CN217973990U CN202222033311.0U CN202222033311U CN217973990U CN 217973990 U CN217973990 U CN 217973990U CN 202222033311 U CN202222033311 U CN 202222033311U CN 217973990 U CN217973990 U CN 217973990U
Authority
CN
China
Prior art keywords
pipe
thick bamboo
road
installation section
pouring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222033311.0U
Other languages
Chinese (zh)
Inventor
胡鑫锋
熊银莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Langxu Construction Engineering Co ltd
Original Assignee
Zhejiang Langxu Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Langxu Construction Engineering Co ltd filed Critical Zhejiang Langxu Construction Engineering Co ltd
Priority to CN202222033311.0U priority Critical patent/CN217973990U/en
Application granted granted Critical
Publication of CN217973990U publication Critical patent/CN217973990U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Repair (AREA)

Abstract

The utility model relates to a road and bridge construction equipment field specifically discloses a be used for highway road and bridge patching device, including the pouring tube, slidable mounting has the conveyer pipe in the pouring tube, and the bottom plate is installed to the bottom of pouring tube, and an installation section of thick bamboo is installed to the bottom of bottom plate, and slidable mounting has the regulating pipe in the installation section of thick bamboo, and the installation section of thick bamboo is run through to the bottom of regulating pipe, and the discharge opening has been seted up to the interior bottom of pouring tube, and the discharge opening runs through to the inside of an installation section of thick bamboo. The utility model discloses can adjust the flexible length of adjusting tube according to fissured degree of depth is automatic when using, make the filler fill gradually to the top from fissured interior bottom all the time, make fissured packing repair more closely knit, the condition of cavity can not appear.

Description

Be used for highway road bridge patching device
Technical Field
The utility model relates to a road bridge construction equipment technical field especially relates to a be used for highway road bridge patching device.
Background
The pavement cracking is a series of mutually communicated cracks generated by fatigue failure of an asphalt surface layer or a stable base layer under the action of repeated traffic loads. Under the repeated loading of vehicles, the cracks are connected to form small blocks with multiple edges and acute angles, and the small blocks are developed into reticular or tortoiseshell cracks. The harm of road crack is not only influence the road appearance beautifully and driving comfort level, if not in time seal the repair to the crack, further extension more easily makes rainwater and other debris get into surface course structure and road bed along the crack, causes structural destruction to the road, leads to road surface bearing capacity to descend, and the local or one-tenth damage in road surface with higher speed to shorten the life of road. When the pavement crack appears, the crack needs to be timely filled and repaired by the filler.
Inside the filler storage repair equipment that finishes mixing is all filled to the equipment of repairing commonly used, and inside the one end of repairing equipment inserted the crack, inside the filler that makes repair equipment inside through the extrusion removes to the crack, but the repair equipment commonly used can't adjust filler pouring position according to cracked degree of depth when using, lead to the filler can pour into a mould from the inside middle-end in crack, make cracked interior bottom a large amount of air appear, after the pavement crack pouring finishes, the condition of cavity can appear in the inside on road surface, after using a period, the crack can appear again on the road surface, the filling repair effect of repair equipment is not good.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a repairing device for a road bridge.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a be used for highway road bridge patching device, includes the pouring tube, slidable mounting has the conveyer pipe in the pouring tube, and the bottom plate is installed to the bottom of pouring tube, and an installation section of thick bamboo is installed to the bottom of bottom plate, and slidable mounting has the regulating tube in the installation section of thick bamboo, and the installation section of thick bamboo is run through to the bottom of regulating tube, and the discharge opening has been seted up to the interior bottom of pouring tube, and the discharge opening runs through to the inside of an installation section of thick bamboo.
Preferably, the pouring tube is run through on the top of conveyer pipe, installs the mounting panel on the conveyer pipe, and the mounting panel is located the top of pouring tube, and the sealing plug is installed at the top of conveyer pipe, and the bottom of sealing plug is located the inside of conveyer pipe.
Preferably, slidable mounting has the spacing collar on the conveyer pipe, and spacing collar fixed mounting all installs the sheet rubber at the bottom both ends of bottom plate at the inner wall top of pouring tube.
Preferably, the rubber block is installed to the bottom of conveyer pipe, and the side of rubber block and the inner wall butt of pouring tube, the connecting hole has been seted up to the bottom of rubber block, and the inside intercommunication of connecting hole and conveyer pipe.
Preferably, slidable mounting has the retainer plate on the control tube, and the retainer plate is installed in the inner wall bottom of installation section of thick bamboo.
Preferably, the elevator is installed at the top of regulating tube, and elevator slidable mounting is in the inside of installation section of thick bamboo, and the elevator is located the top of retainer plate, and the through-hole has been seted up at the top of elevator, and the through-hole communicates with the inside of regulating tube.
Preferably, the outer wall of the lifting block is provided with a mounting groove, and the inner wall of the mounting groove is provided with a sealing ring.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses well be located inside filler promotion lifting block of an installation section of thick bamboo and the control tube removes, make the bottom and the cracked interior bottom butt of control tube, and be located the inside filler of an installation section of thick bamboo alright through-hole and control tube flow to cracked interior bottom, can fill the repair to the crack of the different degree of depth when using, and can adjust the flexible length of control tube according to cracked degree of depth is automatic when using, make the filler fill gradually to the top from cracked interior bottom all the time, make cracked filling repair more closely knit, the condition of cavity can not appear, can reach better repairing effect to the road surface crack when using.
2. The utility model discloses well filler passes through the hose and carries to the inside of conveyer pipe to reinforced to the inside of pouring tube through conveyer pipe and connecting hole, and along with the inside filler of pouring tube increases gradually, the filler that is located the inside of pouring tube alright promote the rubber block and the conveyer pipe shifts up, after the top of rubber block and the bottom butt of spacing collar, the staff alright stop the transport of filler, the staff can predict the inside filler volume of pouring tube according to the distance between mounting panel and the pouring tube when using. The staff passes through the sealing plug threaded mounting on the top of conveyer pipe, and the sealing plug seals the conveyer pipe, and staff's accessible conveyer pipe promotes the inside filler of pouring pipe and pours into a mould to cracked inside when using, also can pack the inside filler of pouring pipe, and is more convenient when using.
Drawings
Fig. 1 is a cross-sectional view of a repairing device for roads and bridges provided by the present invention;
fig. 2 is a perspective view of a repairing device for roads and bridges provided by the present invention;
fig. 3 is a cross-sectional view of an installation cylinder for a road and bridge repairing device provided by the present invention;
fig. 4 is a schematic view of a mounting structure of a sealing ring for a road bridge repairing apparatus provided by the present invention.
