CN210948669U - Combined installation platform for quickly installing ultra-deep vertical shaft equipment - Google Patents

Combined installation platform for quickly installing ultra-deep vertical shaft equipment Download PDF

Info

Publication number
CN210948669U
CN210948669U CN201921643588.7U CN201921643588U CN210948669U CN 210948669 U CN210948669 U CN 210948669U CN 201921643588 U CN201921643588 U CN 201921643588U CN 210948669 U CN210948669 U CN 210948669U
Authority
CN
China
Prior art keywords
frame
oblique
wide
long
roof beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921643588.7U
Other languages
Chinese (zh)
Inventor
周志
张传余
陈慧泉
张弛
唐燕林
丰宏宝
姜波
吴凤才
张奕
孙伟
宋伟
童健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongling Nonferrous Metals Group Tongguan Mine Construction Co ltd
Original Assignee
Tongling Nonferrous Metals Group Tongguan Mine Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongling Nonferrous Metals Group Tongguan Mine Construction Co ltd filed Critical Tongling Nonferrous Metals Group Tongguan Mine Construction Co ltd
Priority to CN201921643588.7U priority Critical patent/CN210948669U/en
Application granted granted Critical
Publication of CN210948669U publication Critical patent/CN210948669U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a quick installation of super dark vertical shaft pit shaft equipment is with combination mounting platform, including the frame, fixedly connected with a plurality of hangs board and limit stop on the frame, has hung and has seted up on the board and hang the hole, and the frame is equipped with the steady dish lead screw of a plurality of all around, the frame includes long frame, wide frame, oblique frame and frame roof beam, and long frame and wide frame all have two, and the oblique frame has four, and the both ends of oblique frame are even as an organic whole with long frame and wide frame respectively, and the frame roof beam is located the within range of long frame, wide frame and oblique frame framing, hangs board and limit stop setting on the frame roof beam, and steady dish lead screw setting is on the oblique frame. After the structure is adopted, the steel member can be conveniently positioned, the stability during transportation is ensured, and the assembled steel member can be conveyed to the installation position by one-time transportation. The calibration time is concentrated on the calibration installation platform, and each steel member does not need to be calibrated during installation, so that the calibration precision and the working efficiency are improved.

Description

Combined installation platform for quickly installing ultra-deep vertical shaft equipment
Technical Field
The utility model relates to an ultra-deep vertical shaft equipment is installed fast and is used composite erection platform.
Background
The mine shaft is classified more, and can be divided into according to the difference of use function: the main shaft, the auxiliary shaft, the air inlet shaft and the air outlet shaft are arranged in different shafts due to different functions. In order to perform the function of lifting materials and personnel, steel members such as cage guide beams, fences, ladder room beams, brackets and the like are generally arranged in the shaft of the auxiliary shaft, and in addition, a pipe cable is required to be arranged. In the installation process of the shaft equipment, a hanging scaffold needs to be used, and a construction unit can correspondingly design the hanging scaffold according to the arrangement of the shaft equipment. During the installation, the platform sling is transferred to the mounted position, and rock drill chisel hole installation stock, mounting bracket after the stock installation, then the hoist engine is down the steel member in proper order, and the staff is according to the measurement winch of arranging from the earth's surface well head and puts the positional deviation of establishing the relative pit shaft central line of each steel member of measurement steel wire calibration, consequently need put and establish many measurement steel wires. After the heavy weight is hung on the measuring steel wire, the heavy weight can be caused to rock due to natural wind and touch in the installation and calibration process, a large amount of time is needed for workers to spend on the stable weight, the whole calibration efficiency is not high, the operation strength is very high, the steel member is sequentially and independently transferred, and the winch needs to move for many times.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that the steel member needs to be transported many times and each steel member needs to be calibrated when the existing installation operation is carried out.
The utility model adopts the technical proposal that: the utility model provides an ultra-deep vertical shaft equips quick installation with combination mounting platform, includes the frame, fixedly connected with a plurality of hangs board and limit stop on the frame, has seted up on hanging the board and has hung the hole, and the frame is equipped with the steady dish lead screw of a plurality of all around.
As a further improvement, the frame includes long frame, wide frame, oblique frame and frame roof beam, and long frame and wide frame all have two, and the oblique frame has four, and the both ends of oblique frame are even as an organic whole with long frame and wide frame respectively, and the frame roof beam is located the within range that long frame, wide frame and oblique frame framed, hangs board and limit stop setting on the frame roof beam, and steady dish screw rod sets up on the oblique frame.
The utility model has the advantages that: after the structure is adopted, the steel member can be conveniently positioned, the stability during transportation is ensured, and the assembled steel member can be conveyed to the installation position by one-time transportation. The calibration time is concentrated on the calibration installation platform, and each steel member does not need to be calibrated during installation, so that the calibration precision and the working efficiency are improved.
Drawings
Fig. 1 is a view of a mounting platform in cooperation with a conventional triple-layer platform.
Fig. 2 is a side view of fig. 1.
Fig. 3 is an enlarged view of the mounting platform of fig. 1 (stabilizer bar not shown).
Fig. 4 is an enlarged top view of the mounting platform of fig. 2.
Fig. 5 is a schematic illustration of the installation platform as it is being constructed within a wellbore.
As shown in the figure. The device comprises a frame 1, a suspension plate 2, a limit stop 3, a disc stabilizing screw rod 4, a long frame 5, a wide frame 6, an inclined frame 7, a frame beam 8, an upper disc 9, a middle disc 10 and a mounting plate 11.
Detailed Description
The technical solution of the present invention will be clearly and completely described below with reference to the accompanying drawings and embodiments.
Example 1: the utility model provides an ultra-deep vertical shaft equips quick installation with combination mounting platform, includes frame 1, and fixedly connected with a plurality of hangs board 2 and limit stop 3 on the frame, has seted up on hanging the board and has hung the hole, and the frame is equipped with all around and has the steady dish screw 4 of a plurality of.
Example 2 differs from example 1 in that: as a further improvement, the frame includes long frame 5, wide frame 6, oblique frame 7 and frame roof beam 8, and long frame and wide frame all have two, and the oblique frame has four, and the both ends of oblique frame are even as an organic whole with long frame and wide frame respectively, and the frame roof beam is located the within range of long frame, wide frame and oblique frame framing, hangs board and limit stop setting on the frame roof beam, and steady dish silk pole setting is on the oblique frame.
When the three-layer hanging scaffold is used, the upper layer disc 9 of the three-layer hanging scaffold in the prior art is used as a lifting disc, 4 sets of 3T chain blocks or electric block suspension mounting platforms are arranged at the suspension points of the upper layer disc blocks, and the mounting platforms are located between the upper layer disc and the middle layer disc 10 of the three-layer hanging scaffold. The mounting platform can specifically comprise a long frame, a wide frame, an inclined frame and a frame cross beam which are connected into a whole, wherein the mounting platform is provided with disc stabilizing screw rods, and preferably, the inclined frames at the four corners of the mounting platform frame are provided with the disc stabilizing screw rods. The frame cross beam is provided with multiple modes, for example, two frame cross beams are arranged and are respectively positioned on two sides of a central line of the length direction of the mounting platform, for example, a plurality of cross beam frames are arranged and are used for mounting a plurality of limit stops respectively, the two frame cross beams are arranged and are respectively positioned on two sides of the central line of the length direction of the mounting platform, the mounting plates can be arranged between the frame cross beams and the frame cross beams, the limit stops are arranged on the mounting plates 11, and the mounting plates are not arranged on the central part of the platform for reducing the weight. After the installation platform is positioned and calibrated, the stable disc screw rod is fixed with the top of the well wall, the position design of the steel member under the shaft is positioned at the position of the limiting stop block on the installation platform, so that when the steel member is installed in the shaft, the position requirement of the steel member relative to the cross line of the shaft can be ensured by installing the steel member according to the position of the limiting stop block, and the time for calibrating the steel member in the shaft is saved.
It should be known to those skilled in the art that the protection scheme of the present invention is not limited to the above-mentioned embodiments, and various permutations, combinations and transformations can be performed on the basis of the above-mentioned embodiments, without violating the spirit of the present invention, all the transformations performed by the present invention fall within the protection scope of the present invention.

Claims (2)

1. The utility model provides an ultra-deep vertical shaft pit shaft equips quick installation with combination mounting platform which characterized in that: the hanging plate comprises a frame, wherein a plurality of hanging plates and limit stop blocks are fixedly connected to the frame, hanging holes are formed in the hanging plates, and a plurality of stable disc screw rods are arranged on the periphery of the frame.
2. The combination mounting platform for the rapid installation of ultra-deep vertical shaft equipment according to claim 1, wherein: the frame includes long frame, wide frame, oblique frame and frame roof beam, and long frame and wide frame all have two, and the oblique frame has four, and the both ends of oblique frame are even as an organic whole with long frame and wide frame respectively, and the frame roof beam is located the scope of long frame, wide frame and oblique frame framing, and hang board and limit stop setting are on the frame roof beam, and steady dish silk pole setting is on the oblique frame.
CN201921643588.7U 2019-09-29 2019-09-29 Combined installation platform for quickly installing ultra-deep vertical shaft equipment Active CN210948669U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921643588.7U CN210948669U (en) 2019-09-29 2019-09-29 Combined installation platform for quickly installing ultra-deep vertical shaft equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921643588.7U CN210948669U (en) 2019-09-29 2019-09-29 Combined installation platform for quickly installing ultra-deep vertical shaft equipment

Publications (1)

Publication Number Publication Date
CN210948669U true CN210948669U (en) 2020-07-07

Family

ID=71372130

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921643588.7U Active CN210948669U (en) 2019-09-29 2019-09-29 Combined installation platform for quickly installing ultra-deep vertical shaft equipment

Country Status (1)

Country Link
CN (1) CN210948669U (en)

Similar Documents

Publication Publication Date Title
CN109440985A (en) Super high-rise building super large curtain wall unit hydraulic synchronizing lifting system and its construction method
CN214740171U (en) Ancient building wall body hoist and mount migration device
CN107013013B (en) Steel structure elevator shaft standard knot hoisting tool and process
CN204001789U (en) Steel work constructing device
CN201793330U (en) Gantry hanger frame device
CN210948669U (en) Combined installation platform for quickly installing ultra-deep vertical shaft equipment
CN211689948U (en) Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge
CN210884873U (en) Installation hanging beam and lifting device of pipeline
CN210064895U (en) Installation hoist of prefabricated unit in space
CN104030176B (en) The equalizer bar of hoisting platform truss and hanging method thereof
CN203959697U (en) The equalizing bar of hoisting platform truss
CN105152052A (en) Glass curtain wall component lifting device and glass curtain wall component installing method
CN103743581A (en) Internal-climbing tower crane test platform apparatus and test method
CN209556401U (en) A kind of super high-rise building super large curtain wall unit hydraulic synchronizing lifting system
CN107700854B (en) Steel plate wall sliding installation device and installation method for super high-rise core tube
CN210238296U (en) Large tower crane wall-attached space steel truss foundation
CN103058083B (en) Bolt sphere truss gig
CN216110020U (en) Small-diameter super-high-rise annular steel structure construction mechanism
CN216238545U (en) Upper and lower channel for pipeline foundation pit
CN221074110U (en) Drilling tower
CN220908406U (en) Top bracket for reinforcement cage construction and construction equipment thereof
CN219217251U (en) Novel six-point hoisting sling
CN111979916B (en) Cable-stayed bridge tower part suspension construction method and suspension operation platform device
CN220036560U (en) Suspension type cage ladder
CN205077876U (en) Machine and stressing jack linkage are worn to restraint by prestress wire

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant