CN217974707U - Catch dirty catch basin - Google Patents
Catch dirty catch basin Download PDFInfo
- Publication number
- CN217974707U CN217974707U CN202222228916.5U CN202222228916U CN217974707U CN 217974707 U CN217974707 U CN 217974707U CN 202222228916 U CN202222228916 U CN 202222228916U CN 217974707 U CN217974707 U CN 217974707U
- Authority
- CN
- China
- Prior art keywords
- well
- rainwater
- connecting pipe
- catch
- chamber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a sewage interception catch basin, which belongs to the technical field of urban drainage and solves the problem of water body pollution caused by the lack of related sewage interception measures in the existing rainwater drainage system; it includes the well body, the well body is including the first well room and the second well room of mutual intercommunication, all install the rainwater grate on the well head of first well room and second well room, all install in the well head of first well room and second well room and cut dirty basket of hanging, rainwater well connecting pipe has been put to second well room below, rainwater well connecting pipe and municipal rainwater inspection shaft intercommunication, rainwater well connecting pipe is provided with the flap valve with the intercommunication department of municipal rainwater inspection shaft, the flap valve is installed in rainwater well connecting pipe exit. The utility model discloses a set up and cut dirty basket of hanging, make the debris in the sewage that collects through the rainwater well to regularly clear up in the later stage, prevent that debris from blockking up in the rainwater well, improve the rainwater well and cross water ability, and through the flap valve in rainwater well connecting pipe department, prevent that the too high time of water level of municipal rainwater inspection shaft from producing and flowing backward.
Description
Technical Field
The utility model relates to a municipal drainage technical field, concretely relates to intercept dirty rainwater well.
Background
The water environment is an indispensable component in the natural environment, and in recent years, with the rapid development of economy and society, water pollution events in China are frequent, and great harm is brought to the ecological environment and the health of residents.
At present, with the acceleration of black and odorous water treatment, urban point source pollution is gradually controlled, and the influence of non-point source pollution represented by urban runoff pollution on the water environment quality is increasingly shown. Non-point source pollution refers to other forms of pollution such as organic pollution and water eutrophication caused by dissolved and solid pollutants which sink into the receiving water body (including rivers, lakes, reservoirs and gulfs) from unspecified places under the scouring action of rainfall. Particularly, in the early stage of rainstorm, pollutants deposited on the ground surface and in the sewer pipe network are suddenly washed and converged into the receiving water body in a short time by rainfall runoff, so that the water body pollution is caused. According to observation, the pollutant concentration generally exceeds the ordinary sewage concentration in the early stage of rainstorm (20 min before rainfall), and urban non-point sources are main pollution sources causing water body pollution and have the characteristics of paroxysmal property, high flow, heavy pollution and the like.
In rainy days, garbage on the road surface, such as leaves, plastic bags, vegetable leaves and the like, enters the municipal rainwater drainage system along with rainwater runoff, is conveyed through a pipeline and finally discharged to a receiving water body along with a rainwater pipeline, and further causes adverse effects on water quality and environment of the water body. In the traditional rainwater drainage system, no matter the source and the conveying process of rainwater collection or the tail end of drainage, relevant sewage interception measures are lacked, so that garbage entering the rainwater system cannot be intercepted, and the garbage directly enters a water body.
SUMMERY OF THE UTILITY MODEL
To the above-mentioned problem among the prior art, the utility model provides a cut dirty rainwater well has solved among the current rainwater drainage system, lacks relevant dirty measure of cutting, leads to water pollution's problem.
In order to achieve the purpose, the utility model adopts the technical scheme as follows:
the utility model provides a cut dirty rainwater well, it includes the well body, the well body is including the first well room and the second well room of mutual intercommunication, all install the rainwater grate on the well head of first well room and second well room, all install in the well head of first well room and second well room and cut dirty string basket, the rainwater well connecting pipe has been put to second well room below, rainwater well connecting pipe and municipal rainwater inspection shaft intercommunication, rainwater well connecting pipe is provided with the flap valve with the intercommunication department of municipal rainwater inspection shaft, the flap valve is installed in rainwater well connecting pipe exit.
The utility model discloses a set up in first well room and second well room and cut dirty basket of hanging, make the debris rubbish in the sewage that collects through the inlet for stom water to regularly clear up in the later stage, prevent that debris rubbish from blockking up in the inlet for stom water, improve the inlet for stom water ability of crossing, and through the flap valve in inlet for stom water connecting pipe department, prevent that the too high time of water level of municipal rainwater inspection shaft from producing and flowing backwards.
Furthermore, grate supports are installed on the well mouths of the first well chamber and the second well chamber, the middle of each grate support is hollow, the rainwater grate is located in the hollow position of each grate support, and one end of the rainwater grate is rotatably connected with the grate supports through a pin shaft.
In this scheme, the rainwater grate rotates with the grate support through the round pin axle and links to each other, and grate support fixed mounting adopts above-mentioned scheme at the entrance of first well room and second well room, simple installation, very big raising efficiency to convenient follow-up to cutting dirty basket interior debris rubbish's clearance of hanging.
Furthermore, a partition wall is arranged above the connection of the first well chamber and the second well chamber, a hollow structure is arranged below the partition wall, and the hollow structure is communicated with the first well chamber and the second well chamber.
In this scheme, through the twin-well room of intercommunication, improve when the rainfall, the inlet for stom water also improves the ability of crossing water of inlet for stom water to the collection ability of rainwater.
Further, all be provided with a plurality of basket supports of hanging on the week of first well indoor wall, second well indoor wall and partition wall inner wall, be provided with the fixed column on hanging the basket support, cut dirty basket opening part of hanging is provided with the turn-ups, set up on the turn-ups with the fixed orifices of fixed column looks adaptation, through the cooperation of fixed orifices and fixed column, will cut dirty basket of hanging and install respectively on the basket support of hanging in first well room and second well room.
In this scheme, will cut dirty string basket through the cooperation of fixed orifices and fixed column and articulate on hanging the basket support, adopt above-mentioned scheme, easy to assemble cuts dirty string basket, also makes things convenient for follow-up sanitationman to cut dirty string basket's extraction, clearance debris rubbish, stability and the security of guaranteeing to use.
Further, be provided with a plurality of handles that draw and cut dirty string basket on the turn-ups.
In this scheme, through set up the handle on cutting dirty turn-ups of hanging the basket, convenient follow-up sanitationman accessible handle is direct will cut dirty hanging the basket and take out the clearance and install again.
Furthermore, cut dirty basket of hanging is the top open-ended tube-shape, and the bottom and the lateral wall of the dirty basket of hanging of cutting of tube-shape are evenly seted up a plurality of through-holes that are used for filtering debris.
In this scheme, through set up on the dirty basket of hanging of intercepting at the tube-shape and pass through, the convenience is held back to debris rubbish, when holding back rubbish, remains the water passing ability at the inlet for stom water.
Furthermore, the material of cutting dirty basket of hanging is the stainless steel.
In this scheme, stainless steel has high temperature resistant, fire-resistant heat resistance, can guarantee to cut dirty string basket and not corroded the damage in moist sewer for a long time.
Furthermore, the flap valve comprises a valve seat and a valve plate hinged with the valve seat, and the valve seat is connected with the rainwater inlet connecting pipe through a flange plate.
In this scheme, set up the flap valve through the exit at rainwater well connecting pipe, avoid pouring into the inlet for stom water when the water level of rainwater inspection shaft is too high, lead to inlet for stom water ponding to spill over the road surface.
Furthermore, the bottom of the well body adopts a reinforced concrete foundation, and a concrete cushion is arranged below the reinforced concrete foundation.
In this scheme, set up the concrete bed course through the reinforced concrete basis below at well body bottom, adopt above-mentioned scheme, improve the bearing capacity of inlet for stom water.
The utility model discloses a cut dirty inlet for stom water, its beneficial effect is:
1. the utility model discloses a be provided with in first well room and second well room and cut dirty basket of hanging, can hold back debris rubbish in the rainwater when the road surface rainwater is collected at the inlet for stom water, pile up debris rubbish, block up in the inlet for stom water after avoiding the rainwash road surface, and then improve the ability of crossing water at the inlet for stom water.
2. The utility model discloses a cut dirty basket installation of hanging and draw convenient, swift, through cutting dirty basket of hanging and the cooperation of hanging the basket support, make things convenient for the quick extraction of sanitationman to cut dirty basket clearance debris rubbish of hanging to and the installation cuts dirty basket of hanging.
3. The utility model discloses an installation flap valve in the exit of rainwater well connecting pipe prevents when the water level in municipal rainwater inspection shaft is too high, pours backward into the inlet for stom water, leads to inlet for stom water ponding to spill over the road surface.
Drawings
Fig. 1 is a schematic structural view of a sewage intercepting gutter inlet of the present invention.
Fig. 2 isbase:Sub>A schematic cross-sectional view taken alongbase:Sub>A-base:Sub>A in fig. 1 according to the present invention.
Fig. 3 is a schematic cross-sectional view taken along line B-B in fig. 1 according to the present invention.
Fig. 4 is a schematic structural view of the rain grate of the present invention.
Fig. 5 is a schematic structural view of the sewage intercepting hanging basket of the present invention.
Fig. 6 is a schematic structural diagram of the present invention at C in fig. 5.
Wherein, 1, well body; 11. a partition wall; 12. a reinforced concrete foundation; 13. a concrete cushion layer; 2. a first well chamber; 3. A second well chamber; 4. a rainwater grate; 5. a sewage intercepting hanging basket; 51. flanging; 52. a handle; 53. a fixing hole; 6. A catch basin connecting pipe; 7. a door is clapped; 8. a cradle support; 81. fixing a column; 9. a grate support; 10. and (7) a pin shaft.
Detailed Description
The present invention is not limited to the specific embodiments, and it should be understood that various changes can be made within the spirit and scope of the present invention as defined and determined by the appended claims.
Well body 1 is provided with partition wall 11 including first well room 2 and the second well room 3 that communicates each other, the top that first well room 2 and second well room 3 link to each other, and partition wall 11 below is cavity, and this hollow structure communicates first well room 2 and second well room 3, through the two well rooms of intercommunication, improves when the rainfall, and the inlet for stom water is to the collection ability of rainwater, also improves the ability of crossing of inlet for stom water.
The rainwater grate 4 is arranged on the well mouths of the first well chamber 2 and the second well chamber 3, the sewage intercepting hanging baskets 5 are arranged in the well mouths of the first well chamber 2 and the second well chamber 3, the sewage intercepting hanging baskets 5 are in a tube shape with an upper opening, a plurality of through holes used for filtering sundries are uniformly formed in the bottom and the side wall of each tube-shaped sewage intercepting hanging basket 5, the sewage intercepting hanging baskets 5 are made of stainless steel, and the stainless steel has high temperature resistance and fire resistance and heat resistance and can ensure that the sewage intercepting hanging baskets are not corroded and damaged in a wet sewer for a long time.
Rainwater well connecting pipe 6 is arranged below second well chamber 3, rainwater well connecting pipe 6 is communicated with municipal rainwater inspection well, a flap valve 7 is arranged at the communication position of rainwater well connecting pipe 6 and municipal rainwater inspection well, flap valve 7 is installed at the outlet of rainwater inlet connecting pipe 6, flap valve 7 comprises a valve seat and a valve plate hinged with the valve seat, the valve seat is connected with rainwater well connecting pipe 6 through a flange, flap valve 7 is arranged at the outlet of rainwater well connecting pipe 6, flap valve 7 is automatically closed to prevent water from flowing backwards, when the water level of rainwater inspection well is lower than that of rainwater connecting pipe 6 inside, water in rainwater connecting pipe 6 can flush the flap valve to drain water in rainwater inspection well, flap valve 7 does not need to manually apply external force, energy saving performance is improved, mechanical structure is simple, maintenance is convenient, service life is long, and rainwater inlet is prevented from flowing backwards to overflow rainwater road surface when the water level in municipal rainwater inspection well is too high.
In embodiment 2, a further scheme of the rainwater grate 4 is provided in this embodiment, referring to fig. 4, grate supports 9 are respectively installed on the well heads of the first well chamber 2 and the second well chamber 3, the middle of each grate support 9 is hollow, the rainwater grate 4 is located in the hollow part of each grate support 9, the rainwater grate 4 is rotatably connected with the grate supports 9 through pins 10, one end of the rainwater grate 4 is rotatably connected with the grate supports 9 through the pins 10, and the grate supports 9 are fixedly installed at the inlets of the first well chamber 2 and the second well chamber 3.
Cut dirty 5 openings of hanging and be provided with turn-ups 51, set up the fixed orifices 53 with fixed column 81 looks adaptation on the turn-ups 51, locate fixed column 81 through overlapping fixed orifices 53 on, thereby will cut dirty hanging basket 5 and install respectively on hanging basket support 8 in first well room 2 and second well room 3, easy to assemble cuts dirty hanging basket 5, also make things convenient for follow-up sanitationman to cut dirty drawing of hanging basket 5, clearance debris rubbish, guarantee to cut dirty stability and the security of hanging basket 5 use.
The plurality of handles 52 for extracting the sewage intercepting hanging basket 5 are arranged on the flanging 51, and the handles 52 are arranged on the flanging 51 of the sewage intercepting hanging basket 5, so that the sewage intercepting hanging basket 5 can be conveniently taken out by a subsequent sanitation worker through the handles 52 to clean sundry garbage and be installed again after being cleaned.
The operating principle of this scheme intercepting dirty inlet for stom water does:
the utility model discloses in practical application, refer to fig. 1-6, the rainwater gets into the inlet for stom water from rainwater grate 4 through the road surface slope, cuts dirty basket 5 of hanging and dams great debris rubbish in the rainwater, and the rainwater gets into first well 2 and the second well 3 of inlet for stom water and carries to municipal rainwater inspection shaft in through rainwater well connecting pipe 6.
Rubbish is dammed in cutting dirty basket 5 of hanging, and rainwater grate 4 is opened to the accessible during sanitationman daily clearance, takes out through handle 52 and cuts dirty basket 5 of hanging and clear up rubbish in the inlet for stom water, avoids because rubbish piles up and blocks up the inlet for stom water, and the water section that crosses that causes reduces, crosses the ability reduction of water.
Set up flap valve 7 through the exit at rainwater well connecting pipe 6, flap valve 7 self-closing prevents that water from flowing backward, when rainwater inspection shaft water level is less than rainwater connecting pipe 6 water level of the inside, water in rainwater connecting pipe 6 can be washed the flap valve open, toward rainwater inspection shaft internal drainage, flap valve 7 need not the manual work and applies external force, has more energy-conservation, and mechanical structure is simple, and it is convenient to maintain, long service life, when preventing the water level in municipal rainwater inspection shaft too high, flow backward into the inlet for stom water, lead to inlet for stom water ponding to spill over the road surface.
Although specific embodiments of the present invention have been described in detail with reference to the accompanying drawings, the scope of protection of the present invention should not be limited thereto. Various modifications and changes may be made by those skilled in the art without inventive step within the scope of the appended claims.
Claims (9)
1. The utility model provides a cut dirty rainwater well which characterized in that: comprises a well body (1);
the well body (1) comprises a first well chamber (2) and a second well chamber (3) which are communicated with each other;
the well mouths of the first well chamber (2) and the second well chamber (3) are both provided with a rainwater grate (4);
sewage intercepting hanging baskets (5) are installed in the well mouths of the first well chamber (2) and the second well chamber (3);
a rainwater well connecting pipe (6) is arranged below the second well chamber (3), and the rainwater well connecting pipe (6) is communicated with the municipal rainwater inspection well;
a flap valve (7) is arranged at the communication position of the rainwater well connecting pipe (6) and the municipal rainwater inspection well, and the flap valve (7) is installed at the outlet of the rainwater well connecting pipe (6).
2. The catch gully according to claim 1, the method is characterized in that: the well mouths of the first well chamber (2) and the second well chamber (3) are both provided with a grate support (9), and the middles of the grate supports (9) are hollow; the rainwater grate (4) is positioned in the hollow part of the grate support (9), and the rainwater grate (4) is rotatably connected with the grate support (9) through a pin shaft (10).
3. The catch wastewater well according to claim 1, the method is characterized in that: a partition wall (11) is arranged above the first well chamber (2) and the second well chamber (3) in a connected mode, the lower portion of the partition wall (11) is hollow, and the hollow structure is communicated with the first well chamber (2) and the second well chamber (3).
4. The catch basins of claim 3, wherein: a plurality of basket hanging supports (8) are arranged on the inner walls of the first well chamber (2), the second well chamber (3) and the partition wall (11) in the circumferential direction; a fixing column (81) is arranged on the cradle support (8);
a flanging (51) is arranged at the opening of the sewage intercepting hanging basket (5), and a fixing hole (53) matched with the fixing column (81) is formed in the flanging (51); and the sewage interception hanging basket (5) is respectively arranged on the hanging basket support (8) in the first well chamber (2) and the second well chamber (3) through the matching of the fixing hole (53) and the fixing column (81).
5. The catch gully according to claim 4, the method is characterized in that: the flanging (51) is provided with a plurality of handles (52) for extracting the sewage intercepting hanging basket (5).
6. The catch gully according to claim 1, the method is characterized in that: the dirt intercepting hanging basket (5) is in a cylindrical shape with an opening at the upper part, and a plurality of through holes used for filtering sundries are uniformly formed in the bottom and the side wall of the dirt intercepting hanging basket (5) in the cylindrical shape.
7. The catch basin according to any one of claims 1 to 6, characterized by: the sewage intercepting hanging basket (5) is made of stainless steel.
8. The catch wastewater well according to claim 1, the method is characterized in that: the flap valve (7) comprises a valve seat and a valve plate hinged with the valve seat; the valve seat is connected with the rainwater well connecting pipe (6) through a flange plate.
9. The catch gully according to claim 1, the method is characterized in that: the bottom of the well body (1) adopts a reinforced concrete foundation (12), and a concrete cushion layer (13) is arranged below the reinforced concrete foundation (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222228916.5U CN217974707U (en) | 2022-08-23 | 2022-08-23 | Catch dirty catch basin |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222228916.5U CN217974707U (en) | 2022-08-23 | 2022-08-23 | Catch dirty catch basin |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217974707U true CN217974707U (en) | 2022-12-06 |
Family
ID=84260227
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222228916.5U Active CN217974707U (en) | 2022-08-23 | 2022-08-23 | Catch dirty catch basin |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217974707U (en) |
-
2022
- 2022-08-23 CN CN202222228916.5U patent/CN217974707U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211006972U (en) | Lever type automatic opening and closing gutter inlet sewage intercepting device | |
CN110080376B (en) | Rainwater collecting and sewage intercepting device for green building community | |
CN210263229U (en) | Building water supply and drainage system | |
CN202689172U (en) | Combined system pipe network dry weather sewage and initial rainwater multifunctional intercepting well | |
CN217974707U (en) | Catch dirty catch basin | |
CN202577564U (en) | Simple sliding grilling anti-locking gutter inlet | |
CN111926899A (en) | A blowwell structure for municipal works | |
CN208430430U (en) | A kind of highway bridge road surface drainage device | |
CN207314489U (en) | A kind of catch-basin of environment-protecting clean | |
CN214246020U (en) | Take dirty type inlet for stom water of cutting of filter screen | |
CN217418339U (en) | Outdoor formula catering big gear street area rain sewage non-point source pollution treatment system at night | |
CN215669989U (en) | Integrated self-adjusting urban rainwater outlet sewage interception and initial rainwater abandonment device | |
CN213014462U (en) | Novel roof rainwater collection device | |
CN213477130U (en) | Automatic dredging, cleaning and collecting device for sewer opening | |
CN211571912U (en) | Urban rainwater collection water level control system | |
CN212427459U (en) | Water conservancy drainage device is used in municipal administration | |
CN211646545U (en) | Rainwater collection and secondary utilization system | |
CN218292185U (en) | Drainage pipeline convenient to clearance | |
CN105756142A (en) | Secondary water double-flow and three-way self-cleaning toilet flushing system without pump, noise and space occupation for building | |
CN207436208U (en) | It is a kind of to cut dirty flow abandoning apparatus convenient for what is dredged | |
CN221422205U (en) | Soil collecting basket device for river water outlet | |
CN220666092U (en) | Hydraulic engineering drainage device | |
CN112211275A (en) | Automatic dredging, cleaning and collecting device for sewer opening | |
CN220486671U (en) | Sinking green land structure capable of collecting garbage | |
CN211814029U (en) | Rural family type reclaimed water recycling system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |