CN217996479U CN202222177163.XU CN202222177163U CN217996479U CN 217996479 U CN217996479 U CN 217996479U CN 202222177163 U CN202222177163 U CN 202222177163U CN 217996479 U CN217996479 U CN 217996479U
Authority
CN
China
Prior art keywords
fixed frame
fixed
fixedly connected
equipment
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222177163.XU
Other languages
Chinese (zh)
Inventor
张志勇
周东阳
吴钟毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Second Metallurgy Group Co Ltd
Original Assignee
China Second Metallurgy Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Second Metallurgy Group Co Ltd filed Critical China Second Metallurgy Group Co Ltd
Priority to CN202222177163.XU priority Critical patent/CN217996479U/en
Application granted granted Critical
Publication of CN217996479U publication Critical patent/CN217996479U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a mechanism that construction site realized quick hoist and mount of equipment, including fixed frame, the top both sides fixedly connected with lug of fixed frame, the equidistant fixedly connected with solid fixed ring in bottom of fixed frame, the inside of fixed frame is provided with adjusting device, adjusting device's both ends fixedly connected with link, the tip fixedly connected with holding frame of link, the utility model relates to a construction technical field. This mechanism of quick hoist and mount of equipment is realized to job site, the top that has reached fixed frame sets up the lug, the tower crane of being convenient for lifts by crane, the bottom of fixed frame sets up a plurality of solid fixed rings, be used for the about band of winding, it is fixed to utilize about band to tie up the building materials, make things convenient for the staff to lift by crane the building materials, set up adjusting device, the staff of being convenient for adjusts the position of holding frame, it is fixed to be convenient for carry out the centre gripping to the building materials after tying up, building materials fixed stability is improved, the staff of being convenient for hoists, satisfy user demand's purpose.

Description

Mechanism for realizing quick hoisting of equipment on construction site
Technical Field
The utility model relates to a construction field, more specifically say, relate to a mechanism that construction site realized quick hoist and mount of equipment.
Background
In a construction site, batch of building materials are often placed on an underground first floor, and during the construction period of a building, workers are required to use a tower crane to lift the building materials to a high place. In order to improve the hoisting stability of the building materials, workers need to fix the building materials by using a hoisting mechanism, and then hoist the building materials. At present, current building materials hoisting machine constructs, and the structure is single, and the staff of being not convenient for ties up the building materials fast fixedly, and is not convenient for further carry out the centre gripping to the building materials fixedly, and then influences building materials hoist and mount stability, can't satisfy the user demand.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
To current building materials hoisting machine who exists among the prior art constructs, single structure, it is fixed to be not convenient for the staff to tie up the building materials fast, and be not convenient for further carry out the centre gripping to the building materials fixed, and then influence building materials hoist and mount stability, can't satisfy user demand's problem, the utility model aims to provide a mechanism that construction site realized equipment hoisted fast, it can realize that the top of fixed frame sets up the lug, the tower crane of being convenient for lifts by crane, the bottom of fixed frame sets up a plurality of solid fixed rings, be used for twining the restraint band, it is fixed to tie up the building materials with the restraint band, make things convenient for the staff to lift by crane the building materials, set up adjusting device, the staff of being convenient for adjusts the position of holding frame, it is fixed to be convenient for carry out the centre gripping to the building materials after tying up, improve building materials fixed stability, the staff of being convenient for hoists, improve work efficiency, satisfy the user demand.
2. Technical scheme
In order to solve the above problems, the utility model adopts the following technical proposal.
The utility model provides a mechanism that construction site realized quick hoist and mount of equipment, includes fixed frame, the top both sides fixedly connected with lug of fixed frame, the equidistant fixedly connected with solid fixed ring in bottom of fixed frame, the inside of fixed frame is provided with adjusting device, adjusting device's both ends fixedly connected with link, the tip fixedly connected with holding frame of link.
Preferably, the adjusting device includes a motor, a main gear, a pinion, a rotating lead screw, a support block, a moving block and a moving rod, the motor is fixedly connected to the inner wall of the fixing frame, the output shaft of the motor is fixedly connected to the main gear, the main gear is in meshing transmission with the pinion, the axis of the pinion is fixedly connected to the rotating lead screw, the rotating lead screw is rotatably connected to the inner wall of the fixing frame, the support block is fixedly connected to the inner wall of the fixing frame, the rotating lead screw is rotatably connected to the support block, the thread directions of the two sides of the rotating lead screw are opposite, the moving block is in threaded connection with the rotating lead screw, the side wall of the moving block is fixedly connected to the moving rod, the moving rod is slidably connected to the fixing frame, and one end of the moving rod, which is located outside the fixing frame, is fixedly connected to the connecting frame.
Preferably, the clamping frame is arc-shaped.
Preferably, the inner wall of the groove of the clamping frame is fixedly connected with a rubber pad.
Preferably, the material of the clamping frame is stainless steel.
Preferably, the number of the fixing rings is five, and the fixing rings are used for installing the restraint strap.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages of:
1. the lifting lug is arranged at the top of the fixing frame, the tower crane is convenient to lift, the fixing frame is provided with a plurality of fixing rings at the bottom for winding the restraint strap, the restraint strap is utilized to bundle and fix the building materials, and the building materials are convenient to lift by workers.
2. Through setting up adjusting device, the staff of being convenient for adjusts the position of holding frame, is convenient for carry out the centre gripping to the building materials after tying up fixedly, improves building materials stability, and the staff of being convenient for hoists, improves work efficiency.
Drawings
Fig. 1 is a schematic view of the overall external structure of the present invention;
FIG. 2 is a schematic view of the overall internal structure of the present invention;
fig. 3 is a schematic structural diagram of the adjusting device of the present invention.
The numbering in the figures illustrates:
1. a fixing frame; 2. lifting lugs; 3. a fixing ring; 4. an adjustment device; 41. a motor; 42. a main gear; 43. a pinion gear; 44. rotating the screw rod; 45. a support block; 46. a motion block; 47. a motion bar; 5. a connecting frame; 6. a clamping frame; 7. and (7) a rubber pad.
Detailed Description
The drawings in the embodiments of the present invention will be combined; the technical scheme in the embodiment of the utility model is clearly and completely described; obviously; the described embodiments are only some of the embodiments of the present invention; rather than all embodiments. Based on the embodiment of the utility model; all other embodiments obtained by a person of ordinary skill in the art without making any creative effort; all belong to the protection scope of the utility model.
Example 1:
referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a mechanism that construction site realized quick hoist and mount of equipment, includes fixed frame 1, the top both sides fixedly connected with lug 2 of fixed frame 1, the equidistant fixedly connected with solid fixed ring 3 in bottom of fixed frame 1, and the inside of fixed frame 1 is provided with adjusting device 4, and adjusting device 4's both ends fixedly connected with link 5, the tip fixedly connected with holding frame 6 of link 5. The top of fixed frame 1 sets up lug 2, and the tower crane of being convenient for lifts by crane, and the bottom of fixed frame 1 sets up a plurality of solid fixed rings 3 for the about band of winding utilizes the about band to tie up the building materials fixedly, makes things convenient for the staff to lift by crane the building materials.
The working principle is as follows: utilize tower crane and lug 2 to fix, can lift by crane the whole, the bottom of fixed frame 1 sets up solid fixed ring 3, it is fixed with solid fixed ring 3 to utilize the restraint band to twine building materials, make the building materials fixed back, the tower crane lifts by crane lug 2, can lift by crane fixed frame 1, and then lift by crane the building materials, set up holding frame 6, utilize adjusting device 4 to drive the motion of holding frame 6, be convenient for carry out the centre gripping to the building materials after tying up fixed, improve building materials stationary stability.
Example 2:
referring to fig. 1-3, a mechanism for realizing rapid hoisting of equipment in a construction site is substantially the same as that in embodiment 1, and further, the adjusting device 4 includes a motor 41, a main gear 42, a pinion 43, a rotary screw 44, a support block 45, a movable block 46 and a movable rod 47, the motor 41 is fixedly connected with the inner wall of the fixed frame 1, an output shaft of the motor 41 is fixedly connected with the main gear 42, the main gear 42 is in meshing transmission with the pinion 43, and the axis of the pinion 43 is fixedly connected with the rotary screw 44;
wherein, rotate the lead screw 44 and be connected with the inner wall of fixed frame 1 rotation, the inner wall fixedly connected with supporting shoe 45 of fixed frame 1, rotate lead screw 44 and be connected with supporting shoe 45 rotation, the both sides screw thread opposite direction of rotating lead screw 44, motion piece 46 and rotation lead screw 44 threaded connection, the lateral wall and the motion pole 47 fixed connection of motion piece 46, motion pole 47 and fixed frame 1 sliding connection, the one end and the link 5 fixed connection that motion pole 47 is located fixed frame 1 outside. Set up adjusting device 4, the staff of being convenient for adjusts the position of holding frame 6, is convenient for carry out the centre gripping to the building materials after tying up fixedly, improves building materials stability, and the staff of being convenient for hoists, improves work efficiency.
The further operation method comprises the following steps: utilize the restraint band earlier to fix the building materials, then utilize the holding frame 6 to carry out the centre gripping to the building materials fixed, motor 41 work drives master gear 42 and rotates, drives pinion 43 and rotates, drives and rotates lead screw 44 and rotates, drives motion piece 46 simultaneously and moves in opposite directions, drives motion pole 47 and moves, drives link 5 and moves, drives the motion of holding frame 6, and then right, be convenient for carry out the centre gripping to the building materials after tying up fixedly, improve building materials fixed stability, the staff of being convenient for hoists, improve work efficiency.
The holding frame 6 is arc-shaped. The clamping frame 6 is arc-shaped, so that the building materials can be clamped conveniently, and the fixing stability is improved.
The inner wall of the groove of the clamping frame 6 is fixedly connected with a rubber pad 7. And a rubber pad 7 is arranged to improve the protection of building materials.
The material of the clamping frame 6 is stainless steel. The stainless steel is adopted to make, and the integral strength is improved.
The number of the fixing rings 3 is five, and the fixing rings 3 are used for installing the restraint strap.
The working principle is as follows: utilize the restraint band earlier to fix the building materials, then utilize the holding frame 6 to carry out the centre gripping to the building materials fixed, motor 41 work drives master gear 42 and rotates, drives pinion 43 and rotates, drives and rotates lead screw 44 and rotates, drives motion piece 46 simultaneously and moves in opposite directions, drives motion pole 47 and moves, drives link 5 and moves, drives the motion of holding frame 6, and then right, be convenient for carry out the centre gripping to the building materials after tying up fixedly, improve building materials fixed stability, the staff of being convenient for hoists, improve work efficiency.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a mechanism that construction site realized quick hoist and mount of equipment, includes fixed frame (1), its characterized in that: the fixed frame is characterized in that lifting lugs (2) are fixedly connected to two sides of the top of the fixed frame (1), fixing rings (3) are fixedly connected to the bottom of the fixed frame (1) at equal intervals, an adjusting device (4) is arranged inside the fixed frame (1), connecting frames (5) are fixedly connected to two ends of the adjusting device (4), and clamping frames (6) are fixedly connected to the end portions of the connecting frames (5).
2. The mechanism for realizing rapid hoisting of equipment on a construction site according to claim 1, characterized in that: adjusting device (4) include motor (41), main gear (42), pinion (43), rotate lead screw (44), supporting shoe (45), motion piece (46) and motion pole (47), the inner wall fixed connection of motor (41) and fixed frame (1), the output shaft and main gear (42) fixed connection of motor (41), main gear (42) and pinion (43) meshing transmission, the axle center department fixed connection of pinion (43) rotates lead screw (44), it is connected with the inner wall rotation of fixed frame (1) to rotate lead screw (44), the inner wall fixed connection of fixed frame (1) has supporting shoe (45), it is connected with supporting shoe (45) to rotate lead screw (44), the both sides screw thread opposite of rotation lead screw (44), motion piece (46) and rotation lead screw (44) threaded connection, the lateral wall and the motion pole (47) fixed connection of motion piece (46), motion pole (47) and fixed frame (1) sliding connection, motion pole (47) are located the fixed frame (5) that the outside of fixed frame (1).
3. The mechanism for realizing rapid hoisting of equipment on a construction site according to claim 1, characterized in that: the clamping frame (6) is arc-shaped.
4. The mechanism for realizing rapid hoisting of equipment on a construction site according to claim 1, characterized in that: the inner wall of the groove of the clamping frame (6) is fixedly connected with a rubber pad (7).
5. The mechanism for realizing rapid hoisting of equipment on a construction site according to claim 1, characterized in that: the clamping frame (6) is made of stainless steel.
6. The mechanism for realizing rapid hoisting of equipment on a construction site according to claim 1, characterized in that: the number of the fixing rings (3) is five, and the fixing rings (3) are used for mounting restraint belts.
CN202222177163.XU 2022-08-18 2022-08-18 Mechanism for realizing quick hoisting of equipment on construction site Active CN217996479U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222177163.XU CN217996479U (en) 2022-08-18 2022-08-18 Mechanism for realizing quick hoisting of equipment on construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222177163.XU CN217996479U (en) 2022-08-18 2022-08-18 Mechanism for realizing quick hoisting of equipment on construction site

Publications (1)

Publication Number Publication Date
CN217996479U true CN217996479U (en) 2022-12-09

Family

ID=84320409

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222177163.XU Active CN217996479U (en) 2022-08-18 2022-08-18 Mechanism for realizing quick hoisting of equipment on construction site

Country Status (1)

Country Link
CN (1) CN217996479U (en)

Similar Documents

Publication Publication Date Title
CN111977550A (en) Concrete plate lifting device for building tower crane
CN217996479U (en) Mechanism for realizing quick hoisting of equipment on construction site
CN213387490U (en) Anti-swing device for crane lifting appliance
CN213171204U (en) Construction equipment hoisting device
CN109346996B (en) Electric power construction line tightening device and method
CN209797313U (en) Electromechanical hoist and mount auxiliary device of building
CN215402552U (en) Collapsible compensating beam support
CN210827143U (en) Bridge turning system based on double power mechanisms
CN212315367U (en) Simple and easy electric block of exempting from installation
CN210127042U (en) Transformer substation equipment lifting device
CN211644413U (en) Single-rope winding type elevator
CN213231214U (en) Crane convenient to fixed material
RU201737U1 (en) Equipment for the mechanized production of circular rope slings "grommetov"
CN220149071U (en) Building material lifting device
CN215828218U (en) Simple hoisting device for installation of steel structure bridge
CN116177417B (en) Generator stator bar hoisting device
CN220432093U (en) Balanced electric hoist
CN218708614U (en) Stacking crane for anode carbon block with rotatable fixture
CN214326899U (en) Hoisting equipment for prefabricated components of fabricated building
CN220723327U (en) Construction hoist ware
CN212198281U (en) Construction steel bar lifting device
CN217478950U (en) Arch hoist device of bank protection construction platform
CN211998592U (en) Reel device for hoisting equipment
CN215287799U (en) Dewatering well water pump hoisting device
CN217317904U (en) Maintenance frame for asynchronous motor

Legal Events

Date Code Title Description
GR01 Patent grant