CN218047116U - A device for green building construction - Google Patents
A device for green building construction Download PDFInfo
- Publication number
- CN218047116U CN218047116U CN202221853630.XU CN202221853630U CN218047116U CN 218047116 U CN218047116 U CN 218047116U CN 202221853630 U CN202221853630 U CN 202221853630U CN 218047116 U CN218047116 U CN 218047116U
- Authority
- CN
- China
- Prior art keywords
- intercommunication
- venturi tube
- building construction
- pipe
- annular
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)
Abstract
The utility model relates to a dust suppression device technical field specifically discloses a device for green building construction, include the mobile station and install the jar body at the mobile station upper surface, jar internal side is provided with and send water mechanism, send water mechanism one end intercommunication to install and violently manage, violently manage outside intercommunication and install the ring canal, the ring canal is kept away from the one end of violently managing and is provided with the dust removal subassembly along the circumferencial direction equidistance, the dust removal subassembly all includes that the intercommunication keeps away from the L venturi tube of violently managing one end at the ring canal, the L venturi tube outside is from last to having set gradually multiunit spraying subassembly down, L venturi tube bottom is provided with the connecting piece, jar external side below position cover is equipped with annular cover, the utility model discloses can press down dirt at the job site, press down the dirt area extensively, and press down effectually, spun water smoke can contact with the dust simultaneously, and annular cover can retrieve the water smoke that falls, then the drainage is used to jar internal portion.
Description
Technical Field
The utility model relates to a dust suppression device technical field specifically discloses a device for green building construction.
Background
When green building construction, the place has a large amount of dust, and the dust inhales too much and can cause the health uncomfortable, consequently can use the dust suppression device, and current device is when suppressing dirt, comparatively wastes water, and the covering surface is little when suppressing dirt, and the result of use is relatively poor, therefore we need improve it.
Disclosure of Invention
The utility model aims at solving the defects existing in the background art and providing a device for green building construction.
For reaching above purpose, the utility model provides a device for green building construction, include the mobile station and install the jar body at the mobile station upper surface, jar internal side is provided with and send water mechanism, send water mechanism one end intercommunication to install violently the pipe, violently manage outside intercommunication and install the ring canal, the ring canal is kept away from the one end of violently managing and is provided with the dust removal subassembly along the circumferencial direction equidistance, the dust removal subassembly all includes that the intercommunication keeps away from the L venturi tube of violently managing one end at the ring canal, the L venturi tube outside is from last to having set gradually multiunit spraying assembly down, L venturi tube bottom is provided with the connecting piece, jar external side below position cover is equipped with annular cover, jar internal side just is close to annular cover bottom position department and is provided with the drainage subassembly.
Preferably, the water feeding mechanism comprises a water pump fixedly mounted at the bottom of the inner side of the tank body, a straight pipe is communicated with the delivery end of the water pump, one end of the straight pipe penetrates through the top of the tank body, and the end part of the straight pipe is communicated with the transverse pipe.
Preferably, the spraying assemblies comprise connectors which are communicated and installed on the inner side of the L-shaped pipe, and spraying pipes are communicated and installed on the outer sides of the connectors at equal intervals in the annular direction.
Preferably, the connecting piece all includes the base of fixed connection in L venturi tube bottom, the fixed cover in base outside is equipped with the annular frame, the annular frame is inboard to have seted up the bar groove along the annular direction equidistance.
Preferably, the drainage subassembly is including all communicateing the multiunit drainage tube of installing in jar internal side and being close to annular cover bottom position, the multiunit the drainage tube is the annular direction equidistance and arranges, the multiunit the filter screen is all installed to the drainage tube inboard.
Preferably, the upper surface of one side of the mobile station is fixedly connected with a push rod, a mobile power supply seat is arranged at one end, away from the push rod, of the mobile station, and a water injection pipe is communicated with and arranged at one end of the tank body.
Compared with the prior art, the utility model discloses following beneficial effect has:
but through the water feeding mechanism suction jar of internal portion's water that sets up, then carry the ring canal and the multiunit L venturi tube inboard to the top, then spout the inside of annular frame with water smoke through the multiunit spray tube in the L venturi tube outside, press down the dirt to the dust in the construction site, it is comparatively abundant to press down the dirt, and the covering is wider, water smoke spun region can contact with annular frame, inside the annular cover of below can be followed to the annular frame outside drippage of partial water smoke, then carry out secondary recycle to jar internal portion through drainage mechanism drainage once more, also can aggravate the volume when water smoke contacts with the dust with the same reason, fall the annular cover inside and concentrate the recovery.
Drawings
FIG. 1 is a schematic view of the present invention;
FIG. 2 is a schematic view of another perspective structure of the present invention;
FIG. 3 is an enlarged view of the point A of FIG. 1 according to the present invention;
fig. 4 is an enlarged view of the point B in fig. 2 according to the present invention.
In the figure: 1. a mobile station; 2. an annular shroud; 3. a tank body; 4. a water injection pipe; 5. an annular frame; 6. an L-shaped tube; 7. a ring pipe; 8. a straight pipe; 9. a transverse tube; 10. a water pump; 11. a drainage tube; 12. a base; 13. a strip-shaped groove; 14. a push rod; 15. a joint; 16. and (4) a spray pipe.
Detailed Description
In order to make the aforementioned objects, features and advantages of the present invention more clearly understood, the present invention will be described in further detail with reference to the accompanying drawings and detailed description.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention, however, the present invention may be practiced in other ways than those specifically described herein, and therefore the present invention is not limited to the specific embodiments disclosed below.
The device for green building construction shown in the figures 1-4 comprises a mobile station 1 and a tank body 3 arranged on the upper surface of the mobile station 1, wherein a water feeding mechanism is arranged on the inner side of the tank body 3, one end of the water feeding mechanism is communicated with and installed with a horizontal pipe 9, the outer side of the horizontal pipe 9 is communicated with and installed with a circular pipe 7, one end, far away from the horizontal pipe 9, of the circular pipe 7 is provided with dust removing components at intervals along the annular direction, each dust removing component comprises an L-shaped pipe 6 communicated with one end, far away from the horizontal pipe 9, of the circular pipe 7, the outer side of the L-shaped pipe 6 is sequentially provided with a plurality of groups of spraying components from top to bottom, a connecting piece is arranged at the bottom of the L-shaped pipe 6, an annular cover 2 is sleeved at the lower position of the outer side of the tank body 3, and a drainage component is arranged at the position, close to the bottom of the annular cover 2, of the inner side of the tank body 3.
The water feeding mechanism comprises a water pump 10 fixedly installed at the bottom of the inner side of the tank body 3, a straight pipe 8 is installed at the conveying end of the water pump 10 in a communicating mode, one end of the straight pipe 8 penetrates through the top of the tank body 3, the end portion of the straight pipe is communicated with a transverse pipe 9, the water pump 10 sucks water in the tank body 3, and then the water is communicated with an annular pipe 7 through the straight pipe 8 and the transverse pipe 9, so that the water is supplied to an L-shaped pipe 6 at one end and a plurality of groups of spraying pipes 16.
The multiple groups of spraying assemblies comprise connectors 15 which are communicated and installed on the inner side of the L-shaped pipe 6, spraying pipes 16 are communicated and installed on the outer side of the connectors 15 along the annular direction at equal intervals, surrounding spraying is carried out on dust raised around by the spraying pipes 16 under the connection of the connectors 15, and the problem that users inhale too much dust to cause discomfort is avoided.
The connecting piece all includes the base 12 of fixed connection in 6 bottoms of L-shaped pipe, and the fixed cover in the base 12 outside is equipped with annular frame 5, and 5 inboard edges annular direction equidistance of annular frame have seted up bar groove 13, and the bar groove 13 of seting up in the 5 outsides of annular frame can let the spray pipe 16 spout to the outside from this department.
The drainage subassembly is including all communicateing the multiunit drainage tube 11 of installing in jar body 3 inboards and being close to annular cover 2 bottom position, and multiunit drainage tube 11 is the annular direction equidistance and arranges, and the filter screen is all installed to multiunit drainage tube 11 inboard, and the filter screen can be filtered impurity when flowing into drainage tube 11 with the water droplet that the dust contact was crossed.
The upper surface fixedly connected with push rod 14 on one side of the mobile station 1, the push rod 14 can drive the mobile station 1 to move flexibly on a construction site at one end, a mobile power supply seat is arranged inside one end, away from the push rod 14, of the mobile station 1, the mobile power supply seat can be linearly connected with the water pump 10, the water pump 10 can be used flexibly in the moving process, the water injection pipe 4 is arranged inside one end of the tank body 3 in a communicated mode, and the water injection pipe 4 can be communicated with a water pipe from the outside to supply water inside the tank body 3.
The working principle is as follows: when the dust suppression device is used, a user can push the push rod 14 to drive the mobile station 1 to move, the water pump 10 is connected with a mobile power supply seat on the mobile station 1, water in the tank body 3 can be sucked in a working mode, then the water is conveyed to the inner sides of the upper ring pipe 7 and the multiple groups of L-shaped pipes 6, water mist is sprayed out from the inner portion of the annular frame 5 through the multiple groups of spraying pipes 16 on the outer sides of the L-shaped pipes 6, dust suppression is carried out on dust in a construction site, the coverage area of the multiple groups of spraying pipes 16 from top to bottom is wide in dust suppression and can be fully contacted with the dust, the dust suppression is sufficient, the area sprayed by the water mist can be contacted with the surface of the annular frame 5, part of the water mist can drip into the annular frame 2 on the lower portion from the outer side of the annular frame 5, then the water is drained to the inner portion of the tank body 3 again through the multiple groups of drainage pipes 11 on the inner side of the tank body 3 and close to the bottom of the annular frame 2 to carry out secondary recycling, and the water mist can also increase the volume when the water mist is contacted with the dust, and the water mist falls into the annular frame 2 to be recycled in a centralized mode.
In the description herein, the appearances of the phrases "one embodiment," "some embodiments," "a specific embodiment," or the like, in various places throughout this specification are not necessarily all referring to the same embodiment or example, but rather to the same embodiment or example. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
Claims (6)
1. The utility model provides a device for green building construction, includes mobile station (1) and installs jar body (3) at mobile station (1) upper surface, its characterized in that: the utility model discloses a dust removal assembly, including jar body (3), it constructs to send water mechanism, send water mechanism's one end intercommunication to install violently pipe (9), violently pipe (9) outside intercommunication is installed ring canal (7), the one end of violently managing (9) is kept away from in ring canal (7) is provided with the dust removal subassembly along the circumferencial direction equidistance, the dust removal subassembly is all kept away from L venturi tube (6) of violently managing (9) one end including the intercommunication in ring canal (7), the L venturi tube (6) outside is from last to having set gradually multiunit spraying subassembly down, L venturi tube (6) bottom is provided with the connecting piece, jar body (3) outside below position cover is equipped with annular cover (2), jar body (3) inboard just is close to annular cover (2) bottom position department and is provided with the drainage subassembly.
2. The apparatus for green building construction as claimed in claim 1, wherein: the water feeding mechanism comprises a water pump (10) fixedly installed at the bottom of the inner side of the tank body (3), a straight pipe (8) is installed at the conveying end of the water pump (10) in a communicating mode, and one end of the straight pipe (8) penetrates through the top of the tank body (3) and the end portion of the straight pipe (8) is communicated with the transverse pipe (9).
3. The apparatus for green building construction as claimed in claim 1, wherein: the multiunit spraying subassembly all includes that the intercommunication is installed in inboard joint (15) of L venturi tube (6), connect (15) outside along the equidistance intercommunication of annular direction and install spray tube (16).
4. The apparatus for green building construction as claimed in claim 1, wherein: the connecting piece all includes base (12) of fixed connection in L venturi tube (6) bottom, the fixed cover in base (12) outside is equipped with annular frame (5), strip groove (13) have been seted up along the annular direction equidistance to annular frame (5) inboard.
5. The apparatus for green building construction as set forth in claim 1, wherein: the drainage assembly comprises a plurality of groups of drainage tubes (11) which are communicated with each other and are arranged on the inner side of the tank body (3) and close to the bottom of the annular cover (2), the drainage tubes (11) are arranged in an annular direction at equal intervals, and the drainage tubes (11) are arranged in multiple groups, wherein filter screens are arranged on the inner sides of the drainage tubes (11).
6. The apparatus for green building construction as claimed in claim 1, wherein: the water injection type portable power supply is characterized in that a push rod (14) is fixedly connected to the upper surface of one side of the mobile platform (1), a mobile power supply seat is arranged at one end, away from the push rod (14), of the mobile platform (1), and a water injection pipe (4) is arranged in the tank body (3) in a communicated mode.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221853630.XU CN218047116U (en) | 2022-07-19 | 2022-07-19 | A device for green building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221853630.XU CN218047116U (en) | 2022-07-19 | 2022-07-19 | A device for green building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218047116U true CN218047116U (en) | 2022-12-16 |
Family
ID=84400323
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221853630.XU Active CN218047116U (en) | 2022-07-19 | 2022-07-19 | A device for green building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218047116U (en) |
-
2022
- 2022-07-19 CN CN202221853630.XU patent/CN218047116U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218047116U (en) | A device for green building construction | |
CN210842858U (en) | Energy-saving and efficient dust collector | |
CN211069532U (en) | Building engineering construction dust collector | |
CN111760836A (en) | Method for cleaning photovoltaic panel in solar photovoltaic array | |
CN208178740U (en) | A kind of welding rod device for peeling | |
CN217107108U (en) | Dust removal and reduction device for tunnel construction | |
CN111229698A (en) | Efficient and environment-friendly cleaning equipment for mechanical parts | |
CN211837000U (en) | Industrial waste gas dust removal device for atmospheric pollution treatment | |
CN209985983U (en) | Garbage disposal device for building engineering | |
CN209770238U (en) | Printing environmental protection dust extraction | |
CN209302418U (en) | Construction site road raise dust prevention and control device | |
CN209317346U (en) | A kind of features simple structure type deduster | |
CN213193014U (en) | Large-scale central authorities dust removal mechanism of furniture production usefulness | |
CN215052573U (en) | Road sweeper with spray function | |
CN215543430U (en) | Pipeline belt cleaning device for water conservation | |
CN218053118U (en) | Saw-dust collection device is used in furniture production | |
CN218281158U (en) | A adsorb dust collector for mining operation vehicle | |
CN217041812U (en) | Dust removal structure and ultra-clean discharge water dust removal equipment using same | |
CN217662294U (en) | Automatic dust suppression spraying device used in open-air trenching blasting | |
CN220195702U (en) | Cleaning device before galvanized sheet galvanization | |
CN219149640U (en) | Indoor automatic dust removal sprinkler of green building | |
CN215668351U (en) | Covering machine with dust removal function for covering yarn production | |
CN211799687U (en) | Electrified dust collector | |
CN221252626U (en) | Colliery belt conveyor | |
CN213193005U (en) | Dust collector for civil engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |