CN217920754U - Cable erecting device for building electromechanical installation - Google Patents

Cable erecting device for building electromechanical installation Download PDF

Info

Publication number
CN217920754U
CN217920754U CN202221879976.7U CN202221879976U CN217920754U CN 217920754 U CN217920754 U CN 217920754U CN 202221879976 U CN202221879976 U CN 202221879976U CN 217920754 U CN217920754 U CN 217920754U
Authority
CN
China
Prior art keywords
cable
fixed mounting
mounting
staff
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221879976.7U
Other languages
Chinese (zh)
Inventor
贾全兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Yongye Construction And Installation Engineering Co ltd
Original Assignee
Hefei Yongye Construction And Installation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Yongye Construction And Installation Engineering Co ltd filed Critical Hefei Yongye Construction And Installation Engineering Co ltd
Priority to CN202221879976.7U priority Critical patent/CN217920754U/en
Application granted granted Critical
Publication of CN217920754U publication Critical patent/CN217920754U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a cable erection device for building electromechanical installation, the on-line screen storage device comprises a base, base top fixed mounting has the U template, all sets up the mounting hole on the left side inner wall of U template and the right side inner wall, all rotates through the bearing in two mounting holes and installs the pivot, and the both ends homoenergetic of pivot can extend to outside the mounting hole. The utility model relates to a rationally, the practicality is good, be convenient for promote the cable dish and move ahead, in-process in the way of advancing, outside the automatic cable dish of going around of steerable cable, and then do not need the manual rotation cable dish of staff to wind out the cable, do not need the handheld cable of staff and drag the cable and move ahead, physical demands when can reducing the staff and erect the cable, and be convenient for transport the one end of cable to high department construction department, so that the staff erects the wiring operation, do not need the staff to climb and send the cable to high department construction department, time saving and labor saving, the potential safety hazard when having eliminated the operation.

Description

Cable erecting device for building electromechanical installation
Technical Field
The utility model relates to a cable erection technical field specifically is a cable erection device is used in electromechanical installation of building.
Background
The building electromechanical installation generally comprises an electrical engineering system, a ventilation and heating system, a water supply and drainage system, a fire fighting system, a mechanical equipment system, a gas system and the like. When the building construction, need use a plurality of different types of electromechanical device, electromechanical device need connect the cable and can only run the use after circular telegram, consequently need use a large amount of cables when the building construction, when using the cable conductor, need use the cable erection device for the electromechanical installation of building for the cable erection of building.
Among the prior art, chinese patent that the grant bulletin number is CN212127033U discloses a cable erection device for building machinery electrical installation, the on-line screen storage device comprises a base, the bottom movable mounting of base has the truckle, one side position of base is equipped with pushes away the handle, the top of base is equipped with damping device, damping device's top is equipped with anchor clamps mechanism, one side movable mounting of anchor clamps mechanism has the connecting axle, the one end movable mounting of connecting axle has the cable roller, outside one side position of cable roller is equipped with cable fixing device, damping device is including shock attenuation cover, shock-absorbing column, damping spring, buffer spring and buffering piece, shock-absorbing column fixed mounting is on the upper portion of base. However, when the cable erection device for building electromechanical installation is in actual use, in the process of cable erection operation, a worker needs to manually rotate the cable disc to wind out a cable, and the worker needs to manually pull the cable to move forward, so that physical power consumption of the worker is increased, the operation process is complicated, the worker also needs to climb to a high position to convey one end of the cable to a high-position construction position to perform cable connection, time and labor are wasted in operation, and potential safety hazards exist.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a cable erection device for building electromechanical installation has solved foretell cable erection device for building electromechanical installation when in-service use, need the manual rotation cable dish of staff to wind the cable out, still need the staff manual cable that pulls go ahead, staff's physical demands has been increased, the operation process is loaded down with trivial details, and it carries out the wiring of cable to the high department of construction department to still need the staff to climb to transport the one end of cable, the operation is wasted time and energy, there is the problem of potential safety hazard.
(II) technical scheme
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a cable erection device for building electromechanical installation, the on-line screen storage device comprises a base, base top fixed mounting has the U template, all set up the mounting hole on the left side inner wall of U template and the right side inner wall, all rotate through the bearing in two mounting holes and install the pivot, the both ends homoenergetic of pivot extends outside the mounting hole, the equal fixed mounting in one end that two pivots are close to each other has the mounting disc, be provided with the cable dish between two mounting discs, two mounting discs pass through the bolt respectively with the both sides fixed connection of cable dish, around being equipped with the cable on the cable dish, the bottom fixed mounting of base has two axle beds, all rotate on two axle beds and install the cross axle, the equal fixed mounting in both ends of two cross axles has the gyro wheel, the left side of U template is provided with actuating mechanism, the right side of U template is provided with send line mechanism.
Preferably, the driving mechanism comprises an auxiliary chain wheel, a main chain wheel and a chain, the auxiliary chain wheel is fixedly sleeved at the left end of one of the two rotating shafts, the main chain wheel is fixedly sleeved on one of the two transverse shafts, and the chain is wound on the auxiliary chain wheel and the main chain wheel.
Preferably, send line mechanism including supporting diaphragm, electric putter, lifter plate, fixing base and double-layered line subassembly, support diaphragm fixed mounting on the right side outer wall of U template, electric putter fixed mounting is at the top of supporting the diaphragm, lifter plate fixed mounting is at electric putter's output axle head, and fixing base fixed mounting is in the bottom of lifter plate, and the hole of placing has been seted up to one side of fixing base.
Preferably, the wire clamping assembly comprises two lead screws, two arc-shaped clamping plates and a motor, the two lead screws are all rotatably installed in the placing holes, the two lead screws are fixedly connected with one ends close to each other, the threads of the two lead screws are oppositely arranged in a rotating direction, the two arc-shaped clamping plates are respectively sleeved on the corresponding lead screws in a threaded manner, the motor is arranged on the right side of the fixing base, and one end of one of the two lead screws extends to the outside of the fixing base and is fixedly connected with the output shaft of the motor.
Preferably, the outer wall of the right side of the fixing seat is fixedly provided with a reinforcing plate, and the motor is fixedly arranged at the top of the reinforcing plate.
Preferably, the guide groove has been seted up on the bottom inner wall of placing the hole, and the equal fixed mounting in bottom of two arc splint has the guide bar, and the equal slidable mounting in bottom of two guide bars is in the guide groove.
Preferably, two L-shaped grab rails are fixedly mounted on the front side wall of the base.
(III) advantageous effects
The utility model provides a cable erection device is used in electromechanical installation of building. The method has the following beneficial effects:
(1) This cable erecting device is used in building machinery electrical installation, can fix the cable dish installation that the winding has the cable between two mounting discs through utilizing the bolt, in-process through promoting the base and go forward, utilize the auxiliary sprocket, the connection cooperation of main sprocket and chain, steerable cable dish and gyro wheel synchronous revolution, and then outside steerable cable is automatic to wind out the cable dish, do not need staff's manual rotation cable dish to wind out the cable, do not need staff to hold the cable and drag the cable to move ahead, physical demands when can reduce staff's set up the cable, when having solved and set up the cable, artifical manual rotation cable dish is wound out the cable, artifical manual cable that drags moves ahead, consume the problem of staff's physical power.
(2) This cable erecting device is used in building electromechanics installation, insert through the one end of cutting the cable and place downtheholely, utilize the connection cooperation of centre gripping subassembly, can press from both sides the one end of cable tightly to fix in the fixing base, through starting electric putter work, can rise when the one end of pressing from both sides the tight fixed cable of clamp to the high position that needs the wiring construction, through pushing away the base to the position that needs to the electromechanical wiring of building, the connection cooperation of utilizing the centre gripping subassembly, it is fixed to remove the centre gripping to the cable, the staff that is located the eminence construction holds the cable, alright carry out the cable and the electromechanical work of setting up the wiring of building, and then conveniently transport the one end of cable to high department of construction department, so that the staff work of working a telephone switchboard, it climbs high to have solved needs the staff and sends the cable to high department of construction department, it is time and energy consuming, there is the problem of potential safety hazard.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic sectional view of the front view of the present invention;
fig. 3 is an enlarged schematic view of a portion a in fig. 2.
In the figure: 1. a base; 2. a U-shaped plate; 3. a rotating shaft; 4. mounting a disc; 5. a cable reel; 6. a cable; 7. a shaft seat; 8. a horizontal axis; 9. a roller; 10. a secondary sprocket; 11. a main sprocket; 12. a chain; 13. supporting the transverse plate; 14. an electric push rod; 15. a lifting plate; 16. a fixed seat; 17. placing holes; 18. a screw rod; 19. an arc-shaped splint; 20. a motor; 21. l-shaped grab rail.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, are not to be construed as limiting the present invention, and in the description of the present invention, "plurality" means two or more unless specifically defined otherwise.
As shown in fig. 1-3, the utility model provides a technical solution: a cable erecting device for building electromechanical installation comprises a base 1, wherein mounting holes are respectively formed in the left inner wall and the right inner wall of a U-shaped plate 2,U fixedly mounted at the top of the base 1, rotating shafts 3 are rotatably mounted in the two mounting holes through bearings, both ends of each rotating shaft 3 can extend out of the mounting holes, mounting discs 4 are fixedly mounted at the mutually close ends of the two rotating shafts 3, a cable disc 5 is arranged between the two mounting discs 4, the two mounting discs 4 are respectively and fixedly connected with both sides of the cable disc 5 through bolts, both sides of the cable disc 5 are respectively and fixedly assembled with the two mounting discs 4 through the bolts, so that the cable disc 5 can be conveniently detached, installed and fixed, the cable disc 5 can be conveniently replaced, a cable 6 is wound on the cable disc 5, cable dish 5 is used for depositing the coiling of cable 6, base 1's bottom fixed mounting has two axle beds 7, all rotate on two axle beds 7 and install cross axle 8, the equal fixed mounting in both ends of two cross axles 8 has gyro wheel 9, utilize four gyro wheels 9, make things convenient for base 1 to move subaerial, the left side of U template 2 is provided with actuating mechanism, utilize actuating mechanism, promote the in-process that the device removed, steerable cable 6 is automatic to be taken around from mounting disc 4, and then do not need staff's manual rotation cable dish 5 to take around cable 6, it goes forward not need staff to pull cable 6, U template 2's right side is provided with wire feeding mechanism, utilize wire feeding mechanism, can realize stabilizing the centre gripping fixed to cable 6's one end, and can send it to high department of construction department, so that staff's operation of working a telephone switchboard.
In this embodiment, the driving mechanism includes an auxiliary sprocket 10, a main sprocket 11 and a chain 12, the auxiliary sprocket 10 is fixedly sleeved on the left end of one of the two rotating shafts 3, the main sprocket 11 is fixedly sleeved on one of the two cross shafts 8, the chain 12 is wound on the auxiliary sprocket 10 and the main sprocket 11, and the auxiliary sprocket 10, the main sprocket 11 and the chain 12 are connected and matched to control the rotation of the cable tray 5 in the process of pushing the base 1 to move forward, so that the cable 6 can be automatically wound out of the cable tray 5.
In this embodiment, send line mechanism including supporting diaphragm 13, electric putter 14, lifter plate 15, fixing base 16 and wire clamping component, support diaphragm 13 fixed mounting on the right side outer wall of U template 2, electric putter 14 fixed mounting is at the top of supporting diaphragm 13, lifter plate 15 fixed mounting is at electric putter 14's output axle head, fixing base 16 fixed mounting is in lifter plate 15's bottom, place hole 17 has been seted up to one side of fixing base 16, electric putter 14 risees or descends with control lifter plate 15 and fixing base 16, wire clamping component is used for pressing from both sides the tight fixing in placing hole 17 of one end of cable 6, so that send the one end of cable 6 to the eminence.
In this embodiment, the wire clamping component includes two lead screws 18, two arc splint 19 and motor 20, two lead screws 18 all rotate to be installed in placing hole 17, the one end fixed connection that two lead screws 18 are close to each other, the screw thread of two lead screws 18 is revolved to opposite setting, two arc splint 19 respectively the screw thread cover establish on corresponding lead screw 18, motor 20 sets up the right side at fixing base 16, the one end of a lead screw 18 in two lead screws 18 extends to fixing base 16 outside and with motor 20's output shaft fixed connection, motor 20 is used for driving two lead screws 18 to rotate, utilize two arc splint 19 respectively with corresponding lead screw 18's threaded connection cooperation, steerable two arc splint 19 are to being close to each other or to the direction removal of keeping away from each other, utilize two arc splint 19's centre gripping cooperation, can stabilize the centre gripping fixed to the one end of cable 6.
In this embodiment, fixed mounting has the gusset plate on the right side outer wall of fixing base, and motor 20 fixed mounting utilizes the gusset plate at the top of gusset plate, plays the effect of supporting motor 20, has improved the fixed reliability of motor 20 installation.
In this embodiment, place and seted up the guide way on the bottom inner wall of hole 17, the equal fixed mounting in bottom of two arc splint 19 has the guide bar, and the equal slidable mounting in bottom of two guide bars utilizes the sliding connection cooperation of two guide bars in the guide way, can lead to two arc splint 19's moving direction for two arc splint 19 can be placing downthehole horizontal migration.
In this embodiment, two L-shaped grab rails 21 are fixedly mounted on the front side wall of the base 1, and the two L-shaped grab rails 21 are used to facilitate the movement of the base 1.
In this embodiment, fixed mounting has control switch on the right side outer wall of U template 2, and electric putter 14, motor 20 and control switch loop through wire and external power cord electric connection and constitute the return circuit, and motor 20 adopts motor that can just reverse, and the start-stop and the reset work of the steerable electric putter 14 of control switch still can control start-stop and just reverse work of motor 20.
When the cable tray is used, the cable tray 5 wound with the cable 6 is fixedly installed between the two installation trays 4 by using bolts, one end of the cable 6 is fixedly placed at a proper place during the operation of erecting the cable, the four rollers 9 roll on the ground in the process of pushing the base 1 to move forwards by holding the corresponding L-shaped grab rail 21 with two hands, so that the two transverse shafts 8 rotate along with the two transverse shafts, the auxiliary chain wheel 10, the main chain wheel 11 and the chain 12 are connected and matched to control the two rotating shafts 3, the two installation trays 4 and the cable tray 5 to rotate synchronously with the rollers 9, further the cable 6 can be controlled to automatically wind out of the cable tray 5, further the cable tray 5 does not need to be manually rotated by a worker to wind out the cable 6, the worker does not need to hold the cable 6 and drag the cable 6 to move forwards, the physical consumption of the worker during the cable erection can be reduced, when the cable 6 is wound out of the required length, the cable 6 is cut off the cable tray 5, the cable disc 5 can be detached from the two mounting discs 4, then one end of the cable 6 which is cut off is inserted into the placing hole 17, the power is switched on, the motor 20 is started to rotate positively, the motor 20 drives the two screw rods 18 to rotate positively, the two screw rods 18 are arranged in opposite screw threads, the two arc-shaped clamping plates 19 can be controlled to move towards the direction which is close to each other, when the two arc-shaped clamping plates 19 clamp one end of the cable 6, the motor 20 stops working, then the electric push rod 14 is started to work, the electric push rod 14 pushes the lifting plate 15, the fixed seat 16 and one end of the cable 6 which is clamped and fixed to rise, when one end of the cable 6 is risen to the height position which needs to be wired, the electric push rod 14 stops working, then the base 1 is pushed to the position which needs to be wired to the building machine, and the motor 20 drives the two screw rods 18 to rotate reversely by starting the motor 20, steerable two arc splint 19 remove to the direction of keeping away from each other, it is fixed to remove the centre gripping to cable 6 promptly, the staff that is located the eminence construction holds cable 6, alright carry out cable 6 and the electromechanical wiring operation that erects of building, and then the convenience is fixed to the one end of cable 6 centre gripping of stabilizing, and can transport the one end of cable 6 to high department of construction department, so that the staff wiring operation, do not need the staff to climb and deliver cable 6 to high department of construction department, time saving and labor saving, the potential safety hazard when having eliminated the operation, the content of not making detailed description in this description all belongs to the prior art that the professional of this field knows simultaneously.
To sum up, this cable erecting device for building electromechanical installation is convenient for promote cable dish 5 and move ahead, in the in-process that moves ahead, steerable cable 6 is automatic to be taken around out cable dish 5, and then do not need the staff manual rotation cable dish 5 to be taken around out cable 6, do not need the staff to hand cable 6 and drag cable 6 and move ahead, physical demands when can reduce the staff and erect the cable, and be convenient for transport the one end of cable 6 to high construction department, so that the staff erects the wiring operation, do not need the staff to climb high and send cable 6 to high construction department, and time saving and labor saving has eliminated the potential safety hazard during operation.

Claims (7)

1. The utility model provides a cable erection device for electromechanical installation of building, includes base (1), its characterized in that: base (1) top fixed mounting has U template (2), all set up the mounting hole on the left side inner wall of U template (2) and the right side inner wall, two all rotate through the bearing in the mounting hole and install pivot (3), the both ends homoenergetic of pivot (3) extend to outside the mounting hole, two the equal fixed mounting in one end that pivot (3) are close to each other has mounting disc (4), two be provided with cable dish (5), two between mounting disc (4) pass through the bolt respectively with the both sides fixed connection of cable dish (5), around being equipped with cable (6) on cable dish (5), the bottom fixed mounting of base (1) has two axle bed (7), two all rotate on axle bed (7) and install cross axle (8), two the equal fixed mounting in both ends of cross axle (8) has gyro wheel (9), the left side of U template (2) is provided with actuating mechanism, the right side of U template (2) is provided with wire feeding mechanism.
2. The cable erection device for building electromechanical installation of claim 1, wherein: actuating mechanism includes auxiliary sprocket (10), main sprocket (11) and chain (12), auxiliary sprocket (10) fixed cover is established at two the left end of a pivot (3) in pivot (3), main sprocket (11) fixed cover is established at two on a cross axle (8) in cross axle (8), chain (12) are around establishing on auxiliary sprocket (10) and main sprocket (11).
3. The cable erection device for building electromechanical installation of claim 1, wherein: send line mechanism including supporting diaphragm (13), electric putter (14), lifter plate (15), fixing base (16) and press from both sides the line subassembly, support diaphragm (13) fixed mounting be in on the right side outer wall of U template (2), electric putter (14) fixed mounting be in support the top of diaphragm (13), lifter plate (15) fixed mounting be in the output axle head of electric putter (14), fixing base (16) fixed mounting be in the bottom of lifter plate (15), place hole (17) have been seted up to one side of fixing base (16).
4. A cable erecting device for building machinery electrical installation according to claim 3, wherein: the wire clamping assembly comprises two screw rods (18), two arc-shaped clamping plates (19) and a motor (20), the screw rods (18) are installed in the placing holes (17) in a rotating mode, the screw rods (18) are fixedly connected with one end, close to each other, of the screw rods (18), the screw threads of the screw rods (18) are oppositely arranged, the arc-shaped clamping plates (19) are correspondingly sleeved with the screw rods (18) in a threaded mode respectively, the motor (20) is arranged on the right side of the fixing base (16), and the end of one screw rod (18) in the screw rods (18) extends to the outside of the fixing base (16) and is fixedly connected with the output shaft end of the motor (20).
5. The cable erection device for building electromechanical installation of claim 4, wherein: the right side outer wall of fixing base is last fixed mounting has the gusset plate, motor (20) fixed mounting be in the top of gusset plate.
6. The cable erection device for building electromechanical installation of claim 4, wherein: the inner wall of the bottom of the placing hole (17) is provided with a guide groove, the bottom of the arc-shaped clamping plate (19) is fixedly provided with a guide rod, and the bottom of the guide rod is slidably mounted in the guide groove.
7. The cable erection device for building electromechanical installation of claim 1, wherein: two L-shaped grab rails (21) are fixedly mounted on the front side wall of the base (1).
CN202221879976.7U 2022-07-20 2022-07-20 Cable erecting device for building electromechanical installation Active CN217920754U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221879976.7U CN217920754U (en) 2022-07-20 2022-07-20 Cable erecting device for building electromechanical installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221879976.7U CN217920754U (en) 2022-07-20 2022-07-20 Cable erecting device for building electromechanical installation

Publications (1)

Publication Number Publication Date
CN217920754U true CN217920754U (en) 2022-11-29

Family

ID=84190580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221879976.7U Active CN217920754U (en) 2022-07-20 2022-07-20 Cable erecting device for building electromechanical installation

Country Status (1)

Country Link
CN (1) CN217920754U (en)

Similar Documents

Publication Publication Date Title
CN209758751U (en) Cable winding and unwinding devices that transformer substation engineering construction was used
CN217920754U (en) Cable erecting device for building electromechanical installation
CN211899512U (en) Building construction equipment of building a wall
CN216981341U (en) Cable winding and unwinding devices for electromechanical installation engineering
CN108767785B (en) Power bus duct fixing equipment
CN113651181B (en) Production equipment and production process of fire-resistant armored cable for aircraft carrier
CN110977078B (en) Special-shaped battery output wire welding device
CN211930123U (en) Threading construction device for building electrical engineering
CN109835768B (en) Wire coil winding machine
CN211110819U (en) Lime kiln feeding system power-off control device
CN111807152A (en) Large-scale cable coiling mechanism
CN214377790U (en) Cutting device for cable processing
CN115570084B (en) Fixed-length cutting device for power cables
CN220011673U (en) Cable supporting frame structure
CN220527553U (en) Wire harness pipe penetrating device for power construction
CN215293852U (en) Fixing device for laying storage pipelines
CN220098464U (en) Installation lifting mechanism for photovoltaic power generation
CN220375949U (en) Labor-saving portable axial paying-off machine
CN213170774U (en) Indoor pay off rack of electric power construction
CN218595544U (en) Pipe fitting production pile up neatly device
CN216471457U (en) Cable coiling device for power engineering
CN219213319U (en) Cutting device is used in rock wool board production
CN217229023U (en) Composite insulation board transfer machine
CN220845347U (en) Cable handling device
CN220787689U (en) Photovoltaic cable processing automatic winding device