CN211930123U - Threading construction device for building electrical engineering - Google Patents
Threading construction device for building electrical engineering Download PDFInfo
- Publication number
- CN211930123U CN211930123U CN202021025937.1U CN202021025937U CN211930123U CN 211930123 U CN211930123 U CN 211930123U CN 202021025937 U CN202021025937 U CN 202021025937U CN 211930123 U CN211930123 U CN 211930123U
- Authority
- CN
- China
- Prior art keywords
- electrical engineering
- fixedly connected
- building electrical
- construction device
- threading
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及电气工程穿线技术领域,尤其涉及一种建筑电气工程穿线施工装置。The utility model relates to the technical field of electrical engineering threading, in particular to a threading construction device for building electrical engineering.
背景技术Background technique
建筑电气线路都是预埋线管,所以后期穿线显得特别的困难,目前人们在建筑施工时,通常都是用手拖拽线缆,其不仅效率低,费时费力,且线缆容易缠绕打结,不便于人们使用,由于大多数都是人工手动操作,存在很多的不稳定性,因此不能保证进线的稳定性,降低进线的效率,为此,我们提出了一种建筑电气工程穿线施工装置。Building electrical lines are all pre-buried pipes, so it is particularly difficult to thread them later. At present, people usually drag the cables by hand during construction, which is not only inefficient, time-consuming and labor-intensive, and the cables are easily entangled and knotted. , It is not convenient for people to use. Because most of them are manually operated, there are many instability, so the stability of the incoming line cannot be guaranteed, and the efficiency of the incoming line can not be guaranteed. For this reason, we propose a construction electrical engineering threading construction device.
实用新型内容Utility model content
本实用新型的目的是为了解决现有技术中得不足,而提出的一种建筑电气工程穿线施工装置。The purpose of the utility model is to solve the deficiencies in the prior art, and propose a wire-threading construction device for building electrical engineering.
为了实现上述目的,本实用新型采用了如下技术方案:In order to achieve the above-mentioned purpose, the utility model adopts the following technical solutions:
一种建筑电气工程穿线施工装置,包括箱体和支撑板,所述箱体内部转动连接有丝杆,所述丝杆左右两端均螺纹连接有第一滑块,两个所述第一滑块顶端均转动连接有升降杆,所述支撑板底部固定连接有凸块,所述凸块上开凿有第一滑槽,所述升降杆远离第一滑块的一端滑动连接在第一滑槽上,所述支撑板外壁固定连接有支架,所述支架顶端转动连接有线盘,所述支撑板顶端外壁固定连接有滑竿,所述滑竿中间开设有第二滑槽,所述第二滑槽内滑动连接有两个第二滑块,两个所述第二滑块外壁均固定连接有第一转轴,两个所述第一转轴上分别转动连接有第一滚轮和第二滚轮,所述第二滑槽内设有第一弹簧和第二弹簧,所述第一弹簧和第二弹簧分别连接在第二滑块与第二滑槽的底部内壁和顶部内壁之间,所述线盘上绕有钢丝绳,所述钢丝绳连接在第一滚轮和第二滚轮之间。A wire-threading construction device for building electrical engineering comprises a box body and a support plate, a screw rod is rotatably connected inside the box body, and first sliders are threadedly connected to the left and right ends of the screw rod. A lifting rod is rotatably connected to the top of the block, a bump is fixedly connected to the bottom of the support plate, a first chute is excavated on the bump, and one end of the lifting rod away from the first slider is slidably connected to the first chute A bracket is fixedly connected to the outer wall of the support plate, the top end of the bracket is rotatably connected to a cable disk, and a sliding rod is fixedly connected to the outer wall of the top end of the support plate. Two second sliders are slidably connected, the outer walls of the two second sliders are fixedly connected with a first rotating shaft, and a first roller and a second roller are respectively rotatably connected to the two first rotating shafts. A first spring and a second spring are arranged in the second chute, and the first spring and the second spring are respectively connected between the bottom inner wall and the top inner wall of the second sliding block and the second chute. There is a wire rope connected between the first roller and the second roller.
作为本实用新型优选的实施方式:所述箱体底部固定连接有万向轮。As a preferred embodiment of the present invention, a universal wheel is fixedly connected to the bottom of the box body.
作为本实用新型优选的实施方式:所述箱体侧壁固定连接有第一把手。As a preferred embodiment of the present invention, a first handle is fixedly connected to the side wall of the box body.
作为本实用新型优选的实施方式:所述箱体顶部设有第三滑槽,所述支撑板底部设有第三滑块,所述第三滑块滑动连接在第三滑槽内。As a preferred embodiment of the present invention, the top of the box is provided with a third chute, and the bottom of the support plate is provided with a third sliding block, and the third sliding block is slidably connected in the third chute.
作为本实用新型优选的实施方式:所述支撑板外壁固定连接有电机,所述电机和线盘输出端均设有带轮,所述带轮通过皮带相连接。As a preferred embodiment of the present invention, a motor is fixedly connected to the outer wall of the support plate, the motor and the output end of the spool are both provided with pulleys, and the pulleys are connected by belts.
作为本实用新型优选的实施方式:所述丝杆两端螺纹旋向相反,两个所述第一滑块分别螺纹连接在丝杆的两端。As a preferred embodiment of the present invention, the screw threads at both ends of the screw rod are in opposite directions, and the two first sliders are respectively threadedly connected to the two ends of the screw rod.
作为本实用新型优选的实施方式:所述丝杆上可拆卸连接有第二把手。As a preferred embodiment of the present invention, a second handle is detachably connected to the screw rod.
与现有技术相比,本实用新型提供了一种建筑电气工程穿线施工装置,具备以下有益效果:Compared with the prior art, the utility model provides a wiring construction device for building electrical engineering, which has the following beneficial effects:
本实用新型中,一般建筑时都会将线管盖进建筑的墙体内部,所以穿线时变得极为困难,且劳动难度大,本电气工程穿线施工装置将根据穿线时所遇见的困难设计,因为墙体的高低,线路也是错综复杂,高处和低处都有线管,使用本装置时利用第一把手把穿线装置通过万向轮推动到穿线位置,根据建筑内的线管的高低,利用第二把手转动丝杆,丝杆两边的第一滑块将带动升降杆将支撑板调节到合适的高度,箱体上的第三滑槽和支撑板底部的第三滑块能让升降时的设备稳定性更高,当高度调节好后,将钢丝绳的线头对准线管,电机输出端将通过皮带带动线盘转动,线盘将钢丝绳平稳匀速送入线管内,滑竿上的第一滚轮和第二滚轮会让线盘上的钢丝绳进给过程更平稳,本装置结构和操作简单,移动方便,可应对不同场景的穿线作业,省时省力,极大的提高了穿线效率,节约了劳动成本。In the utility model, in general construction, the wire pipe will be covered inside the wall of the building, so it becomes extremely difficult to thread the wire, and the labor is difficult. The height of the wall and the wiring are also intricate. There are wire pipes at the high and low places. When using this device, the first handle is used to push the threading device to the threading position through the universal wheel. According to the height of the wire pipes in the building, the second handle is used. Turn the screw, the first sliders on both sides of the screw will drive the lifting rod to adjust the support plate to a suitable height, the third chute on the box and the third slider at the bottom of the support plate can make the equipment stable during lifting Higher, when the height is adjusted, align the wire end of the wire rope to the wire tube, the motor output end will drive the wire reel to rotate through the belt, the wire reel will send the wire rope into the wire tube smoothly and evenly, the first roller and the second roller on the sliding rod It will make the feeding process of the wire rope on the spool more stable. The device has simple structure and operation, and is convenient to move. It can cope with threading operations in different scenarios, save time and effort, greatly improve threading efficiency, and save labor costs.
附图说明Description of drawings
图1为本实用新型提出的一种建筑电气工程穿线施工装置的结构示意图之一;Fig. 1 is one of the structural representations of a kind of building electrical engineering threading construction device proposed by the utility model;
图2为本实用新型提出的一种建筑电气工程穿线施工装置图1中A部分的结构示意图;Fig. 2 is the structural representation of part A in Fig. 1 of a kind of building electrical engineering threading construction device proposed by the utility model;
图3为本实用新型提出的一种建筑电气工程穿线施工装置的结构示意图之二;Fig. 3 is the second structural schematic diagram of a kind of construction electrical engineering threading construction device proposed by the utility model;
图4为本实用新型提出的一种建筑电气工程穿线施工装置图1中B部分的结构示意图。FIG. 4 is a schematic structural diagram of part B in FIG. 1 of a wiring construction device for building electrical engineering proposed by the utility model.
图中:1、箱体;101、万向轮;102、第三滑槽;103、第一把手;2、丝杆;201、第一滑块;3、升降杆;4、第二把手;5、第三滑块;6、支撑板;601、第一滑槽;602、支架;603、滑竿;7、线盘;8、电机;9、第一滚轮;901、第二滑块;10、第二滚轮;11、第一弹簧;12、第二弹簧。In the figure: 1. Box body; 101, Universal wheel; 102, Third chute; 103, First handle; 2, Screw rod; 201, First slider; 3, Lifting rod; 4, Second handle; 5 , the third slider; 6, the support plate; 601, the first chute; 602, the bracket; 603, the sliding rod; 7, the wire reel; 8, the motor; 9, the first roller; 901, the second slider; 10, The second roller; 11, the first spring; 12, the second spring.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example.
在本实用新型的描述中,需要理解的是,术语“上”、“下”、“前”、“后”、“左”、“右”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inside", The orientation or positional relationship indicated by "outside" is based on the orientation or positional relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the indicated device or element must have a specific orientation , are constructed and operated in a specific orientation, and therefore should not be construed as a limitation of the present invention.
参照图1-4,一种建筑电气工程穿线施工装置,包括箱体1和支撑板6,箱体1内部转动连接有丝杆2,丝杆2左右两端均螺纹连接有第一滑块201,两个第一滑块201顶端均转动连接有升降杆3,支撑板6底部固定连接有凸块,凸块上开凿有第一滑槽601,升降杆3远离第一滑块201的一端滑动连接在第一滑槽601上,支撑板6外壁固定连接有支架602,支架602顶端转动连接有线盘7,支撑板6顶端外壁固定连接有滑竿603,滑竿603中间开设有第二滑槽,第二滑槽内滑动连接有两个第二滑块901,两个第二滑块901外壁均固定连接有第一转轴,两个第一转轴上分别转动连接有第一滚轮9和第二滚轮10,第二滑槽内设有第一弹簧11和第二弹簧12,第一弹簧11和第二弹簧12分别连接在第二滑块901与第二滑槽的底部内壁和顶部内壁之间,线盘7上绕有钢丝绳,钢丝绳连接在第一滚轮9和第二滚轮10之间。Referring to Figures 1-4, a wire-threading construction device for building electrical engineering includes a
箱体1底部固定连接有万向轮101。A
箱体1侧壁固定连接有第一把手103。A
箱体1顶部设有第三滑槽102,支撑板6底部设有第三滑块5,第三滑块5滑动连接在第三滑槽102内。The top of the
支撑板6外壁固定连接有电机8,电机8和线盘7输出端均设有带轮,带轮通过皮带相连接。A
丝杆2两端螺纹旋向相反,两个第一滑块201分别螺纹连接在丝杆2的两端。The two ends of the
丝杆2上可拆卸连接有第二把手4。A second handle 4 is detachably connected to the
本实用新型中,一般建筑时都会将线管盖进建筑的墙体内部,所以穿线时变得极为困难,且劳动难度大,本电气工程穿线施工装置将根据穿线时所遇见的困难设计,因为墙体的高低,线路也是错综复杂,高处和低处都有线管,使用本装置时利用第一把手103把穿线装置通过万向轮101推动到穿线位置,根据建筑内的线管的高低,利用第二把手4转动丝杆2,丝杆2两边的第一滑块201将带动升降杆3将支撑板6调节到合适的高度,箱体1上的第三滑槽102和支撑板6底部的第三滑块5能让升降时的设备稳定性更高,当高度调节好后,将钢丝绳的线头对准线管,电机8输出端将通过皮带带动线盘7转动,线盘7将钢丝绳平稳匀速送入线管内,滑竿603上的第一滚轮9和第二滚轮10会让线盘7上的钢丝绳进给过程更平稳,本装置结构和操作简单,移动方便,可应对不同场景的穿线作业,省时省力,极大的提高了穿线效率,节约了劳动成本。In the utility model, in general construction, the wire pipe will be covered inside the wall of the building, so it becomes extremely difficult to thread the wire, and the labor is difficult. The height of the wall and the wiring are also intricate, and there are wire pipes at both high and low places. When using this device, use the
以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above description is only a preferred embodiment of the present invention, but the protection scope of the present invention is not limited to this. Equivalent replacement or modification of the new technical solution and its utility model concept shall be included within the protection scope of the present utility model.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202021025937.1U CN211930123U (en) | 2020-06-08 | 2020-06-08 | Threading construction device for building electrical engineering |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202021025937.1U CN211930123U (en) | 2020-06-08 | 2020-06-08 | Threading construction device for building electrical engineering |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211930123U true CN211930123U (en) | 2020-11-13 |
Family
ID=73321188
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202021025937.1U Expired - Fee Related CN211930123U (en) | 2020-06-08 | 2020-06-08 | Threading construction device for building electrical engineering |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211930123U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113071812A (en) * | 2021-03-31 | 2021-07-06 | 陕西科技大学 | Model storage device |
-
2020
- 2020-06-08 CN CN202021025937.1U patent/CN211930123U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113071812A (en) * | 2021-03-31 | 2021-07-06 | 陕西科技大学 | Model storage device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN218144999U (en) | Cable pay-off rack convenient to use | |
| CN211310392U (en) | Cable draw gear for electric power construction | |
| CN211930123U (en) | Threading construction device for building electrical engineering | |
| CN219394232U (en) | Cable paying-off vehicle for cable construction | |
| CN109095270B (en) | Communication optical cable pay-off | |
| CN205011175U (en) | Carousel type cable reversing line device | |
| CN211700875U (en) | Automatic termination of electric power construction | |
| CN218478400U (en) | Cable paying-off device | |
| CN219498754U (en) | Threading construction device for building electrical engineering | |
| CN217984297U (en) | Automatic quantitative cable laying device | |
| CN216736916U (en) | Bundling machine for cable processing production | |
| CN211564348U (en) | Cable unwrapping wire cutting device for power engineering | |
| CN212245664U (en) | A junction box for power engineering erection | |
| CN217882612U (en) | Traction device for electric threading pipe production | |
| CN209940171U (en) | Portable trailer for quick cable laying and paying off for four-axis security | |
| CN202529659U (en) | Cable clamping roller | |
| CN221939740U (en) | Cable processing is with pulling coiling device | |
| CN206014072U (en) | A kind of automatic coiling device | |
| CN211509219U (en) | Adjustable device of building integrated management system | |
| CN207258930U (en) | A kind of movable type cable disk | |
| CN210838910U (en) | Novel flat cable pulley | |
| CN218809544U (en) | A cable storage reel | |
| CN218520775U (en) | A multi-functional winching device for electric power construction | |
| CN216335814U (en) | Automatic wire arranging device of winding machine | |
| CN216335776U (en) | Water conservancy and hydropower construction pipe laying pay-off |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CB03 | Change of inventor or designer information | ||
| CB03 | Change of inventor or designer information |
Inventor after: Gao Jingchao Inventor after: Tan Hao Inventor after: Xu Lele Inventor after: Zhan Cen Inventor before: Zhan Cen |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201113 |