CN218027745U - Geotechnical engineering side slope reinforcing apparatus - Google Patents

Geotechnical engineering side slope reinforcing apparatus Download PDF

Info

Publication number
CN218027745U
CN218027745U CN202221856955.3U CN202221856955U CN218027745U CN 218027745 U CN218027745 U CN 218027745U CN 202221856955 U CN202221856955 U CN 202221856955U CN 218027745 U CN218027745 U CN 218027745U
Authority
CN
China
Prior art keywords
check
fixing
bracing piece
geotechnological
geotechnical engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221856955.3U
Other languages
Chinese (zh)
Inventor
程云
常李阳
卜峰
韩峰
刘凤胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221856955.3U priority Critical patent/CN218027745U/en
Application granted granted Critical
Publication of CN218027745U publication Critical patent/CN218027745U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/23Dune restoration or creation; Cliff stabilisation

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model discloses a geotechnical engineering side slope reinforcing apparatus, including geotechnique's check, fixing bolt and bracing piece, be provided with the through-hole on the geotechnique's check, geotechnique's check both ends all are provided with the connecting hole. The beneficial effects are that: the utility model discloses a set up the bracing piece, fixed pin and fixed cover, can make the fixed pin pass through the bracing piece and be connected fixedly with one side of geotechnological check, and fixed cover then is connected fixedly with the other end of geotechnological check, when installation geotechnological check, the staff can insert fixed cover with the fixed pin and connect fixedly to adjacent geotechnological check, form split type structure, not only convenient transportation, can also adjust the size according to concrete usable floor area, facilitate the use, the practicality of the device is improved, and simultaneously, connection through fixed pin and fixed cover can make and have certain shock-absorbing capacity between the geotechnological check, reduce the impact force of rockfall to geotechnological check, the life of geotechnological check is prolonged.

