CN217946616U - Novel feeding and discharging device - Google Patents

Novel feeding and discharging device Download PDF

Info

Publication number
CN217946616U
CN217946616U CN202221839616.4U CN202221839616U CN217946616U CN 217946616 U CN217946616 U CN 217946616U CN 202221839616 U CN202221839616 U CN 202221839616U CN 217946616 U CN217946616 U CN 217946616U
Authority
CN
China
Prior art keywords
axle
axis
driving piece
rotary driving
fixed plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221839616.4U
Other languages
Chinese (zh)
Inventor
孙孝寿
孙孝阳
孙孝勤
张昌林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan Mingyiyou Automation Equipment Co ltd
Original Assignee
Dongguan Mingyiyou Automation Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Mingyiyou Automation Equipment Co ltd filed Critical Dongguan Mingyiyou Automation Equipment Co ltd
Priority to CN202221839616.4U priority Critical patent/CN217946616U/en
Application granted granted Critical
Publication of CN217946616U publication Critical patent/CN217946616U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Intermediate Stations On Conveyors (AREA)

Abstract

The application provides a pair of novel go up unloader, including transfer passage and a plurality of letter sorting passageway and transition module, the transition module includes first fixed plate, first Z axle driving piece, first rotary driving piece and a plurality of roll axis, first Z axle driving piece drive is connected with the second fixed plate, first rotary driving piece is installed on the second fixed plate, the second fixed plate is put on the shelf and is equipped with first mounting bracket, the roll axis is along Y axle direction align to grid on first mounting bracket, first rotary driving piece drives the roll axis through the belt and rotates. This application can let the material frame accomplish the material loading back from the material loading end, will expect that the frame conveys to the unloading end pair product through transfer passage and load, can not only reduce extra transportation and the operation of material frame, can also carry out high-efficient utilization with material frame, greatly improves the convenience and the practicality of the last unloading of device, greatly improves the last unloading work efficiency of product.

Description

Novel feeding and discharging device
Technical Field
The utility model relates to a loading attachment technical field specifically is a novel go up unloader.
Background
At first need carry out the material loading with electric core product in the manufacturing process of electric core, most of loading attachment and unloader separately set up on the market now, equipment such as material frame that this design not only exists on loading attachment and unloader need be transported again and load, and the distance of being separated by between two devices is far away, not only inconvenient control the management to two devices during the operation, and need carry out independent maintenance to two devices, the operation is complicated, the maintenance cost is high, lead to manufacturing cost high, maintain difficult scheduling problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel go up unloader to solve the technical problem in the background art.
In order to achieve the above purpose, the present application provides the following technical solutions:
the utility model provides a novel go up unloader, includes transfer passage and a plurality of letter sorting passageway and transition module, transfer passage sets up along X axle direction, letter sorting passageway sets up at the transfer passage side along Y axle direction, the transition module sets up in transfer passage along Z axle direction, the transition module includes first fixed plate, first Z axle driving piece, first rotary driving piece and a plurality of roll axis, first fixed plate and transfer passage fixed connection, first Z axle driving piece is installed on first fixed plate, first Z axle driving piece drive is connected with the second fixed plate, first rotary driving piece is installed on the second fixed plate, the second fixed plate is put on the shelf and is equipped with first mounting bracket, the roll axis is along Y axle direction align to grid on first mounting bracket, first rotary driving piece drives the roll axis through the belt and rotates.
Furthermore, a plurality of anti-skid rubber sleeves are sleeved on the rolling shaft.
Furthermore, a plurality of positioning rods are mounted at the bottom end of the second fixing plate, and the lower ends of the positioning rods penetrate through the first fixing plate and are in sliding connection with the first fixing plate.
Further, transfer passage includes conveying frame, second rotary driving spare, first X axle conveying track and second X axle conveying track, second rotary driving spare is installed in conveying frame bottom, first X axle conveying track and second X axle conveying track structure are the same and the symmetry is installed on the conveying frame, install first transfer lever between first X axle conveying track and the second X axle conveying track, second rotary driving spare passes through the belt and is connected with first transfer lever drive.
Further, the letter sorting passageway includes second mounting bracket, third rotary driving spare, first Y axle transfer orbit and second Y axle transfer orbit, third rotary driving spare is installed in second mounting bracket bottom, first Y axle transfer orbit and second Y axle transfer orbit structure are the same and the symmetry is installed on the second mounting bracket, install the second transfer line between first Y axle transfer orbit and the second Y axle transfer orbit, third rotary driving spare passes through the belt and is connected with the drive of second transfer line.
Furthermore, a plurality of positioning mechanisms are arranged on the conveying channel and comprise a second Z-axis driving part and a positioning baffle, the second Z-axis driving part is installed on the conveying frame, and the second Z-axis driving part is in driving connection with the positioning baffle.
Further, the number of the sorting channels is two.
Further, the number of the transition modules is two.
Compared with the prior art, this application sets up two letter sorting passageways through setting up at the transfer passage side, be convenient for convey the letter sorting with the material on the transfer passage, and set up two transition modules on transfer passage, the material of being convenient for is in the place smooth transition that transfer passage and letter sorting passageway are borderline, this setting can let material frame accomplish the material loading back from the material loading end, will expect that the frame conveys to the unloading end through transfer passage and load the product, can not only reduce extra transportation and the operation of material frame, can also carry out high-efficient utilization with material frame, greatly improve the convenience and the practicality of unloading on the device, greatly improve the last unloading work efficiency of product.
Drawings
FIG. 1: the structure of the application is schematic;
FIG. 2 is a schematic diagram: the structure of the transmission channel in the application is shown schematically;
FIG. 3: the structure schematic diagram of the transition module in the application;
FIG. 4: the structure of the transmission channel in the application is shown schematically;
FIG. 5: the structure schematic diagram of positioning mechanism in this application.
Reference numerals:
1. a transfer channel; 11. a conveying frame; 12. a second rotary drive; 13. a first X-axis transfer rail; 14. a second X-axis transfer rail; 15. a first drive lever;
2. a sorting channel; 21. a second mounting bracket; 22. a third rotary drive member; 23. a first Y-axis transfer rail; 24. a second Y-axis transfer rail; 25. a second transmission rod;
3. a transition module; 31. a first fixing plate; 32. a first Z-axis drive; 33. a first rotary drive member; 34. a roll axis; 321. a second fixing plate; 322. a first mounting bracket; 323. positioning a rod; 341. an anti-slip rubber sleeve;
4. a positioning mechanism; 41. a second Z-axis drive; 42. and positioning the baffle.
Detailed Description
The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application.
Specific example 1: referring to fig. 1, the sorting system includes a conveying channel 1, a plurality of sorting channels 2 and transition modules 3, wherein the conveying channel 1 is disposed along an X-axis direction, the sorting channels 2 are disposed at side ends of the conveying channel 1 along a Y-axis direction, the transition modules 3 are disposed in the conveying channel 1 along a Z-axis direction, and the transition modules 3 are disposed at side ends of the sorting channels 2 along the Y-axis direction. The quantity of letter sorting passageway 2 is two, and the quantity of transition module 3 is two, consequently two letter sorting passageways 2 can be used to material loading letter sorting and unloading letter sorting respectively to help the material frame to carry out the smooth conveying between letter sorting passageway 2 and transfer passage 1 through setting up two transition modules 3.
Referring to fig. 2, the conveying channel 1 includes a conveying frame 11, a second rotary driving member 12, a first X-axis conveying rail 13 and a second X-axis conveying rail 14, the second rotary driving member 12 is installed at the bottom end of the conveying frame 11, the first X-axis conveying rail 13 and the second X-axis conveying rail 14 have the same structure and are symmetrically installed on the conveying frame 11, a first transmission rod 15 is installed between the first X-axis conveying rail 13 and the second X-axis conveying rail 14, and the second rotary driving member 12 is drivingly connected to the first transmission rod 15 through a belt. When the material frame conveying device is used, the first transmission rod 15 is driven to transmit through the second rotary driving piece 12, so that the first X-axis conveying rail 13 and the second X-axis conveying rail 14 are driven to slide, and the material frame above the conveying frame 11 is driven to move along the X-axis direction.
Referring to fig. 4, the sorting passage 2 includes a second mounting frame 21, a third rotary driving member 22, a first Y-axis conveying rail 23 and a second Y-axis conveying rail 24, the third rotary driving member 22 is mounted at the bottom end of the second mounting frame 21, the first Y-axis conveying rail 23 and the second Y-axis conveying rail 24 have the same structure and are symmetrically mounted on the second mounting frame 21, a second transmission rod 25 is mounted between the first Y-axis conveying rail 23 and the second Y-axis conveying rail 24, and the third rotary driving member 22 is drivingly connected to the second transmission rod 25 through a belt. When the material frame mounting device is used, the third rotary driving piece 22 drives the second transmission rod 25 to rotate, so that the first Y-axis transmission rail 23 and the second Y-axis transmission rail 24 are driven to synchronously move, and the material frame on the second mounting frame 21 is driven to move along the Y-axis direction.
Please combine fig. 3, the transition module 3 includes a first fixing plate 31, a first Z-axis driving member 32, a first rotating driving member 33 and a plurality of rolling shafts 34, the first fixing plate 31 is fixedly connected to the conveying channel 1, the first Z-axis driving member 32 is installed on the first fixing plate 31, the first Z-axis driving member 32 is connected to a second fixing plate 321 in a driving manner, the first rotating driving member 33 is installed on the second fixing plate 321, a first mounting frame 322 is erected on the second fixing plate 321, the rolling shafts 34 are uniformly arranged on the first mounting frame 322 along the Y-axis direction, and the first rotating driving member 33 drives the rolling shafts 34 to rotate through a belt. During the use, the material frame is located rolling shaft 34 top, and the height of material frame is adjusted to first Z axle driving piece 32 of accessible, avoids causing the damage to first X axle transfer orbit 13 and second X axle transfer orbit 14 in the transfer passage 1 among the transportation process, is equipped with four rolling shaft 34 in this embodiment, drives four rolling shaft 34 through first rotary driving piece 33 and carries out synchronous motion, and then drives the material frame and remove along Y axle direction.
The rolling shafts 34 are sleeved with the anti-skidding rubber sleeves 341, the number of the anti-skidding rubber sleeves 341 on each rolling shaft 34 is two, friction force between the rolling shafts 34 and the material frame is improved by arranging the anti-skidding rubber sleeves 341, and the material frame is guaranteed not to skid or shift in the moving process.
A plurality of locating levers 323 are installed to second fixed plate 321 bottom, and the quantity of locating lever 323 is four in this embodiment, and the lower extreme of locating lever 323 passes first fixed plate 31 and with first fixed plate 31 sliding connection, improves the steadiness that second fixed plate 321 removed the in-process through setting up locating lever 323.
Please refer to fig. 5, a plurality of positioning mechanisms 4 are disposed on the conveying channel 1, each positioning mechanism 4 includes a second Z-axis driving member 41 and a positioning baffle 42, the second Z-axis driving member 41 is mounted on the conveying frame 11, the second Z-axis driving member 41 is in driving connection with the positioning baffle 42, and the positioning mechanisms 4 are set to ensure accurate positioning of the material frame when the material frame reaches the loading operation position and the unloading operation position, so as to improve the accuracy of loading and unloading.
The use process comprises the following steps: the bipartition letter sorting passageway is used for material loading letter sorting and unloading letter sorting respectively, when the material frame in coordination with the material frame in the product from the material loading punishment letter sorting passageway convey to transfer passage on, for the material frame provides smooth transition through the transition module, fix a position this material frame through positioning mechanism, treat the material loading after accomplishing, the product has been taken away in the material frame this moment, convey to unloading module department through the transfer passage, the product unloading position after processing is accomplished here, load the product to the material frame in the back, punishment letter sorting passageway with product to unloading through the transition module.
Compared with the prior art, this application sets up two letter sorting passageways through setting up at the transfer passage side, be convenient for convey the letter sorting with the material on the transfer passage, and set up two transition modules on transfer passage, the material of being convenient for is in the place smooth transition that transfer passage and letter sorting passageway are borderline, this setting can let material frame accomplish the material loading back from the material loading end, will expect that the frame conveys to the unloading end through transfer passage and load the product, can not only reduce extra transportation and the operation of material frame, can also carry out high-efficient utilization with material frame, greatly improve the convenience and the practicality of unloading on the device, greatly improve the last unloading work efficiency of product.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the application being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (8)

1. The utility model provides a novel go up unloader which characterized in that: including transfer passage and a plurality of letter sorting passageway and transition module, the transfer passage sets up along X axle direction, the letter sorting passageway sets up at the transfer passage side along Y axle direction, the transition module sets up in the transfer passage along Z axle direction, the transition module includes first fixed plate, first Z axle driving piece, first rotary driving piece and a plurality of roll axis, first fixed plate and transfer passage fixed connection, first Z axle driving piece is installed on first fixed plate, first Z axle driving piece drive is connected with the second fixed plate, first rotary driving piece is installed on the second fixed plate, the second fixed plate is put on the shelf and is equipped with first mounting bracket, the roll axis is along Y axle direction align to grid on first mounting bracket, first rotary driving piece drives the roll axis through the belt and rotates.
2. The novel loading and unloading device as claimed in claim 1, wherein: the rolling shaft is sleeved with a plurality of anti-skid rubber sleeves.
3. The novel loading and unloading device as claimed in claim 1, wherein: and a plurality of positioning rods are mounted at the bottom end of the second fixing plate, and the lower ends of the positioning rods penetrate through the first fixing plate and are in sliding connection with the first fixing plate.
4. The novel loading and unloading device as claimed in claim 1, wherein: the conveying channel comprises a conveying frame, a second rotary driving piece, a first X-axis conveying track and a second X-axis conveying track, the second rotary driving piece is installed at the bottom end of the conveying frame, the first X-axis conveying track and the second X-axis conveying track are identical in structure and symmetrically installed on the conveying frame, a first transmission rod is installed between the first X-axis conveying track and the second X-axis conveying track, and the second rotary driving piece is in driving connection with the first transmission rod through a belt.
5. The novel loading and unloading device as claimed in claim 1, wherein: letter sorting passageway includes second mounting bracket, third rotary driving spare, first Y axle transfer orbit and second Y axle transfer orbit, third rotary driving spare is installed in second mounting bracket bottom, first Y axle transfer orbit and second Y axle transfer orbit structure are the same and the symmetry is installed on the second mounting bracket, install the second transfer line between first Y axle transfer orbit and the second Y axle transfer orbit, third rotary driving spare passes through the belt and is connected with the drive of second transfer line.
6. The novel loading and unloading device as claimed in claim 4, wherein: the conveying channel is provided with a plurality of positioning mechanisms, each positioning mechanism comprises a second Z-axis driving part and a positioning baffle, the second Z-axis driving parts are installed on the conveying frame, and the second Z-axis driving parts are in driving connection with the positioning baffles.
7. The novel loading and unloading device as claimed in claim 1, wherein: the number of the sorting channels is two.
8. The novel loading and unloading device as claimed in claim 1, wherein: the number of the transition modules is two.
CN202221839616.4U 2022-07-18 2022-07-18 Novel feeding and discharging device Active CN217946616U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221839616.4U CN217946616U (en) 2022-07-18 2022-07-18 Novel feeding and discharging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221839616.4U CN217946616U (en) 2022-07-18 2022-07-18 Novel feeding and discharging device

Publications (1)

Publication Number Publication Date
CN217946616U true CN217946616U (en) 2022-12-02

Family

ID=84222969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221839616.4U Active CN217946616U (en) 2022-07-18 2022-07-18 Novel feeding and discharging device

Country Status (1)

Country Link
CN (1) CN217946616U (en)

Similar Documents

Publication Publication Date Title
CN110015481A (en) Connection platform
CN108680851A (en) A kind of large scale circuit board automatic test machine
CN113460565B (en) Feeding and discharging device of special flat-panel printer for printing
CN217946616U (en) Novel feeding and discharging device
CN109158824B (en) Three-outlet-line-type bus-belt supply mechanism, bus-belt welding machine and belt supply method
CN110497102A (en) A kind of material transmission system and laser process equipment
CN201952003U (en) Magazine circulation device and system thereof
CN217888713U (en) Automatic sorting system equipment for logistics storage
CN111470301A (en) Glass plate coating material loading conveying system
CN216580511U (en) Luggage placing device in high-speed rail carriage
CN207037022U (en) A kind of continuous detection machine of flexible PCB
CN105236083A (en) Air cylinder drive mechanism used for stepping conveying and matching method
CN215099945U (en) Buffer memory conveying device
CN215432735U (en) Full-automatic annular transfer chain of combined type intelligence
CN214933858U (en) Robot loading and unloading is with transport frame of plugging into
CN115649787A (en) Unmanned aerial vehicle production line communication testing device and testing method
CN205397446U (en) Automatic loading attachment and have its automatic feeding machine
CN212023227U (en) Automatic paste mark assembly device
CN212291871U (en) Transplanting device
CN111804829A (en) Automatic move last unloading transport structure who carries machine
CN113305569A (en) Power supply fan assembling equipment
CN113427309B (en) Full-automatic annular transfer chain of combined type intelligence
CN219468851U (en) Silicone rubber cylinder transfer table
CN220885797U (en) Automatic feeding and discharging mechanism for stamping IGBT (insulated Gate Bipolar transistor) substrate
CN214848192U (en) Go up unloading slip table mechanism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 523000 Room 102, Building 1, No. 1, Hongwu Road, Zhangkengchang, Hengli Town, Dongguan, Guangdong

Patentee after: Dongguan Mingyiyou Automation Equipment Co.,Ltd.

Address before: No. 780, Liaobu Section, Shida Road, Liaobu Town, Dongguan, Guangdong 523,000

Patentee before: Dongguan Mingyiyou Automation Equipment Co.,Ltd.