CN219012053U - Wall hole concrete plugging template - Google Patents

Wall hole concrete plugging template Download PDF

Info

Publication number
CN219012053U
CN219012053U CN202223496464.5U CN202223496464U CN219012053U CN 219012053 U CN219012053 U CN 219012053U CN 202223496464 U CN202223496464 U CN 202223496464U CN 219012053 U CN219012053 U CN 219012053U
Authority
CN
China
Prior art keywords
baffle
nut
steel
rubber baffle
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223496464.5U
Other languages
Chinese (zh)
Inventor
赖源
唐磊磊
罗钊旭
陈昱宇
刘永祁
林立
王岩龙
张围
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Bureau South China Co Ltd
Original Assignee
China Construction Eighth Bureau South China Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Bureau South China Co Ltd filed Critical China Construction Eighth Bureau South China Co Ltd
Priority to CN202223496464.5U priority Critical patent/CN219012053U/en
Application granted granted Critical
Publication of CN219012053U publication Critical patent/CN219012053U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

The utility model relates to a wall-through hole concrete plugging template which comprises a rectangular steel baffle, a rectangular first rubber baffle, a circular second rubber baffle, a counter-pulling screw rod, a first nut and a PVC sleeve, wherein the first long side of the first rubber baffle is connected with the first long side of the steel baffle, a circular through hole is formed in the steel baffle, the second nut is embedded in the center of the second rubber baffle, a plurality of metal elastic sheets embedded in the second rubber baffle are arranged outside the second nut Zhou Gujie, one end of the counter-pulling screw rod is in threaded connection with the second nut, the other end of the counter-pulling screw rod is in threaded connection with the first nut after penetrating through the circular through hole, and the PVC sleeve is sleeved on the counter-pulling screw rod between the steel baffle and the second rubber baffle. The beneficial effects are that: the wall-through hole concrete plugging template has the advantages of simple structure, convenient operation and repeated utilization, and is convenient for plugging the wall-through hole on the floor slab or the wall body by using concrete.

Description

Wall hole concrete plugging template
Technical Field
The utility model relates to the technical field of building templates, in particular to a wall hole concrete plugging template.
Background
In the building construction process, the following conditions often occur, i-steel wall penetrating holes are reserved on the concrete outer wall due to the construction process, or holes are reserved on the concrete floor by mistake due to electromechanical construction deviation. The traditional hole plugging method is to install a template reinforcing system on the outer side and fill micro-expansion fine stone concrete on the inner side. The traditional method needs to manually operate the fixed template at the outer side, consumes labor cost and measure cost, has low construction efficiency, often has the quality problems of uncompacted vibration filling, honeycomb pitting surface and the like after concrete plugging, forms leakage hidden trouble, and further causes post reworking and repairing.
Disclosure of Invention
The utility model aims to overcome the problems in the prior art and provide the wall hole concrete plugging template.
In order to achieve the technical purpose and the technical effect, the utility model is realized by the following technical scheme:
the utility model provides a wall hole concrete shutoff template, includes rectangular steel baffle, rectangular first rubber baffle, annular second rubber baffle, to drawing screw rod, first nut, PVC sleeve pipe, the first long limit of first rubber baffle is connected with the first long limit of steel baffle, be equipped with circular through-hole on the steel baffle, the second nut has been buried in the center of second rubber baffle, the outer Zhou Gujie of second nut has many metal shrapnel buried in the second rubber baffle, to drawing screw rod one end and second nut spiro union, to drawing screw rod another end after passing circular through-hole with first nut spiro union, PVC sleeve pipe is on the drawing screw rod between steel baffle and second rubber baffle.
Further, the bottom end of the second nut is welded with a stainless steel hook with part exposed outside the second rubber baffle.
The beneficial effects of the utility model are as follows: the steel baffle plate, the first rubber baffle plate and the second rubber baffle plate are respectively fixed at two ends of the wall-penetrating hole by utilizing the matching of the opposite-pull screw rod and the first nut and the second nut, and concrete is poured into the wall-penetrating hole by lifting the first rubber baffle plate; filling the PVC sleeve with expansion mortar after demolding, so as to seal the PVC sleeve; the wall-through hole concrete plugging template has the advantages of simple structure, convenient operation and repeated utilization, and is convenient for plugging the wall-through hole on the floor slab or the wall body by using concrete.
Drawings
The accompanying drawings, which are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this application, illustrate embodiments of the utility model and together with the description serve to explain the utility model and do not constitute a limitation on the utility model. In the drawings:
FIG. 1 is a schematic diagram of the structure of an assembly of a wall hole concrete plugging template in the utility model;
FIG. 2 is an exploded view of a wall hole concrete block form of the present utility model;
FIG. 3 is a schematic view of the structure of the concrete plugging template for the through-wall hole in the utility model when the concrete plugging template is installed on the through-wall hole;
the reference numerals in the figures illustrate: the double-pull screw rod 1, a first nut 2, a steel baffle 3, a first rubber baffle 4, a PVC sleeve 5, a second rubber baffle 6, a second nut 7, a metal spring piece 8, a stainless steel hook 9 and a circular through hole 10.
Detailed Description
The utility model will be described in detail below with reference to the drawings in combination with embodiments.
As shown in fig. 1 to 3, a wall-penetrating hole concrete plugging template comprises a rectangular steel baffle 3, a rectangular first rubber baffle 4, a circular second rubber baffle 6, a split screw 1, a first nut 2 and a PVC sleeve 5, wherein a first long side of the first rubber baffle 4 is connected with a first long side of the steel baffle 3, the front surface of the steel baffle 3 and the front surface of the first rubber baffle 4 are positioned on the same plane, and when the wall-penetrating hole is installed, the front surface of the steel baffle 3 and the front surface of the first rubber baffle 4 face towards the wall-penetrating hole; the width of the steel baffle 3 is two thirds of the length of the steel baffle 3, the width of the first rubber baffle 4 is one third of the length of the first rubber baffle 4, and the length of the steel baffle 3 is equal to the length of the first rubber baffle 4.
The steel baffle plate 3 is provided with a circular through hole, the distance between the circular through hole 10 and two short sides of the steel baffle plate 3 is the same, and the distance between the circular through hole and the second long side of the steel baffle plate 3 is equal to the distance between the circular through hole and any short side of the steel baffle plate 3.
The center of second rubber baffle 6 has buried second nut 7 in the embedding, the center pin of second nut 7 and the center pin collineation of second rubber baffle 6, the periphery rigid coupling of second nut 7 has four metal shrapnel 8 of embedding in second rubber baffle 6, four metal shrapnels 8 are arranged according to annular array with the center pin of second nut 7 as the center, metal shrapnel 8 can improve the axial strength of second rubber baffle 6 promptly, still be convenient for pass through the wall hole after the bending of second rubber baffle 6 edge when the installation template.
One end of the opposite-pulling screw rod 1 is in threaded connection with the second nut 7, the other end of the opposite-pulling screw rod 1 passes through the circular through hole and is in threaded connection with the first nut 2, and the PVC sleeve 5 is sleeved on the opposite-pulling screw rod 1 between the steel baffle 3 and the second rubber baffle 6.
The bottom welding of second nut 7 has the part to expose at the outside stainless steel couple 9 of second rubber baffle 6, when demolishing second rubber baffle 6, through drawing stainless steel couple 9, improves the demolishing efficiency of second rubber baffle 6.
The steel baffle plate, the first rubber baffle plate and the second rubber baffle plate are respectively fixed at two ends of the wall-penetrating hole by utilizing the matching of the opposite-pull screw rod and the first nut and the second nut, and concrete is poured into the wall-penetrating hole by lifting the first rubber baffle plate; filling the PVC sleeve with expansion mortar after demolding, so as to seal the PVC sleeve; before the wall hole concrete plugging template is installed, a layer of oily release agent is smeared on the surfaces of the front surface of the steel baffle, the front surface of the first rubber baffle, the front surface of the second rubber baffle and the opposite-pulling screw.
The foregoing has shown and described the basic principles, principal features and advantages of the utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims.

Claims (6)

1. A through-wall hole concrete shutoff template which characterized in that: including rectangular steel baffle, rectangular first rubber baffle, annular second rubber baffle, to drawing screw rod, first nut, PVC sleeve pipe, the first long limit of first rubber baffle is connected with the first long limit of steel baffle, be equipped with circular through-hole on the steel baffle, the second nut has been buried in the center of second rubber baffle, the outer Zhou Gujie of second nut has many metal shrapnel of embedding in second rubber baffle, to drawing screw rod one end and second nut spiro union, to drawing screw rod another head after passing circular through-hole with first nut spiro union, PVC sleeve pipe is on the to drawing screw rod between steel baffle and the second rubber baffle.
2. The through-wall hole concrete plugging template of claim 1, wherein: the width of the steel baffle plate is two thirds of the length of the steel baffle plate, the width of the first rubber baffle plate is one third of the length of the first rubber baffle plate, and the length of the steel baffle plate is equal to the length of the first rubber baffle plate.
3. The through-wall hole concrete plugging template of claim 1, wherein: the front face of the steel baffle plate and the front face of the first rubber baffle plate are located on the same plane.
4. The through-wall hole concrete plugging template of claim 1, wherein: the distance between the round through hole and the two short sides of the steel baffle is the same, and the distance between the round through hole and the second long side of the steel baffle is equal to the distance between the round through hole and any short side of the steel baffle.
5. The through-wall hole concrete plugging template of claim 1, wherein: the central shaft of the second nut is collinear with the central shaft of the second rubber baffle, and the plurality of metal elastic sheets are distributed in an annular array with the central shaft of the second nut as the center.
6. The through-wall hole concrete plugging template of claim 1, wherein: the bottom end of the second nut is welded with a stainless steel hook with part exposed outside the second rubber baffle.
CN202223496464.5U 2022-12-27 2022-12-27 Wall hole concrete plugging template Active CN219012053U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223496464.5U CN219012053U (en) 2022-12-27 2022-12-27 Wall hole concrete plugging template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223496464.5U CN219012053U (en) 2022-12-27 2022-12-27 Wall hole concrete plugging template

Publications (1)

Publication Number Publication Date
CN219012053U true CN219012053U (en) 2023-05-12

Family

ID=86243408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223496464.5U Active CN219012053U (en) 2022-12-27 2022-12-27 Wall hole concrete plugging template

Country Status (1)

Country Link
CN (1) CN219012053U (en)

Similar Documents

Publication Publication Date Title
CN101705697A (en) Diaphragm wall joint flexible water stop installing device and method
CN113585430B (en) Trenchless repairing component and method for water burst at joint of inspection well and pipeline
CN219012053U (en) Wall hole concrete plugging template
CN214657263U (en) Adjustable post-cast strip power transmission device of prestressing force
CN113700046A (en) Basement structure antiseep bushing apparatus
CN101839030A (en) Novel building assembled wall body and construction method
CN202164698U (en) Steel die for sewage inspection well
CN107514097B (en) Prestressed corrugated pipe assembly and installation and construction method thereof
CN213174794U (en) Novel reserved hole formwork tool
CN109577498B (en) Plugging device suitable for small-area floor entrance to a cave
CN210316592U (en) Prestressed pipeline positioning device of segment beam
CN211172078U (en) Assembled waterproof lifting hook
CN220870296U (en) PCCP (prestressed concrete cylinder pipe) with inner cladding
CN112012243A (en) Prefabricated integrated reinforced concrete inspection well and construction method thereof
CN216891988U (en) Make things convenient for anchor extension sleeve deeply that buries of mud jacking
CN112049990A (en) Anti-seepage device for reserved hole of through-floor or through-wall pipeline and construction method
CN206973068U (en) A kind of through-flooring is pre-buried to use the pre-buried adapter of flexible interface adjusting center
CN216787364U (en) Cement mortar band-plastering tool for bell and spigot concrete pipeline interface
CN218785668U (en) Concrete pipe pile forming device
CN205382491U (en) Slip casting formula pouring jacket back cover auxiliary device
CN213061668U (en) Connecting assembly for sealing and fastening multi-specification anchor backing plate and corrugated pipe
CN214195135U (en) Curtain convenient to dismantle and installation
CN213871489U (en) High-strength plant fiber reinforced cement pipe
CN218862116U (en) Novel connecting component for embedded parts of concrete cable channel
CN217840332U (en) Pre-support for concrete beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant