CN220723327U - Construction hoist ware - Google Patents

Construction hoist ware Download PDF

Info

Publication number
CN220723327U
CN220723327U CN202322198417.0U CN202322198417U CN220723327U CN 220723327 U CN220723327 U CN 220723327U CN 202322198417 U CN202322198417 U CN 202322198417U CN 220723327 U CN220723327 U CN 220723327U
Authority
CN
China
Prior art keywords
fixed
plate
clamping plate
movable
construction hoist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322198417.0U
Other languages
Chinese (zh)
Inventor
胡士海
刘立圣
时兆新
张锦恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shengpu Construction Engineering Co ltd
Original Assignee
Beijing Shengpu Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shengpu Construction Engineering Co ltd filed Critical Beijing Shengpu Construction Engineering Co ltd
Priority to CN202322198417.0U priority Critical patent/CN220723327U/en
Application granted granted Critical
Publication of CN220723327U publication Critical patent/CN220723327U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model belongs to the technical field of hoisting devices, in particular to a construction hoisting device, which comprises a U-shaped plate, two U-shaped plates are distributed in parallel, the tops of the two U-shaped plates are respectively fixed with a fixed plate, the tops of the fixed plates are fixedly provided with a plurality of uniformly distributed supporting frames, the construction hoisting device also comprises a fixed clamping plate and a movable clamping plate, the plurality of fixed clamping plates are uniformly distributed and fixed on the tops of the fixed plates and are positioned below the supporting frames, and the plurality of movable clamping plates are movably arranged on the supporting frames; according to the building construction hoisting device, the plurality of steel pipes can be fixed at one time through the arrangement of the fixed clamping plates and the movable clamping plates, so that the hoisting machine can hoist the plurality of steel pipes at one time, the stability of the device is higher than that of the hoisting in the prior art, the X-shaped plate which is convenient to adjust according to the length of the steel pipes is arranged in the device, the applicability of the hoisting device is improved, and the use is convenient.

Description

Construction hoist ware
Technical Field
The utility model belongs to the technical field of hoisting devices, and particularly relates to a building construction hoisting device.
Background
Hoisting refers to the collective term that a crane or a lifting mechanism is used for installing and positioning equipment, and various hoisting machines are utilized to hoist materials in the building construction process;
the utility model provides a construction hoist has multiple in prior art, through retrieving, "a construction hoist is disclosed to chinese patent application number CN202320870167.8 for example," in this scheme, "including construction hoist board, construction hoist board's front end fixedly connected with motor, the output fixedly connected with rotatory worm of motor, rotatory worm runs through construction hoist board and rotates with it to be connected, rotatory worm meshing has two worm wheels, every all run through on the worm wheel and be equipped with rather than fixed connection's first threaded rod, every first threaded rod all rotates with construction hoist board to be connected, every first threaded rod all fixedly connected with second threaded rod, every second threaded rod all rotates with construction hoist board to be connected, every first threaded rod all overlaps with the outer wall of second threaded rod and is equipped with rather than threaded connection's movable plate. According to the utility model, the two clamping blocks are arranged to clamp and fix the building construction pipeline; the self-locking property of the worm gear is arranged, so that the clamping stability of the building construction pipeline can be ensured;
the technical scheme solves the problem that when the pipeline in the building construction process is hoisted, the round pipe is generally bundled by the rope and then hoisted, but the bundled round pipe is easy to shake in the hoisting process of the building construction pipeline, so that the falling possibility is caused, and the hoisting device has certain practicability; in the building engineering, when building a house building, a steel pipe frame needs to be built, and along with the lifting of the building height, a tower crane is required to be used for lifting a steel pipe to a high position, but the scheme can lift one steel pipe at a time, otherwise, the steel pipe is unstable, and the lifting of the tower crane is generally slower for ensuring the safety, so that the steel pipe cannot be supplied to workers for building, and needs to be improved;
therefore, the utility model provides a construction hoisting device for solving the defects.
Disclosure of Invention
In order to solve the problems in the prior art, the utility model provides a construction hoisting device, which has the characteristics of convenience in hoisting a plurality of steel pipes and high stability.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a construction hoist, includes the U template, two U template parallel distribution, two the top of U template all is fixed with the fixed plate, the top of fixed plate is fixed with a plurality of evenly distributed's support frame, still includes fixed splint and movable splint, a plurality of fixed splint evenly distributed fixes at the top of fixed plate and is located the below of support frame, a plurality of the equal movable mounting of movable splint is on the support frame.
As a preferable technical scheme of the utility model, the fixed clamping plate and the movable clamping plate are arc-shaped clamping members with opposite arc openings, and the movable clamping plate can be movably covered at the top end of the fixed clamping plate.
As a preferable technical scheme of the utility model, an X-shaped plate is hinged between the two U-shaped plates, a rotating shaft is arranged in the middle of the X-shaped plate, and sliding friction force is arranged between the X-shaped plate and the rotating shaft to form a damping state.
As a preferable technical scheme of the utility model, the top head end and the tail end of the fixing plate are respectively fixed with a hanging ring.
As a preferable technical scheme of the utility model, the middle part of the support frame is rotatably connected with a threaded rod, the movable clamping plate is rotatably arranged at the bottom of the threaded rod through a rotating sleeve, and the top of the threaded rod is fixedly provided with a knob.
As a preferable technical scheme of the utility model, a plurality of anti-slip strips are uniformly distributed on the inner wall of the arc opening of the fixed clamping plate.
Compared with the prior art, the utility model has the beneficial effects that: according to the building construction hoisting device, the plurality of steel pipes can be fixed at one time through the arrangement of the fixed clamping plates and the movable clamping plates, so that the hoisting machine can hoist the plurality of steel pipes at one time, the stability of the device is higher than that of the hoisting in the prior art, the X-shaped plate which is convenient to adjust according to the length of the steel pipes is arranged in the device, the applicability of the hoisting device is improved, and the use is convenient.
Drawings
The accompanying drawings are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate the utility model and together with the embodiments of the utility model, serve to explain the utility model. In the drawings:
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic side view of the present utility model;
FIG. 3 is a schematic diagram of an axial structure according to the present utility model;
in the figure: 1. a U-shaped plate; 2. a fixing plate; 3. an X-shaped plate; 4. a rotating shaft; 5. a support frame; 6. a fixed clamping plate; 7. a movable clamping plate; 8. a hanging ring; 9. a threaded rod; 10. a rotating sleeve; 11. a knob; 12. an anti-slip strip.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-3, the present utility model provides the following technical solutions: the construction hoisting device comprises U-shaped plates 1, wherein the two U-shaped plates 1 are distributed in parallel, the top parts of the two U-shaped plates 1 are respectively fixed with a fixed plate 2, the top parts of the fixed plates 2 are fixedly provided with a plurality of uniformly distributed supporting frames 5, the construction hoisting device also comprises fixed clamping plates 6 and movable clamping plates 7, the plurality of fixed clamping plates 6 are uniformly distributed and fixed at the top parts of the fixed plates 2 and are positioned below the supporting frames 5, and the plurality of movable clamping plates 7 are movably mounted on the supporting frames 5; the fixed clamping plate 6 and the movable clamping plate 7 are arc clamping members with opposite arc openings, and the movable clamping plate 7 can be movably covered at the top end of the fixed clamping plate 6; the middle part of the support frame 5 is rotatably connected with a threaded rod 9, the movable clamping plate 7 is rotatably arranged at the bottom of the threaded rod 9 through a rotating sleeve 10, and a knob 11 is fixed at the top of the threaded rod 9; the head end and the tail end of the top of the fixed plate 2 are respectively fixed with a hanging ring 8; during hoisting, the movable clamping plate 7 can be far away from the fixed clamping plate 6 by screwing the knob 11 anticlockwise, then a steel pipe passes through between the movable clamping plate 7 and the fixed clamping plate 6 and moves to between the movable clamping plate 7 and the fixed clamping plate 6 corresponding to the other group of levels, then the movable clamping plate 7 can be fixed by screwing the knob 11 clockwise so as to clamp the steel pipe, then a steel wire rope can be used to pass through the four hanging rings 8, the middle part of the steel wire rope is hung on a hanging hook of the tower crane, the hoisting can be performed, the use is convenient, and the stability is higher.
Specifically, as can be seen from fig. 1 and 3, in the present embodiment, an X-shaped plate 3 is hinged between two U-shaped plates 1, a rotating shaft 4 is provided at the middle of the X-shaped plate 3, and sliding friction force is provided between the X-shaped plate 3 and the rotating shaft 4 to form a damping state; the X-shaped plate 3 can enable the distance between the two U-shaped plates 1 to be changed, the device is convenient to adjust according to steel pipes with different lengths, so that the stability of steel pipe installation and hoisting is improved, sliding damping is arranged between the X-shaped plate 3 and the rotating shaft 4, stability is arranged between the X-shaped plate 3 and the rotating shaft 4, and the device is convenient to rotate and stable and is beneficial to use.
Specifically, as can be seen from fig. 1 and 3, in this embodiment, a plurality of anti-slip strips 12 are uniformly distributed on the inner wall of the arc opening of the fixing splint 6; the anti-slip strips 12 can increase the friction coefficient, thereby improving the stability of the steel pipe installation.
It should be noted that: the parts not described in detail in this embodiment are all existing structural parts in the related art, are well known to those skilled in the related art, and the specific parts or slots in this embodiment are commercially available or custom-made.
The working principle and the using flow of the utility model are as follows: according to the construction hoisting device, when the lifting device is used for hoisting, the movable clamping plate 7 can be far away from the fixed clamping plate 6 by screwing the knob 11 anticlockwise, then a steel pipe passes through and moves between the movable clamping plate 7 and the fixed clamping plate 6 corresponding to the other group of horizontal movable clamping plate 7 and the fixed clamping plate 6, then the movable clamping plate 7 can be fixed by screwing the knob 11 clockwise to clamp the steel pipe, then a steel wire rope can pass through the four lifting rings 8, the middle part of the steel wire rope is hung on the lifting hook of the tower crane for hoisting, and the lifting device is convenient to use and high in stability.
Finally, it should be noted that: the foregoing description is only a preferred embodiment of the present utility model, and the present utility model is not limited thereto, but it is to be understood that modifications and equivalents of some of the technical features described in the foregoing embodiments may be made by those skilled in the art, although the present utility model has been described in detail with reference to the foregoing embodiments. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.

Claims (6)

1. The utility model provides a construction hoist, includes U template (1), its characterized in that: two U template (1) parallel distribution, two the top of U template (1) all is fixed with fixed plate (2), the top of fixed plate (2) is fixed with a plurality of evenly distributed's support frame (5), still includes fixed splint (6) and movable splint (7), a plurality of fixed splint (6) evenly distributed fix at the top of fixed plate (2) and lie in the below of support frame (5), a plurality of movable splint (7) are equal movable mounting on support frame (5).
2. A construction hoist according to claim 1, characterized in that: the fixed clamping plate (6) and the movable clamping plate (7) are arc clamping members with opposite arc openings, and the movable clamping plate (7) can be movably covered at the top end of the fixed clamping plate (6).
3. A construction hoist according to claim 1, characterized in that: an X-shaped plate (3) is hinged between the two U-shaped plates (1), a rotating shaft (4) is arranged in the middle of the X-shaped plate (3), and sliding friction force is arranged between the X-shaped plate (3) and the rotating shaft (4) to form a damping state.
4. A construction hoist according to claim 1, characterized in that: hanging rings (8) are fixed at the head end and the tail end of the top of the fixing plate (2).
5. A construction hoist according to claim 1, characterized in that: the middle part of support frame (5) connects soon to wear to be equipped with threaded rod (9), movable clamp plate (7) are installed in the bottom of threaded rod (9) through rotating cover (10) rotation, the top of threaded rod (9) is fixed with knob (11).
6. A construction hoist according to claim 1, characterized in that: a plurality of anti-slip strips (12) are uniformly distributed on the inner wall of the arc opening of the fixed clamping plate (6).
CN202322198417.0U 2023-08-16 2023-08-16 Construction hoist ware Active CN220723327U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322198417.0U CN220723327U (en) 2023-08-16 2023-08-16 Construction hoist ware

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322198417.0U CN220723327U (en) 2023-08-16 2023-08-16 Construction hoist ware

Publications (1)

Publication Number Publication Date
CN220723327U true CN220723327U (en) 2024-04-05

Family

ID=90526184

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322198417.0U Active CN220723327U (en) 2023-08-16 2023-08-16 Construction hoist ware

Country Status (1)

Country Link
CN (1) CN220723327U (en)

Similar Documents

Publication Publication Date Title
CN208441100U (en) A kind of hydraulic engineering pile body pile pulling device
CN110593583B (en) Curtain wall moves board support
CN110902579A (en) Hydraulic lifting device for construction
CN215371313U (en) Anti-seismic support and hanger structure
CN211444722U (en) Fixing device is used in construction of water conservancy water and electricity pipeline
CN220723327U (en) Construction hoist ware
CN211758250U (en) Stirrup processing device
CN209081325U (en) A kind of large fan installation and repairing hanging device
CN207673267U (en) A kind of safe climbing device of power construction
CN212669044U (en) A insulating ladder rack for workshop of power plant
CN207375669U (en) The electronic lifting bracket of cable tunnel inner column formula cable
CN219217259U (en) Hoisting lockset capable of preventing hoisted object from tilting
CN219751780U (en) Lifting device for installing pipeline in comprehensive pipe rack
CN215828149U (en) Hoisting structure of crawler crane
CN215160249U (en) Hoisting mechanism for transporting steel ingot mold
CN216825023U (en) Filter equipment is used in rice oil production
CN213569163U (en) Spacing protection hoisting accessory of aluminum alloy bolt ball rack
CN212151392U (en) Equipment hoisting machine constructs for building site
CN216829854U (en) Special suspension type placing device for cylindrical universal parts
CN219279261U (en) Assembled building hoisting accessory
CN216180034U (en) Auxiliary platform for mounting large electromechanical equipment
CN217808388U (en) Electric power accessory overhead hoist
CN210710360U (en) Crown block lifting hook anti-drop device
CN218345045U (en) Auxiliary mounting tool for aerated concrete slab
CN219885608U (en) Hoisting platform in elevator well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant