Prior art keywords
floor
strength concrete
prefabricated
jsc
concrete slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221741334.0U
Other languages
Chinese (zh)
Inventor
陈凤娟
蔡鑫龙
蔡育林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Shiwei Intelligent Technology Co ltd
Original Assignee
Shanghai Shiwei Intelligent Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Shiwei Intelligent Technology Co ltd filed Critical Shanghai Shiwei Intelligent Technology Co ltd
Priority to CN202221741334.0U priority Critical patent/CN217975038U/en
Application granted granted Critical
Publication of CN217975038U publication Critical patent/CN217975038U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model discloses a prefabricated JSC floor relates to prefabricated floor technical field, including main keel frame, main keel frame's outside is provided with the high-strength concrete board, and the interior roof of high-strength concrete board is connected with the support bar. The utility model discloses in, through the inside at the high-strength concrete slab sets up the main joist, make the inside intensity and the rigidity of prefabricated JSC floor improve, and made things convenient for the construction process of prefabricated JSC floor, the on-the-spot construction fossil fragments of workman have been avoided, and simultaneously, through setting up support bar and arc parting bead at the interior roof interval of high-strength concrete slab, make the strong and atress of surface bearing capacity of prefabricated JSC floor even, be favorable to prolonging the life of prefabricated JSC floor, and set up decorative bottom plate through the bottom at the high-strength concrete slab, make the floor directly decorate the bottom surface top after the installation, made things convenient for the follow-up top surface veneer of floor, construction process has been practiced thrift, and be favorable to improving subsequent headspace, the practicality that the reinforcing floor used.

Description

Prefabricated JSC floor
Technical Field
The utility model relates to a prefabricated floor technical field especially relates to a prefabricated JSC floor.
Background
With the rapid development of economy and the advancement of science and technology in various regions, buildings assembled from prefabricated parts at a construction site, called as fabricated buildings, are classified into five types, i.e., block buildings, plate buildings, box buildings, skeleton plate buildings, and raised floor buildings according to the form and construction method of prefabricated parts.
Current prefabricated JSC floor, when using, need the manual work to carry out fossil fragments construction at the equipment scene, only can carry out simple concatenation to the floor to do not possess the heat retaining effect that gives sound insulation in the floor inside, can not directly carry out the veneer through the floor to the bottom in addition, lead to prefabricated JSC floor when the installation inconvenient with other wall connection, ensure that intensity is low, the efficiency of construction is slow, and the heat preservation effect that gives sound insulation is poor.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving current prefabricated JSC floor, when using, need the manual work to carry out fossil fragments construction at the assembly site, only can carry out simple concatenation to the floor, and do not possess the heat retaining effect that gives sound insulation in the floor inside, and can not directly carry out the veneer to the bottom through the floor, it is inconvenient with other wall connection when leading to prefabricated JSC floor when the installation, ensure that intensity is low, the efficiency of construction is slow, the poor shortcoming of heat preservation effect gives sound insulation, and the prefabricated JSC floor of proposing.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a prefabricated JSC floor slab comprises a main keel frame, wherein a high-strength concrete plate is arranged outside the main keel frame, a supporting strip is connected to the inner top wall of the high-strength concrete plate, arc-shaped partition bars are arranged on two sides of the supporting strip, a first polystyrene plate is connected to the bottom end of each arc-shaped partition bar, a first hollow tube is mounted at the bottom of each first polystyrene plate, a second polystyrene plate is connected to the bottom of each first hollow tube, heat-preservation rock wool is arranged at the bottom end of each second polystyrene plate, a third polystyrene plate is connected to the bottom end of each heat-preservation rock wool, a second hollow tube is arranged at the bottom end of each third polystyrene plate, a fourth polystyrene plate is connected to the bottom end of each second hollow tube, a decorative bottom plate is connected to the bottom end of each high-strength concrete plate, and a light steel plug-in is mounted on the outer wall of one side of each high-strength concrete plate;
one side of high-strength concrete board is provided with the mount pad, and the inside of mount pad is run through and is provided with the inserted bar, the outer wall cover of inserted bar is equipped with reset spring, and one side fixed mounting of inserted bar has the board of supporting.
As a further description of the above technical solution:
the main keel frame is in a king shape at the middle position of the high-strength concrete plate, and the main keel frame is in an E shape symmetrically arranged at two sides of the high-strength concrete plate.
As a further description of the above technical solution:
the light steel plug-in components are fixedly installed on the outer wall of the high-strength concrete slab, the light steel plug-in components are E-shaped, and the two groups of high-strength concrete slabs are spliced and installed through the light steel plug-in components.
As a further description of the above technical solution:
the mounting seat is I-shaped, two groups of insertion rods penetrate through the inside of the mounting seat, and the two groups of insertion rods correspond to the first hollow tube and the second hollow tube respectively.
As a further description of the above technical solution:
the mounting seat forms a fixed structure through the inserted bar, the first hollow pipe, the second hollow pipe and the high-strength concrete plate, and the inserted bar forms an elastic structure through the reset spring and the mounting seat.
To sum up, owing to adopted above-mentioned technical scheme, the beneficial effects of the utility model are that:
1. the utility model discloses in, through the inside at the high-strength concrete slab sets up the main joist, make the inside intensity and the rigidity of prefabricated JSC floor improve, and made things convenient for the construction process of prefabricated JSC floor, the on-the-spot construction fossil fragments of workman have been avoided, and simultaneously, through setting up support bar and arc parting bead at the interior roof interval of high-strength concrete slab, make the strong and atress of surface bearing capacity of prefabricated JSC floor even, be favorable to prolonging the life of prefabricated JSC floor, and set up decorative bottom plate through the bottom at the high-strength concrete slab, make the floor directly decorate the bottom surface top after the installation, made things convenient for the follow-up top surface veneer of floor, construction process has been practiced thrift, and be favorable to improving subsequent headspace, the practicality that the reinforcing floor used.
2. The utility model discloses in, set up first hollow tube and second hollow tube through the inside at the high-strength concrete board, make the high-strength concrete board be connected stably with the mount pad, and can the convenience of customers walk the line in inside through the hollow tube, the flexibility that the floor used has been improved, and through setting up heat preservation rock wool at the intermediate position, make the heat preservation effect promote, and through setting up the polyphenyl board at inside interval, not only have good flame retardant efficiency, and the heat-proof quality of floor has been improved greatly, and the thermal current of floor has been reduced loses, the energy utilization efficiency is improved, energy conservation and environmental protection.
Drawings
Fig. 1 is a schematic diagram of a splicing three-dimensional structure of a prefabricated JSC floor slab of the present invention;
fig. 2 is a schematic sectional structure diagram of a high-strength concrete slab according to the present invention;
fig. 3 is the utility model discloses side view section connection structure schematic diagram of well high-strength concrete board and mount pad.
Illustration of the drawings:
1. a main keel frame; 2. a high strength concrete panel; 3. a supporting strip; 4. arc-shaped parting strips; 5. a first polystyrene board; 6. a first hollow tube; 7. a second polystyrene sheet; 8. heat preservation rock wool; 9. a third polystyrene board; 10. a second hollow tube; 11. a fourth polystyrene board; 12. decorating the bottom plate; 13. a light steel insert; 14. a mounting seat; 15. inserting a rod; 16. a return spring; 17. a support plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-3, a prefabricated JSC floor slab comprises a main keel frame 1, a high-strength concrete plate 2, a support bar 3, arc-shaped partition bars 4, a first polystyrene board 5, a first hollow tube 6, a second polystyrene board 7, heat-preservation rock wool 8, a third polystyrene board 9, a second hollow tube 10, a fourth polystyrene board 11, a decorative bottom board 12, a light steel plug-in 13, a mounting seat 14, an inserted rod 15, a return spring 16 and a support board 17, wherein the high-strength concrete plate 2 is arranged outside the main keel frame 1, the support bar 3 is connected to the inner top wall of the high-strength concrete plate 2, the arc-shaped partition bars 4 are arranged on two sides of the support bar 3, the first polystyrene board 5 is connected to the bottom end of the arc-shaped partition bars 4, the first hollow tube 6 is mounted to the bottom of the first polystyrene board 5, and the second polystyrene board 7 is connected to the bottom of the first hollow tube 6, the bottom end of the second polystyrene board 7 is provided with the heat preservation rock wool 8, the bottom end of the heat preservation rock wool 8 is connected with a third polystyrene board 9, the bottom of the third polystyrene board 9 is provided with a second hollow pipe 10, the bottom end of the second hollow pipe 10 is connected with a fourth polystyrene board 11, the bottom end of the high-strength concrete board 2 is connected with a decorative bottom board 12, the outer wall of one side of the high-strength concrete board 2 is provided with a light steel plug-in 13, the other side of the high-strength concrete board 2 is slightly long, the high-strength concrete board 2 can be conveniently and seamlessly plugged through the light steel plug-in 13, the attractiveness of the light steel plug-in 13 during splicing is ensured, and the decorative bottom board 12 is arranged at the bottom end of the high-strength concrete board 2, so that the top surface of the floor slab can be directly decorated during installation, and the practicability and attractiveness of the floor slab are enhanced;
one side of high-strength concrete slab 2 is provided with mount pad 14, and the inside of mount pad 14 runs through and is provided with inserted bar 15, the outer wall cover of inserted bar 15 is equipped with reset spring 16, and one side fixed mounting of inserted bar 15 has offset 17, install high-strength concrete slab 2 through mount pad 14, then make high-strength concrete slab 2 can firmly install with JSC building wall, it carries out the site operation to have ensured to have avoided the manual work, the construction efficiency of JSC building has been improved, moreover, the steam generator is simple in structure, and convenient for operation.
Further, main keel frame 1 is "king" type at the intermediate position of high-strength concrete board 2, and main keel frame 1 is "E" type that the symmetry set up in the both sides of high-strength concrete board 2, sets up through the inboard with main keel frame 1 at high-strength concrete board 2, makes the bulk strength of floor improve to avoid workman site operation fossil fragments, reduced the installation procedure, improved the installation effectiveness of floor.
Further, light steel plug-in components 13 are at the outer wall fixed mounting of high-strength concrete board 2, and light steel plug-in components 13 are "E" type, and two sets of high-strength concrete boards 2 splice the installation through light steel plug-in components 13, through setting up light steel plug-in components 13 in one side of high-strength concrete board 2, under the slightly long effect in 2 one sides of high-strength concrete board, make adjacent high-strength concrete board 2 splice through light steel plug-in components 13, has realized the high-efficient installation of floor.
Further, mount pad 14 is "worker" type, and the inside of mount pad 14 runs through and is provided with two sets of inserted bars 15, and two sets of inserted bars 15 respectively with first hollow tube 6, second hollow tube 10 is corresponding, through first hollow tube 6, the setting of second hollow tube 10 and inserted bar 15, make mount pad 14 and high-strength concrete board 2 firm in connection, and through first hollow tube 6, the setting of second hollow tube 10, make the user can carry out the threading in the inside of floor, the use flexibility of floor has been improved.
Further, mount pad 14 constitutes fixed knot structure through between inserted bar 15, first hollow tube 6, second hollow tube 10 and the high-strength concrete board 2, and inserted bar 15 passes through to constitute elastic construction between reset spring 16 and the mount pad 14, through reset spring 16's setting, makes inserted bar 15 nimble in the inside activity of mount pad 14, and the user of being convenient for dismantles high-strength concrete board 2.
The working principle is as follows: when the prefabricated JSC floor is used, the mounting seat 14 and the prefabricated JSC wall are mounted, the inserting columns of the prefabricated JSC wall are inserted and fixed in the mounting seat 14, one side of the abutting plate 17 is extruded, so that the reset spring 16 is compressed, the inserting rods 15 are used for fixing the high-strength concrete plates 2 through the first hollow tube 6 and the second hollow tube 10 under the fixing action of the abutting plate 17 and the inserting rods 15, the main body of the prefabricated JSC floor is mounted and fixed, the light steel plug-ins 13 are arranged on one side of the high-strength concrete plates 2, the adjacent high-strength concrete plates 2 are spliced through the light steel plug-ins 13 under the action of the slightly longer side of the high-strength concrete plates 2, the efficient mounting of the floor is realized, and the heat preservation rock wool 8 is arranged in the floor, then the heat preservation effect of prefabricated JSC floor improves, and through setting up heat preservation rock wool 8 at the floor intermediate position, it is convenient to have realized the construction, and the fire prevention flame retardant efficiency has been improved, simultaneously through setting up the multilayer polyphenyl board at the inside interval of floor, the heat-proof quality is greatly improved, and the heat loss of floor has been reduced, the energy efficiency is improved, and under the effect of the interval setting of support bar 3 and arc parting bead 4, make support bar 3 and arc parting bead 4 have good support at the interior roof of high strength concrete board 2, the top rigidity and the intensity of prefabricated JSC floor have been improved, the pressure resistance of floor has been guaranteed, be favorable to prolonging the life of floor, the bearing effect of floor has been guaranteed, just so accomplish the theory of operation of this prefabricated JSC floor.
Above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the design of the present invention, equivalent replacement or change should be covered within the protection scope of the present invention.

Claims (5)

1. The utility model provides a prefabricated JSC floor, includes main keel frame (1), its characterized in that: the high-strength concrete slab is characterized in that a high-strength concrete slab (2) is arranged outside the main keel frame (1), the inner top wall of the high-strength concrete slab (2) is connected with a support bar (3), arc-shaped partition bars (4) are arranged on two sides of the support bar (3), the bottom end of each arc-shaped partition bar (4) is connected with a first polystyrene board (5), a first hollow tube (6) is mounted at the bottom of each first polystyrene board (5), a second polystyrene board (7) is connected to the bottom of each first hollow tube (6), heat-insulating rock wool (8) is arranged at the bottom end of each second polystyrene board (7), a second polystyrene board (9) is connected to the bottom end of each heat-insulating rock wool (8), a second hollow tube (10) is arranged at the bottom of each second polystyrene board (9), a fourth polystyrene board (11) is connected to the bottom end of each second polystyrene board (10), a decorative bottom board (12) is connected to the bottom end of the high-strength concrete slab (2), and light steel plug-in parts (13) are mounted on the outer wall of one side of the high-strength concrete slab (2);
one side of high-strength concrete board (2) is provided with mount pad (14), and the inside of mount pad (14) runs through and is provided with inserted bar (15), the outer wall cover of inserted bar (15) is equipped with reset spring (16), and one side fixed mounting of inserted bar (15) has and supports board (17).
2. A prefabricated JSC floor as claimed in claim 1, wherein: the main keel frame (1) is of a king shape at the middle position of the high-strength concrete slab (2), and the main keel frame (1) is of an E shape symmetrically arranged at two sides of the high-strength concrete slab (2).
3. A prefabricated JSC floor according to claim 1, wherein: the light steel plug-in components (13) are fixedly installed on the outer wall of the high-strength concrete slab (2), the light steel plug-in components (13) are E-shaped, and the two groups of high-strength concrete slabs (2) are spliced and installed through the light steel plug-in components (13).
4. A prefabricated JSC floor according to claim 1, wherein: the mounting seat (14) is I-shaped, two groups of insertion rods (15) penetrate through the mounting seat (14), and the two groups of insertion rods (15) correspond to the first hollow pipe (6) and the second hollow pipe (10) respectively.
5. A prefabricated JSC floor according to claim 4, wherein: the mounting seat (14) forms a fixed structure with the high-strength concrete plate (2) through the inserted bar (15), the first hollow pipe (6), the second hollow pipe (10), and the inserted bar (15) forms an elastic structure with the mounting seat (14) through the return spring (16).
CN202221741334.0U 2022-07-08 2022-07-08 Prefabricated JSC floor Active CN217975038U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221741334.0U CN217975038U (en) 2022-07-08 2022-07-08 Prefabricated JSC floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221741334.0U CN217975038U (en) 2022-07-08 2022-07-08 Prefabricated JSC floor

Publications (1)

Publication Number Publication Date
CN217975038U true CN217975038U (en) 2022-12-06

Family

ID=84275078

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221741334.0U Active CN217975038U (en) 2022-07-08 2022-07-08 Prefabricated JSC floor

Country Status (1)

Country Link
CN (1) CN217975038U (en)

Similar Documents

Publication Publication Date Title
CN111636619A (en) Prefabricated wallboard of multi-functional green building of assembled
CN217975038U (en) Prefabricated JSC floor
CN110761450A (en) Whole light partition wall system in superelevation space
CN107965088B (en) Wall structure
CN210947267U (en) Energy-saving heat-insulating wall body for steel structure board room workshop
CN213897968U (en) Novel anti-static raised movable floor
CN1963101A (en) Combined plate
CN216041843U (en) Outer wall veneer hanging and pasting structure
CN206143963U (en) Integral type wallboard of modularization installation
CN211369168U (en) Whole light partition wall system in superelevation space
CN219158547U (en) Multilayer assembled energy-saving building
CN218205384U (en) Combined prefabricated wallboard
CN219138047U (en) Light external wall panel using high-ductility concrete
CN218061022U (en) Energy-saving foundation structure of assembled building wall
CN210177827U (en) Gutter installation node structure in various steel sandwich panel roof
CN208280389U (en) A kind of assembled architecture wallboard
CN214658418U (en) Inserted sheet type close-spliced wallboard fixing structure
CN212153787U (en) Economical building composite wall board
CN215367987U (en) Green energy-saving building outer wall
CN218814415U (en) Connection structure of assembled light partition plate
CN213539434U (en) Curtain wall construction for outdoor architectural decoration
CN220928406U (en) Combined wall structure for building engineering
CN215330583U (en) Energy-concerving and environment-protective building heat preservation thermal-insulated structure
CN214574909U (en) Assembled steel construction building presss from both sides core wall body and beam column connection structure
CN216380122U (en) Demountable installation partition board