CN218058234U - Tower crane jib loading boom chord round pin anticreep device - Google Patents
Tower crane jib loading boom chord round pin anticreep device Download PDFInfo
- Publication number
- CN218058234U CN218058234U CN202221691033.1U CN202221691033U CN218058234U CN 218058234 U CN218058234 U CN 218058234U CN 202221691033 U CN202221691033 U CN 202221691033U CN 218058234 U CN218058234 U CN 218058234U
- Authority
- CN
- China
- Prior art keywords
- tower crane
- steel pipe
- drop
- pin
- anticreep
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model relates to a tower crane boom chord pin anti-drop device, belonging to the technical field of building construction; the anti-drop steel pipe comprises two anti-drop steel pipes, wherein one ends of the two anti-drop steel pipes are provided with triangular baffle embedding openings, one ends of the two anti-drop steel pipes, which are close to the triangular baffle embedding openings, are provided with opening pin holes, and one ends of the two anti-drop steel pipes, which are far away from the triangular baffle embedding openings, are connected with adjusting screw rods; the utility model discloses the development of a tower crane jib loading boom chord pin anticreep device can be fine avoid the tower crane in the use, and half open type round pin axle is with the ejecting danger that causes the tower crane jib loading boom to drop of triangle-shaped baffle.
Description
Technical Field
The utility model relates to a tower crane jib loading boom chord pin anticreep device belongs to the technical field of construction.
Background
In the building installation engineering, many kinds of hoisting machinery capable of simultaneously completing vertical lifting and horizontal moving of a heavy object are available, wherein tower cranes are widely applied, and become indispensable main construction machinery in mechanization and equipment of modern high-rise industry and civil buildings. However, the collapse accident of the tower crane in the construction site happens occasionally, the later fruit is often disastrous, and at present, most of the crane jib joints of the tower crane are connected by adopting a half-split pin shaft and are fixed by a triangular baffle and a split pin. The disadvantages of this approach are: in the use process of the tower crane, the triangular baffle is easily ejected out by the semi-open type pin shaft to cause the jib connecting chord pin to fall off, and at the moment, the jib bears huge lateral force instantly, so that the jib is easily broken to cause the collapse of the tower crane.
SUMMERY OF THE UTILITY MODEL
In order to solve the above-mentioned problem that prior art exists, the utility model provides a tower crane jib loading boom chord pin anticreep device, the tower crane of avoiding that can be fine is in the use, and half open type round pin axle is ejecting with the triangle-shaped baffle and is caused the danger that the tower crane jib loading boom drops, through adjustment accommodate the lead screw, can fine match multiple specification and dimension tower crane moreover, can accomplish safe and reliable and the tight triangle-shaped baffle in efficient top, fixed connection round pin axle under various operating modes.
The technical scheme of the utility model as follows:
the utility model provides a tower crane jib loading boom chord pin anticreep device, includes two anticreep steel pipes, two anticreep steel pipe one end is equipped with triangle-shaped baffle and inlays mouthful, two one of anticreep steel pipe is close to triangle-shaped baffle and inlays mouthful serves and be equipped with the opening pinhole, two the one end that triangle-shaped baffle inlays mouthful is kept away from to the anticreep steel pipe is connected with accommodate the lead screw.
The anti-falling steel pipe is connected with the adjusting screw rod through the screw rod connector.
The adjusting screw rod is characterized in that adjusting threads in opposite rotating directions are respectively arranged at two ends of the adjusting screw rod, and a screw rod adjusting hole is formed in the middle of the adjusting screw rod.
The utility model discloses following beneficial effect has:
1. the utility model relates to a tower crane boom chord pin anti-drop device, which can well match tower cranes with various specifications and sizes by adjusting the adjusting screw rod, and can safely and reliably jack the triangular baffle plate and fixedly connect the pin shaft with high efficiency under various working conditions; the danger that a tower crane boom falls off due to the fact that the triangular baffle is ejected out by the semi-open type pin shaft in the use process of the tower crane can be well avoided.
2. The utility model relates to a tower crane jib loading boom chord pin anticreep device should be through anticreep steel pipe top swizzle axle and baffle, even be a whole with the tower crane jib loading boom after penetrating the split pin, the effect of load when can playing the operation of equipartition jib loading boom to the effect of guarantee round pin hub connection fastening, satisfied user demand that can be fine.
3. The utility model relates to a tower crane jib loading boom chord pin anticreep device through be assembled between/be connected between, need not the scene and welds, requires lowly to the operation environment, and is low to site operation personnel's operating skill and quality dependence, is convenient for inspect and monitor in the high altitude.
Drawings
FIG. 1 is a schematic structural view of the anti-disengaging device for the chord pin of the tower crane boom of the utility model;
FIG. 2 is an effect schematic diagram of the tower crane boom chord pin anti-disengaging device of the utility model;
fig. 3 is the utility model relates to a tower crane boom chord pin anticreep device's overall structure schematic diagram.
The reference numbers in the figures denote:
2-anti-falling device, 21-anti-falling steel pipe, 211-triangular baffle embedding opening, 212-split pin hole, 22-lead screw connector, 23-adjusting lead screw, 231-lead screw adjusting hole and 232-adjusting screw thread.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings and specific embodiments.
Referring to fig. 1, 2 and 3, the anti-falling device for the chord pin of the tower crane boom comprises two anti-falling steel pipes 21, wherein one ends of the two anti-falling steel pipes 21 are provided with triangular baffle embedding openings 211, one ends of the two anti-falling steel pipes 21 close to the triangular baffle embedding openings 211 are provided with opening pin holes 212, the opening pin holes 212 are used for penetrating through opening pin connecting pin shafts, and one ends of the two anti-falling steel pipes 21 far away from the triangular baffle embedding openings 211 are connected with adjusting screw rods 23;
further, two the one end that triangle-shaped baffle scarf 211 was kept away from to anticreep steel pipe 21 is provided with lead screw connector 22, lead screw connector 22 is equipped with the internal thread, two anticreep steel pipe 21 passes through lead screw connector 22 and is connected with accommodate the lead screw 23.
Furthermore, two ends of the adjusting screw rod 23 are respectively provided with adjusting threads 232 with opposite turning directions, and the middle part of the adjusting screw rod 23 is provided with a screw rod adjusting hole 231.
The utility model discloses a theory of operation:
the two ends of the adjusting screw rod 23 are screwed into the anti-falling steel pipe 21 with the screw rod connector 22, then the triangular baffle embedding opening 211 on the anti-falling steel pipe 21 is rotated to align the triangular baffle on the crane boom, the anti-falling steel pipe 21 is embedded on the triangular baffle and sleeved with the pin shaft firmly, the cotter pin penetrates into the triangular baffle, after the cotter pins on the two sides penetrate into the triangular baffle, the screw rod adjusting hole 231 is rotated through a force applying rod such as a crowbar, the adjusting screw rod 23 is rotated, the anti-falling steel pipe 21 is tightly jacked, and the connection of the device is completed.
The above only is the embodiment of the present invention, not limiting the patent scope of the present invention, all the equivalent structures or equivalent processes that are used in the specification and the attached drawings or directly or indirectly applied to other related technical fields are included in the patent protection scope of the present invention.
Claims (3)
1. The utility model provides a tower crane boom chord pin anticreep device which characterized in that: including two anticreep steel pipes (21), two anticreep steel pipe (21) one end is equipped with triangle-shaped baffle rabbet (211), two anticreep steel pipe (21) are close to one of triangle-shaped baffle rabbet (211) and serve and be equipped with opening pinhole (212), two the one end that triangle-shaped baffle rabbet (211) was kept away from in anticreep steel pipe (21) is connected with accommodate the lead screw (23).
2. The tower crane boom chord pin anti-falling device of claim 1, characterized in that: two the one end that triangle-shaped baffle rabbet (211) was kept away from in anticreep steel pipe (21) is provided with lead screw connector (22), lead screw connector (22) are equipped with the internal thread, two anticreep steel pipe (21) are connected with accommodate the lead screw (23) through lead screw connector (22).
3. The tower crane boom chord pin anti-falling device of claim 1, characterized in that: adjusting screw threads (232) with opposite turning directions are respectively arranged at two ends of the adjusting screw rod (23), and a screw rod adjusting hole (231) is formed in the middle of the adjusting screw rod (23).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221691033.1U CN218058234U (en) | 2022-07-01 | 2022-07-01 | Tower crane jib loading boom chord round pin anticreep device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221691033.1U CN218058234U (en) | 2022-07-01 | 2022-07-01 | Tower crane jib loading boom chord round pin anticreep device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218058234U true CN218058234U (en) | 2022-12-16 |
Family
ID=84434959
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221691033.1U Active CN218058234U (en) | 2022-07-01 | 2022-07-01 | Tower crane jib loading boom chord round pin anticreep device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218058234U (en) |
-
2022
- 2022-07-01 CN CN202221691033.1U patent/CN218058234U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204675621U (en) | A kind of shackle for rapid unhooking in tubing string lifting | |
CN218058234U (en) | Tower crane jib loading boom chord round pin anticreep device | |
CN106351245A (en) | Tower crane foundation base and construction method thereof | |
CN110409322B (en) | Bridge steel upright post hoisting and turning device and turning method | |
CN204454225U (en) | A kind of welded structure of solid drawn pipe is without moment of flexure support beam | |
CN205116883U (en) | Mast hoisting device of superelevation layer steel construction launching tower | |
CN211110630U (en) | Multifunctional lifting appliance for lifting high-speed rail concrete box girder | |
CN210678538U (en) | Frock is dismantled to subdivision formula centrifugal compressor baffle | |
CN206816752U (en) | A kind of steel wire rope fixes rope sling | |
CN208869171U (en) | One kind lifting reusable porous grade for steelwork tower truss and hangs lid | |
CN210505316U (en) | Arm head with detachable lifting rope stress releaser | |
CN111874825A (en) | Construction method for hoisting component by using unconventional hoisting equipment | |
CN205663226U (en) | Super high -rise building thing top steel construction symmetry is hung and is drawn device | |
CN218950789U (en) | Lifting positioning mechanism of reinforcement cage for pile foundation | |
CN109987501A (en) | A kind of device threaded off in Quick air in steel structure hoisting and tripping method | |
CN110733988A (en) | method for improving safety of temporary support frame of internal climbing arm tower crane | |
CN210655848U (en) | Detachable double-pin-shaft lifting appliance for lifting large-tonnage thin-wall plate type component | |
CN205243147U (en) | Hoist that uses during special high -tension transmission iron tower of helicopter assemblage | |
CN220201135U (en) | Hoisting auxiliary device for single machine double hoisting points of hoisting equipment | |
CN215711325U (en) | Tower crane driver upper and lower passageway buffer | |
CN216737195U (en) | Steel column hoisting device | |
CN215669491U (en) | Prefabricated square pile head butt joint horizontal displacement handling frame | |
CN213326310U (en) | Device for quickly hoisting hexagonal prefabricated part | |
CN212863820U (en) | Steel structure lifting appliance | |
CN210620075U (en) | Tower machine balance arm pull rod fast-assembling device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |