CN217896592U - Foundation pit support horizontal displacement monitoring structure - Google Patents

Foundation pit support horizontal displacement monitoring structure Download PDF

Info

Publication number
CN217896592U
CN217896592U CN202221371231.XU CN202221371231U CN217896592U CN 217896592 U CN217896592 U CN 217896592U CN 202221371231 U CN202221371231 U CN 202221371231U CN 217896592 U CN217896592 U CN 217896592U
Authority
CN
China
Prior art keywords
enclosure
pipe
horizontal displacement
survey
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221371231.XU
Other languages
Chinese (zh)
Inventor
许彪
张亚军
王栋
董斌
窦之文
于学徽
刘丁瑞
刘若琳
任泽奎
杨浩龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Engineering Group Co Ltd
Original Assignee
China Railway Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Engineering Group Co Ltd filed Critical China Railway Construction Engineering Group Co Ltd
Priority to CN202221371231.XU priority Critical patent/CN217896592U/en
Application granted granted Critical
Publication of CN217896592U publication Critical patent/CN217896592U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a building engineering construction safety monitoring technical field especially relates to a foundation ditch enclosure horizontal displacement monitoring structure, include the foundation ditch and encircle the enclosure that the foundation ditch set up, the enclosure includes the structure wall and sets up structural pile in the middle of the structure wall, the inside still is provided with of foundation ditch is used for supporting the bearing structure of structural pile and structure wall, the inside of structural pile is provided with the survey pipe to one side, the survey pipe to one side is connected through the steel reinforcement cage ligature in bundle silk and the structural pile, places the survey appearance to one side that can follow the survey pipe to one side and reciprocate in the survey pipe to one side. The utility model discloses can know whether normal foundation ditch enclosure state through survey pipe and survey appearance to one side, provide the powerful foundation for the safety of engineering.

Description

Foundation pit support horizontal displacement monitoring structure
Technical Field
The utility model relates to a building engineering construction safety monitoring technical field especially relates to a foundation ditch enclosure horizontal displacement monitoring structure.
Background
The foundation pit enclosure mainly bears water pressure and soil pressure generated by a soil body to the foundation pit enclosure in the excavation process of the foundation pit and the building construction process, and transmits the pressure to the supporting structure, so that the foundation pit is stabilized by the temporary retaining wall structure. Therefore, a structure capable of monitoring the horizontal displacement of the foundation pit enclosure is needed, whether the state of the foundation pit enclosure is normal under the action of factors such as internal and external loads and foundation deformation can be known in time through the structure, and a basis is provided for safe operation of engineering.
SUMMERY OF THE UTILITY MODEL
Therefore, the to-be-solved technical problem of the utility model lies in providing a foundation ditch enclosure horizontal displacement monitoring structure can monitor the produced horizontal displacement of enclosure.
The utility model provides a foundation ditch enclosure horizontal displacement monitoring structures, includes the foundation ditch and encircles the enclosure that the foundation ditch set up, the enclosure includes the structure wall and sets up constructional pile in the middle of the structure wall, the inside still is provided with of foundation ditch is used for supporting the bearing structure of constructional pile and structure wall, the inside of constructional pile is provided with the survey pipe to one side, the survey pipe to one side is connected through the steel reinforcement cage ligature in wire and the constructional pile to one side, places the survey appearance to one side that can follow the survey pipe to one side and reciprocate in the survey pipe to one side.
As the utility model discloses well foundation ditch enclosure horizontal displacement monitoring structures is preferred, the bottom of survey pipe to one side is closed structure, and the bottom of survey pipe to one side is kept level or is less than the bottom of steel reinforcement cage with the bottom of steel reinforcement cage, and ground 5cm-8cm is stretched out at the top.
As the utility model discloses well foundation ditch enclosure horizontal displacement monitoring structures is preferred, survey the pipe to one side and be connected the completion back with the steel reinforcement cage, survey intraductal two measuring grooves to one side and be on a parallel with the displacement direction of enclosure.
As a preferred of the utility model discloses well foundation ditch enclosure horizontal displacement monitoring structure, the ligature interval of pricking the silk is not more than 1.5m.
As the utility model discloses well foundation ditch enclosure horizontal displacement monitoring structures's an preferred, the upper portion of survey appearance that inclines passes through the cable and is connected with receiving arrangement, be provided with the distance scale on the surface of cable.
As the utility model discloses well foundation ditch enclosure horizontal displacement monitoring structures is preferred, the entrance of survey pipe to one side is provided with the shutoff lid.
The utility model discloses technical scheme has following advantage: the utility model discloses a pre-buried pipe of surveying to one side in the enclosure, whether the survey appearance reciprocates monitoring enclosure and has produced horizontal displacement in the pipe of surveying to one side, can in time know whether foundation ditch enclosure state is normal, provide the powerful foundation for the safety of engineering.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the technical solutions in the prior art will be briefly described below.
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is the utility model discloses well inclinometer and cable junction sketch map.
Fig. 3 is the utility model discloses well steel reinforcement cage and survey union coupling sketch map to one side.
Description of reference numerals:
1. a foundation pit; 2. enclosing; 3. a support structure; 4. an oblique measuring pipe; 5. an inclinometer; 6. an electrical cable.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Furthermore, the technical features mentioned in the different embodiments of the invention described below can be combined with each other as long as they do not conflict with each other.
Example 1
This embodiment provides a foundation ditch enclosure horizontal displacement monitoring structures, as shown in fig. 1 and fig. 3, include foundation ditch 1 and encircle enclosure 2 that foundation ditch 1 set up, enclosure 2 includes the structure wall and sets up structural pile in the middle of the structure wall, 1 inside still is provided with of foundation ditch is used for supporting structural pile and structural wall's bearing structure 3, structural pile's inside is provided with survey pipe 4 to one side, survey pipe 4 to one side is connected through the steel reinforcement cage ligature in wire and the structural pile, places the survey appearance 5 to one side that can follow survey pipe 4 to one side in surveying pipe 4 to one side.
By adopting the structure, whether the enclosure 2 generates horizontal displacement can be monitored through the inclinometer 5 which moves up and down in the inclinometry pipe 4, whether the state of the enclosure 2 is normal can be known in time, and a powerful basis is provided for the safety of engineering.
In this embodiment, the bottom of the oblique measuring pipe 4 is a closed structure, the bottom of the oblique measuring pipe 4 is level with or lower than the bottom of the steel reinforcement cage, and the top of the oblique measuring pipe 4 extends out of the ground by 5cm-8cm.
By adopting the structure, the bottom of the oblique measuring pipe 4 is sealed, and impurities such as water and soil in a soil layer are prevented from entering the oblique measuring pipe 4, so that adverse effects on monitoring operation are avoided.
In this embodiment, after the oblique measuring pipe 4 is connected with the reinforcement cage, two measuring grooves in the oblique measuring pipe 4 are parallel to the displacement direction of the enclosure 2.
By adopting the structure, when the enclosure 2 generates horizontal displacement, the feedback can be timely obtained through the inclinometer 5 during monitoring operation, and the displacement generated by the enclosure 2 can not be omitted.
In this embodiment, in order to make firm in connection between survey pipe 4 and the steel reinforcement cage to one side, the ligature interval of two adjacent ligature silk should be not more than 1.5m, can adopt two ligature silk to carry out the ligature.
In the present embodiment, as shown in fig. 2, the upper part of the inclinometer 5 is connected with the receiving device through a cable 6, and the outer surface of the cable 6 is provided with distance scales.
Adopt above-mentioned structure, the distance scale of printing on the surface of cable 6 can play the indicative function when 4 jam of inclinometer, can also carry out data acquisition through observing the scale fixed point at the in-process that uses inclinometer 5 to monitor.
In this embodiment, a plugging cover is arranged at the inlet of the inclinometer pipe 4.
By adopting the structure, the inclination measuring pipe 4 is protected, concrete can be prevented from entering the inclination measuring pipe 4 in the pouring process of the enclosure 2, and blockage caused by sundries entering the inclination measuring pipe 4 can be prevented in the using process, so that the monitoring work cannot be normally unfolded.
In this embodiment, the inclinometer pipe 4 is formed by connecting a plurality of sections, the upper pipe and the lower pipe are well connected, no seam exists, and the joint is firmly fixed and sealed. The smoothness and the straightness of the inclined measuring pipe 4 are kept in the processes of binding the inclined measuring pipe 4 and pouring concrete of the enclosure 2.
Example 2
This example is the monitoring process in example 1:
s1: before monitoring, firstly, the analog probe is placed in the inclined measuring tube 4, and whether the measuring groove can be used or not and whether the phenomenon of probe clamping exists or not are checked;
s2: starting an inclination measuring instrument 5, inserting a probe guide wheel into a measuring groove in an inclination measuring pipe 4, loosening a cable 6, slowly lowering the inclination measuring instrument 5 to the bottom of the inclination measuring pipe 4 and stabilizing for eight minutes, then lifting the inclination measuring instrument 5 from bottom to top through the cable 6 from the bottom of the inclination measuring pipe 4, reading data once every 0.5m through the scale on the cable 6, and recording the depth and reading of a measuring point;
s3: and after the measurement is finished, rotating the probe by 180 degrees and inserting the probe into the same measuring groove, repeating the step S2, wherein the absolute values of the readings at the same depth in two times are the same, and timely performing compensation measurement when the readings are abnormal.
Example 3
The difference between the embodiment and the embodiment 1 is that the inclined measuring pipe 4 is not embedded into the enclosure 2, but is embedded into the enclosure 2 after the enclosure 2 is built, and the specific process is as follows: firstly, drilling a hole on an enclosure 2 according to a monitoring point position, wherein the aperture of the drilled hole is slightly larger than the outer diameter of an oblique measuring pipe 4, the outer diameter of the oblique measuring pipe 4 adopted in the embodiment is phi 76, the inner diameter of the drilled hole is phi 110, the hole depth is required to penetrate through the bottom surface of the enclosure for 3-8 m, the hard substrate is small, the soft substrate is large, and then the oblique measuring pipe 4 connected on the ground is placed into the drilled hole.
It should be understood that the above examples are only for clarity of illustration and are not intended to limit the embodiments. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. And obvious changes and modifications can be made without departing from the scope of the invention.

Claims (6)

1. A foundation pit enclosure horizontal displacement monitoring structure is characterized in that: including foundation ditch (1) and encircleing enclosure (2) that foundation ditch (1) set up, enclosure (2) are in including structure wall and setting structure stake in the middle of the structure wall, foundation ditch (1) inside still is provided with and is used for supporting bearing structure (3) of structure stake and structure wall, the inside of structure stake is provided with survey pipe (4) to one side, survey pipe (4) to one side is through pricking the steel reinforcement cage ligature connection in silk and the structure stake, places in surveying pipe (4) to one side and has followed survey appearance (5) to one side that pipe (4) reciprocated to one side.
2. The foundation pit enclosure horizontal displacement monitoring structure of claim 1, wherein the bottom of the inclinometric tube (4) is a closed structure, the bottom of the inclinometric tube (4) is level with or lower than the bottom of the reinforcement cage, and the top of the inclinometric tube extends 5cm-8cm above the ground.
3. The structure for monitoring the horizontal displacement of the foundation pit enclosure according to claim 2, wherein after the inclined pipe (4) is connected with the reinforcement cage, two measuring grooves in the inclined pipe (4) are parallel to the displacement direction of the enclosure (2).
4. The foundation pit support horizontal displacement monitoring structure of claim 1, wherein the binding distance of the binding wires is not more than 1.5m.
5. The foundation pit enclosure horizontal displacement monitoring structure of claim 1, wherein the upper part of the inclinometer (5) is connected with the receiving device through a cable (6), and distance scales are arranged on the outer surface of the cable (6).
6. The foundation pit enclosure horizontal displacement monitoring structure of claim 1, wherein a blocking cover is arranged at the entrance of the inclinometric pipe (4).
CN202221371231.XU 2022-06-02 2022-06-02 Foundation pit support horizontal displacement monitoring structure Active CN217896592U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221371231.XU CN217896592U (en) 2022-06-02 2022-06-02 Foundation pit support horizontal displacement monitoring structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221371231.XU CN217896592U (en) 2022-06-02 2022-06-02 Foundation pit support horizontal displacement monitoring structure

Publications (1)

Publication Number Publication Date
CN217896592U true CN217896592U (en) 2022-11-25

Family

ID=84112891

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221371231.XU Active CN217896592U (en) 2022-06-02 2022-06-02 Foundation pit support horizontal displacement monitoring structure

Country Status (1)

Country Link
CN (1) CN217896592U (en)

Similar Documents

Publication Publication Date Title
KR101162918B1 (en) Method of measuring underground displacement using inclinometer
KR101177459B1 (en) A testing pipe for underground water level and inclinometer and its equiping procedure
KR20100096992A (en) Unit structure of pivot joint for measuring 3d displacement and apparatus measuring 3d displacement by it
CN112554247A (en) Foundation pit monitoring system
CN205580447U (en) Automatic deviational survey pipe of fast -assembling
JP2015135045A (en) Method for stabilization when installing long object and method for installing long object
CN217896592U (en) Foundation pit support horizontal displacement monitoring structure
CN208219650U (en) A kind of tubular pole inclinometer locating guide device
CN110374094A (en) A kind of construction method of mechanical hole perfusion post
KR101008307B1 (en) Sinking measuring method for soft ground
CN112187843A (en) BIM-based system and method for automatically monitoring capital construction risks of deep foundation pit
Handfelt et al. Instrumentation for test fill in Hong Kong
CN112049100B (en) Multi-sphere detection method for foundation settlement
KR102237268B1 (en) Detecting system of flow variation
CN112197806B (en) Method for installing equipment for monitoring movement deformation, hydrology and stress of coal mining subsidence area
CN110440696B (en) Slope deep continuous displacement monitoring device and method
CN106592654A (en) Monitoring method for perpendicularity of steel pipe pile
CN111395339A (en) Mounting structure and mounting method for accurately embedding cast-in-situ bored pile casing
CN212452815U (en) Device suitable for foundation ditch deviational survey
CN219301562U (en) River course revetment safety integration monitoring station
KR100595009B1 (en) Method for processing underground inclination data in embankment, recording medium recorded with same, and apparatus using same
Bjerrum et al. Measuring instruments for strutted excavations
CN109736296A (en) The installation method of pre-buried benchmark and the setting method of workshop benchmark
CN211898602U (en) True top surface elevation detection device of concrete under water
KR200324464Y1 (en) Apparatus for measurement of ground condition in embankment

Legal Events

Date Code Title Description
GR01 Patent grant