In the figure: 1. a pouring tube; 2. a limiting ring; 3. a delivery pipe; 4. a base plate; 5. mounting the cylinder; 6. an adjusting tube; 7. mounting a plate; 8. a sealing plug; 9. a rubber block; 10. connecting holes; 11. a discharge hole; 12. a rubber sheet; 13. a fixed ring; 14. a lifting block; 15. a through hole; 16. mounting grooves; 17. and (5) sealing rings.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, a be used for highway road and bridge patching device, including pouring tube 1, slidable mounting has conveyer pipe 3 in pouring tube 1, and the bottom of pouring tube 1 is fixed with bottom plate 4, and the bottom of bottom plate 4 is fixed with an installation section of thick bamboo 5, and slidable mounting has regulating tube 6 in the installation section of thick bamboo 5, and installation section of thick bamboo 5 is run through to the bottom of regulating tube 6, and discharge opening 11 has been seted up to the interior bottom of pouring tube 1, and discharge opening 11 runs through to the inside of installation section of thick bamboo 5.
As a technical optimization scheme, the pouring tube 1 is run through on conveyer pipe 3's the top, installs mounting panel 7 on the conveyer pipe 3, and mounting panel 7 is located the top of pouring tube 1, and sealing plug 8 is installed to conveyer pipe 3's top screw thread, and staff's accessible conveyer pipe 3 is carried to the filler that carries on of pouring tube 1 when using, and after the filler was carried and is finished, the staff alright sealed the top of conveyer pipe 3 through sealing plug 8.
As a technical optimization scheme of the utility model, slidable mounting has spacing collar 2 on conveyer pipe 3, and 2 fixed mounting of spacing collar are at the inner wall top of pouring tube 1, and sheet rubber 12 is all installed at bottom 4's bottom both ends, and bottom and the ground butt of bottom plate 4 make pouring tube 1 and ground keep perpendicular when using.
As a technical optimization scheme of the utility model, block rubber 9 is installed to conveyer pipe 3's bottom, block rubber 9's side and pouring tube 1's inner wall butt, and block rubber 9's bottom is equipped with connecting hole 10, and connecting hole 10 communicates with conveyer pipe 3's inside each other, and staff's accessible mounting panel 7 drives conveyer pipe 3 and block rubber 9 and removes to pouring tube 1's interior bottom when using, and is located pouring tube 1 inside filler alright fill to the crack on the road surface inside.
As the utility model discloses a technical optimization scheme, slidable mounting has retainer plate 13 on the regulating tube 6, and retainer plate 13 is fixed in the inner wall bottom of an installation section of thick bamboo 5, and when the staff filled the crack, the filler can promote regulating tube 6 and remove to cracked interior bottom, makes the filler upwards fill gradually from cracked interior bottom.
As the utility model discloses a technical optimization scheme, elevator 14 is installed at the top of regulating tube 6, and elevator 14 slidable mounting is in the inside of installation section of thick bamboo 5, and elevator 14 is located the top of retainer plate 13, and through-hole 15 has been seted up at elevator 14's top, and through-hole 15 and regulating tube 6's inside intercommunication, elevator 14 and retainer plate 13 mutually support when using can play better stabilizing effect to regulating tube 6.
As a technical optimization scheme of the utility model, be equipped with mounting groove 16 on the outer wall of elevator 14, be fixed with sealing washer 17 on the inner wall of mounting groove 16, sealing washer 17 can seal between elevator 14 and the 5 inner walls of installation section of thick bamboo when using.
The utility model discloses when using, staff's accessible hose is connected conveyer pipe 3's top and filler storage container, makes the filler carry to conveyer pipe 3's inside through the hose, and reinforced to the inside of pouring tube 1 along conveyer pipe 3's inside and connecting hole 10, and along with the filler of pouring tube 1 inside increases gradually, lie in the filler of pouring tube 1 inside alright promote block rubber 9 and conveyer pipe 3 and shift up, after the top of block rubber 9 and the bottom butt of spacing collar 2, staff alright stop the transport of filler. The worker mounts the sealing plug 8 on the top end of the delivery pipe 3 through threads, and the sealing plug 8 performs a sealing process on the delivery pipe 3.
When the pouring tube is used, a worker inserts the installation tube 5 into a gap on the road surface, the bottom of the bottom plate 4 is abutted to the ground, the pouring tube 1 is kept perpendicular to the ground, the pouring tube 1 is more stable when the pouring tube is used, and the worker can more conveniently press the conveying tube 3 to enable force. The rubber chip 12 and the ground butt of the bottom of bottom plate 4 when using prevent that the staff from leading to bottom plate 4 position to appear moving when pushing down pouring pipe 1, can play better protection effect to bottom plate 4 simultaneously, prevent when using ground and bottom looks mutual friction of bottom plate 4, lead to the bottom of bottom plate 4 to appear the scratch.
After installation of installation section of thick bamboo 5 finishes, the staff alright press the top of mounting panel 7, make mounting panel 7 drive conveyer pipe 3 and block rubber 9 and remove to the interior bottom of pouring tube 1, and the inside filler that is located pouring tube 1 flows to the inside of installation section of thick bamboo 5 through discharge opening 11 along with the pushing down of block rubber 9 gradually. After the filler got into the inside of installation section of thick bamboo 5, installation section of thick bamboo 5 can carry out the storage of short time to the filler, and increase gradually along with the inside filler of installation section of thick bamboo 5, the filler that is located the inside of installation section of thick bamboo 5 alright promote elevator 14 and adjust pipe 6 and remove, and adjust pipe 6 when removing, the bottom of adjusting pipe 6 alright remove to fissured interior bottom, and when the bottom of adjusting pipe 6 and fissured interior bottom butt, adjust pipe 6 alright stop to remove, and the filler that is located the inside of installation section of thick bamboo 5 alright flow to fissured interior bottom through-hole 15 and adjust pipe 6.
After the inner bottom of the crack is filled, the filler can flow to the positions at the two sides of the installation cylinder 5 in the crack. Can fill the repair to the crack of the different degree of depth when using, and can adjust adjusting tube 6's flexible length according to cracked degree of depth is automatic when using, make the filler fill gradually to the top from cracked interior bottom all the time, make cracked filling repair more closely knit, the condition of cavity can not appear, can reach better repair effect to the road surface crack when using.
The above, only be the embodiment of the preferred of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, which are designed to be replaced or changed equally, all should be covered within the protection scope of the present invention.

Claims (7)

1. The utility model provides a be used for highway road and bridge patching device, includes pouring tube (1), its characterized in that, slidable mounting has conveyer pipe (3) in pouring tube (1), and bottom plate (4) are installed to the bottom of pouring tube (1), and installation section of thick bamboo (5) are installed to the bottom of bottom plate (4), and slidable mounting has regulating tube (6) in installation section of thick bamboo (5), and installation section of thick bamboo (5) are run through to the bottom of regulating tube (6), and discharge opening (11) have been seted up to the interior bottom of pouring tube (1), and discharge opening (11) run through to the inside of installation section of thick bamboo (5).
2. A road and bridge repairing device according to claim 1, wherein the top end of the conveying pipe (3) penetrates through the pouring pipe (1), a mounting plate (7) is mounted on the conveying pipe (3), the mounting plate (7) is positioned above the pouring pipe (1), a sealing plug (8) is mounted on the top of the conveying pipe (3), and the bottom end of the sealing plug (8) is positioned inside the conveying pipe (3).
3. The road and bridge repairing device for the highway according to the claim 1, wherein the conveying pipe (3) is slidably provided with a spacing ring (2), the spacing ring (2) is fixedly arranged on the top of the inner wall of the pouring pipe (1), and both ends of the bottom plate (4) are provided with rubber sheets (12).
4. The road and bridge repairing device for the highway according to claim 3, wherein a rubber block (9) is installed at the bottom of the conveying pipe (3), the side surface of the rubber block (9) is abutted against the inner wall of the pouring pipe (1), a connecting hole (10) is formed in the bottom of the rubber block (9), and the connecting hole (10) is communicated with the inside of the conveying pipe (3).
5. A road and bridge repairing device according to claim 1, wherein said adjusting pipe (6) is slidably mounted with a fixing ring (13), and said fixing ring (13) is mounted at the bottom of the inner wall of the mounting cylinder (5).
6. The device for repairing the road and bridge according to claim 5, wherein the top of the adjusting pipe (6) is provided with a lifting block (14), the lifting block (14) is slidably installed inside the installation barrel (5), the lifting block (14) is located above the fixing ring (13), a through hole (15) is formed in the top of the lifting block (14), and the through hole (15) is communicated with the inside of the adjusting pipe (6).
7. A road and bridge repairing device according to claim 6, wherein the outer wall of the lifting block (14) is provided with a mounting groove (16), and the inner wall of the mounting groove (16) is provided with a sealing ring (17).
CN202222033311.0U 2022-08-03 2022-08-03 Be used for highway road bridge patching device Active CN217973990U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222033311.0U CN217973990U (en) 2022-08-03 2022-08-03 Be used for highway road bridge patching device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222033311.0U CN217973990U (en) 2022-08-03 2022-08-03 Be used for highway road bridge patching device

Publications (1)

Publication Number Publication Date
CN217973990U true CN217973990U (en) 2022-12-06

Family

ID=84257082

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222033311.0U Active CN217973990U (en) 2022-08-03 2022-08-03 Be used for highway road bridge patching device

Country Status (1)

Country Link
CN (1) CN217973990U (en)

Similar Documents

Publication Publication Date Title
CN204894192U (en) Self preservation temperature concrete block's quick filling device of heat preservation core material thick liquid
CN204626216U (en) Core repair apparatus is bored on a kind of vehicular road surface
CN108867291B (en) Municipal road surface repairing equipment and repairing method
CN112878714B (en) Automatic brick laying machine for building engineering
CN217973990U (en) Be used for highway road bridge patching device
CN105442425B (en) A kind of roadbase disease Quick repairing device and method
CN103074871B (en) Arc-shaped slope concrete sliding and lifting template
CN108867233A (en) A kind of municipal works road pavement structure and laying method
CN111749104A (en) Asphalt pavement crack filling device
CN115772841A (en) Highway pavement crack repairing device and method
CN214882846U (en) Crack filling equipment for highway maintenance
CN113882213A (en) Highway damage repairing method
CN209368727U (en) A kind of explosion-proof lifting pillar roadblock for stopping vehicles
CN203471955U (en) Leakage stop device of concrete mixing truck
CN210459305U (en) Municipal administration well lid replacement device
CN103206484A (en) Movable engineering machine and counter weight mechanism
CN216198027U (en) Fracturing sand tank truck for oilfield operation
CN218667055U (en) Highway concrete crack repair equipment
CN220284564U (en) Municipal road crack repairing device
CN212199994U (en) Highway subgrade maintenance road surface cementation of fissures device
CN212103603U (en) Pavement crack repairing device for highway maintenance
CN220977637U (en) Asphalt pavement crack pouring device
CN217733704U (en) Road surface cementation of fissures device is used in town road construction
CN214271551U (en) Road and bridge crack reinforcing structure
CN112796188B (en) Assembled type repair pavement