座1上的第一凹槽11内完成保护板9的安装。Fix the support base 1 on the prepared foundation, use bolts 2 to fix the fixed shaft 3 on the support base 1, put a first plate 4 on the outermost fixed shaft 3; put a third plate 6 sets On the adjacent fixed shaft 3, put a first plate 4 on the adjacent fixed shaft 3, and so on, alternately install the first plate 4 and the third plate 6 to complete the installation of the first layer of the wall. The H-shaped grooves and H-shaped protrusions of the board are fixedly connected to the horizontal adjacent boards, and the square protrusions and square grooves of all boards are fixedly connected to the vertical adjacent boards, and the installation to the sub-top layer is completed in sequence according to the above sequence; When the topmost layer is installed, the spring 57 provided can facilitate the downward movement of the upper card seat 53 during installation. When the upper card seat 53 moves downward, the spring 57 will be compressed, thereby connecting the second plate 5 and the fourth plate 7. They are respectively installed on the first plate 5 and the third plate 7 set on the sub-top layer to achieve the same height of the top layer; the fixing plate 8 is fixedly installed on the top of the wall through the grooves on the plate, and finally several protection plates 9 are stuck on the fixed plate. The installation of the protection plate 9 is completed in the groove on the plate 8 and the first groove 11 on the support base 1 .

在本发明的描述中,需要理解的是,指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。In the description of the present invention, it should be understood that the indicated orientation or positional relationship is based on the orientation or positional relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying the indicated device. Or elements must have a particular orientation, be constructed and operate in a particular orientation, and therefore should not be construed as limiting the invention.

在本发明中,除非另有明确的规定和限定,例如,可以是固定连接,也可以是可拆卸连接,或成一体;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系,除非另有明确的限定,对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本发明中的具体含义。In the present invention, unless otherwise expressly specified and limited, for example, it may be a fixed connection, a detachable connection, or an integrated; it may be a mechanical connection or an electrical connection; it may be a direct connection or a The indirect connection through an intermediate medium may be the internal communication of two elements or the interaction relationship between the two elements. Unless otherwise clearly defined, those of ordinary skill in the art can understand the above terms in the present invention according to specific circumstances. specific meaning in .

尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, and substitutions can be made in these embodiments without departing from the principle and spirit of the invention and modifications, the scope of the present invention is defined by the appended claims and their equivalents.

Claims (8)

1. The utility model provides a prevent splitting antiseep building wallboard convenient to quick installation, includes supporting seat (1), bolt (2), fixed axle (3), first panel (4), second panel (5), third panel (6) and fourth panel (7), its characterized in that: a fixed shaft (3) is fixedly arranged at the upper end of the supporting seat (1), the supporting seat (1) is in threaded connection with the fixed shaft (3) through a plurality of bolts (2), a first plate (4), a second plate (5), a third plate (6) and a fourth plate (7) are detachably mounted on the outer wall of the fixed shaft (3), the upper end of the first plate (4) is arranged to be a square bulge, the upper end of the first plate (4) is provided with a first shaft hole (41), the first plate (4) is detachably connected with the fixed shaft (3) through a first shaft hole (41), one end of the first plate (4) far away from the fixed shaft (3) is arranged to be in an H-shaped convex shape, the other end of the first plate (4) far away from the fixed shaft (3) is provided with a first H-shaped groove (42), a first inner cavity (43) is formed in the lower end of the first plate (4).
2. The crack-resistant and leak-resistant building panel facilitating quick installation of claim 1, wherein: the fixing plate is characterized in that the upper ends of the third plate (6) and the fourth plate (7) are detachably provided with fixing plates (8), the lower ends of the fixing plates (8) are provided with grooves, and the fixing plates (8) are in sliding connection with the protection plates (9) through the grooves.
3. The crack-resistant and leak-resistant building panel facilitating quick installation of claim 1, wherein: a plurality of first grooves (11) are formed in the upper end of the supporting seat (1), four screw holes (12) are formed in the inner wall of each first groove (11), the supporting seat (1) is in threaded connection with the bolt (2) through the screw holes (12), a second groove (13) is formed in the upper end of the supporting seat (1), and the supporting seat (1) is in sliding connection with the protection plate (9) through the second groove (13).
4. The crack-resistant and leak-resistant building panel facilitating quick installation of claim 1, wherein: the second plate (5) comprises an upper clamping seat (53) and a lower clamping seat (54), the upper clamping seat (53) is movably connected with the lower clamping seat (54), a limiting groove (55) is formed in the lower clamping seat (54), a spring (57) is arranged in the limiting groove (55), the lower part of the upper clamping seat (53) is sleeved in the spring (57), two clamping columns (56) are arranged on the side wall of the lower clamping seat (54), the clamping columns (56) are located at the top of the spring (57), the clamping columns (56) are abutted to the spring (57), and the bottom of the spring (57) is fixed to the bottom of the lower clamping seat (54).
5. The crack-resistant and leak-resistant building panel facilitating quick installation of claim 1, wherein: the upper end of the upper clamping seat 53 is provided with a second shaft hole (51), the upper clamping seat 53 is connected with the fixed shaft (3) through the second shaft hole (51), one end, far away from the fixed shaft (3), of the lower clamping seat 54 is arranged to be in an H-shaped convex shape, and the other end, far away from the fixed shaft (3), of the lower clamping seat 54 is provided with a second H-shaped groove (52).
6. The crack-resistant and leak-resistant building panel facilitating quick installation of claim 1, wherein: second inner chamber (62) have been seted up to third panel (6) inside, third panel (6) can be dismantled through second inner chamber (62) and fixed plate (8) and be connected, fixed axle (3) one end is kept away from in third panel (6) sets up to the protruding form of H shape, third H shape recess (61) have been seted up to the other end of keeping away from fixed axle (3) in third panel (6).
7. The crack-resistant and leak-resistant building panel facilitating quick installation of claim 1, wherein: third inner chamber (72) have been seted up to fourth panel (7) inside, fourth panel (7) can be dismantled through third inner chamber (72) and fixed plate (8) and be connected, fixed axle (3) one end is kept away from in fourth panel (7) sets up to the protruding form of H shape, fourth H shape recess (71) have been seted up to the other end of keeping away from fixed axle (3) in fourth panel (7).
8. A method for installing an anti-crack and anti-leakage building wallboard convenient to install quickly is characterized by comprising the following steps of: the method comprises the following steps:
s1, fixedly installing the supporting seat (1) on a prepared foundation, fixing the fixed shaft (3) on the supporting seat (1) by using a bolt (2), and sleeving a first plate (4) on the fixed shaft (3) at the outermost end;
s2, sleeving a third plate (6) on the adjacent fixed shaft (3), sleeving a first plate (4) on the adjacent fixed shaft (3), alternately installing the first plate (4) and the third plate (6) by the same method to complete installation of the first layer of wall body, fixedly connecting the H-shaped grooves and the H-shaped bulges of all the plates with the horizontally adjacent plates, fixedly connecting the square bulges and the square grooves of all the plates with the vertically adjacent plates, and sequentially completing installation to the second top layer according to the sequence;
s4, when the topmost layer is installed, the upper clamping seat (53) can move downwards conveniently in the installation process through the arranged spring (57), and when the upper clamping seat (53) moves downwards, the spring (57) is compressed, so that the second plate (5) and the fourth plate (7) are respectively installed on the first plate (5) and the third plate (7) arranged on the second topmost layer, and the top layer is consistent in height;
s5, fixedly installing the fixing plate (8) on the top of the wall body through the grooves in the plates, and finally clamping the plurality of protection plates (9) in the grooves in the fixing plate (8) and the first grooves (11) in the supporting seat (1) to complete installation of the protection plates (9).
CN202010803707.1A 2020-08-11 2020-08-11 A kind of anti-crack and anti-leakage building wall panel and installation method for easy and quick installation Pending CN111910793A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010803707.1A CN111910793A (en) 2020-08-11 2020-08-11 A kind of anti-crack and anti-leakage building wall panel and installation method for easy and quick installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010803707.1A CN111910793A (en) 2020-08-11 2020-08-11 A kind of anti-crack and anti-leakage building wall panel and installation method for easy and quick installation

Publications (1)

Publication Number Publication Date
CN111910793A true CN111910793A (en) 2020-11-10

Family

ID=73284108

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010803707.1A Pending CN111910793A (en) 2020-08-11 2020-08-11 A kind of anti-crack and anti-leakage building wall panel and installation method for easy and quick installation

Country Status (1)

Country Link
CN (1) CN111910793A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113684946A (en) * 2021-08-30 2021-11-23 中儒科信达建设集团有限公司 Energy-saving and environment-friendly assembled wall with fireproof function and assembling method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6571526B2 (en) * 2001-02-21 2003-06-03 Frankie A. R. Queen Concrete masonry unit (CMU) vertical reinforcement and anchor bolt positioning device
CN101506444A (en) * 2006-05-23 2009-08-12 洪·贾伊罗·马蒂内斯纳兰霍 Brick system with rod
CN204662706U (en) * 2015-06-08 2015-09-23 肖洪彬 Energy-saving heat preserving light cement prefabricated component construction wall
CN108457420A (en) * 2018-05-20 2018-08-28 王硕干 A kind of the assembled waterproof wallboard and its installation method of novel seam construction
CN208777498U (en) * 2018-08-16 2019-04-23 成都伟腾环保科技有限公司 Building wall board made of a kind of high molecular material
CN110273514A (en) * 2019-07-31 2019-09-24 重庆科琳安吉新材料有限公司 A kind of splice brick, prefabricated panel, insulating interlayer and insulated wall
US20200102738A1 (en) * 2018-04-26 2020-04-02 Shenzhen New Tenon Co., Ltd. Recyclable builidng block and building system used for constructing building
CN111424876A (en) * 2020-03-26 2020-07-17 上海市房屋建筑设计院有限公司 Assembled wall building block and assembled construction method of wall building block

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6571526B2 (en) * 2001-02-21 2003-06-03 Frankie A. R. Queen Concrete masonry unit (CMU) vertical reinforcement and anchor bolt positioning device
CN101506444A (en) * 2006-05-23 2009-08-12 洪·贾伊罗·马蒂内斯纳兰霍 Brick system with rod
CN204662706U (en) * 2015-06-08 2015-09-23 肖洪彬 Energy-saving heat preserving light cement prefabricated component construction wall
US20200102738A1 (en) * 2018-04-26 2020-04-02 Shenzhen New Tenon Co., Ltd. Recyclable builidng block and building system used for constructing building
CN108457420A (en) * 2018-05-20 2018-08-28 王硕干 A kind of the assembled waterproof wallboard and its installation method of novel seam construction
CN208777498U (en) * 2018-08-16 2019-04-23 成都伟腾环保科技有限公司 Building wall board made of a kind of high molecular material
CN110273514A (en) * 2019-07-31 2019-09-24 重庆科琳安吉新材料有限公司 A kind of splice brick, prefabricated panel, insulating interlayer and insulated wall
CN111424876A (en) * 2020-03-26 2020-07-17 上海市房屋建筑设计院有限公司 Assembled wall building block and assembled construction method of wall building block

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113684946A (en) * 2021-08-30 2021-11-23 中儒科信达建设集团有限公司 Energy-saving and environment-friendly assembled wall with fireproof function and assembling method thereof

Similar Documents

Publication Publication Date Title
CN111910793A (en) A kind of anti-crack and anti-leakage building wall panel and installation method for easy and quick installation
CN110453915A (en) Formwork tooling for cast-in-place section of composite column and its application method
CN112376747A (en) Building decoration is with assembled partition wall that inside can lay circuit
CN220414681U (en) Ultralight steel connecting piece for building roof color steel tile
CN218071359U (en) Installation mechanism and photovoltaic system
CN216713346U (en) Energy-concerving and environment-protective type house construction is with steel construction node component
CN207086707U (en) Lighting proof strip overlaps the curved processing mold of " second " word
CN210713661U (en) Liftable ground supporting structure for bottom plate
CN209908015U (en) An assembled channel system
CN116733137A (en) Anti-cracking and anti-leakage building wallboard convenient to install rapidly and installation method
CN209760969U (en) Construction enclosure with fabricated foundation
CN211548108U (en) A load-bearing connection angle of a computer room accessory
CN211341160U (en) Metal plate house for building convenient to assembly
CN210507963U (en) Detachable panel unit curtain wall
CN221298428U (en) X-shaped metal composite tile and novel BIPV photovoltaic system
CN205382711U (en) Transfer connection structure of frame formwork and frameless formwork
CN110700602A (en) Assembled interior wall location jacking device
CN219094948U (en) Light Fu Pingmian W frame positioning mechanism
CN222009393U (en) Overhead heat insulation roof of assembled building
CN221321276U (en) Assembled building support base
CN205557851U (en) On -site Assembly formula compound incubation synthesis connecting device for wallboard
CN218541049U (en) A prefabricated foamed concrete wall
CN210724638U (en) Device convenient to solar panel roof installation
CN219241052U (en) A building plate structure
CN221422514U (en) Building energy-saving wall panel with quick splicing structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20201110

RJ01 Rejection of invention patent application after publication