CN217975722U - Isolation fence for building engineering management - Google Patents

Isolation fence for building engineering management Download PDF

Info

Publication number
CN217975722U
CN217975722U CN202222054245.5U CN202222054245U CN217975722U CN 217975722 U CN217975722 U CN 217975722U CN 202222054245 U CN202222054245 U CN 202222054245U CN 217975722 U CN217975722 U CN 217975722U
Authority
CN
China
Prior art keywords
groove
building engineering
bracing pieces
engineering management
draw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222054245.5U
Other languages
Chinese (zh)
Inventor
穆凤麟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222054245.5U priority Critical patent/CN217975722U/en
Application granted granted Critical
Publication of CN217975722U publication Critical patent/CN217975722U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Catching Or Destruction (AREA)

Abstract

The utility model belongs to the technical field of the rail, especially, building engineering management is with keeping apart rail to the problem of current inconvenient transportation, the following scheme is proposed at present, and it includes two bases and two bracing pieces, rotates on two bracing pieces and installs same rail net, is provided with cardboard and card hole on two bracing pieces respectively, cardboard and card hole mutually support, all are provided with the card on two bases and solidify the mechanism, the card constructs including the flange, flange and bracing piece fixed connection, be provided with the draw-in groove on the base, be provided with the bayonet lock on the draw-in groove, the cover is equipped with the spring on the bayonet lock, be provided with the pinhole on the flange, bayonet lock and pinhole mutually support, be provided with the apron on the draw-in groove, all be provided with dust fall mechanism on two bracing pieces, the utility model discloses can accomodate, conveniently transport has the dust fall function, reduces the pollution to the air, and is simple to use, convenient operation.

Description

Isolation fence for building engineering management
Technical Field
The utility model relates to a rail technical field especially relates to a building engineering management is with keeping apart rail.
Background
Railing is generally used for separation and block crowd, the livestock and uses, in current society, railing's usage is more extensive, in the in-process of road maintenance and engineering building, railing is generally built temporarily to general needs, in order to keep apart pedestrian and vehicle, railing also plays the warning effect simultaneously, the bulletin number of authorizing is CN213927803U discloses a building engineering safety control keeps apart the rail, belong to building engineering equipment technical field, a building engineering safety control keeps apart the rail, including railing, the equal fixedly connected with bracing piece in both ends about railing, the lower extreme fixedly connected with fixture block of bracing piece, the bracing piece downside is equipped with the base, base upper end fixedly connected with fixed block, this easy to assemble, but because the rail can not accomodate, inconvenient transportation, and the function is single, we propose a building engineering management for this rail.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming of inconvenient transportation that exists among the prior art, and the isolation rail for building engineering management who provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a building engineering management is with keeping apart rail, includes two bases and two bracing pieces, rotates on two bracing pieces and installs same rail net, is provided with cardboard and card hole on two bracing pieces respectively, cardboard and card hole are mutually supported, all are provided with the solid mechanism of card on two bases, the solid mechanism of card includes the flange, flange and bracing piece fixed connection, be provided with the draw-in groove on the base, be provided with the bayonet lock on the draw-in groove, the cover is equipped with the spring on the bayonet lock, be provided with the pinhole on the flange, bayonet lock and pinhole mutually support, be provided with the apron on the draw-in groove, all be provided with dust fall mechanism on two bracing pieces, dust fall mechanism includes the connecting pipe, connecting pipe and base fixed connection, is provided with standpipe and connecting pipe joint on the bracing piece, is provided with the atomising head on the standpipe, is provided with in the base and aggravates the water tank, is provided with the water filling port on the base, and aggravate the water tank mutually support.
Preferably, all be provided with the fixed plate on two bases, all rotate on two draw-in grooves and install the handle.
Preferably, the clamping groove is provided with two groove rails, and the two groove rails are connected with the clamping pin in a sliding manner.
Preferably, the cover plate is provided with a through hole, and the through hole is matched with the support rod.
The utility model discloses in, a building engineering management is with isolation rail's beneficial effect: the cooperation setting of draw-in groove, flange, bayonet lock and pinhole in the card solid mechanism can be in the same place bracing piece and base are fixed, conveniently fixes the rail, and the cooperation setting of connecting pipe, standpipe and atomising head can spray water the dust fall in the dust fall mechanism, reduces the dust influence air that the construction produced, and the rail is conveniently accomodate in setting up of rail net, convenient transportation.
The utility model discloses can accomodate, the convenient transportation has the dust fall function, reduces the pollution to the air, simple to use, convenient operation.
Drawings
Fig. 1 is a schematic three-dimensional structure diagram of an isolation fence for building engineering management provided by the present invention;
fig. 2 is a schematic cross-sectional view of a first embodiment of an isolation fence for construction engineering management according to the present invention;
fig. 3 is an enlarged schematic structural view of a portion a in fig. 2 of the isolation fence for construction engineering management according to the present invention;
fig. 4 is a schematic view of a top-cut structure of a base of the isolation fence for construction engineering management provided by the present invention;
fig. 5 is a schematic sectional view of a second embodiment of the isolation fence for construction engineering management according to the present invention.
In the figure: 1. a base; 2. a support bar; 3. a fence net; 4. clamping a plate; 5. a clamping hole; 6. a convex plate; 7. a card slot; 8. a bayonet lock; 9. a spring; 10. a pin hole; 11. a cover plate; 12. a connecting pipe; 13. a vertical tube; 14. a spray head; 15. a weighted water tank; 16. a water injection port; 17. a fixing plate; 18. a handle; 19. a placement groove; 20. a reinforcing plate; 21. and (7) reinforcing the holes.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Example one
Referring to fig. 1-4, an isolation fence for building engineering management, including two bases 1 and two bracing pieces 2, rotate on two bracing pieces 2 and install same fence net 3, be provided with cardboard 4 and card hole 5 on two bracing pieces 2 respectively, cardboard 4 and card hole 5 mutually support, all be provided with the card on two bases 1 and fix the mechanism, the card is fixed the mechanism and is included flange 6, flange 6 and bracing piece 2 fixed connection, be provided with draw-in groove 7 on the base 1, be provided with bayonet lock 8 on the draw-in groove 7, the cover is equipped with spring 9 on the bayonet lock 8, be provided with pinhole 10 on the flange 6, bayonet lock 8 and pinhole 10 mutually support, be provided with apron 11 on the draw-in groove 7, all be provided with dust fall mechanism on two bracing pieces 2.
Referring to fig. 1-3, dust fall mechanism includes connecting pipe 12, connecting pipe 12 and base 1 fixed connection, is provided with standpipe 13 and connecting pipe 12 joint on the bracing piece 2, is provided with atomising head 14 on the standpipe 13, is provided with in the base 1 and aggravates water tank 15, is provided with water filling port 16 on the base 1, and water filling port 16 mutually supports with aggravating water tank 15.
Referring to fig. 4, all being provided with fixed plate 17 on two bases 1, all rotating on two draw-in grooves 7 and installing handle 18, the base can be consolidated in the setting of fixed plate 17, increases stability, and handle 18's setting is conveniently carried.
Referring to fig. 3-4, the cover plate 11 is provided with a through hole, the through hole is matched with the support rod 2, and the support rod 2 and the base 1 are conveniently connected together through the through hole.
Referring to fig. 4, the clamping groove 7 is provided with two groove rails, the two groove rails are both connected with the clamping pin 8 in a sliding manner, and the groove rails can enable the clamping pin 8 to slide at a fixed position.
In this embodiment, during the use, pull open cardboard 4 earlier, relieve two bracing pieces 2, to two bracing pieces 2 of both sides pulling, pull open enclosure net 3, two bayonet locks 8 are pulled out respectively, insert two draw-in grooves 7 with flange 6 on two bracing pieces 2, release bayonet lock 8, under the cooperation of two springs 9, two bayonet lock 8 insert in the pinhole 10, it is fixed to accomplish, put the back with the rail, can toward aggravating 15 water injections of water tank aggravate, stability is improved, also can take out aggravate water tank 15, it is fixed through other heavy objects, also can use the nail to insert downthehole in the fixed plate 17, consolidate the rail, use the completion draw in can.
Example two
Referring to fig. 5, the present embodiment is different from the first embodiment in that: the standing groove 19 has been seted up on two bracing pieces 2, all is provided with gusset plate 20 in two standing grooves 19, has seted up a plurality of reinforcement holes 21 on the rail net 3, during the use, after pulling open rail net 3, takes out a plurality of gusset plates 20, inserts in a plurality of reinforcement holes 21, accomplishes fixedly, increases the stability of rail.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. The utility model provides a building engineering management is with keeping apart rail, includes two bases (1) and two bracing pieces (2), its characterized in that rotates on two bracing pieces (2) and installs same rail net (3), is provided with cardboard (4) and card hole (5) on two bracing pieces (2) respectively, cardboard (4) and card hole (5) mutually support, all are provided with the card on two bases (1) and fix the mechanism, the card is fixed the mechanism and is included flange (6), flange (6) and bracing piece (2) fixed connection, be provided with draw-in groove (7) on base (1), be provided with bayonet lock (8) on draw-in groove (7), the cover is equipped with spring (9) on bayonet lock (8), be provided with pinhole (10) on flange (6), bayonet lock (8) and pinhole (10) mutually support, be provided with apron (11) on draw-in groove (7), all be provided with dust fall mechanism on two bracing pieces (2).
2. The isolation fence for the building engineering management according to claim 1, characterized in that the dust falling mechanism comprises a connecting pipe (12), the connecting pipe (12) is fixedly connected with the base (1), a vertical pipe (13) is arranged on the supporting rod (2), the vertical pipe (13) is connected with the connecting pipe (12) in a clamping manner, a spray head (14) is arranged on the vertical pipe (13), a weighting water tank (15) is arranged in the base (1), a water filling port (16) is arranged on the base (1), and the water filling port (16) and the weighting water tank (15) are matched with each other.
3. The isolation fence for building engineering management according to claim 1, wherein fixing plates (17) are arranged on the two bases (1), and handles (18) are rotatably arranged on the two clamping grooves (7).
4. An isolation fence for building engineering management according to claim 1, characterized in that the cover plate (11) is provided with through holes which are matched with the support bars (2).
5. The isolation fence for building engineering management as claimed in claim 1, wherein the clamping groove (7) is provided with two groove rails, and both groove rails are slidably connected with the clamping pin (8).
CN202222054245.5U 2022-08-05 2022-08-05 Isolation fence for building engineering management Active CN217975722U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222054245.5U CN217975722U (en) 2022-08-05 2022-08-05 Isolation fence for building engineering management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222054245.5U CN217975722U (en) 2022-08-05 2022-08-05 Isolation fence for building engineering management

Publications (1)

Publication Number Publication Date
CN217975722U true CN217975722U (en) 2022-12-06

Family

ID=84256516

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222054245.5U Active CN217975722U (en) 2022-08-05 2022-08-05 Isolation fence for building engineering management

Country Status (1)

Country Link
CN (1) CN217975722U (en)

Similar Documents

Publication Publication Date Title
CN217975722U (en) Isolation fence for building engineering management
CN213870918U (en) Multifunctional support for cast-in-place floor
CN206279783U (en) Assembled construction safety channel
CN205976397U (en) Portable handling frame
CN214656613U (en) Folding detachable iron horse guardrail
CN208472576U (en) A kind of bent cap framework of steel reinforcement auxiliary installation device
CN207620433U (en) A kind of suspension type riding track mounting structure based on central tube
CN215212696U (en) Protection device with detachable structure for construction
CN205677224U (en) A kind of scaffold being readily disassembled
CN215717373U (en) High-rise building floor unloading platform
CN214943156U (en) Foldable well head protector
CN110821135A (en) Attached lifting scaffold
CN217028330U (en) Novel support pole setting
CN218061391U (en) Foldable protection sole with locking function
CN216406126U (en) Novel climbing frame is with down tube horizontal support truss structure
CN214170187U (en) Steel construction safety device that is under construction
CN215886132U (en) Anti-climbing platform for tower crane
CN215859428U (en) Good-stability protective fence for repairing road
CN214697282U (en) Green's municipal works are with protection rack
CN212974112U (en) Combined type arena for sports fighting
CN220365014U (en) Geotechnical engineering slope reinforcing apparatus
CN220414784U (en) Building construction frame with protective structure
CN114016770B (en) Energy-saving assembled steel structure house
CN211228574U (en) A template for construction of protective fence basis
CN220725163U (en) Cantilever type movable house foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant