KR200402162Y1 - Temporary works bridge - Google Patents

Temporary works bridge Download PDF

Info

Publication number
KR200402162Y1
KR200402162Y1 KR20-2005-0024759U KR20050024759U KR200402162Y1 KR 200402162 Y1 KR200402162 Y1 KR 200402162Y1 KR 20050024759 U KR20050024759 U KR 20050024759U KR 200402162 Y1 KR200402162 Y1 KR 200402162Y1
Authority
KR
South Korea
Prior art keywords
circular steel
steel pipe
bridge
fixing bracket
circular
Prior art date
Application number
KR20-2005-0024759U
Other languages
Korean (ko)
Inventor
전호건
홍현민
전미선
Original Assignee
명보산공 주식회사
전호건
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 명보산공 주식회사, 전호건 filed Critical 명보산공 주식회사
Priority to KR20-2005-0024759U priority Critical patent/KR200402162Y1/en
Application granted granted Critical
Publication of KR200402162Y1 publication Critical patent/KR200402162Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/12Portable or sectional bridges
    • E01D15/133Portable or sectional bridges built-up from readily separable standardised sections or elements, e.g. Bailey bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/005Piers, trestles, bearings, expansion joints or parapets specially adapted for portable or sectional bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Abstract

본 고안은 원형강관지주식 가설교량에 관한 것으로, 다수개의 지주와, 그 상부에 설치되는 주형보 및 상부구조물로 구성되는 가설교량에 있어서, 상부측에 체결부가 형성되고, 단면이 원통형이며, 지면에 대해 수직되게 설치되는 다수개의 원형강관지주와; 상기 다수개의 원형강관지주의 상부측에 결합되되, 소정의 고정금구에 의해 탈착가능하게 설치되며, 상기 교량의 주형보를 지지하도록 설치되는 다수개의 지주머리부재와; 상기 다수개의 지주머리부재의 측부에 수평으로 연결되는 다수개의 가로보 형강과; 상기 다수개의 원형강관지주의 측부에 수평으로 연결되는 다수개의 가로버팀 형강;을 포함하여 구성된다.The present invention relates to a circular steel pipe stock temporary bridge, in the temporary bridge consisting of a plurality of struts, a mold beam and an upper structure installed on the upper portion, a fastening portion is formed on the upper side, the cross section is cylindrical, the ground A plurality of circular steel pipe columns which are installed perpendicular to each other; A plurality of strut head members coupled to an upper side of the plurality of circular steel tubes, detachably installed by a predetermined fixing bracket, and installed to support the mold beam of the bridge; A plurality of cross beam steels horizontally connected to the sides of the plurality of support head members; It is configured to include; a plurality of transverse brace steel horizontally connected to the side of the plurality of circular steel pipe column.

상술한 구성을 본 고안에 의하면, 원형강관지주를 사용하여 교각의 설치 갯수를 줄일 수 있게 되므로, 종래의 경우보다 시공성이 좋아지며 유수 흐름의 방해를 피할 수 있고, 그에 따른 횡압 증가와 붕괴의 위험성 등의 문제가 발생하는 것을 방지할 수 있다.According to the present invention, according to the present invention, since the number of piers can be reduced by using a circular steel pipe column, the construction is better than in the conventional case, and the flow of the flowing water can be avoided, thereby increasing the lateral pressure and risk of collapse. Such problems can be prevented from occurring.

Description

원형강관지주식 가설교량 {Temporary works bridge}Circular steel pipe stock temporary bridge {Temporary works bridge}

본 고안은 원형강관지주식 가설교량에 관한 것으로, 더욱 상세하게는 유수의 저항을 최소화하여 내구성이 향상될 수 있고, 설치가 용이하여 공사기간을 절감할 수 있도록 한 원형강관지주식 가설교량에 관한 것이다.The present invention relates to a circular steel pipe stock temporary bridge, and more particularly, to a circular steel pipe stock temporary bridge that can be improved durability by minimizing the resistance of flowing water, easy to install will be.

일반적으로 육지와 섬을 연결하는 연육교 또는 강이나 호수를 가로지르는 교량을 건설하기 위해서는, 우물통, 교각, 교량 상판 등의 설치에 필요한 건설자재의 운반과 건설 장비 및 작업인원이 통행하기 위한 임시 교량(이하 '가설교량'이라 함)을 우선적으로 건설하게 된다.In general, in order to build bridges that cross land and islands, or bridges across rivers or lakes, temporary bridges for transporting construction materials and construction equipment and personnel for the installation of wells, bridges, bridge decks, etc. (Hereinafter referred to as 'temporary bridge') will be constructed first.

전술한 가설교량은 지주로 사용될 다수개의 파일을 대형 크레인을 이용하여 이동시키고, 수직된 상태에서 파일(pile)의 상단을 유압햄머로 항타하여 규정 깊이만큼 근입시키고 난 후, 이들 파일의 상부에 상판을 설치함으로써 완공된다. The above-mentioned temporary bridge moves a number of piles to be used as props by using a large crane, and moves the upper end of the pile with a hydraulic hammer in a vertical state to drive the pile to the prescribed depth, and then the upper plate on the upper portions of these piles. It is completed by installing it.

종래의 가설교량을 설치하기 위하여 시공되는 지주는 대개 H형강으로 이루어졌다. The struts constructed to install conventional temporary bridges are usually made of H-beams.

즉, 임시로 설치되는 가설교량의 교각을 시공하는 경우, 다수개의 H형강을 수직으로 나란하게 설치하고, 그 상부에는 브레이싱 부재를 설치한다. That is, when constructing a bridge of temporary bridges temporarily installed, a plurality of H-shaped steels are installed side by side vertically, and a bracing member is provided on the upper portion thereof.

상기 H형강은 일반적으로 2열로 배치하게 되며, 그 상부에는 주형보를 설치하고, 그 상부에는 복공판 등의 상부 구조물을 설치하게 된다.The H-beams are generally arranged in two rows, and the upper part is provided with a mold beam, and the upper part is provided with an upper structure such as a perforated plate.

이와 같은 종래의 가설교량에서는 많은 수의 H형강을 사용하기 때문에, 하천을 가로질러 가설교량이 설치되는 경우 단면적이 넓은 H형강이 유수의 흐름에 상당한 저항요인이 된다. Since a large number of H-beams are used in such a conventional temporary bridge, when the temporary bridge is installed across a river, the H-section steel having a large cross-sectional area becomes a significant resistance to the flow of running water.

즉, 많은 수의 H형강이 설치됨으로 인하여 하천 단면이 축소되어 하부의 물 흐름이 원활하게 되지 못하게 된다.That is, because a large number of H-shaped steel is installed, the river cross section is reduced so that the water flow in the lower portion is not smooth.

특히, H형강에 의하여 하천 단면이 축소됨에 따라 물과 함께 떠내려 오는 부유물이 H형강에 걸리게 되는데, 이러한 부유물의 정체로 인하여 교각에 상당한 하중이 작용하게 된다. In particular, as the cross-section of the river is reduced by the H-beams, the floating material floating with the water is caught on the H-beams, and due to the stagnation of the floating material, a significant load acts on the piers.

따라서, 심한 경우에는 이러한 부유물과 유수의 흐름에 의하여 상당한 횡하중이 작용하게 되어 교각이 붕괴되는 문제점이 발생되었다. Therefore, in the severe case, a significant lateral load is caused by the flow of the float and the flowing water, causing a problem in that the pier collapses.

또한, 많은 수의 H형강을 설치하기 위해서는 많은 작업이 필요하며, 그 과정에서 시공오차에 따른 편심 발생가능성이 높아지게 되는 문제점이 있으며, H형강과 교량의 상부구조물을 용접에 의해 접합하므로, 시공에 많은 시간이 소요되는 문제점이 있었다. In addition, a large number of work is required to install a large number of H-shaped steel, there is a problem that the possibility of eccentricity due to the construction error in the process increases, and because the upper structure of the H-beam and the bridge is joined by welding, There was a time-consuming problem.

본 고안은 상기한 종래 기술의 문제점을 해소하기 위해 안출된 것으로, 유수의 저항을 비교적 덜 받는 원형강관을 지주로 사용함으로써 유수의 흐름을 원활하게 하여 하천 단면 축소 및 하천 부유물의 정체를 최소화할 수 있어 교각 붕괴의 위험을 방지할 수 있고, 이러한 원형강관과 그 상부에 설치되는 지주머리부재를 착탈이 가능한 조립식 구조로 규격화시켜 대량 생산함으로써 설치가 용이하여 시공기간을 현저히 단축시킬 수 있으며, 아울러 정확한 설치가 가능하여 시공성을 향상시킬 수 있도록 한 원형강관지주식 가설교량을 제공하는데 그 목적이 있다.The present invention has been devised to solve the above problems of the prior art, by using a circular steel pipe that is relatively less resistant to the flow of water as a prop can smooth the flow of the flow of water to minimize the stream cross-section and to minimize the congestion of the river floating It is possible to prevent the risk of collapse of the bridge, and to standardize the round steel pipe and the support head member installed on the upper part in a detachable prefabricated structure. The purpose is to provide temporary steel bridge stock bridges that can be installed to improve workability.

상기 목적을 제공하기 위해 본 고안에 따른 원형강관지주식 가설교량은,Circular steel pipe stock temporary construction bridge according to the present invention to provide the above object,

다수개의 지주와, 그 상부에 설치되는 주형보 및 상부구조물로 구성되는 가설교량에 있어서, 상부측에 체결부가 형성되고, 단면이 원통형이며, 지면에 대해 수직되게 설치되는 다수개의 원형강관지주와; 상기 다수개의 원형강관지주의 상부측에 결합되되, 소정의 고정금구에 의해 탈착가능하게 설치되며, 상기 교량의 주형보를 지지하도록 설치되는 다수개의 지주머리부재와; 상기 다수개의 지주머리부재의 측부에 수평으로 연결되는 다수개의 가로보 형강과; 상기 다수개의 원형강관지주의 측부에 수평으로 연결되는 다수개의 가로버팀 형강;을 포함하여 이루어짐을 특징으로 한다.A temporary bridge composed of a plurality of struts, a mold beam and an upper structure installed on an upper portion thereof, comprising: a plurality of circular steel pipe pillars having a fastening portion formed on an upper side thereof, having a cylindrical cross section, and installed perpendicular to the ground; A plurality of strut head members coupled to an upper side of the plurality of circular steel tubes, detachably installed by a predetermined fixing bracket, and installed to support the mold beam of the bridge; A plurality of cross beam steels horizontally connected to the sides of the plurality of support head members; And a plurality of transverse brace sections connected horizontally to the sides of the plurality of circular steel tubes.

또한, 상기 원형강관지주의 상부에는 고정금구를 체결하는 체결부가 형성된 것을 특징으로 한다.In addition, the upper portion of the circular steel tube is characterized in that the fastening portion for fastening the fixing bracket is formed.

또한, 상기 지주머리부재는 원형강관지주의 외경에 대응하는 관경을 가지며, 교량의 주형보와 고정금구에 의해 체결되는 지주머리덮개판이 상단에 형성되고, 하단에는 상기 체결부와 고정금구에 의해 체결되는 하부연결브라켓이 형성되어 이루어짐을 특징으로 한다.In addition, the holding head member has a tube diameter corresponding to the outer diameter of the circular steel tube holding, the holding head cover plate is fastened by the mold beam and the fixing bracket of the bridge is formed at the upper end, the lower end is fastened by the fastening portion and the fixing bracket Characterized in that the lower connection bracket is formed.

이하 본 고안의 바람직한 실시예를 첨부된 도면을 참고로 상세하게 설명하면 다음과 같다.Hereinafter, described in detail with reference to the accompanying drawings a preferred embodiment of the present invention.

도면에 있어서 동일 부분은 동일 부호를 부여하고 그 반복 설명은 생략한다.In the drawings, the same parts are denoted by the same reference numerals and the description thereof will be omitted.

첨부된 도 1은 본 고안에 따른 원형강관지주식 가설교량의 실시예를 나타낸 정면도이고, 도 2는 상기 도 1에 대한 측면도이며, 도 3은 상기 도 1에서 A에 대한 분해사시도이다.Attached Figure 1 is a front view showing an embodiment of a circular steel pipe stock temporary bridge according to the present invention, Figure 2 is a side view for the Figure 1, Figure 3 is an exploded perspective view of A in Figure 1.

도 1 및 도 2에 나타낸 바와 같이, 본 고안에 따른 원형강관지주식 가설교량(B)은, 지면에 수직되게 설치되며 단면이 원통형으로 된 복수개의 원형강관지주(2)와; 상기 복수개의 원형강관지주(2)의 상단에 끼워지되, 고정금구(9)에 의해 탈착가능하게 설치되며, 교량의 주형보(10)를 지지하도록 설치되는 복수개의 지주머리부재(4)와; 상기 복수개의 지주머리부재(4)를 연결하는 가로보 형강(6)과; 상기 복수개의 원형강관지주(2)를 연결하는 가로버팀 형강(8);으로 구성된다.As shown in Figure 1 and 2, the circular steel pipe stock temporary bridge (B) according to the present invention, is installed perpendicular to the ground and a plurality of circular steel pipe columns (2) having a cylindrical cross section; A plurality of prop head members (4) fitted to the upper ends of the plurality of circular steel pipe supports (2), detachably installed by the fixing bracket (9), and installed to support the mold beam (10) of the bridge; A cross beam steel 6 for connecting the plurality of prop head members 4; Consists of a transverse brace steel (8) connecting the plurality of circular steel pipe column (2).

상기 원형강관지주(2)는 소정 직경을 갖는 원통체로써, 하천의 바닥에 대해 수직된 상태에서 유압햄머로 항타하여 규정 깊이만큼 근입시키게 되는데, 그 상부 일측의 외주면에는, 도 3에 나타낸 바와 같이, 볼트 및 너트로 구성된 고정금구(9)가 체결될 수 있도록 통공(220)을 갖는 체결부(22)가 형성된다.The circular steel pipe column (2) is a cylindrical body having a predetermined diameter, and is driven by a hydraulic hammer in a vertical state with respect to the bottom of the river, so as to enter the predetermined depth, as shown in Figure 3 on the outer peripheral surface of the upper one side , The fastening part 22 having the through-hole 220 is formed so that the fixing bracket 9 consisting of a bolt and a nut can be fastened.

여기서, 상기 체결부(22)는 후술될 지주머리부재(4)의 하부연결브라켓(46)과 고정금구(9)에 의해 체결되는 것으로, 지주머리부재(4)의 높이에 대응되는 길이만큼 상단으로부터 하부측으로 이격되어 형성됨이 바람직하며, 대개 플랜지와 같은 형상으로 형성된다.Here, the fastening portion 22 is fastened by the lower connection bracket 46 and the fixing bracket 9 of the support head member 4 to be described later, the upper end by a length corresponding to the height of the support head member (4) It is preferably formed spaced apart from the lower side, and is usually formed in a flange-like shape.

상기 지주머리부재(4)는 전술한 원형강관지주(2)의 상단에 설치되어, 교량의 주형보(10)를 지지하도록 하기 위한 것으로, 도 3에 나타낸 바와 같이, 상기 원형강관지주(2)의 외경에 대응되는 내경을 갖는 원통체로 형성되며, 그 상단에는 주형보(10)와 고정금구(7)에 의해 체결되는 지주머리덮개판(42)이 형성되고, 하단부에는 고장력의 볼트 및 너트로 구성된 고정금구(9)를 체결하기 위한 구멍(460)을 갖는 하부연결브라켓(46)이 형성된다.The holding head member 4 is installed on the upper end of the above-described circular steel pipe column (2) to support the mold beam 10 of the bridge, as shown in Figure 3, the circular steel pipe column (2) It is formed of a cylindrical body having an inner diameter corresponding to the outer diameter of the, the upper end of the holding head cover plate 42 is fastened by the mold beam 10 and the fixing bracket 7 is formed, the lower end of the high tension bolts and nuts A lower connection bracket 46 is formed having a hole 460 for fastening the configured fastener 9.

상기 지주머리덮개판(42)은 외주연에 고정금구(7)를 체결하기 위한 구멍(420)이 형성되고, 외주연의 저면에는 지주머리부재(4)의 측면과 연결된 다수개의 보강리브(44)가 형성됨으로써 변형되거나 파손되지 않도록 내구성을 향상시켰다.The support head cover plate 42 has a hole 420 for fastening the fixing bracket 7 to the outer circumference, and a plurality of reinforcing ribs 44 connected to the side of the support head member 4 on the bottom of the outer circumference. ) Is formed to improve the durability to prevent deformation or breakage.

또한, 도 1에 나타낸 바와 같이, 상기 지주머리부재(4)의 측부에는 H빔으로 된 가로보 형강(6)이 횡방향으로 설치되어 있는데, 대향되게 배치된 두 개의 지지머리부재(4)는 각각의 가로보 형강(6)의 끝단이 서로 맞대어진 후 다수개의 볼트(60)에 의해 체결됨으로써 고정되도록 하여 강도가 보강될 수 있게 된다.In addition, as shown in Figure 1, the side beam of the holding head member 4 is provided with a horizontal beam shape steel 6 made of H beams in the lateral direction, the two support head members 4 are disposed opposite each other The ends of the cross beams of the steel (6) are butted together by being fastened by a plurality of bolts (60) so that the strength can be reinforced.

따라서, 상기 가로보 형강(6)과 후술될 가로버팀 형강(8)을 설치함으로써 원형강관지주(2)의 지지력이 강화될 수 있으므로, 종래 H형강을 사용할때 보다 훨씬 적은 갯수의 원형강관지주를 사용하더라도 강한 지지력에 의해 교각의 역할을 충분히 수행할 수 있게 된다.Therefore, since the supporting force of the circular steel pipe column (2) can be strengthened by installing the cross beam steel (6) and the horizontal brace steel (8) to be described later, using a much smaller number of circular steel pipe column than when using the conventional H-beam Even if it is strong enough to be able to perform the role of bridge piers.

상기 가로버팀 형강(8)은 H빔이 주로 사용되며, 대향되게 설치된 두 개의 원형강관지주(2)의 측부에 수평되게 연결됨으로써 원형강관지주(2)의 지지력을 보강할 수 있도록 설치된다. The transverse brace steel 8 is mainly used for the H beam, and is horizontally connected to the sides of the two circular steel pipe holdings 2 opposed to each other is installed to reinforce the supporting force of the circular steel pipe holdings (2).

이와 같이 구성된 본 고안에 따른 원형강관지주식 가설교량의 설치예를 설명하면 다음과 같다.Referring to the installation example of the circular steel pipe stock temporary bridge according to the present invention configured as described above.

하천이나 해안 등의 시공될 위치에 다수개의 원형강관지주(2)를 수직되게 항타시켜 규정된 깊이로 근입시킨다.A plurality of circular steel pipe columns (2) are vertically driven at a position to be constructed such as a river or a coast, and entered at a prescribed depth.

종래 H형강을 사용할 경우 지지력을 강화하기 위해 많은 갯수의 H형강을 사용하였으나, 본 고안에서는 이보다 훨씬 적은 갯수의 원형강관지주(2)를 사용하게 되며, 적은 수의 원형강관지주(2)를 사용하더라도 지지력은 전술한 가로보 형강(6)과 가로버팀 형강(8)의 설치에 의해 더욱 강화될 수 있다.Conventionally, when using H-shaped steel, a large number of H-shaped steels were used to reinforce the bearing capacity. However, in the present design, a much smaller number of circular steel pipe supports (2) are used, and a smaller number of circular steel pipe supports (2) are used. Even if the bearing capacity can be further strengthened by the installation of the cross beam steel 6 and the cross brace steel (8) described above.

이후, 상기 원형강관지주(2)의 상부에 지주머리부재(4)를 결합하고, 상기 하부연결브라켓(46)과 체결부(22)를 볼트와 너트로 구성된 고정금구(9)를 체결함으로써 고정시키게 된다.Thereafter, the holding head member 4 is coupled to the upper portion of the circular steel pipe column 2, and the lower connection bracket 46 and the fastening part 22 are fixed by fastening the fixing bracket 9 composed of bolts and nuts. Let's go.

이때, 상기 지주머리부재(4)는 그 관경이 원형강관지주(2)의 외경에 대응되는 정도로 크므로 원형강관지주(2)의 상단에 씌워져 결합될 수 있고, 고정금구(9)에 의해 고정되므로 외력이 가해지더라도 흔들리거나 이탈될 위험이 배제될 수 있어 견고한 결합이 가능하다.At this time, the holding head member (4) is large enough to correspond to the outer diameter of the circular steel tube holder (2) can be coupled to the upper end of the circular steel tube holder (2), it is fixed by the fixing bracket (9) Therefore, even if an external force is applied, the risk of shaking or deviating can be eliminated, thereby enabling a firm coupling.

다음, 인접된 복수개의 원형강관지주(2)의 측부에는 상기 가로버팀 형강(8)을 수평으로 설치하여 지지력이 보강될 수 있도록 하는데, 가로버팀 형강(8)은 통상 용접에 의해 고정시키게 되나, 이외에 볼트체결방식에 의해 결합시킬 수도 있다.Next, the horizontal brace steel (8) is installed horizontally on the side of the plurality of adjacent circular steel pipe column (2) so that the bearing force can be reinforced, the horizontal brace steel (8) is usually fixed by welding, In addition, it can be combined by bolting method.

그리고, 인접된 복수개의 원형강관지주(2)에 결합된 복수개의 지주머리부재(4)의 측부에는 가로보 형강(6)이 설치되고, 양측의 가로보 형강(6)을 맞댄 후 볼트(60)를 체결하여 결합시키게 된다.Then, the cross beams 6 are installed on the side portions of the plurality of strut head members 4 coupled to the plurality of adjacent round steel pipe supports 2, and the bolts 60 are brought into contact with the cross beams 6 on both sides. It is coupled by fastening.

따라서, 복수개의 원형강관지주(2)는 가로버팀 형강(8)에 의해 견고하게 지지되고, 그 상부의 지주머리부재(4)는 가로보 형강(6)에 의해 지지되므로 견고한 교각의 역할을 충분히 수행할 수 있게 된다.Therefore, the plurality of circular steel pipe column (2) is firmly supported by the transverse support section steel (8), the upper support head member (4) is supported by the cross beam steel (6) to perform a role of a solid piers fully You can do it.

이후, 상기 지주머리부재(4)의 상단에 형성된 지주머리덮개판(42)의 상면에 교량의 주형보(10)가 얹혀진 후 볼트와 너트로 된 고정금구(7)를 체결함으로써 고정시키게 된다.Subsequently, the mold beam 10 of the bridge is placed on the upper surface of the support head cover plate 42 formed on the top of the support head member 4, and then fixed by fastening the fixing bracket 7 made of a bolt and a nut.

즉, 상기 주형보(10)는, 도 3에 나타낸 바와 같이, I 형강을 사용하므로, 하부의 수평면(120)에 상기 지주머리덮개판(42)의 구멍(420)에 대응하는 다수의 결합공(122)을 형성하여 고정금구(7)를 체결할 수 있도록 하였다.That is, since the mold beam 10 uses I-shaped steel, as shown in FIG. 3, a plurality of coupling holes corresponding to the holes 420 of the prop head cover plate 42 in the lower horizontal surface 120 are provided. (122) was formed so that the fixing bracket (7) can be fastened.

따라서, 상기 주형보(10)는, 도 1에 나타낸 바와 같이, 원형강관지주(2)의 배열수만큼 다수개로 설치될 수 있으며, 이들 다수개의 주형보(10)는 주형버팀형강(12)에 의해 연결됨으로써 서로 지지될 수 있도록 한다. Thus, as shown in Figure 1, as shown in Figure 1, a plurality of the number of the array of the circular steel pipe column (2) can be installed, these multiple beams 10 are formed in the mold brace steel 12 So that they can be supported by each other.

이후, 상기 다수개의 주형보(10)의 상면에는 복공판(14)이 설치됨으로써 가설교량(B)이 완성된다.Subsequently, a temporary bridge B is completed by installing a multi-hole plate 14 on the upper surfaces of the plurality of mold beams 10.

따라서, 상기 원형관지주(2)는 모든 방향의 단면 강성이 동일하므로, 예측하지 못한 방향에서 전달되는 하중에 대해서도 충분한 강성을 갖게 되어 구조적으로 안전성이 증가된다.Therefore, since the circular pipe column 2 has the same cross-sectional stiffness in all directions, the circular tube column 2 has sufficient rigidity against a load transmitted in an unexpected direction, thereby increasing the structural safety.

그리고, 원형관지주(2)의 외부형상이 원형으로 되어 있으므로, 부유물이 원형관지주(2)의 측면을 타고 미끄러져 흘러내려가게 되므로, 부유물이 걸리는 현상이 거의 발생하지 않아 부유물에 의한 하중의 폐단이 방지될 수 있게 된다.In addition, since the external shape of the circular pipe column 2 is circular, floating matter slides down the side surface of the circular pipe column 2, so that the phenomenon of suspended matter hardly occurs, so that the floating load Closure can be prevented.

이상 본 고안자에 의해서 이루어진 고안을 상기 실시예에 따라 구체적으로 설명하였지만, 본 고안은 상기 실시예에 한정되는 것은 아니고 그 요지를 이탈하지 않는 범위에서 여러 가지로 변경 가능한 것은 물론이다.Although the invention made by the present inventors has been described in detail according to the above embodiment, the present invention is not limited to the above embodiment and can be variously changed within the scope not departing from the gist of the present invention.

상술한 바와 같이, 본 고안에 따른 원형강관지주식 가설교량은, 원형강관지주를 사용하여 교각의 설치 갯수를 줄일 수 있게 되므로, 종래의 경우보다 시공성이 좋아지며 유수 흐름의 방해를 피할 수 있고, 그에 따른 횡압 증가와 붕괴의 위험성 등의 문제가 발생하는 것을 방지할 수 있는 효과가 제공된다.As described above, the circular steel pipe stock temporary bridge according to the present invention, it is possible to reduce the number of installation of the piers by using the circular steel pipe column, the construction properties are better than the conventional case, it is possible to avoid the flow of the flow of water, There is provided an effect that can prevent problems such as increase in the lateral pressure and the risk of collapse.

특히, 원형강관지주가 원형으로 되어 있으므로, 모든 방향의 단면 강성이 동일하여, 예측하지 못한 방향의 하중에 대해서도 충분한 강성을 가질 수 있으며, 부유물이 지주의 측면을 타고 미끄러져 흘러내려가게 되므로, 부유물이 지주에 걸리는 현상이 거의 발생하지 않게 된다.In particular, since the circular steel pipe column has a circular shape, the cross-section stiffness in all directions is the same, so that it can have sufficient rigidity against an unforeseen load, and the floating material slides down the side of the support, so that the floating material The phenomenon which hangs on this shore rarely occurs.

또한, 본 고안에서는 지주의 설치 개수를 줄임으로써, 시공시 작업량을 줄이게 되어 경제적인 시공을 가능하게 할 뿐만 아니라, 지주 설치시 오차의 발생, 불량시공 가능성 등을 낮출 수 있게 된다.In addition, in the present invention, by reducing the number of installation of the struts, it is possible to reduce the amount of work during construction to enable economical construction, as well as to reduce the occurrence of errors, poor construction and the like during the installation of the struts.

도 1은 본 고안에 따른 원형강관지주식 가설교량의 실시예를 나타낸 정면도이다.1 is a front view showing an embodiment of a circular steel pipe stock temporary bridge according to the present invention.

도 2는 상기 도 1에 대한 측면도이다.2 is a side view of FIG. 1.

도 3은 상기 도 1에서 A에 대한 분해사시도이다.3 is an exploded perspective view of A in FIG. 1.

* 도면의 주요 부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

2 : 원형강관지주 4 : 지주머리부재2: round steel pipe holder 4: holding head member

6 : 가로보 형강 7, 9 : 고정금구6: cross beam shape steel 7, 9: fixing bracket

8 : 가로버팀 형강 10 : 주형보8: horizontal brace section steel 10: mold beam

12 : 주형버팀형강 14 : 복공판12: mold brace steel 14: perforated plate

Claims (3)

다수개의 지주와, 그 상부에 설치되는 주형보 및 상부구조물로 구성되는 가설교량에 있어서, In the temporary bridge composed of a plurality of struts, the mold beam and the upper structure installed on the upper 상부측에 체결부가 형성되고, 단면이 원통형이며, 지면에 대해 수직되게 설치되는 다수개의 원형강관지주와,A plurality of circular steel pipe pillars having a fastening portion formed at an upper side thereof, having a cylindrical cross section and installed perpendicularly to the ground; 상기 다수개의 원형강관지주의 상부측에 결합되되, 소정의 고정금구에 의해 탈착가능하게 설치되며, 상기 교량의 주형보를 지지하도록 설치되는 다수개의 지주머리부재와,A plurality of strut head members coupled to an upper side of the plurality of circular steel tubes, detachably installed by a predetermined fixing bracket, and installed to support the mold beam of the bridge; 상기 다수개의 지주머리부재의 측부에 수평으로 연결되는 다수개의 가로보 형강과,A plurality of cross beam steels horizontally connected to the sides of the plurality of support head members, 상기 다수개의 원형강관지주의 측부에 수평으로 연결되는 다수개의 가로버팀 형강을 포함하여 이루어진 것을 특징으로 하는 원형강관지주식 가설교량.Circular steel pipe stock temporary construction bridge, characterized in that it comprises a plurality of transverse brace steel horizontally connected to the side of the plurality of circular steel pipe column. 제1항에 있어서,The method of claim 1, 상기 지주머리부재는 원형강관지주의 외경에 대응하는 관경을 가지며, 교량의 주형보와 고정금구에 의해 체결되는 지주머리덮개판이 상단에 형성되고, 하단에는 상기 체결부와 고정금구에 의해 체결되는 하부연결브라켓이 형성된 것을 특징으로 하는 원형강관지주식 가설교량.The holding head member has a tube diameter corresponding to the outer diameter of the circular steel tube holding, the holding head cover plate is fastened by the mold beam and the fixing bracket of the bridge is formed at the top, the lower portion is fastened by the fastening portion and the fixing bracket Circular steel pipe stock temporary bridge, characterized in that the connection bracket is formed. 제1항 또는 제2항에 있어서,The method according to claim 1 or 2, 상기 원형강관지주의 체결부는 상기 지주머리부재의 높이에 대응되는 길이만큼 상단으로부터 하부측으로 이격 형성된 것을 특징으로 하는 원형강관지주식 가설교량.The fastening portion of the circular steel pipe column, characterized in that the circular steel pipe joints temporary bridge, characterized in that spaced apart from the upper side by a length corresponding to the height of the holding head member.
KR20-2005-0024759U 2005-08-29 2005-08-29 Temporary works bridge KR200402162Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2005-0024759U KR200402162Y1 (en) 2005-08-29 2005-08-29 Temporary works bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2005-0024759U KR200402162Y1 (en) 2005-08-29 2005-08-29 Temporary works bridge

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020050079212A Division KR20070026951A (en) 2005-08-29 2005-08-29 Temporary works bridge

Publications (1)

Publication Number Publication Date
KR200402162Y1 true KR200402162Y1 (en) 2005-11-28

Family

ID=43703151

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2005-0024759U KR200402162Y1 (en) 2005-08-29 2005-08-29 Temporary works bridge

Country Status (1)

Country Link
KR (1) KR200402162Y1 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100776234B1 (en) 2007-09-10 2007-11-16 하진영 A main girder of temporary bridge using circle pipe
KR200459851Y1 (en) * 2009-11-12 2012-04-19 주식회사 스페이스테크놀로지 Bridge construction structure using steel pipe pile and composition beam for bicycle only
KR101204256B1 (en) 2011-04-13 2012-11-27 최종배 A temporary bridge and Method for construting thereof
KR101570474B1 (en) * 2014-11-19 2015-11-19 (주)신승이앤씨 Structure of pipe bridge and Constructing method of pipe bridge
KR101580118B1 (en) * 2015-06-12 2015-12-29 (주)에이치엔피테크 Aqueduct and installation methods thereof
KR101767161B1 (en) * 2015-10-26 2017-08-10 (주)에이치엔피테크 Steel pipes assist devices and its construction method
CN107119571A (en) * 2017-06-13 2017-09-01 天津第市政公路工程有限公司 A kind of constructing tie beam steel platform and its assembling and application method for carrying bored concrete pile in liftable water
CN109457557A (en) * 2018-12-28 2019-03-12 中车长江车辆有限公司 A kind of suspension type monorail traffic system and its pillarwork
KR102274245B1 (en) 2020-07-21 2021-07-07 엘에스알스코 주식회사 Bridge Structures with Improved Movement Performance due to Thermal Expansion or Contraction

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100776234B1 (en) 2007-09-10 2007-11-16 하진영 A main girder of temporary bridge using circle pipe
KR200459851Y1 (en) * 2009-11-12 2012-04-19 주식회사 스페이스테크놀로지 Bridge construction structure using steel pipe pile and composition beam for bicycle only
KR101204256B1 (en) 2011-04-13 2012-11-27 최종배 A temporary bridge and Method for construting thereof
KR101570474B1 (en) * 2014-11-19 2015-11-19 (주)신승이앤씨 Structure of pipe bridge and Constructing method of pipe bridge
KR101580118B1 (en) * 2015-06-12 2015-12-29 (주)에이치엔피테크 Aqueduct and installation methods thereof
KR101767161B1 (en) * 2015-10-26 2017-08-10 (주)에이치엔피테크 Steel pipes assist devices and its construction method
CN107119571A (en) * 2017-06-13 2017-09-01 天津第市政公路工程有限公司 A kind of constructing tie beam steel platform and its assembling and application method for carrying bored concrete pile in liftable water
CN109457557A (en) * 2018-12-28 2019-03-12 中车长江车辆有限公司 A kind of suspension type monorail traffic system and its pillarwork
KR102274245B1 (en) 2020-07-21 2021-07-07 엘에스알스코 주식회사 Bridge Structures with Improved Movement Performance due to Thermal Expansion or Contraction

Similar Documents

Publication Publication Date Title
KR200402162Y1 (en) Temporary works bridge
KR101024259B1 (en) Temporary bride construction method using pile upper bracket
US4018057A (en) Off shore structures
CN102953342A (en) Assembling and lifting method of half-span skeleton of tied arch bridge
KR100776234B1 (en) A main girder of temporary bridge using circle pipe
KR20070026951A (en) Temporary works bridge
CN215925691U (en) Bearing support for casting No. 0 block of bridge
CN213203831U (en) Construction support combining suspended casting method 0# block cast-in-place support and temporary consolidation
EP3904674B1 (en) Floating platform for high-power wind turbines
KR100543946B1 (en) Temporary Pier Using Steel Pipe Piles
JP5087154B2 (en) Construction method and scaffold structure of water structure
KR100543948B1 (en) Capping Apparatus for Temporary Pier Using Steel Pipe Piles
KR100748950B1 (en) A frp column filled concrete with internally confined hollow
KR20050088628A (en) Hollow type pier structure using corrugated steel pipe and construction method thereof
CN209891158U (en) Aqueduct supporting system
CN202969246U (en) Semi-stride hoisting bowstring arch bridge
KR200360932Y1 (en) Temporary Pier Using Steel Pipe Piles and Capping Apparatus therefor
CN210066694U (en) Steel platform structure on water
CN216006581U (en) Bolted connection formula steel-pipe pile landing stage based on four-point location
CN213681677U (en) Concrete precast tubular pile temporary bridge structure
CN218559122U (en) Comb tooth structure floating platform based on pile foundation hoop overhanging positioning
CN218809982U (en) Gantry crane
CN214301823U (en) Deep foundation pit all-steel structure combined large tower crane foundation
CN220353162U (en) Connecting node of embedded steel plate shear wall and reinforced concrete conversion beam
CN217782131U (en) Firm steel-pipe pile basis of aquatic tower crane

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20121106

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20131111

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20141114

Year of fee payment: 10