Combined type universal lifting platform for tower body Download PDF

Info

Publication number
CN218025103U
CN218025103U CN202222257135.9U CN202222257135U CN218025103U CN 218025103 U CN218025103 U CN 218025103U CN 202222257135 U CN202222257135 U CN 202222257135U CN 218025103 U CN218025103 U CN 218025103U
Authority
CN
China
Prior art keywords
tower
tower body
lifting platform
lift platform
machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222257135.9U
Other languages
Chinese (zh)
Inventor
赵欣
王明鑫
白晶
柴佳
刘志阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fushun Yongmao Construction Machinery Co ltd
Original Assignee
Fushun Yongmao Construction Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fushun Yongmao Construction Machinery Co ltd filed Critical Fushun Yongmao Construction Machinery Co ltd
Priority to CN202222257135.9U priority Critical patent/CN218025103U/en
Application granted granted Critical
Publication of CN218025103U publication Critical patent/CN218025103U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a general lift platform of modular tower body relates to tower crane's technical field, the utility model discloses aim at solving the too high problem of independent height, the utility model discloses a tower machine, the below of tower machine is passed through the tower machine and is connected the lower margin and install general lift platform, a plurality of tower bodies are installed to general lift platform below, the basis is installed to the below of tower body, the jacking stock is installed to the outer wall of tower body. General lift platform of combination formula tower body adopts conventional tower body, through the mode of combination for connect general lift platform and tower machine basis, guarantee the overall stability and the rigidity of tower machine, reach the requirement of guaranteeing tower machine safe handling, tower machine connection lower margin structure is adjustable lower margin, through adjusting the connecting bolt on the lower margin, can connect different cross-sectional dimensions's tower body, thereby realize multiple tower machine tower body connection combination, realized the commonality and the interchangeability of all parts, reduced transportation and ann tear the cost open.

Description

Combined type universal lifting platform for tower body
Technical Field
The utility model relates to a general lift platform's of combination formula body of tower technical field specifically is a general lift platform of combination formula body of tower.
Background
With the wider application field of tower cranes, the severe working environment and the ultrahigh independent height become the normal use state of tower cranes. In order to ensure the safe use of the tower crane, the tower body with a larger cross section is often needed or the tower body is coated with a layer of tower body, but a series of problems of low universal rate, difficult installation and disassembly and the like of the tower crane are caused.
SUMMERY OF THE UTILITY MODEL
In order to solve the problems, namely the problems provided by the background technology, the utility model provides a combined universal lifting platform for tower bodies, which comprises a tower crane, wherein the universal lifting platform is arranged below the tower crane through a tower crane connecting ground foot, a plurality of tower bodies are arranged below the universal lifting platform, a foundation is arranged below each tower body, a jacking sleeve frame is arranged on the outer wall of each tower body, and the upper part of each jacking sleeve frame is connected with the universal lifting platform;
an attachment device is arranged below the general lifting platform, and the periphery of the attachment device is fixedly sleeved on the outer walls of the tower bodies respectively.
The utility model discloses a further set up to: the tower body is a combined type tower body.
The utility model discloses a further set up to: the attachment device comprises a plurality of attachment frames and a plurality of attachment support rods, the attachment frames are fixedly connected to the outer wall of the tower body in a fixing mode, and the attachment frames are fixedly connected through the plurality of attachment support rods.
The utility model has the advantages of: general lift platform of combination formula body adopts conventional body of a tower for connect general lift platform and tower machine basis, guarantee the overall stability and the rigidity of tower machine, reach the requirement of guaranteeing tower machine safe handling, tower machine connection lower margin structure is adjustable lower margin, through the connecting bolt on the adjustment lower margin, can connect the body of a tower of different cross sectional dimensions, thereby realize multiple tower machine body of a tower connection combination, realized the commonality and the interchangeability of all parts, reduced transportation and ann tear the cost open.
Drawings
Fig. 1 shows the overall structure of the scheme.
Fig. 2 shows a schematic view of the tower and the infrastructure.
Fig. 3 shows a schematic structural diagram of a jacking sleeve frame and a universal lifting platform.
Fig. 4 shows a schematic structural diagram of a tower crane and a universal lifting platform.
Fig. 5 shows a schematic view of a general lifting platform structure.
Fig. 6 shows a schematic view of the structure of the attachment frame and the attachment brace.
The tower crane comprises a reference number 1, a foundation 2, a tower body 3, a jacking sleeve frame 4, a universal lifting platform 5, a tower crane 6, an attachment device 7, an attachment frame 8 and an attachment support rod.
Detailed Description
Preferred embodiments of the present invention will be described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only for explaining the technical principle of the present invention, and are not intended to limit the scope of the present invention.
The utility model provides a general lift platform of combined tower body, as shown in fig. 1-6, install tower body 2 on respective basis 1 respectively, and link to each other with basis 1 through the round pin axle, tower body 2 is the combined type tower body, is used for connecting general lift platform 4 and basis 1, guarantees the overall stability and the rigidity of tower machine, and the combined type tower body structure matches the combination of tower body 2 of different cross-sections according to the use height and the external environment requirement of tower machine 5, has effectively reduced the use cost of tower machine, and basis 1 is the concrete foundation, places on the ground, is used for fixed combined type tower body 2; the method comprises the steps of installing a jacking sleeve frame 3, connecting the jacking sleeve frame with a universal lifting platform 4, enabling the jacking sleeve frame 3 to be operated synchronously through a plurality of groups of jacking oil cylinders, achieving integral lifting of the universal lifting platform 4, performing synchronous operation of the plurality of groups of jacking oil cylinders, and installing an intelligent level detector on the platform for ensuring the safety of the synchronous operation, wherein the levelness and the verticality of the universal lifting platform under the working condition of combined tower body lifting can be monitored in real time, so that the safe operation under the working condition is ensured, the tower crane 5 is installed on the universal lifting platform 4 through a tower crane connecting ground foot, the tower crane connecting ground foot is positioned on the universal lifting platform 4 and used for connecting the tower crane 5 on the universal lifting platform 4, the tower crane connecting ground foot structure is adjustable, the tower cranes with different cross-section sizes can be connected through connecting bolts on the adjusting ground feet, accordingly, various tower crane connecting combinations are achieved, the tower cranes 5 are connected to the required height through the jacking sleeve frame 3 and the universal lifting platform 4, when the tower crane 5 is too high, the tower crane 5 is connected through an attachment frame 7, the foundation is avoided from being overturned, the foundation, the problem that the foundation is greatly reduced due to the integral stress of the combined tower crane, and the foundation can be reduced, and the foundation construction cost of the foundation is greatly reduced.
While the invention has been described with reference to a preferred embodiment, various modifications may be made and equivalents may be substituted for elements thereof without departing from the scope of the invention, and particularly, various features shown in the various embodiments may be combined in any combination as long as there is no structural conflict. The present invention is not limited to the particular embodiments disclosed herein, but encompasses all technical solutions falling within the scope of the claims.
In the description of the present invention, the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like, which indicate directions or positional relationships, are based on the directions or positional relationships shown in the drawings, which are merely for convenience of description, and do not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
Furthermore, it should be noted that, in the description of the present invention, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
The terms "comprises," "comprising," or any other similar term are intended to cover a non-exclusive inclusion, such that a process, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, article, or apparatus.
So far, the technical solution of the present invention has been described with reference to the preferred embodiments shown in the drawings, but it is easily understood by those skilled in the art that the scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, a person skilled in the art can make equivalent changes or substitutions to the related technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.

Claims (3)

1. The utility model provides a general lift platform of modular tower body, includes tower machine (5), its characterized in that: a universal lifting platform (4) is mounted below the tower crane (5) through a tower crane connecting ground foot, a plurality of tower bodies (2) are mounted below the universal lifting platform (4), a foundation (1) is mounted below the tower bodies (2), a jacking sleeve frame (3) is mounted on the outer wall of each tower body (2), and the upper part of each jacking sleeve frame (3) is connected with the universal lifting platform (4);
an attachment device (6) is arranged below the general lifting platform (4), and the periphery of the attachment device (6) is fixedly sleeved on the outer walls of the tower bodies (2) respectively.
2. The combined tower universal lifting platform of claim 1, wherein: the tower body (2) is a combined type tower body.
3. The combined tower universal lifting platform of claim 1, wherein: the attaching device (6) comprises a plurality of attaching frames (7) and a plurality of attaching support rods (8), the attaching frames (7) are fixedly connected to the outer wall of the tower body (2) in a fixing mode, and the attaching frames (7) are fixedly connected through the plurality of attaching support rods (8).
CN202222257135.9U 2022-08-26 2022-08-26 Combined type universal lifting platform for tower body Active CN218025103U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222257135.9U CN218025103U (en) 2022-08-26 2022-08-26 Combined type universal lifting platform for tower body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222257135.9U CN218025103U (en) 2022-08-26 2022-08-26 Combined type universal lifting platform for tower body

Publications (1)

Publication Number Publication Date
CN218025103U true CN218025103U (en) 2022-12-13

Family

ID=84350728

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222257135.9U Active CN218025103U (en) 2022-08-26 2022-08-26 Combined type universal lifting platform for tower body

Country Status (1)

Country Link
CN (1) CN218025103U (en)

Similar Documents

Publication Publication Date Title
CN210528234U (en) Device for hoisting tower of wind generating set
CN218025103U (en) Combined type universal lifting platform for tower body
CN211772852U (en) Main tower cross brace structure system capable of bearing three-way load
CN202252699U (en) Elevating rotary installation frame
CN209145256U (en) The dedicated climbing frame of assembled architecture
CN103213910B (en) Hoisting frame for attachment of inner climbing type tower crane
CN203112379U (en) Quick-mounting tower cap climbing ladder of tower crane
CN215407505U (en) Large-scale round pin axle thrustor
CN115215229A (en) Universal lifting platform for combined tower body
CN104847108A (en) Hydraulic climbing formwork structure and construction method of hydraulic climbing formwork structure
CN210238296U (en) Large tower crane wall-attached space steel truss foundation
CN208345571U (en) Engine rooms of wind power generators suspender
CN209556401U (en) A kind of super high-rise building super large curtain wall unit hydraulic synchronizing lifting system
CN218958457U (en) Tubular busbar hoisting bracket special for wind power stepped concrete tower
CN106522207A (en) Reinforcement cage bracket and reinforcement cage mounting device
CN214786424U (en) Outer protection bearing structure for construction of conical top of squat silo
CN108502700A (en) Engine rooms of wind power generators suspender
CN112160608A (en) Lifting and mounting method for high-altitude full-transparent steel ring gallery
CN215443190U (en) Convenient installation system of large-scale round pin axle
CN220618219U (en) Overhauling hanging bracket for high-speed brake of wind turbine generator
CN206397107U (en) Armored concrete construction of lift well operating platform bracket
CN210001414U (en) high-altitude hoisting wall-riding equipment
CN210948669U (en) Combined installation platform for quickly installing ultra-deep vertical shaft equipment
CN215164752U (en) A hang basket that is arranged in bridge construction staple bolt system to ann to tear open
CN218117150U (en) Outer hanging construction operation platform that dismantles

Legal Events