CN216006581U - Bolted connection formula steel-pipe pile landing stage based on four-point location - Google Patents

Bolted connection formula steel-pipe pile landing stage based on four-point location Download PDF

Info

Publication number
CN216006581U
CN216006581U CN202122429744.3U CN202122429744U CN216006581U CN 216006581 U CN216006581 U CN 216006581U CN 202122429744 U CN202122429744 U CN 202122429744U CN 216006581 U CN216006581 U CN 216006581U
Authority
CN
China
Prior art keywords
steel pipe
steel
pipe pile
bridge floor
reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122429744.3U
Other languages
Chinese (zh)
Inventor
卢军球
陈莘
陈石
李健
汪亦显
汤瑞
王凯
郭永刚
徐健跃
刘校峰
王启生
钟剑
左小晗
邵亚会
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei University of Technology
Anhui Road and Bridge Engineering Group Co Ltd
Original Assignee
Hefei University of Technology
Anhui Road and Bridge Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei University of Technology, Anhui Road and Bridge Engineering Group Co Ltd filed Critical Hefei University of Technology
Priority to CN202122429744.3U priority Critical patent/CN216006581U/en
Application granted granted Critical
Publication of CN216006581U publication Critical patent/CN216006581U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the technical field of bridge construction, in particular to a bolted steel pipe pile trestle based on four-point positioning, which comprises a bridge floor and a steel pipe pile supporting mechanism; the bridge deck comprises I-shaped steel longitudinal beams which are arranged at equal intervals and a pattern steel panel which is laid at the upper ends of the I-shaped steel longitudinal beams; the steel pipe pile supporting mechanism comprises steel pipe pile groups which are positioned below the bridge floor and are arranged at equal intervals along the length direction of the bridge floor, and each group of steel pipe piles comprises four steel pipe piles which are vertically arranged at four right angles of a square; each group of steel pipe piles further comprise reinforcing mechanisms, each reinforcing mechanism comprises four pairs of reinforcing supports, a pair of reinforcing supports are correspondingly arranged on the upper portion and the lower portion between every two adjacent steel pipe piles, and each reinforcing support is fixedly connected with the two adjacent steel pipe piles through high-strength bolts. Make the utility model discloses a steel-pipe pile of steel-pipe pile landing stage hangs down straightness and obtains guaranteeing, has improved the stability of landing stage in rivers. Firm, the installation is dismantled swiftly.

Description

Bolted connection formula steel-pipe pile landing stage based on four-point location
Technical Field
The utility model belongs to the technical field of the bridge construction, in particular to bolted connection formula steel-pipe pile landing stage based on four-point location.
Background
The trestle is a temporary bearing structure built on water for transporting materials, equipment and personnel, and has the remarkable characteristics of high bearing capacity, high construction speed, convenience in disassembly and assembly and the like. The steel trestle has the advantages of light structure, good integrity and small deformation, and is widely applied in the bridge construction process.
In actual construction and use, the riverbed bottom geological conditions often differ a lot, and river surface rivers impact force also can cause adverse effect to landing stage support stability, and along with the lapse of time, the deflection and the displacement volume of landing stage support increase gradually, and landing stage life reduces, and this has also caused serious threat to landing stage's structural safety. Based on this, the conventional practice is: steel members such as steel pipes and channel steels are welded between the steel pipe piles to resist relative displacement between the steel pipe piles. This approach, although simple and easy to implement, has a number of drawbacks: the prestress between the non-standard steel component and the steel pipe pile is large and is not easy to eliminate; the welding can generate larger residual stress to cause local deformation, and the welding quality is not easy to check; the welding process is time-consuming and labor-consuming, the support is inconvenient to disassemble, and the reusability of materials is damaged.
Therefore, how to realize the stability of the trestle support under the conditions of complex geology and strong water flow impact and further improve the construction efficiency of the trestle becomes the direction for improving the structural form and the construction method of the trestle.
SUMMERY OF THE UTILITY MODEL
The utility model relates to a solve the not enough that prior art exists, propose can realize the landing stage structure quick, that stabilize the structure under complicated geology and strong water impact condition, concrete technical scheme as follows:
a four-point positioning based bolt connection type steel pipe pile trestle comprises a bridge floor and a steel pipe pile supporting mechanism, wherein two sides of the bridge floor are provided with fences 11;
the bridge deck comprises I-shaped steel longitudinal beams 12 which are arranged at equal intervals, and a pattern steel panel 13 which is laid at the upper ends of the I-shaped steel longitudinal beams 12; the steel pipe pile supporting mechanism comprises steel pipe pile groups which are positioned below the bridge floor and are arranged at equal intervals along the length direction of the bridge floor, each group of steel pipe piles comprises four steel pipe piles 21 which are vertically arranged at four right angles of a square, each steel pipe pile 21 is provided with a pile cap 22,
two adjacent steel pipe piles 21 positioned in the width direction of the bridge floor are fixedly arranged on the lower bottom surface of the bridge floor through I-shaped steel cross beams 23;
each group the steel-pipe pile still includes reinforcing mechanism, and reinforcing mechanism includes four pairs of reinforcement support for upper portion and lower part between two adjacent steel-pipe piles 21 correspond arranges a pair of reinforcement support, and every reinforcement support 3 respectively with two adjacent steel-pipe piles 21 through high strength bolt fixed connection.
Further, every consolidate support 3 and be the channel-section steel welding spare, and including the rectangle and consolidate the frame, consolidate the frame and go up a pair of bracing 31 of welded fastening, four right angles departments of rectangle reinforcement frame are respectively through strengthening steel sheet 4 and the 21 bolt fastening of steel-pipe pile that correspond.
Further, the notches of the channel steel welding pieces of the fixed support 3 face the inner sides of the corresponding steel pipe pile groups.
The utility model has the advantages of as follows:
the utility model discloses a steel-pipe pile landing stage, four steel-pipe piles are as a set of steel-pipe pile, occupy four summits of square respectively on every group steel-pipe pile plane, upper portion between two adjacent steel-pipe piles of every group steel-pipe pile and lower part correspondence arrange a pair of reinforcement support, and every reinforcement support respectively with two adjacent steel-pipe piles through high strength bolt fixed connection, can not take place relative displacement between the steel-pipe pile of assurance every group steel-pipe pile, guaranteed the straightness that hangs down of steel-pipe pile when having limited steel-pipe pile's skew, improved the stability of landing stage in rivers, make the utility model discloses a landing stage simple structure, the installation is dismantled swiftly for landing stage construction progress.
Drawings
Fig. 1 is a schematic structural diagram of the steel pipe pile trestle of the present invention.
Fig. 2 is an enlarged view of a portion a in fig. 1.
Fig. 3 is a side view of the steel pipe pile trestle of the present invention.
Reference numerals: 11 fences, 12I-steel longitudinal beams, 13 pattern steel panels, 21 steel pipe piles, 22 pile caps, 23I-steel cross beams, 3 reinforcing supports, 31 pairs of inclined struts and 4 reinforcing steel plates.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention will be described in further detail with reference to the accompanying drawings and embodiments. It should be understood that the detailed description and specific examples, while indicating the invention, are given by way of illustration only.
Examples
Referring to fig. 1, the four-point positioning based bolt connection type steel pipe pile trestle comprises a bridge floor and a steel pipe pile supporting mechanism, wherein two sides of the bridge floor are provided with fences 11;
the bridge deck comprises I-shaped steel longitudinal beams 12 which are arranged at equal intervals, and a pattern steel panel 13 which is laid at the upper ends of the I-shaped steel longitudinal beams 12; the steel pipe pile supporting mechanism comprises steel pipe pile groups which are positioned below the bridge floor and are arranged at equal intervals along the length direction of the bridge floor, each group of steel pipe piles comprises four steel pipe piles 21 which are vertically arranged at four right angles of a square, each steel pipe pile 21 is provided with a pile cap 22,
two adjacent steel pipe piles 21 positioned in the width direction of the bridge floor are fixedly arranged on the lower bottom surface of the bridge floor through I-shaped steel cross beams 23;
each group the steel-pipe pile still includes reinforcing mechanism, and reinforcing mechanism includes four pairs of reinforcement support for upper portion and lower part between two adjacent steel-pipe piles 21 correspond arranges a pair of reinforcement support, and every reinforcement support 3 respectively with two adjacent steel-pipe piles 21 through high strength bolt fixed connection.
Referring to fig. 2 and 3, each of the reinforcing brackets 3 is a channel steel welded part and includes a rectangular reinforcing frame, a pair of diagonal braces 31 are welded and fixed to the reinforcing frame, and four right-angle portions of the rectangular reinforcing frame are respectively fixedly connected to corresponding steel pipe piles 21 through reinforcing steel plates 4 by bolts.
The notches of the channel steel welding pieces of the fixed support 3 face the inner sides of the corresponding steel pipe pile groups.
It will be understood by those skilled in the art that the foregoing is merely a preferred embodiment of the present invention, and is not intended to limit the invention to the particular forms disclosed, but on the contrary, the intention is to cover all modifications, equivalents, and alternatives falling within the spirit and scope of the invention as defined by the appended claims.

Claims (3)

1. A four-point positioning based bolt connection type steel pipe pile trestle comprises a bridge floor and a steel pipe pile supporting mechanism, wherein two sides of the bridge floor are provided with fences (11);
the bridge deck comprises I-shaped steel longitudinal beams (12) which are arranged at equal intervals, and a pattern steel panel (13) laid at the upper ends of the I-shaped steel longitudinal beams (12); the steel pipe pile supporting mechanism comprises steel pipe pile groups which are positioned below the bridge floor and are arranged at equal intervals along the length direction of the bridge floor, each steel pipe pile group comprises four steel pipe piles (21) which are vertically arranged at four square right angles, each steel pipe pile (21) is provided with a pile cap (22), and two adjacent steel pipe piles (21) positioned in the width direction of the bridge floor are fixedly arranged on the lower bottom surface of the bridge floor through I-shaped steel cross beams (23);
the method is characterized in that: each group of steel pipe piles further comprise reinforcing mechanisms, each reinforcing mechanism comprises four pairs of reinforcing supports, a pair of reinforcing supports are correspondingly arranged on the upper portion and the lower portion between every two adjacent steel pipe piles (21), and each reinforcing support (3) is fixedly connected with every two adjacent steel pipe piles (21) through high-strength bolts.
2. The four-point positioning based bolted steel pipe pile trestle of claim 1, which is characterized in that: every consolidate support (3) and be the channel-section steel welding spare, and including the rectangle and consolidate the frame, consolidate the frame and go up a pair of bracing (31) of welded fastening, four right angles departments of rectangle reinforcement frame are respectively through strengthening steel sheet (4) and corresponding steel-pipe pile (21) bolt fixed connection.
3. The four-point positioning based bolted steel pipe pile trestle of claim 2, which is characterized in that: the notches of the channel steel welding pieces of the fixed support (3) face towards the inner sides of the corresponding steel pipe pile groups.
CN202122429744.3U 2021-10-09 2021-10-09 Bolted connection formula steel-pipe pile landing stage based on four-point location Active CN216006581U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122429744.3U CN216006581U (en) 2021-10-09 2021-10-09 Bolted connection formula steel-pipe pile landing stage based on four-point location

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122429744.3U CN216006581U (en) 2021-10-09 2021-10-09 Bolted connection formula steel-pipe pile landing stage based on four-point location

Publications (1)

Publication Number Publication Date
CN216006581U true CN216006581U (en) 2022-03-11

Family

ID=80583013

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122429744.3U Active CN216006581U (en) 2021-10-09 2021-10-09 Bolted connection formula steel-pipe pile landing stage based on four-point location

Country Status (1)

Country Link
CN (1) CN216006581U (en)

Similar Documents

Publication Publication Date Title
KR200402162Y1 (en) Temporary works bridge
WO2023020381A1 (en) Fabricated platform for offshore wind power monopile rock-socketed foundation construction
CN102777050B (en) Assembly type jig frame for longspan pipe truss roof girder
CN208088312U (en) Double-row steel sheet pile cofferdam structure formed by connecting section steel and split screws in combined manner
CN216006581U (en) Bolted connection formula steel-pipe pile landing stage based on four-point location
CN111809654A (en) Assembled tower crane foundation structure
CN217231826U (en) Supporting steel sleeve box suitable for excavation of silt layer sand layer bearing platform
KR20070026951A (en) Temporary works bridge
CN213572357U (en) Basement board reinforcing structure under one-column one-pile working condition of top-down construction method
CN209760139U (en) All-steel wharf structure
CN217896490U (en) Telescopic double-layer guide frame
CN214061275U (en) Attached type cylindrical pier operation protection platform
CN217923358U (en) All-steel assembled wharf structure
CN217923359U (en) All-steel frame type wharf structure
CN215164755U (en) Assembled steel pipe pile support
CN220848801U (en) Reinforcing steel bar processing platform structure for narrow place
CN215329999U (en) Pile group type tower crane foundation
CN213896799U (en) Steel pipe bailey beam column type support
CN113718628A (en) Four-point positioning-based bolted steel pipe pile trestle and construction method
CN215714981U (en) Integrated enclosing and wailing structure for pile cap construction of high-pile wharf
CN214423126U (en) Steel temporary bridge for high-pile wharf construction
CN117127744B (en) Construction method of steel bar machining platform erected by Bailey beams and section steel
CN109914371B (en) Assembled construction steel platform and underwater water intake head method
CN216304444U (en) Highway bridge construction equipment
CN216238599U (en) Highway bridge construction cofferdam device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant