CN217896490U - Telescopic double-layer guide frame - Google Patents
Telescopic double-layer guide frame Download PDFInfo
- Publication number
- CN217896490U CN217896490U CN202221575434.0U CN202221575434U CN217896490U CN 217896490 U CN217896490 U CN 217896490U CN 202221575434 U CN202221575434 U CN 202221575434U CN 217896490 U CN217896490 U CN 217896490U
- Authority
- CN
- China
- Prior art keywords
- guide frame
- frame
- parallel connection
- cross beam
- telescopic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
Description
技术领域technical field
本实用新型属于建筑施工技术领域,具体涉及一种伸缩式双层导向架。The utility model belongs to the technical field of building construction, in particular to a telescopic double-layer guide frame.
背景技术Background technique
在桥梁桩基施工中,在进行开挖桩孔之前,为保证桩基成孔质量,往往需要打设钢护筒,钢护筒能够有效导向钻进、隔离地表流水及防止塌孔等作用。In bridge pile foundation construction, before excavating pile holes, steel casings are often required to ensure the quality of pile foundation holes. Steel casings can effectively guide drilling, isolate surface water, and prevent hole collapse.
钻孔灌注桩在打设钢护筒时一般通过导向架来控制打设钢护筒的垂直度,传统的双层双孔导向架在群桩基础钢护筒打设施工中,设计图中因设计原因会出现两钻孔灌注桩的间距不同,在两孔之间的距离间距不一样时,常规的处理方式是制作不同规格的导向架,不同规格导向架用于两孔距离不同的桩基钢护筒打设,这样的方式用到的导向架数量较多,步骤繁琐,耗材多。The verticality of the steel casing is generally controlled by the guide frame when the bored pile is installed. The traditional double-layer double-hole guide frame is used in the construction of the steel casing of the pile group foundation. Due to the Due to the design reason, the distance between the two bored piles is different. When the distance between the two holes is different, the conventional processing method is to make guide frames of different specifications. The guide frames of different specifications are used for pile foundations with different distances between the two holes. The steel casing is drilled. This method uses a large number of guide frames, cumbersome steps, and a lot of consumables.
公开号为CN203403418U,公告日为2014年1月22日的中国专利文献公开了一种桥梁基础施工技术领域的导向架结构,具体涉及一种钢护筒双层导向架结构,包括有上层导向架和下层导向架,所述上层导向架与所述下层导向架固定连接,所述上层导向架与下层导向架均为桁架结构,该桁架结构水平截面为开口式设计,且开口处设有锁扣拉杆,该桁架结构其竖直截面为矩形,所述桁架结构其下部的四个角上分别设有沿钻孔桩钢护筒半径方向顶推的液压螺旋千斤顶;该文献解决了常规桁架式导向结构制约吊机作业能力的技术难题,同时对大直径超长钢护筒的导向限位具有更优的效果。但是该文献没有解决现有不同规格导向架用于两孔距离不同的桩基钢护筒打设时,导向架数量较多,安拆步骤繁琐,导致工期较长、效益低的问题。The publication number is CN203403418U, and the Chinese patent document with the announcement date of January 22, 2014 discloses a guide frame structure in the technical field of bridge foundation construction, specifically related to a double-layer guide frame structure of a steel casing, including an upper guide frame and the lower guide frame, the upper guide frame and the lower guide frame are fixedly connected, the upper guide frame and the lower guide frame are both truss structures, the horizontal section of the truss structure is an open design, and a lock is provided at the opening The vertical section of the truss structure is rectangular, and the four corners of the lower part of the truss structure are respectively equipped with hydraulic screw jacks that push along the radial direction of the bored pile steel casing; this document solves the problem of the conventional truss-type guide The structure restricts the technical problem of the crane's working ability, and at the same time, it has a better effect on the guide limit of the large-diameter and super-long steel casing. However, this document does not solve the problem that when the existing guide frames of different specifications are used for the construction of pile foundation steel casings with different distances between two holes, the number of guide frames is large, and the installation and disassembly steps are cumbersome, resulting in long construction period and low benefit.
实用新型内容Utility model content
本实用新型提供的伸缩式双层导向架目的是克服现有技术中不同规格导向架用于两孔距离不同的桩基钢护筒打设时,导向架数量较多,安拆步骤繁琐,导致工期较长、效益低的问题。The purpose of the telescopic double-layer guide frame provided by the utility model is to overcome the large number of guide frames and the cumbersome installation and disassembly steps in the prior art when the guide frames of different specifications are used for the construction of pile foundation steel casings with different distances between the two holes, resulting in The problem of long construction period and low efficiency.
为此,本实用新型提供了一种伸缩式双层导向架,包括第一导向架、第二导向架和伸缩部件,第一导向架和第二导向架均包括多根支撑立柱,第一导向架还包括第一上层架和第一下层架,第二导向架还包括第二上层架和第二下层架,第一下层架通过多根支撑立柱上连接第一上层架,第二下层架通过多根支撑立柱上连接第二上层架,第一上层架和第二上层架之间通过伸缩部件连接,第一下层架和第二下层架之间通过伸缩部件连接。For this reason, the utility model provides a telescopic double-deck guide frame, comprising a first guide frame, a second guide frame and telescopic parts, the first guide frame and the second guide frame both include a plurality of supporting columns, and the first guide frame The frame also includes a first upper frame and a first lower frame, and the second guide frame also includes a second upper frame and a second lower frame, and the first lower frame is connected to the first upper frame through a plurality of supporting columns, and the second lower frame The frame is connected to the second upper frame through a plurality of supporting columns, the first upper frame and the second upper frame are connected through telescopic components, and the first lower frame and the second lower frame are connected through telescopic components.
优选的,所述第一上层架包括2根第一顶部横梁和2根第一顶部平联,2根第一顶部横梁前后间隔横向设置,2根第一顶部横梁的左部之间和右部之间均垂直连接1根第一顶部平联;Preferably, the first upper frame includes 2 first top beams and 2 first top parallel links, the 2 first top beams are arranged transversely at intervals front and back, and the left and right parts of the 2 first top beams are A first top parallel connection is vertically connected between them;
第一下层架包括2根第一底部横梁和2根第一底部平联,2根第一底部横梁前后间隔横向设置,2根第一底部横梁的左部之间和右部之间均垂直连接1根第一底部平联;The first lower frame includes 2 first bottom beams and 2 first bottom horizontal beams, the 2 first bottom beams are arranged horizontally at intervals, and the left and right parts of the 2 first bottom beams are vertical Connect 1 first bottom parallel connection;
第二上层架包括2根第二顶部横梁和2根第二顶部平联,2根第二顶部横梁前后间隔横向设置,2根第二顶部横梁的左部之间和右部之间均垂直连接1根第二顶部平联;The second upper frame includes 2 second top beams and 2 second top parallel connections, the 2 second top beams are arranged horizontally at intervals, and the left and right parts of the 2 second top beams are connected vertically 1 second top parallel connection;
第二下层架包括2根第二底部横梁和2根第二底部平联,2根第二底部横梁前后间隔横向设置,2根第二底部横梁的左部之间和右部之间均垂直连接1根第二底部平联。The second lower frame includes 2 second bottom beams and 2 second bottom horizontal beams, the 2 second bottom beams are arranged horizontally at intervals, and the left and right parts of the 2 second bottom beams are vertically connected 1 second bottom parallel connection.
优选的,所述第一导向架和第二导向架均还包括斜撑,第一导向架的每个侧面和第二导向架的每个侧面均连接有斜撑。Preferably, both the first guide frame and the second guide frame further include a brace, each side of the first guide frame and each side of the second guide frame are connected with a brace.
优选的,所述第一顶部横梁内侧、第一顶部平联内侧、第一底部横梁内侧、第一底部平联内侧、第二顶部横梁内侧、第二顶部平联内侧、第二底部横梁内侧和第二底部平联内侧均设置连接有导向轮。Preferably, the inside of the first top beam, the inside of the first top parallel, the inside of the first bottom beam, the inside of the first bottom parallel, the inside of the second top beam, the inside of the second top parallel, the inside of the second bottom beam and The inner side of the second bottom parallel connection is provided with and connected with guide wheels.
优选的,所述伸缩部件包括套板和插销,第二顶部横梁的左端和第二底部横梁的左端均连接有套板,套板、第一顶部横梁的右端和第一底部横梁的右端上均开设有多个通孔,插销穿接通孔将第二顶部横梁和第一顶部横梁连接,插销穿接通孔将第二底部横梁和第一底部横梁连接。Preferably, the telescopic part includes a cover plate and a latch, the left end of the second top beam and the left end of the second bottom beam are connected with a cover plate, and the cover plate, the right end of the first top beam and the right end of the first bottom beam are all A plurality of through holes are opened, and the bolt passes through the through hole to connect the second top cross beam with the first top cross beam, and the bolt passes through the through hole to connect the second bottom cross beam with the first bottom cross beam.
优选的,所述第一顶部横梁、第一顶部平联、第一底部横梁、第一底部平联、第二顶部横梁、第二顶部平联、第二底部横梁和第二底部平联均采用H型钢。Preferably, the first top cross beam, the first top parallel connection, the first bottom cross beam, the first bottom parallel connection, the second top cross beam, the second top top connection, the second bottom cross beam and the second bottom parallel connection all use H-shaped steel.
优选的,所述支撑立柱、第一底部横梁、第一底部平联、第二底部横梁和第二底部平联的腹板面沿竖直方向布置,第一顶部平联、第二顶部横梁、第二顶部平联和第二底部平联的腹板面沿水平方向布置。Preferably, the support column, the first bottom cross beam, the first bottom parallel connection, the second bottom cross beam and the web surface of the second bottom parallel connection are arranged in the vertical direction, and the first top top connection, the second top cross beam, The web surfaces of the second top parallel connection and the second bottom parallel connection are arranged along the horizontal direction.
优选的,所述第一导向架和第二导向架均还包括面板,第一上层架的上面和第二上层架的上面均铺设有面板。Preferably, both the first guide frame and the second guide frame further include a panel, and panels are laid on the top of the first upper frame and the top of the second upper frame.
优选的,所述第一导向架周向上面和第二导向架周向上面均设置连接有护栏。Preferably, the first guide frame and the second guide frame are provided with guardrails connected to the circumferential upper surface.
优选的,所述套板的形状为长方体,长方体的左段自左向右水平开设有左凹槽,长方体的右段自右向左水平开设有右凹槽,左凹槽和右凹槽均和H型钢的腹板匹配连接。Preferably, the shape of the cover plate is a cuboid, the left section of the cuboid is horizontally opened with a left groove from left to right, and the right section of the cuboid is horizontally opened with a right groove from right to left, and the left groove and the right groove are both Matching connection with the web of H-beam.
本实用新型的有益效果:The beneficial effects of the utility model:
1、本实用新型提供的这种伸缩式双层导向架,第一导向架和第二导向架均为双层结构,双层结构可以有效提高打设钢护筒时的垂直度,第一导向架通过伸缩部件连接第二导向架,伸缩部件可使第一导向架和第二导向架横向伸缩,横向伸缩可以解决群桩基础两孔之间距离不同而需要制作多个导向架的问题。1. In the telescopic double-layer guide frame provided by the utility model, the first guide frame and the second guide frame are double-layer structures. The double-layer structure can effectively improve the verticality when laying steel casings. The first guide frame The frame is connected to the second guide frame through a telescopic part, and the telescopic part can make the first guide frame and the second guide frame expand and contract laterally, and the lateral telescopic expansion can solve the problem that multiple guide frames need to be made due to the different distances between the two holes of the pile group foundation.
2、本实用新型提供的这种伸缩式双层导向架,插销穿接通孔将第二顶部横梁和第一顶部横梁连接,插销穿接通孔将第二底部横梁和第一底部横梁连接;对第一导向架或第二导向架进行移动,移动完成后调节套板的位置,最后使用插销对套板进行固定即可,导向架可横移的优势,可以减少制作不同规格导向架的数量,导向架适用广泛,可以重复利用,仅需要对伸缩部件进行调节(即确定通孔的间距),就能实现定位两个之间的距离,并能有效解决通孔孔距不一所带来的问题;伸缩部件结构简单,加工容易,灵活性强,可以根据现场需求自行加工,适用范围广。2. In the telescopic double-layer guide frame provided by the present invention, the bolt passes through the through hole to connect the second top beam with the first top beam, and the bolt passes through the through hole to connect the second bottom beam with the first bottom beam; Move the first guide frame or the second guide frame, adjust the position of the cover plate after the movement is completed, and finally use the bolt to fix the cover plate. The advantage of the guide frame can be moved laterally, which can reduce the number of guide frames of different specifications. , the guide frame is widely applicable and can be reused. It only needs to adjust the telescopic parts (that is, determine the distance between the through holes) to realize the positioning of the distance between the two, and can effectively solve the problem caused by the different distance between the through holes. The problem; the telescopic parts have simple structure, easy processing, strong flexibility, can be processed according to the needs of the site, and have a wide range of applications.
3、本实用新型提供的这种伸缩式双层导向架,第一导向架周向上面和第二导向架周向上面均设置连接有护栏,保证作业人员在平台上的安全作业。3. In the telescopic double-layer guide frame provided by the present invention, the first guide frame and the second guide frame are provided with guardrails connected to the circumferential upper surface, so as to ensure the safe operation of the operators on the platform.
附图说明Description of drawings
以下将结合附图对本实用新型做进一步详细说明。The utility model will be described in further detail below in conjunction with the accompanying drawings.
图1是伸缩式双层导向架结构主视图;Fig. 1 is the front view of telescopic double-deck guide frame structure;
图2是伸缩式双层导向架结构俯视图;Figure 2 is a top view of the telescopic double-layer guide frame structure;
图3是伸缩式双层导向架结构左视图;Fig. 3 is the left view of telescopic double-deck guide frame structure;
图4是伸缩式双层导向架结构右视图。Fig. 4 is a right view of the telescopic double-layer guide frame structure.
附图标记说明:1、支撑立柱;2、第一底部横梁;3、第一底部平联;4、第一顶部横梁;5、第一顶部平联;6、斜撑;7、节点板;8、面板;9、导向轮;10、护栏;11、插销;12、套板;13、第二顶部横梁;14、第二顶部平联;15、第二底部横联;16、第二底部平联;17、通孔。Explanation of reference signs: 1. Supporting column; 2. First bottom beam; 3. First bottom parallel connection; 4. First top beam; 5. First top parallel connection; 8. Panel; 9. Guide wheel; 10. Guardrail; 11. Latch; 12. Sleeve plate; 13. Second top beam; 14. Second top horizontal connection; 15. Second bottom horizontal connection; 16. Second bottom Parallel; 17, through hole.
具体实施方式Detailed ways
实施例1:Example 1:
如图1和图2所示,一种伸缩式双层导向架,包括第一导向架、第二导向架和伸缩部件,第一导向架和第二导向架均包括多根支撑立柱1,第一导向架还包括第一上层架和第一下层架,第二导向架还包括第二上层架和第二下层架,第一下层架通过多根支撑立柱1上连接第一上层架,第二下层架通过多根支撑立柱1上连接第二上层架,第一上层架和第二上层架之间通过伸缩部件连接,第一下层架和第二下层架之间通过伸缩部件连接。As shown in Figures 1 and 2, a telescopic double-layer guide frame includes a first guide frame, a second guide frame and telescopic components, the first guide frame and the second guide frame each include a plurality of supporting
第一导向架和第二导向架均为双层结构,双层结构可以有效提高打设钢护筒时的垂直度,第一导向架通过伸缩部件连接第二导向架,伸缩部件可使第一导向架和第二导向架横向伸缩,横向伸缩可以解决群桩基础两孔之间距离不同而需要制作多个导向架的问题,操作方便,缩短工期。Both the first guide frame and the second guide frame are of double-layer structure. The double-layer structure can effectively improve the verticality when laying steel casings. The first guide frame is connected to the second guide frame through telescopic parts, and the telescopic parts can make the first The guide frame and the second guide frame are laterally telescopic, and the lateral telescopic expansion can solve the problem that multiple guide frames need to be manufactured due to the different distances between the two holes of the pile group foundation. The operation is convenient and the construction period is shortened.
实施例2:Example 2:
在实施例1的基础上,所述第一上层架包括2根第一顶部横梁4和2根第一顶部平联5,2根第一顶部横梁4前后间隔横向设置,2根第一顶部横梁4的左部之间和右部之间均垂直连接1根第一顶部平联5;On the basis of Example 1, the first upper frame includes two first
第一下层架包括2根第一底部横梁2和2根第一底部平联3,2根第一底部横梁2前后间隔横向设置,2根第一底部横梁2的左部之间和右部之间均垂直连接1根第一底部平联3;The first lower frame includes two
第二上层架包括2根第二顶部横梁13和2根第二顶部平联14,2根第二顶部横梁13前后间隔横向设置,2根第二顶部横梁13的左部之间和右部之间均垂直连接1根第二顶部平联14;The second upper frame includes 2 second top cross beams 13 and 2 second top
第二下层架包括2根第二底部横梁15和2根第二底部平联16,2根第二底部横梁15前后间隔横向设置,2根第二底部横梁15的左部之间和右部之间均垂直连接1根第二底部平联16。The second lower frame includes 2 second bottom beams 15 and 2 second bottom parallel links 16. The 2 second bottom beams 15 are arranged horizontally at intervals. Between the left and right parts of the 2 second bottom beams 15 Each of them is vertically connected with a second bottom
该结构现场拼装、拆卸、运输方便,且能够节约材料的使用,显著提高了打设钢护筒的施工效率。The structure is convenient for on-site assembly, disassembly and transportation, and can save the use of materials, and significantly improves the construction efficiency of laying steel casings.
如图3和图4所示,优选的,所述第一导向架和第二导向架均还包括斜撑6,第一导向架的每个侧面和第二导向架的每个侧面均连接有斜撑6。As shown in Figures 3 and 4, preferably, the first guide frame and the second guide frame also include a
斜撑6提高导向架结构的稳定性。The
优选的,所述第一导向架的每个侧面和第二导向架的每个侧面均通过节点板7连接有斜撑6。节点板7方便连接斜撑6。Preferably, each side of the first guide frame and each side of the second guide frame are connected with
优选的,所述斜撑6采用槽钢。槽钢取材方便,经济环保。Preferably, the
优选的,所述第一顶部横梁4内侧、第一顶部平联5内侧、第一底部横梁2内侧、第一底部平联3内侧、第二顶部横梁13内侧、第二顶部平联14内侧、第二底部横梁15内侧和第二底部平联16内侧均设置连接有导向轮9。Preferably, the inner side of the first
导向轮9设置在导向架的内侧,通过导向轮9对钢护筒进行限位,双层布置导向轮9有效提高打设钢护筒的垂直度。The
优选的,所述第一上层架、第一下层架、第二上层架和第二下层架均设置有4个导向轮9,4个导向轮9周向等间距分布;结构简单,用最少数量的导向轮9即可有效提高打设钢护筒的垂直度。Preferably, the first upper frame, the first lower frame, the second upper frame and the second lower frame are all provided with 4
实施例3:Embodiment 3:
在实施例2的基础上,所述伸缩部件包括套板12和插销11,第二顶部横梁13的左端和第二底部横梁15的左端均连接有套板12,套板12、第一顶部横梁4的右端和第一底部横梁2的右端上均开设有多个通孔17,插销11穿接通孔17将第二顶部横梁13和第一顶部横梁4连接,插销11穿接通孔17将第二底部横梁15和第一底部横梁2连接。On the basis of
可以根据现场实际需要打通孔17,插销12用来对伸缩后的导向架进行固定,保证导向架的整体性及确保伸缩后导向架不发生滑移。对第一导向架或第二导向架进行移动,移动完成后调节套板12的位置,最后使用插销11对套板12进行固定即可,导向架可横移的优势,可以减少制作不同规格导向架的数量,导向架适用广泛,可以重复利用,仅需要对伸缩部件进行调节(即确定通孔17的间距),就能实现定位两个之间的距离,并能有效解决通孔17孔距不一所带来的问题;伸缩部件结构简单,加工容易,灵活性强,可以根据现场需求自行加工,适用范围广。The
优选的,所述套板12、第一顶部横梁4和第一底部横梁2上的通孔17间距相等。便于插销11通过通孔17对套板12和横梁进行固定连接,便于伸缩部件距离的调节。Preferably, the through
优选的,所述第一顶部横梁4、第一顶部平联5、第一底部横梁2、第一底部平联3、第二顶部横梁13、第二顶部平联14、第二底部横梁15和第二底部平联16均采用H型钢。Preferably, the first
H型钢翼缘宽,侧向刚度大,抗弯能力强,作为主框架结构,H型钢比工字钢大约5%-10%,翼缘两表面相互平行使得连接、加工、安装简便;与焊接工字钢相比,H型钢成本低,精度高,残余应力小,无需昂贵的焊接材料和焊缝检测,节约钢结构制作成本30%左右;相同截面负荷下,热轧H钢结构比传统钢结构重量减轻15%-20%;省工省料,加快工程施工进度。H-shaped steel has wide flange, large lateral rigidity and strong bending resistance. As the main frame structure, H-shaped steel is about 5%-10% larger than I-shaped steel. The two surfaces of the flange are parallel to each other, which makes connection, processing and installation easy; and welding Compared with I-shaped steel, H-shaped steel has low cost, high precision, small residual stress, no need for expensive welding materials and weld inspection, and saves about 30% of the cost of steel structure manufacturing; under the same section load, hot-rolled H-shaped steel structure The structural weight is reduced by 15%-20%; labor and materials are saved, and the construction progress of the project is accelerated.
优选的,所述支撑立柱1、第一底部横梁2、第一底部平联3、第二底部横梁15和第二底部平联16的腹板面沿竖直方向布置,第一顶部平联5、第二顶部横梁13、第二顶部平联14和第二底部平联16的腹板面沿水平方向布置。Preferably, the web surfaces of the
支撑立柱1、第一底部横梁2、第一底部平联3、第二底部横梁15和第二底部平联16的腹板面沿竖直方向布置可以提高结构的稳定性;第一顶部平联5、第二顶部横梁13、第二顶部平联14和第二底部平联16的腹板面沿水平方向布置,既可以方便在第一上层架的上面和第二上层架的上面均铺设有面板8,也可以方便安装连接伸缩部件。The web surfaces of the
优选的,所述第一导向架和第二导向架均还包括面板8,第一上层架的上面和第二上层架的上面均铺设有面板8。Preferably, both the first guide frame and the second guide frame further include a
在不影响导向架结构稳定的前提下,面板8方便员工进行施工。Under the premise of not affecting the structural stability of the guide frame, the
优选的,所述第一导向架周向上面和第二导向架周向上面均设置连接有护栏10。确保作业人员进行施工时的安全。Preferably,
优选的,所述套板12的形状为长方体,长方体的左段自左向右水平开设有左凹槽,长方体的右段自右向左水平开设有右凹槽,左凹槽和右凹槽均和H型钢的腹板匹配连接。Preferably, the shape of the
结构简单,制作取材方便,根据需要随时制作适合长度的套板12,在不需要改变第一导向架和第二导向架结构的前提下,即可满足各种距离的横向调节。The structure is simple, the production is convenient, and the
为了更好的保证本施工装置施工的完整性,具体施工及操作步骤如下:In order to better ensure the integrity of the construction of this construction device, the specific construction and operation steps are as follows:
步骤1):焊接第一导向架和第二导向架;Step 1): welding the first guide frame and the second guide frame;
步骤2):制作套板,在第二顶部横梁13和第二底部横梁15上均固定连接套板;Step 2): Make the cover plate, and fix and connect the cover plate on the second
步骤3):在套板及第一顶部横梁4和第一底部横梁2上进行打孔,打孔的间距根据孔距进行确定,最后通过移动第一导向架和/或第二导向架至所需的位置,再通过插销进行固定。Step 3): punch holes on the cover plate and the first
步骤4):对导向架操作平台及护栏焊接加工。Step 4): Welding and processing the guide frame operating platform and guardrail.
本实用新型提供的这种伸缩式双层导向架,导向架双层布置,双层布置可以有效提高打设钢护筒时的垂直度,导向架横向伸缩可以解决群桩基础两孔之间距离不同而需要制作多个导向架的问题,导向架适用性广,且可以重复利用,导向架的横向移动方便,仅需要对套板进行调节,调节完成后用插销进行固定即可。横梁、套板、插销组成的简易伸缩装置结构简单,加工容易,灵活性强,可以根据现场需求自行加工;且伸缩便捷,适用范围广。The telescopic double-layer guide frame provided by the utility model has a double-layer arrangement of the guide frame. The double-layer arrangement can effectively improve the verticality when laying steel casings. Different from the problem of making multiple guide frames, the guide frame has wide applicability and can be reused. The lateral movement of the guide frame is convenient. It only needs to adjust the sleeve plate, and fix it with the bolt after the adjustment is completed. The simple telescopic device composed of beams, sets and bolts has simple structure, easy processing, strong flexibility, and can be processed according to site requirements; it is convenient to expand and contract, and has a wide range of applications.
本实用新型的描述中,需要理解的是,若有术语“上”、“内”、“下”等指示的方位或位置关系为基于附图所示的方位或位置关系,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此附图中描述位置关系的用语仅用于示例性说明,不能理解为对本实用新型的限制。In the description of the present utility model, it should be understood that if the orientation or positional relationship indicated by the terms "upper", "inner" and "lower" is based on the orientation or positional relationship shown in the drawings, it does not indicate or imply The devices or components referred to must have specific orientations, be constructed and operated in specific orientations, so the terms describing positional relationships in the drawings are for illustrative purposes only, and should not be construed as limitations on the present invention.
以上例举仅仅是对本实用新型的举例说明,并不构成对本实用新型的保护范围的限制,凡是与本实用新型相同或相似的设计均属于本实用新型的保护范围之内。The above examples are only illustrations of the utility model, and do not constitute a limitation to the protection scope of the utility model. All designs identical or similar to the utility model all belong to the protection scope of the utility model.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202221575434.0U CN217896490U (en) | 2022-06-22 | 2022-06-22 | Telescopic double-layer guide frame |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202221575434.0U CN217896490U (en) | 2022-06-22 | 2022-06-22 | Telescopic double-layer guide frame |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN217896490U true CN217896490U (en) | 2022-11-25 |
Family
ID=84133017
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202221575434.0U Active CN217896490U (en) | 2022-06-22 | 2022-06-22 | Telescopic double-layer guide frame |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN217896490U (en) |
-
2022
- 2022-06-22 CN CN202221575434.0U patent/CN217896490U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107191000A (en) | The temporary support of telescopic in height regulation reinforces combination steel construction | |
| CN111424948A (en) | Construction method and construction platform for cantilever structure layer of high-rise building | |
| CN212582721U (en) | Bearing platform of tower crane for vertical tower of top plate of foundation garage | |
| CN115788111A (en) | Deep foundation pit ladder cage subsection reverse installation method | |
| CN119121962B (en) | Steel-concrete combined supporting structure for large-span deep foundation pit and construction method thereof | |
| CN114776078A (en) | Adjustable type steel support changing system with multiple annular support point positions and construction method | |
| WO2023020381A1 (en) | Fabricated platform for offshore wind power monopile rock-socketed foundation construction | |
| CN205777593U (en) | A kind of adjustable combination type bracing frame for vertical supporting sill anchor | |
| WO2025236409A1 (en) | Traveling tower crane foundation on step and construction method therefor | |
| CN206942191U (en) | A kind of temporary support of telescopic in height regulation reinforces combination steel construction | |
| CN220247723U (en) | Detachable lattice column supporting jig frame with overhanging steel structure | |
| CN117605277A (en) | A reverse construction method for high-altitude cantilevered steel structure corridors | |
| CN114718082A (en) | Combined supporting structure of large-span foundation pit and construction method thereof | |
| CN115405231A (en) | A lifting platform for MJS horizontal pile construction and its construction method | |
| CN207538193U (en) | A kind of steel core concrete column and reinforced concrete column concrete core cylinder mixed structure | |
| CN221052585U (en) | Installation system of full sand layer geological oversized-diameter composite pile steel pipe | |
| CN223876407U (en) | H-beam segment in-situ assembly frame | |
| CN222614823U (en) | Parapet wall template erecting device | |
| CN217352141U (en) | Construction system of large-section steel box girder | |
| CN223359050U (en) | Vertical column type operation platform for loading and unloading drill rod | |
| CN221346496U (en) | Floor type steel tower for building machine | |
| CN216892837U (en) | Electronic factory building large-span steel construction assembly device | |
| CN217379236U (en) | Novel assembled I-shaped steel column-cushion cap connected node that web slope | |
| CN218522196U (en) | A steel column for climbing frame attachment | |
| CN220747273U (en) | Lattice column supports quick splicing device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250324 Address after: 210000 No. 396 Binjiang Avenue, Jiangbei new area, Nanjing, Jiangsu Patentee after: East China Construction Co., Ltd. of CCCC Second Highway Engineering Co.,Ltd. Country or region after: China Address before: 710119 No.29, No.1 Enterprise Park, West Avenue, high tech Zone, Xi'an City, Shaanxi Province Patentee before: CCCC-SHEC SECOND ENGINEERING Co.,Ltd. Country or region before: China |