Description

Geotechnical engineering side slope reinforcing apparatus
Technical Field
The utility model relates to a side slope reinforcement technical field, concretely relates to geotechnical engineering side slope reinforcement.
Background
Slope reinforcement refers to a measure for improving the stability of a strip mine slope, and the stability of the slope is improved by arranging slope angle retaining walls under slope angles of a slope crushing zone, arranging anti-slide piles on a local crushing zone or the slope and grouting rock strata with open joints and cracks. The measures are beneficial to safety, and can improve the side slope angle \28885andreduce the stripping work amount.
Current geotechnical engineering side slope reinforcing apparatus is in the use, through installing geotechnological check and sheltering from the rubble on the bank protection, and when using, connects through the welded mode each other between the geotechnological check, not only causes the transportation difficulty, and simultaneously, geotechnological check specification is great, can not carry out the adjustment size according to concrete usable floor area, and inconvenient use reduces the practicality of device, consequently needs a geotechnological engineering side slope reinforcing apparatus to solve current problem.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
In order to overcome prior art not enough, the geotechnical engineering side slope reinforcing apparatus that now provides has solved current geotechnical engineering side slope reinforcing apparatus in the use, shelters from the rubble through installing geotechnological check on the bank protection, and when using, connects through the welded mode each other between the geotechnological check, not only causes the transportation difficulty, and simultaneously, geotechnological check specification is great, can not carry out the size adjustment according to specific usable floor area, inconvenient use, the problem of the practicality of reduction device.
(II) technical scheme
The utility model discloses a following technical scheme realizes: the utility model provides a geotechnical engineering side slope reinforcing apparatus, including geotechnique's check, fixing bolt and bracing piece, be provided with the through-hole on the geotechnique's check, geotechnique's check both ends all are provided with the connecting hole, install in the connecting hole fixing bolt, fixing nut is installed to fixing bolt one end, the fixing bolt outside is provided with the mount, mount one end is connected with the dead lever, install geotechnique's check one side the bracing piece, the bracing piece bottom is connected with the fixed pin, fixed cover is installed to geotechnique's check both sides.
Furthermore, the geogrid is of an arc-shaped structure, and the through holes are formed in the geogrid.
Through adopting above-mentioned technical scheme, can pass through geotechnological check shelter from the bank protection rockfall, simultaneously, the staff can fill out between geotechnological check and consolidate, and fill out then can pass through-hole interconnect.
Furthermore, the connecting holes are formed in the geogrid, and the fixing bolts penetrate through the connecting holes.
By adopting the technical scheme, the fixing bolt can be connected with the earthwork grid and the fixing frame through the connecting hole.
Furthermore, the fixing bolt is rotatably connected with the fixing nut, and the fixing bolt penetrates through the fixing frame.
By adopting the technical scheme, the fixing bolt is convenient to fix after the fixing nut is installed.
Furthermore, the fixing frame is of a split structure and is welded with the fixing rod.
Through adopting above-mentioned technical scheme, the staff can with the dead lever installation is fixed on the bank protection, then uses fixing bolt with fixation nut passes through the connecting hole with the mount is right geotechnological check are installed fixedly.
Further, the bracing piece with geotechnological check welding, the fixed pin with the bracing piece welding.
Through adopting above-mentioned technical scheme, can make the fixed pin pass through the bracing piece with geotechnological check are connected fixedly.
Furthermore, the fixed sleeve is welded with the earthwork grid, and the fixed pin is inserted into the fixed sleeve.
Through adopting above-mentioned technical scheme, can be in the installation during geotechnological check, the staff can with the fixed pin inserts fixed cover is adjacent geotechnological check are connected.
(III) advantageous effects
Compared with the prior art, the utility model, following beneficial effect has:
for solving current geotechnical engineering side slope reinforcing apparatus in the use, through installing the geotechnique's check and sheltering from the rubble on the bank protection, and when using, connect through the welded mode each other between the geotechnique's check, not only cause the transportation difficulty, simultaneously, geotechnical check specification is great, can not adjust the size according to concrete usable floor area, inconvenient use, the problem of reducing means's practicality, the utility model discloses a set up bracing piece, fixed pin and fixed cover, can make the fixed pin pass through the bracing piece and be connected fixedly with one side of geotechnique's check, fixed cover then is connected fixedly with the other end of geotechnical check, when installing geotechnical check, the staff can insert fixed cover with the fixed pin and connect fixedly to adjacent geotechnical check, form split type structure, not only convenient transportation, can also adjust the size according to specific usable floor area, facilitate the use, improve the practicality of device, simultaneously, can make to have certain shock-absorbing capacity between the geotechnical check through the connection of fixed pin and fixed cover, reduce the impact force of rock fall to geotechnical check, improve the life of geotechnical check.
Drawings
Fig. 1 is a main sectional view of a geotechnical engineering slope reinforcement device of the present invention;
fig. 2 is a schematic structural view of a geogrid in the geotechnical engineering slope reinforcing apparatus of the present invention;
fig. 3 is an enlarged view of a position a in the geotechnical engineering slope reinforcing apparatus.
The reference numerals are explained below:
1. earthwork grids; 2. a through hole; 3. connecting holes; 4. fixing the bolt; 5. fixing a nut; 6. a fixed mount; 7. fixing the rod; 8. a support bar; 9. a fixing pin; 10. a fixing sleeve.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the invention.
As shown in fig. 1-3, a geotechnical engineering slope reinforcement device in this embodiment, including geotechnique's check 1, fixing bolt 4 and bracing piece 8, geotechnique's check 1 is last to be provided with through-hole 2, the staff can fill out between geotechnique's check 1 and consolidate, and fill out soil and then can pass through-hole 2 interconnect, geotechnique's check 1 both ends all are provided with connecting hole 3, connecting hole 3 can install fixing bolt 4, install fixing bolt 4 in connecting hole 3, fixing bolt 4 can be connected geotechnique's check 1 and mount 6 fixedly, fixing nut 5 is installed to fixing bolt 4 one end, fixing nut 5 can be fixed fixing bolt 4, the fixing bolt 4 outside is provided with mount 6, mount 6 one end is connected with dead lever 7, dead lever 7 can be connected with the bank protection, and then fix geotechnique's check 1, bracing piece 8 is installed to geotechnique's check 1 one side, bracing piece 8 can install fixed pin 9, 8 bottom of bracing piece is connected with fixed pin 9, fixed pin 9 can insert in fixed cover 10, fixed cover 10 is installed to geotechnique's check 1 both sides.
As shown in fig. 1 to 3, in the present embodiment, the geogrid 1 is an arc-shaped structure, the through hole 2 is formed on the geogrid 1, the connection hole 3 is formed on the geogrid 1, and the fixing bolt 4 penetrates through the connection hole 3.
As shown in fig. 1-3, in the embodiment, the fixing bolt 4 is rotatably connected to the fixing nut 5, the fixing bolt 4 penetrates through the fixing frame 6, the fixing frame 6 is a split structure, and the fixing frame 6 is welded to the fixing rod 7.
As shown in fig. 1 to 3, in the present embodiment, the support rod 8 is welded to the geogrid 1, the fixing pin 9 is welded to the support rod 8, the fixing sleeve 10 is welded to the geogrid 1, and the fixing pin 9 and the fixing sleeve 10 are inserted.
The specific implementation process of this embodiment is as follows: when the device is used, a worker assembles the earthwork lattices 1 on site according to use requirements, in the assembling process, the fixing pin 9 is fixedly connected with one side of the earthwork lattices 1 through the supporting rod 8, the fixing sleeve 10 is fixedly connected with the other end of the earthwork lattices 1, when the earthwork lattices 1 are installed, the worker can insert the fixing pin 9 into the fixing sleeve 10 to fixedly connect the adjacent earthwork lattices 1, after the fixing and the installation, the worker can install and fix the fixing rod 7 on a slope protection, and then the earthwork lattices 1 and the fixing rod 7 are fixedly installed through the connecting hole 3 and the fixing frame 6 by using the fixing bolt 4 and the fixing nut 5, in the use, fall the stone through geotechnological check 1 and shelter from to the bank protection, and simultaneously, the staff can fill out between geotechnological check 1 and consolidate, and fill out and then can pass through-hole 2 interconnect, and form split type structure with geotechnological check 1, not only make things convenient for the transportation, can also adjust the size according to specific usable floor area, facilitate the use, the practicality of improving the device, and simultaneously, connection through fixed pin 9 and fixed cover 10 can make and have certain shock-absorbing capacity between geotechnological check 1, reduce the impact force of falling the stone to geotechnological check 1, improve geotechnological check 1's life.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (7)

1. The utility model provides a geotechnical engineering side slope reinforcing apparatus which characterized in that: including geotechnological check (1), fixing bolt (4) and bracing piece (8), be provided with through-hole (2) on geotechnological check (1), geotechnological check (1) both ends all are provided with connecting hole (3), install in connecting hole (3) fixing bolt (4), fixing nut (5) are installed to fixing bolt (4) one end, the fixing bolt (4) outside is provided with mount (6), mount (6) one end is connected with dead lever (7), install geotechnological check (1) one side bracing piece (8), bracing piece (8) bottom is connected with fixed pin (9), fixed cover (10) are installed to geotechnological check (1) both sides.
2. The geotechnical engineering slope reinforcement device according to claim 1, characterized in that: the geogrid (1) is of an arc-shaped structure, and the through holes (2) are formed in the geogrid (1).
3. The geotechnical engineering slope reinforcement device according to claim 1, characterized in that: the connecting holes (3) are formed in the geogrid (1), and the fixing bolts (4) penetrate through the connecting holes (3).
4. The geotechnical engineering slope reinforcement device according to claim 1, characterized in that: the fixing bolt (4) is rotationally connected with the fixing nut (5), and the fixing bolt (4) penetrates through the fixing frame (6).
5. The geotechnical engineering slope reinforcement device according to claim 1, characterized in that: the fixing frame (6) is of a split structure, and the fixing frame (6) is welded with the fixing rod (7).
6. The geotechnical engineering slope reinforcement device according to claim 1, characterized in that: the bracing piece (8) with geotechnological check (1) welding, fixed pin (9) with bracing piece (8) welding.
7. The geotechnical engineering slope reinforcement device according to claim 1, characterized in that: the fixing sleeve (10) is welded with the geogrid (1), and the fixing pin (9) is connected with the fixing sleeve (10) in an inserting mode.
CN202221856955.3U 2022-07-19 2022-07-19 Geotechnical engineering side slope reinforcing apparatus Active CN218027745U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221856955.3U CN218027745U (en) 2022-07-19 2022-07-19 Geotechnical engineering side slope reinforcing apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221856955.3U CN218027745U (en) 2022-07-19 2022-07-19 Geotechnical engineering side slope reinforcing apparatus

Publications (1)

Publication Number Publication Date
CN218027745U true CN218027745U (en) 2022-12-13

Family

ID=84383973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221856955.3U Active CN218027745U (en) 2022-07-19 2022-07-19 Geotechnical engineering side slope reinforcing apparatus

Country Status (1)

Country Link
CN (1) CN218027745U (en)

Similar Documents

Publication Publication Date Title
CN201125354Y (en) Steep hill road bed branch block reinforced structure
CN100564700C (en) The job practices of lattice type steel column tower crane pedestal
CN106968257B (en) Concrete-fabricated profile steel mixed supporting system for ultra-large deep foundation pit and construction method thereof
KR100633796B1 (en) Connecting structure of mid supporting beam for temporary soil sheathing work
CN206956742U (en) High precipitous rock roadbed side slope repair system
KR102234513B1 (en) Block type reinforcement retaining wall structure and constructing method for the same
CN105525627A (en) Two-way anchorage plate retaining wall and construction method thereof
CN205382507U (en) Two -way anchored retaining wall by tie rods
CN109914422A (en) A kind of steel pipe and soil nailing combined type foundation pit supporting construction and construction method
CN208309593U (en) A kind of steel pipe structure with oblique member
CN207933826U (en) The fore-telling shaped pile anchor structure of guardrail reinforcing integrated with roadbed
CN206800370U (en) It is a kind of to excavate the continuous side wall supporting and retaining system protective construction in underground without fertile groove
CN218027745U (en) Geotechnical engineering side slope reinforcing apparatus
CN203741848U (en) Steel tube plate type retaining structure
CN210106749U (en) Counter-force structure of soft soil foundation super large section push pipe jacking operation
JP2015183366A (en) Structure and construction method for banking structure
CN2659966Y (en) Ribbed pile vertical arch spraying anchor combined support structure for deep foundation ditch
KR20130081849A (en) Tunnel supporting structure
CN211498887U (en) Broken rock soil body cutting slope flexible retaining reinforced structure
CN108589738A (en) Half gravity dam formula foundation pit enclosure structure and its construction method
CN213571956U (en) Combined construction method pile supporting structure
KR101534058B1 (en) Soil retaining wall for load support and constructing method thereof
KR101218825B1 (en) Method of land-side protection wall using bracing
CN212270914U (en) Supporting structure of wall protection template of non-circular artificial bored pile with super-large section
CN212561488U (en) Hole pile dado structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant