CN218031847U - Mounting structure of pre-buried formula stagnant water festival - Google Patents

Mounting structure of pre-buried formula stagnant water festival Download PDF

Info

Publication number
CN218031847U
CN218031847U CN202222183493.XU CN202222183493U CN218031847U CN 218031847 U CN218031847 U CN 218031847U CN 202222183493 U CN202222183493 U CN 202222183493U CN 218031847 U CN218031847 U CN 218031847U
Authority
CN
China
Prior art keywords
buried
stagnant water
wall
water
water stop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222183493.XU
Other languages
Chinese (zh)
Inventor
黄建
卫烽烽
高树明
周波
周跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Sutong Electromechanical Installation Co ltd
Original Assignee
Nantong Sutong Electromechanical Installation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Sutong Electromechanical Installation Co ltd filed Critical Nantong Sutong Electromechanical Installation Co ltd
Priority to CN202222183493.XU priority Critical patent/CN218031847U/en
Application granted granted Critical
Publication of CN218031847U publication Critical patent/CN218031847U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model relates to a mounting structure of pre-buried formula stagnant water festival relates to construction technical field, for solving the stagnant water and economize on water inconvenient problem of construction when this body installation, and it includes stagnant water festival body and is used for installing the template of stagnant water festival body, be provided with the seal ring on the stagnant water festival body outer wall, still be provided with a plurality of location strips on the outer wall of stagnant water festival body, each the through hole has all been seted up on the location strip, be provided with in the through hole and be used for the pre-buried subassembly fixed with the template, pre-buried subassembly includes pre-buried screw rod and embedded nut, pre-buried screw rod sets up in the template, the one end of pre-buried screw rod extends and passes the inner wall of through hole towards stagnant water festival body one side, embedded nut and pre-buried screw rod threaded connection, embedded nut supports tightly on the location strip. This application has construction convenience's effect.

Description

Mounting structure of pre-buried formula stagnant water festival
Technical Field
The application relates to the technical field of building construction, in particular to a mounting structure of a pre-buried water stop joint.
Background
The current building technology in China is developed to a higher level, people have higher and higher awareness on building construction and requirements on the quality of building engineering, various leakage phenomena of parts such as a toilet, a kitchen, a balcony and the like gradually become one of the common quality problems of the current building construction engineering, and in order to avoid the sounding of the leakage phenomena, a water stopping joint is pre-embedded on the surface of a building in the construction process of the building, so that the effects of stopping water and preventing seepage are achieved.
The patent related to the prior publication No. CN202188237U provides a novel water stop joint, which comprises a hollow water stop joint body and a base connected with the water stop joint body, wherein at least one convex water stop ring is arranged outside the water stop joint body, water stop steps are arranged outside the water stop joint body, and 4-6 fixing holes are uniformly distributed on the base; when the water stop joint is installed, the water stop joint body is placed on a floor slab template, fixed with the template through a screw penetrating through a fixing hole, and then concrete is poured; through the setting of stagnant water step, reduce the possibility that the fracture takes place in the shrink of stagnant water festival body.
In the process of implementing the application, the inventor finds that at least the following problems exist in the technology: in the installation, need the position of the fixed stagnant water festival body of constructor, pass the fixed orifices that corresponds with a plurality of screws in proper order again and fix the stagnant water festival body on the template through the mode of hammering, the construction is comparatively inconvenient, and leads to stagnant water festival body to appear cracked possibility easily when the hammering dynamics is too big, so remain to improve.
SUMMERY OF THE UTILITY MODEL
In order to solve the inconvenient problem of construction when stagnant water festival this body installation, this application provides a mounting structure of pre-buried formula stagnant water festival.
The application provides a mounting structure of pre-buried formula stagnant water festival adopts following technical scheme:
the utility model provides an installation structure of pre-buried formula stagnant water festival, includes stagnant water festival body and is used for installing the template of stagnant water festival body, be provided with the seal ring on the stagnant water festival body outer wall, still be provided with a plurality of location strips on the outer wall of stagnant water festival body, each the through hole has all been seted up on the location strip, be provided with in the through hole and be used for the pre-buried subassembly fixed with the template, pre-buried subassembly includes embedded screw and embedded nut, embedded screw sets up in the template, the one end of embedded screw extends and passes the inner wall of through hole towards stagnant water festival body one side, embedded nut and embedded screw threaded connection, embedded nut supports tightly on the location strip.
After the water stop joint body needs to be fixed in position by a constructor in the installation process, a plurality of screws sequentially penetrate through corresponding fixing holes to fix the water stop joint body on the template in a hammering mode, so that the construction is inconvenient, and the possibility of breakage is easy to occur when hammering force is too large; by adopting the technical scheme, a plurality of embedded screws are embedded in the template in advance before construction, when the water stopping joint body is installed, the through holes of the positioning strips on the water stopping joint body are aligned to the corresponding embedded screws, the water stopping joint body is gradually close to the template, until the water stopping joint body is placed on the template, the embedded screws penetrate through the corresponding through holes, the embedded nuts are taken out, the embedded nuts are sleeved on the embedded screws, the embedded nuts are tightly abutted to the positioning strips by rotating the embedded nuts, and the water stopping joint body is installed; through the setting of location strip, embedded screw and embedded nut, the installation of stagnant water festival body of being convenient for, construction convenience has reduced constructor's intensity of labour, has shortened the installation stagnant water and has practiced thrift this required time of body, and installation period is short, appears stagnant water festival this body and takes place the possibility of breaking when avoiding installing through the mode of hammering simultaneously.
Optionally, it is a plurality of the location strip sets up along the circumference direction of stagnant water festival body, and is a plurality of equidistance sets up between the location strip.
By adopting the technical scheme, the plurality of positioning strips are arranged at equal intervals along the circumferential direction of the water stop joint body; through the mode that the equidistance of location strip set up, the stagnant water festival body appears one side and sticks up the possibility when reducing to the stagnant water festival body and installing, helps improving the stability of this body installation of stagnant water festival, and is more pleasing to the eye in the shape simultaneously.
Optionally, a friction gasket is arranged on one side, close to the embedded nut, of the positioning strip, the friction gasket is sleeved on the embedded screw, one end of the friction gasket is abutted against the positioning strip, and the other end of the friction gasket is abutted against the embedded nut.
By adopting the technical scheme, each embedded screw is sleeved with a friction gasket; through friction pad's setting, increase area of contact between embedded nut and the location strip, reduce pressure has the effect of relaxing, supports the possibility that tight location strip leads to location strip surface mar, pit to appear for a long time through reducing pre-buried screw, has prolonged the life of location strip.
Optionally, a supporting ring plate is arranged on the outer wall of the water stopping joint body, the supporting ring plate is arranged along the circumferential direction of the water stopping joint body, the positioning strip is located on the supporting ring plate, a plurality of through holes are formed in the supporting ring plate and correspond to the through holes one to one, and the inner walls of the through holes are arranged coaxially with the inner walls of the corresponding through holes.
By adopting the technical scheme, the outer wall of the water stop joint body is integrally formed with the supporting ring plate, and any one positioning strip is integrally formed on the supporting ring plate; through the setting of the support ring plate, the contact area between the water stop joint body and the template is increased, and the support strength of the positioning strip is improved.
Optionally, a plurality of reinforcing ribs are arranged on the supporting ring plate, and one ends of the reinforcing ribs are connected to the outer wall of the water stop joint body.
By adopting the technical scheme, the supporting ring plate is integrally formed with the plurality of reinforcing ribs, and one ends of the plurality of reinforcing ribs are integrally formed on the outer wall of the water stop joint body; through the setting of a plurality of strengthening ribs, improved the joint strength between supporting ring board and the stagnant water festival body, improved holistic stability, prolonged holistic life.
Optionally, the inner wall of the water stopping joint body is provided with a mounting ring, and the mounting ring is arranged along the circumferential direction of the inner wall of the water stopping joint body.
By adopting the technical scheme, the mounting ring is integrally formed on the inner wall of the water stop joint body; through the setting of collar, when the one end of pipeline was inserted and is established when stagnant water festival is originally internal, the collar supported the one end of pipeline, location when helping realizing the piping erection.
Optionally, a guide plate is obliquely arranged on one side of the mounting ring.
By adopting the technical scheme, the guide plate is obliquely arranged on one side of the mounting ring; through the setting of guide plate, the guide plate plays the cushioning effect to rivers when rivers flow through the pipeline.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the arrangement of the positioning strips, the embedded screw rods and the embedded nuts is convenient for the installation of the water stop joint body, the construction is convenient, the labor intensity of constructors is reduced, the time for installing the water stop joint body is shortened, the installation period is short, and the possibility of the water stop joint body breaking during the installation in a hammering mode is avoided;
2. through friction pad's setting, increase area of contact between embedded nut and the location strip, reduce pressure has the effect of relaxing, supports the possibility that tight location strip leads to location strip surface mar, pit to appear for a long time through reducing pre-buried screw, has prolonged the life of location strip.
Drawings
Fig. 1 is a schematic structural diagram of an installation structure of a pre-buried water stop joint in an embodiment of the present application.
Fig. 2 isbase:Sub>A sectional view taken along linebase:Sub>A-base:Sub>A in fig. 1.
Fig. 3 is an enlarged view of a portion a of fig. 2.
Fig. 4 is an enlarged view of a portion B of fig. 1.
Description of reference numerals: 1. a water stop section body; 11. a water stop ring; 2. a template; 3. a positioning bar; 31. a through hole; 4. pre-burying the assembly; 41. pre-burying a screw; 42. pre-burying a nut; 5. a rubbing pad; 6. a support ring plate; 61. a through hole; 62. reinforcing ribs; 7. a mounting ring; 71. a baffle.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses mounting structure of pre-buried formula stagnant water festival. Referring to fig. 1, the mounting structure of pre-buried formula stagnant water festival includes stagnant water festival body 1 and installation stagnant water festival body 1's template 2, and this embodiment stops that water festival body 1 can be inside hollow tubular structure, and stagnant water festival body 1 places on template 2.
Referring to fig. 1 and 2, an installation ring 7 is integrally formed on the inner wall of the water stop joint body 1, the installation ring 7 is arranged along the circumferential direction of the water stop joint body 1, and the installation ring 7 is used for supporting and positioning a pipeline and the water stop joint body 1 during installation; the guide plate 71 is installed in the one side slope that the seal festival body 1 inner wall was kept away from to collar 7, and guide plate 71 inclines towards template 2 one side in this implementation and sets up for play the cushioning effect when flowing through the pipeline to rivers.
Referring to fig. 1, a water stop ring 11 is integrally formed on the outer wall of the water stop joint body 1, a supporting ring plate 6 is further integrally formed on the outer wall of the water stop joint body 1, the supporting ring plate 6 and the water stop ring 11 are arranged along the circumferential direction of the water stop joint body 1, the supporting ring plate 6 and the water stop ring 11 are arranged in parallel, and the supporting ring plate 6 is located at one end, close to the template 2, of the water stop joint body 1.
Referring to fig. 1, the supporting ring plate 6 is integrally formed with a plurality of reinforcing ribs 62, and one ends of the plurality of reinforcing ribs 62 are integrally formed on the outer wall of the water stop joint body 1, so that the connection strength between the supporting ring plate 6 and the water stop joint body 1 is improved, the overall stability is improved, and the overall service life is prolonged. Referring to fig. 1, integrated into one piece has a plurality of location strip 3 on the support ring board 6, and a plurality of location strip 3 along length direction's one end integrated into one piece on the outer wall of stagnant water festival body 1, a plurality of location strip 3 along the circumferential direction setting of support ring board 6, and the equidistance sets up between a plurality of location strip 3, and the quantity of location strip 3 can be 4 in this embodiment.
Referring to fig. 1 and 3, a through hole 31 is formed in each positioning strip 3 in a penetrating manner, a plurality of through holes 61 corresponding to the corresponding through holes 31 are formed in the supporting ring plate 6, the inner walls of the through holes 61 and the inner walls of the through holes 31 are coaxially arranged, and embedded components 4 used for being fixed with the template 2 are installed in the through holes 61.
Referring to fig. 1 and 4, the embedded assembly 4 includes an embedded screw 41 and an embedded nut 42, one end of the embedded screw 41 is located in the formwork 2, the other end of the embedded screw 41 extends toward one side of the water stop joint body 1, the end of the embedded screw 41 penetrates through the through hole 61 and the inner wall of the through hole 31, a friction gasket 5 is sleeved on the embedded screw 41, one end of the friction gasket 5 abuts against the positioning strip 3, the other end of the friction gasket 5 abuts against the embedded nut 42, and the embedded nut 42 is in threaded connection with the embedded screw 41; the embedded nut 42 is rotated, the embedded nut 42 is in threaded connection with the embedded screw rod 41, the embedded screw rod 41 moves along the length direction of the embedded screw rod 41 until the embedded nut 42 abuts against the positioning strips 3 through the friction gaskets 5, repeated operation is conducted, the positioning strips 3 are fixed, and therefore the water stop joint body 1 is installed.
The implementation principle of the installation structure of the pre-buried water stop joint in the embodiment of the application is as follows: the method comprises the steps that a plurality of embedded screws 41 are embedded in a template 2 before construction, when a water stop joint body 1 is installed, through holes 31 of positioning strips 3 on the water stop joint body 1 are aligned to the corresponding embedded screws 41, the water stop joint body 1 is gradually close to the template 2 until the water stop joint body 1 is placed on the template 2, the embedded screws 41 sequentially penetrate through the corresponding through holes 31 and the corresponding through holes 61, friction gaskets 5 are sleeved on the embedded screws 41, at the moment, the embedded nuts 42 are taken out, the embedded nuts 42 are sleeved on the embedded screws 41, the embedded nuts 42 are rotated, the embedded nuts 42 move along the length direction of the embedded screws 41 until the embedded nuts 42 abut against the surfaces of the positioning strips 3 through the friction gaskets 5, operation is repeated, after the corresponding positioning strips 3 are fixed, the water stop joint body 1 is installed, and then concrete is poured; through location strip 3, embedded screw 41 and embedded nut 42's setting, the stagnant water of being convenient for is economized on water body 1's installation, and construction convenience has reduced constructor's intensity of labour, has shortened the installation stagnant water and has economized on water the required time of festival body 1, and installation period is short, appears when avoiding installing through the mode of hammering simultaneously and economizes on water festival body 1 and takes place cracked possibility.
The above are preferred embodiments of the present application, and the scope of protection of the present application is not limited thereto, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (7)

1. The utility model provides a mounting structure of pre-buried formula stagnant water festival, includes stagnant water festival body (1) and is used for installing template (2) of stagnant water festival body (1), be provided with stagnant water ring (11), its characterized in that on stagnant water festival body (1) outer wall: still be provided with a plurality of location strips (3) on the outer wall of stagnant water festival body (1), each location strip (3) is gone up and has all been seted up through hole (31), be provided with in through hole (31) and be used for pre-buried subassembly (4) fixed with template (2), pre-buried subassembly (4) are including pre-buried screw rod (41) and embedded nut (42), pre-buried screw rod (41) set up in template (2), the inner wall that the one end of pre-buried screw rod (41) just passed through hole (31) extends towards stagnant water festival body (1) one side, embedded nut (42) and pre-buried screw rod (41) threaded connection, embedded nut (42) support tightly on location strip (3).
2. The mounting structure of the pre-buried water stop joint according to claim 1, characterized in that: a plurality of location strip (3) set up along the circumference direction of stagnant water festival body (1), and are a plurality of equidistance sets up between location strip (3).
3. The mounting structure of the pre-buried water stop joint as set forth in claim 1, characterized in that: one side of the positioning strip (3) close to the embedded nut (42) is provided with a friction gasket (5), the friction gasket (5) is sleeved on the embedded screw rod (41), one end of the friction gasket (5) is abutted against the positioning strip (3), and the other end of the friction gasket (5) is abutted against the embedded nut (42).
4. The mounting structure of the pre-buried water stop joint according to claim 1, characterized in that: be provided with supporting ring board (6) on the outer wall of stagnant water festival body (1), supporting ring board (6) are followed the circumference direction setting of stagnant water festival body (1), arbitrary location strip (3) all are located supporting ring board (6), a plurality of through-holes (61), a plurality of have been seted up on supporting ring board (6) through-hole (61) and a plurality of through hole (31) one-to-one, the inner wall of through-hole (61) and the coaxial setting of inner wall that corresponds through hole (31).
5. The mounting structure of the pre-buried water stop joint as set forth in claim 4, characterized in that: the water stop joint is characterized in that a plurality of reinforcing ribs (62) are arranged on the supporting ring plate (6), and one ends of the reinforcing ribs (62) are connected to the outer wall of the water stop joint body (1).
6. The mounting structure of the pre-buried water stop joint as set forth in claim 1, characterized in that: the water stopping joint is characterized in that a mounting ring (7) is arranged on the inner wall of the water stopping joint body (1), and the mounting ring (7) is arranged along the circumferential direction of the inner wall of the water stopping joint body (1).
7. The mounting structure of the pre-buried water stop joint according to claim 6, characterized in that: and a guide plate (71) is obliquely arranged on one side of the mounting ring (7).
CN202222183493.XU 2022-08-19 2022-08-19 Mounting structure of pre-buried formula stagnant water festival Active CN218031847U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222183493.XU CN218031847U (en) 2022-08-19 2022-08-19 Mounting structure of pre-buried formula stagnant water festival

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222183493.XU CN218031847U (en) 2022-08-19 2022-08-19 Mounting structure of pre-buried formula stagnant water festival

Publications (1)

Publication Number Publication Date
CN218031847U true CN218031847U (en) 2022-12-13

Family

ID=84349045

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222183493.XU Active CN218031847U (en) 2022-08-19 2022-08-19 Mounting structure of pre-buried formula stagnant water festival

Country Status (1)

Country Link
CN (1) CN218031847U (en)

Similar Documents

Publication Publication Date Title
CN218031847U (en) Mounting structure of pre-buried formula stagnant water festival
CN213174794U (en) Novel reserved hole formwork tool
CN213062942U (en) Close rib roof beam mould shell fixing device for construction
CN211341782U (en) Split bolt for fixing template
CN112211259B (en) Connection module of water supply and drainage system of green building and construction method thereof
CN113048294A (en) Water stop joint and mounting method thereof
CN112049990A (en) Anti-seepage device for reserved hole of through-floor or through-wall pipeline and construction method
CN217232748U (en) Shear force wall antiseep is to drawing structure
CN108266204B (en) Core concrete pouring equipment and process for assembled confined concrete arch truss
CN219012053U (en) Wall hole concrete plugging template
CN220555907U (en) Novel outer frame cantilever I-steel fixing anchor ring device
CN217176484U (en) Pre-buried cat ladder
CN219317845U (en) BIM technology-based pipe-well casing pre-burying device
CN217056644U (en) Embedded part for mounting sewer main pipe in building
CN218935486U (en) Device for preventing floating up during pouring of pipeline
CN215981187U (en) Prefabricated connecting device for water supply and drainage pipeline of assembly type building
CN220848946U (en) Quick hinge joint connecting piece of platform
CN218952798U (en) Device for repairing electromechanical pipe hole of floor slab in urban updating project
CN219413780U (en) Pump pipe fixed establishment and pump pipe are washed in high-rise building concrete placement
CN210623775U (en) Concealed connection structure of shower water mixer
CN212480377U (en) Wear floor or wear wall pipeline and reserve entrance to a cave anti-seepage device
CN217896602U (en) A attach fitting for precast pile is pressed and is pulled out experiment
CN216340861U (en) Diagonal bracing structure for aluminum alloy template
CN218881590U (en) Fixing device for beam-penetrating sleeve
CN218152850U (en) Rain sewage pipeline leak protection mechanism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant