CN217840877U - Adjustable support truss for house building plane formwork - Google Patents

Adjustable support truss for house building plane formwork Download PDF

Info

Publication number
CN217840877U
CN217840877U CN202222025582.1U CN202222025582U CN217840877U CN 217840877 U CN217840877 U CN 217840877U CN 202222025582 U CN202222025582 U CN 202222025582U CN 217840877 U CN217840877 U CN 217840877U
Authority
CN
China
Prior art keywords
formwork
rotating shaft
wall
telescopic column
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202222025582.1U
Other languages
Chinese (zh)
Inventor
伊凌云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222025582.1U priority Critical patent/CN217840877U/en
Application granted granted Critical
Publication of CN217840877U publication Critical patent/CN217840877U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本实用新型涉及建筑施工辅助结构技术领域,尤其涉及房屋建筑平面模板支模的可调式支撑桁架。其技术方案包括:立柱,所述立柱的端壁中心位置开设有安装槽孔,所述安装槽孔的上方和下方均安装有伸缩柱,所述伸缩柱的一端端壁中心位置开设有螺纹孔,所述螺纹孔内安装有第一转轴,所述第一转轴的另一端穿过第二连接块表面上的轴承与第一锥形齿轮连接,所述伸缩柱的另一端外壁上开设有凹槽,所述凹槽内安装有第一连接块。本实用新型不仅便于调节整体长度,可以对不同间距的结构梁之间的支模进行连接,还可以调节安装板与伸缩柱之间的夹角,从而可以对不同水平高度位置的结构梁之间的支模进行连接,通用性强。

Figure 202222025582

The utility model relates to the technical field of auxiliary structures for building construction, in particular to an adjustable supporting truss for building plane formwork supporting formwork. The technical solution includes: a column, the center of the end wall of the column is provided with an installation slot, the upper and lower sides of the installation slot are equipped with a telescopic column, and the center of the end wall of one end of the telescopic column is provided with a threaded hole , the first rotating shaft is installed in the threaded hole, the other end of the first rotating shaft passes through the bearing on the surface of the second connecting block to connect with the first bevel gear, and the outer wall of the other end of the telescopic column is provided with a concave groove, and the first connecting block is installed in the groove. The utility model is not only convenient to adjust the overall length, but also can connect the formwork between the structural beams with different distances, and can also adjust the angle between the installation plate and the telescopic column, so that the structural beams at different horizontal heights can be connected. The support formwork is connected, and the versatility is strong.

Figure 202222025582

Description

房屋建筑平面模板支模的可调式支撑桁架Adjustable supporting trusses for formwork support of house construction plane formwork

技术领域technical field

本实用新型涉及建筑施工辅助结构技术领域,具体为房屋建筑平面模板支模的可调式支撑桁架。The utility model relates to the technical field of auxiliary structures for building construction, in particular to an adjustable support truss for building plane formwork supporting formwork.

背景技术Background technique

在房屋建筑楼板结构施工中,需要在结构梁之间支模才能在其上绑扎钢筋和浇筑混凝土,而平面模板通常是采用搭设满堂脚手架来支。In the construction of building floor slab structures, it is necessary to support the formwork between the structural beams to bind steel bars and pour concrete on it, and the plane formwork is usually supported by erecting a full-scale scaffolding.

经检索,专利公告号为CN114541742A公开一种用于房屋建筑平面模板支模的可调式支撑桁架。桁架由上梁、下梁、斜撑、衬档、立撑、连接件、定位件、涨紧螺杆等组成。上梁、下梁、斜撑、衬档均由相应的套杆和插杆相匹配来调节它们之间的相对活动距离;上梁的两端设有涨紧螺杆,用于对桁架跨距定位的涨紧固定;立撑由螺母套杆与螺杆相匹配,用于不同结构梁之高度对桁架的支。After retrieval, the patent notification number is CN114541742A, which discloses an adjustable support truss used for formwork support of building plane formwork. The truss is composed of upper beam, lower beam, diagonal brace, liner, vertical brace, connector, positioning piece, tensioning screw and so on. The upper beam, the lower beam, the diagonal brace and the lining are all matched with the corresponding sleeve rods and insert rods to adjust the relative movable distance between them; the two ends of the upper beam are equipped with tightening screws for positioning the span of the truss The tension is fixed; the vertical support is matched with the nut sleeve rod and the screw rod, and is used for supporting the truss of different structural beam heights.

现有的房屋建筑平面模板支模的可调式支撑桁架存在的缺陷是:The defective that the adjustable support truss that existing house construction plane formwork forms support exists is:

1、现有的房屋建筑平面模板支模的可调式支撑桁架在实际使用时,不便于调节支撑桁架整体的长度,从而不便于对不同间距的结构梁之间的支模进行连接,通用性差;1. The existing adjustable supporting trusses for the plane formwork support of the building construction are inconvenient to adjust the overall length of the support truss during actual use, so that it is not convenient to connect the formwork between the structural beams with different spacings, and the versatility is poor;

2、现有的房屋建筑平面模板支模的可调式支撑桁架在实际使用时,不便于对不同水平高度位置的结构梁之间的支模进行连接,安装繁琐,通用性差,为此我们提出房屋建筑平面模板支模的可调式支撑桁架来解决现有的问题。2. In actual use, the existing adjustable support trusses for the plane formwork formwork of houses are inconvenient to connect the formwork between the structural beams at different horizontal heights, the installation is cumbersome, and the versatility is poor. The adjustable supporting truss of the formwork support of the building plane formwork is used to solve the existing problems.

实用新型内容Utility model content

本实用新型的目的在于提供房屋建筑平面模板支模的可调式支撑桁架,以解决上述背景技术中提出的问题。The purpose of this utility model is to provide an adjustable support truss for building plane formwork to support the formwork, so as to solve the problems raised in the above-mentioned background technology.

为实现上述目的,本实用新型提供如下技术方案:房屋建筑平面模板支模的可调式支撑桁架,包括立柱,所述立柱的端壁中心位置开设有安装槽孔,所述安装槽孔的上方和下方均安装有伸缩柱,所述伸缩柱的一端端壁中心位置开设有螺纹孔,所述螺纹孔内安装有第一转轴,所述第一转轴的另一端穿过第二连接块表面上的轴承与第一锥形齿轮连接,所述伸缩柱的另一端外壁上开设有凹槽,所述凹槽内安装有第一连接块,所述第一连接块的一端安装有安装板。In order to achieve the above object, the utility model provides the following technical solutions: the adjustable supporting truss of the building plane formwork support formwork, including a column, the center of the end wall of the column is provided with an installation slot, the top of the installation slot and the Bottoms are equipped with telescopic columns, and a threaded hole is provided at the center of one end of the telescopic column, and a first rotating shaft is installed in the threaded hole, and the other end of the first rotating shaft passes through a hole on the surface of the second connecting block. The bearing is connected with the first bevel gear, a groove is opened on the outer wall of the other end of the telescopic column, a first connection block is installed in the groove, and a mounting plate is installed at one end of the first connection block.

通过伸缩柱、立柱、第二旋转调节板、第一转轴、第二转轴、螺纹孔等一系列结构的配合设置,工作人员需要调节本实用新型整体的长度时,工作人员对第二旋转调节板进行正转或反转时会间接的带动第一转轴进行正转或反转,因第一转轴外壁上的外螺纹与伸缩柱上的螺纹孔之间为螺纹啮合连接,从而第一转轴进行正转或反转时会使得伸缩柱在安装槽孔内进行伸缩,伸缩柱进行伸缩从而可以调节本实用新型的整体长度,从而本实用新型可以对不同间距的结构梁之间的支模进行连接,增强了通用性,通过第一旋转调节板、主动齿轮、从动齿轮、第一连接块、第三转轴、第四转轴等一系列结构的配合设置,工作人员需要调节安装板与伸缩柱之间的夹角时,工作人员对第一旋转调节板进行转动时即可间接的带动安装板进行转动,安装板进行转动时既可调节安装板与伸缩柱之间的夹角,从而本实用新型可以对不同水平高度位置的结构梁之间的支模进行连接,进一步增强了通用性。Through the cooperative arrangement of a series of structures such as telescopic column, column, second rotating adjustment plate, first rotating shaft, second rotating shaft, threaded hole, etc., when the staff needs to adjust the overall length of the utility model, the staff will adjust the second rotating adjusting plate When performing forward rotation or reverse rotation, it will indirectly drive the first rotating shaft to perform forward rotation or reverse rotation. Because the external thread on the outer wall of the first rotating shaft and the threaded hole on the telescopic column are threaded and engaged, the first rotating shaft performs positive rotation. When turning or reversing, the telescopic column will expand and contract in the installation slot, and the telescopic column will expand and contract to adjust the overall length of the utility model, so that the utility model can connect the formwork between structural beams with different distances, Enhanced versatility, through the coordination of a series of structures such as the first rotating adjustment plate, driving gear, driven gear, first connecting block, third rotating shaft, and fourth rotating shaft, the staff needs to adjust the distance between the mounting plate and the telescopic column When the angle between the installation plate and the telescopic column is adjusted, the staff can indirectly drive the installation plate to rotate when the first rotation adjustment plate is rotated. When the installation plate is rotated, the angle between the installation plate and the telescopic column can be adjusted. Connecting formwork between structural beams at different horizontal heights further enhances versatility.

优选的,所述伸缩柱的外壁与安装槽孔的孔壁之间为间隙连接。Preferably, there is a clearance connection between the outer wall of the telescopic column and the wall of the installation slot.

优选的,所述第一转轴的外壁上设置有外螺纹,所述第一转轴外壁上的外螺纹与伸缩柱上的螺纹孔之间为螺纹啮合连接。Preferably, external threads are provided on the outer wall of the first rotating shaft, and the external threads on the outer wall of the first rotating shaft and the threaded holes on the telescopic column are threadedly engaged.

优选的,所述第二连接块设置在安装槽孔内。Preferably, the second connection block is arranged in the installation slot.

优选的,所述第一锥形齿轮与第二锥形齿轮啮合连接,所述第二锥形齿轮安装在第二转轴的一端上,所述第二转轴的另一端贯穿立柱一侧外壁上的轴承并延伸到外部与第二旋转调节板连接。Preferably, the first bevel gear is meshed with the second bevel gear, the second bevel gear is installed on one end of the second rotating shaft, and the other end of the second rotating shaft passes through the The bearing extends to the outside and is connected with the second rotation adjusting plate.

优选的,所述第一连接块的两侧外壁上均安装有第四转轴,所述第四转轴的另一端均安装在伸缩柱外壁上的轴承内,且第一连接块一侧上的第四转轴穿过轴承与从动齿轮连接。Preferably, a fourth rotating shaft is installed on both sides of the first connecting block, the other end of the fourth rotating shaft is installed in a bearing on the outer wall of the telescopic column, and the second rotating shaft on one side of the first connecting block The four rotating shafts pass through bearings and are connected with driven gears.

优选的,所述从动齿轮与主动齿轮啮合连接,所述主动齿轮安装在第三转轴的外壁上,所述第三转轴的一端安装在伸缩柱外壁上的轴承内,所述第三转轴的另一端安装有第一旋转调节板。Preferably, the driven gear is meshed with the driving gear, the driving gear is installed on the outer wall of the third rotating shaft, one end of the third rotating shaft is installed in a bearing on the outer wall of the telescopic column, and the third rotating shaft The other end is installed with a first rotation adjusting plate.

优选的,所述安装板的表面开设有安装孔。Preferably, the surface of the mounting board is provided with mounting holes.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:

1、本实用新型通过伸缩柱、立柱、第二旋转调节板、第一转轴、第二转轴、螺纹孔等一系列结构的配合设置,工作人员需要调节本实用新型整体的长度时,工作人员对第二旋转调节板进行正转或反转时会间接的带动第一转轴进行正转或反转,因第一转轴外壁上的外螺纹与伸缩柱上的螺纹孔之间为螺纹啮合连接,从而第一转轴进行正转或反转时会使得伸缩柱在安装槽孔内进行伸缩,伸缩柱进行伸缩从而可以调节本实用新型的整体长度,从而本实用新型可以对不同间距的结构梁之间的支模进行连接,增强了通用性。1. The utility model is set through the coordination of a series of structures such as the telescopic column, the column, the second rotating adjustment plate, the first rotating shaft, the second rotating shaft, and the threaded hole. When the staff needs to adjust the overall length of the utility model, the staff will When the second rotating adjustment plate rotates forward or reversely, it will indirectly drive the first rotating shaft to rotate forward or reversely, because the external thread on the outer wall of the first rotating shaft is threadedly engaged with the threaded hole on the telescopic column, so that When the first rotating shaft rotates forward or reversely, the telescopic column will expand and contract in the installation slot, and the telescopic column will expand and contract so that the overall length of the utility model can be adjusted, so that the utility model can adjust the distance between structural beams with different distances. Formwork is connected to enhance the versatility.

2、本实用新型通过第一旋转调节板、主动齿轮、从动齿轮、第一连接块、第三转轴、第四转轴等一系列结构的配合设置,工作人员需要调节安装板与伸缩柱之间的夹角时,工作人员对第一旋转调节板进行转动时即可间接的带动安装板进行转动,安装板进行转动时既可调节安装板与伸缩柱之间的夹角,从而本实用新型可以对不同水平高度位置的结构梁之间的支模进行连接,进一步增强了通用性。2. The utility model cooperates with a series of structures such as the first rotating adjustment plate, the driving gear, the driven gear, the first connecting block, the third rotating shaft, and the fourth rotating shaft. The staff need to adjust the distance between the mounting plate and the telescopic column When the angle between the installation plate and the telescopic column is adjusted, the staff can indirectly drive the installation plate to rotate when the first rotation adjustment plate is rotated, and the angle between the installation plate and the telescopic column can be adjusted when the installation plate is rotated. The versatility is further enhanced by connecting formwork between structural beams at different horizontal heights.

附图说明Description of drawings

图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型的内部结构示意图;Fig. 2 is a schematic diagram of the internal structure of the utility model;

图3为本实用新型图2中的A处局部放大结构示意图。Fig. 3 is a schematic diagram of a partially enlarged structure at A in Fig. 2 of the present invention.

图中:1、安装孔;2、安装板;3、第一连接块;4、凹槽;5、伸缩柱;6、立柱;7、从动齿轮;8、第一旋转调节板;9、主动齿轮;10、第二旋转调节板;11、螺纹孔;12、第一转轴;13、第一锥形齿轮;14、第二转轴;15、第二连接块;16、第二锥形齿轮;17、安装槽孔;18、第三转轴;19、第四转轴。In the figure: 1. mounting hole; 2. mounting plate; 3. first connecting block; 4. groove; 5. telescopic column; 6. column; 7. driven gear; 8. first rotation adjustment plate; 9. Driving gear; 10, the second rotation adjustment plate; 11, threaded hole; 12, the first rotating shaft; 13, the first bevel gear; 14, the second rotating shaft; 15, the second connecting block; 16, the second bevel gear ; 17, the installation slot; 18, the third rotating shaft; 19, the fourth rotating shaft.

具体实施方式Detailed ways

下文结合附图和具体实施例对本实用新型的技术方案做进一步说明。The technical scheme of the utility model is further described below in conjunction with the accompanying drawings and specific embodiments.

实施例一Embodiment one

如图1-3所示,本实用新型提出的房屋建筑平面模板支模的可调式支撑桁架,包括立柱6,立柱6的端壁中心位置开设有安装槽孔17,安装槽孔17的上方和下方均安装有伸缩柱5,伸缩柱5的一端端壁中心位置开设有螺纹孔11,螺纹孔11内安装有第一转轴12,第一转轴12的另一端穿过第二连接块15表面上的轴承与第一锥形齿轮13连接,伸缩柱5的另一端外壁上开设有凹槽4,凹槽4内安装有第一连接块3,第一连接块3的一端安装有安装板2。As shown in Figure 1-3, the adjustable support truss of the housing construction planar formwork supporting formwork that the utility model proposes, comprises column 6, and the end wall center position of column 6 is provided with installation slot 17, and the top of installation slot 17 and The telescopic column 5 is installed below, and the central position of the end wall of one end of the telescopic column 5 is provided with a threaded hole 11, and the first rotating shaft 12 is installed in the threaded hole 11, and the other end of the first rotating shaft 12 passes through the surface of the second connecting block 15. The bearing is connected with the first bevel gear 13, and a groove 4 is provided on the outer wall of the other end of the telescopic column 5, the first connecting block 3 is installed in the groove 4, and the mounting plate 2 is installed at one end of the first connecting block 3.

基于实施例一的房屋建筑平面模板支模的可调式支撑桁架工作原理是:使用时,工作人员需要调节本实用新型整体的长度时,工作人员对第二旋转调节板10进行正转或反转时会间接的带动第一转轴12进行正转或反转,因第一转轴12外壁上的外螺纹与伸缩柱5上的螺纹孔11之间为螺纹啮合连接,从而第一转轴12进行正转或反转时会使得伸缩柱5在安装槽孔17内进行伸缩,伸缩柱5进行伸缩从而可以调节本实用新型的整体长度,从而本实用新型可以对不同间距的结构梁之间的支模进行连接,增强了通用性,工作人员需要调节安装板2与伸缩柱5之间的夹角时,工作人员对第一旋转调节板8进行转动时即可间接的带动安装板2进行转动,安装板2进行转动时既可调节安装板2与伸缩柱5之间的夹角,从而本实用新型可以对不同水平高度位置的结构梁之间的支模进行连接,进一步增强了通用性。The working principle of the adjustable support truss based on the housing construction plane formwork support formwork of Embodiment 1 is: when in use, when the staff needs to adjust the overall length of the utility model, the staff will forward or reverse the second rotating adjustment plate 10 Sometimes it will indirectly drive the first rotating shaft 12 to rotate forward or reversely, because the external thread on the outer wall of the first rotating shaft 12 is threadedly engaged with the threaded hole 11 on the telescopic column 5, so that the first rotating shaft 12 rotates forward Or when reversed, the telescopic column 5 will expand and contract in the installation slot 17, and the telescopic column 5 will expand and contract so that the overall length of the utility model can be adjusted, so that the utility model can support formwork between structural beams with different distances. connection, which enhances the versatility. When the staff needs to adjust the angle between the installation plate 2 and the telescopic column 5, the staff can indirectly drive the installation plate 2 to rotate when the staff rotates the first rotation adjustment plate 8, and the installation plate 2. When rotating, the angle between the mounting plate 2 and the telescopic column 5 can be adjusted, so that the utility model can connect the formwork between the structural beams at different horizontal heights, further enhancing the versatility.

实施例二Embodiment two

如图1-3所示,本实用新型提出的房屋建筑平面模板支模的可调式支撑桁架,相较于实施例一,本实施例还包括:伸缩柱5的外壁与安装槽孔17的孔壁之间为间隙连接,第一转轴12的外壁上设置有外螺纹,第一转轴12外壁上的外螺纹与伸缩柱5上的螺纹孔11之间为螺纹啮合连接,第二连接块15设置在安装槽孔17内,第一锥形齿轮13与第二锥形齿轮16啮合连接,第二锥形齿轮16安装在第二转轴14的一端上,第二转轴14的另一端贯穿立柱6一侧外壁上的轴承并延伸到外部与第二旋转调节板10连接,第一连接块3的两侧外壁上均安装有第四转轴19,第四转轴19的另一端均安装在伸缩柱5外壁上的轴承内,且第一连接块3一侧上的第四转轴19穿过轴承与从动齿轮7连接,从动齿轮7与主动齿轮9啮合连接,主动齿轮9安装在第三转轴18的外壁上,第三转轴18的一端安装在伸缩柱5外壁上的轴承内,第三转轴18的另一端安装有第一旋转调节板8,安装板2的表面开设有安装孔1。As shown in Figures 1-3, the adjustable supporting truss of the housing construction planar formwork supporting formwork proposed by the utility model, compared with the first embodiment, this embodiment also includes: the outer wall of the telescopic column 5 and the hole for installing the slot hole 17 There is a gap connection between the walls, the outer wall of the first rotating shaft 12 is provided with external threads, the external thread on the outer wall of the first rotating shaft 12 is threaded and engaged with the threaded hole 11 on the telescopic column 5, and the second connecting block 15 is provided In the mounting slot 17, the first bevel gear 13 is meshed with the second bevel gear 16, and the second bevel gear 16 is installed on one end of the second rotating shaft 14, and the other end of the second rotating shaft 14 runs through the column 6- The bearing on the side outer wall extends to the outside to connect with the second rotation adjustment plate 10, the fourth rotating shaft 19 is installed on the outer walls of both sides of the first connecting block 3, and the other end of the fourth rotating shaft 19 is installed on the outer wall of the telescopic column 5 In the bearing on the top, and the fourth rotating shaft 19 on one side of the first connection block 3 passes through the bearing and is connected with the driven gear 7, the driven gear 7 is meshed with the driving gear 9, and the driving gear 9 is installed on the third rotating shaft 18 On the outer wall, one end of the third rotating shaft 18 is installed in the bearing on the outer wall of the telescopic column 5, and the other end of the third rotating shaft 18 is equipped with the first rotation adjusting plate 8, and the surface of the mounting plate 2 is provided with the mounting hole 1.

本实施例中,因伸缩柱5的外壁与安装槽孔17的孔壁之间为间隙连接,可以对伸缩柱5的伸缩运动起到限位的作用,避免了伸缩柱5会随着第一转轴12而转动的情况发生,安装孔1的设置,可以将安装板2安装到支模上。In this embodiment, because there is a gap connection between the outer wall of the telescopic column 5 and the hole wall of the installation slot 17, it can limit the telescopic movement of the telescopic column 5, and prevent the telescopic column 5 from falling with the first The situation that rotating shaft 12 rotates takes place, and the setting of mounting hole 1 can be installed on the mounting plate 2 on the formwork.

上述具体实施例仅仅是本实用新型的几种优选的实施例,基于本实用新型的技术方案和上述实施例的相关启示,本领域技术人员可以对上述具体实施例做出多种替代性的改进和组合。The above-mentioned specific embodiments are only several preferred embodiments of the present utility model. Based on the technical solutions of the present utility model and the related inspirations of the above-mentioned embodiments, those skilled in the art can make various alternative improvements to the above-mentioned specific embodiments. and combinations.

Claims (8)

1.房屋建筑平面模板支模的可调式支撑桁架,包括立柱(6),其特征在于:所述立柱(6)的端壁中心位置开设有安装槽孔(17),所述安装槽孔(17)的上方和下方均安装有伸缩柱(5),所述伸缩柱(5)的一端端壁中心位置开设有螺纹孔(11),所述螺纹孔(11)内安装有第一转轴(12),所述第一转轴(12)的另一端穿过第二连接块(15)表面上的轴承与第一锥形齿轮(13)连接,所述伸缩柱(5)的另一端外壁上开设有凹槽(4),所述凹槽(4)内安装有第一连接块(3),所述第一连接块(3)的一端安装有安装板(2)。1. The adjustable supporting truss of the building plane formwork supporting formwork, comprises column (6), is characterized in that: the end wall center position of described column (6) is provided with installation slot (17), and described installation slot ( 17) above and below are equipped with a telescopic column (5), the central position of one end end wall of the telescopic column (5) is provided with a threaded hole (11), the first rotating shaft (11) is installed in the threaded hole (11) 12), the other end of the first rotating shaft (12) passes through the bearing on the surface of the second connection block (15) to connect with the first bevel gear (13), and the other end of the telescopic column (5) on the outer wall A groove (4) is opened, a first connecting block (3) is installed in the groove (4), and a mounting plate (2) is installed at one end of the first connecting block (3). 2.根据权利要求1所述的房屋建筑平面模板支模的可调式支撑桁架,其特征在于:所述伸缩柱(5)的外壁与安装槽孔(17)的孔壁之间为间隙连接。2. The adjustable support truss for building plane formwork support formwork according to claim 1, characterized in that: the outer wall of the telescopic column (5) and the hole wall of the installation slot (17) are gap-connected. 3.根据权利要求1所述的房屋建筑平面模板支模的可调式支撑桁架,其特征在于:所述第一转轴(12)的外壁上设置有外螺纹,所述第一转轴(12)外壁上的外螺纹与伸缩柱(5)上的螺纹孔(11)之间为螺纹啮合连接。3. The adjustable supporting truss of the plane formwork support formwork of house construction according to claim 1, characterized in that: the outer wall of the first rotating shaft (12) is provided with external threads, and the outer wall of the first rotating shaft (12) It is a threaded engagement connection between the external thread on the top and the threaded hole (11) on the telescopic column (5). 4.根据权利要求1所述的房屋建筑平面模板支模的可调式支撑桁架,其特征在于:所述第二连接块(15)设置在安装槽孔(17)内。4. The adjustable support truss for building plane formwork support formwork according to claim 1, characterized in that: the second connecting block (15) is arranged in the installation slot (17). 5.根据权利要求1所述的房屋建筑平面模板支模的可调式支撑桁架,其特征在于:所述第一锥形齿轮(13)与第二锥形齿轮(16)啮合连接,所述第二锥形齿轮(16)安装在第二转轴(14)的一端上,所述第二转轴(14)的另一端贯穿立柱(6)一侧外壁上的轴承并延伸到外部与第二旋转调节板(10)连接。5. The adjustable support truss of the plane formwork support formwork of house construction according to claim 1, characterized in that: the first bevel gear (13) is meshed with the second bevel gear (16), and the first bevel gear (16) is meshed and connected. Two bevel gears (16) are installed on one end of the second rotating shaft (14), and the other end of the second rotating shaft (14) passes through the bearing on the outer wall of the column (6) side and extends to the outside to adjust with the second rotation. The plate (10) is connected. 6.根据权利要求1所述的房屋建筑平面模板支模的可调式支撑桁架,其特征在于:所述第一连接块(3)的两侧外壁上均安装有第四转轴(19),所述第四转轴(19)的另一端均安装在伸缩柱(5)外壁上的轴承内,且第一连接块(3)一侧上的第四转轴(19)穿过轴承与从动齿轮(7)连接。6. The adjustable supporting truss of the plane formwork support formwork of house construction according to claim 1, is characterized in that: the fourth rotating shaft (19) is all installed on the both sides outer walls of described first connection block (3), so The other end of the fourth rotating shaft (19) is all installed in the bearing on the outer wall of the telescopic column (5), and the fourth rotating shaft (19) on one side of the first connection block (3) passes through the bearing and the driven gear ( 7) Connect. 7.根据权利要求6所述的房屋建筑平面模板支模的可调式支撑桁架,其特征在于:所述从动齿轮(7)与主动齿轮(9)啮合连接,所述主动齿轮(9)安装在第三转轴(18)的外壁上,所述第三转轴(18)的一端安装在伸缩柱(5)外壁上的轴承内,所述第三转轴(18)的另一端安装有第一旋转调节板(8)。7. The adjustable supporting truss of the plane formwork support formwork of house construction according to claim 6, characterized in that: the driven gear (7) is meshed with the driving gear (9), and the driving gear (9) is installed On the outer wall of the third rotating shaft (18), one end of the third rotating shaft (18) is installed in the bearing on the outer wall of the telescopic column (5), and the other end of the third rotating shaft (18) is installed with the first rotating Adjustment plate (8). 8.根据权利要求1所述的房屋建筑平面模板支模的可调式支撑桁架,其特征在于:所述安装板(2)的表面开设有安装孔(1)。8. The adjustable supporting truss for supporting the formwork of the building construction planar formwork according to claim 1, characterized in that: the surface of the installation plate (2) is provided with an installation hole (1).
CN202222025582.1U 2022-08-02 2022-08-02 Adjustable support truss for house building plane formwork Expired - Fee Related CN217840877U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222025582.1U CN217840877U (en) 2022-08-02 2022-08-02 Adjustable support truss for house building plane formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222025582.1U CN217840877U (en) 2022-08-02 2022-08-02 Adjustable support truss for house building plane formwork

Publications (1)

Publication Number Publication Date
CN217840877U true CN217840877U (en) 2022-11-18

Family

ID=84012108

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222025582.1U Expired - Fee Related CN217840877U (en) 2022-08-02 2022-08-02 Adjustable support truss for house building plane formwork

Country Status (1)

Country Link
CN (1) CN217840877U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116556769A (en) * 2023-06-14 2023-08-08 山西二建集团有限公司 A rapid erection device for temporary isolation nets for building construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116556769A (en) * 2023-06-14 2023-08-08 山西二建集团有限公司 A rapid erection device for temporary isolation nets for building construction

Similar Documents

Publication Publication Date Title
CN207794609U (en) One kind accurately adjusting compound jacking
CN217840877U (en) Adjustable support truss for house building plane formwork
CN211974353U (en) An adjustable bracket for construction engineering
CN112227711B (en) Multifunctional supporting device for building template
CN221942059U (en) A building formwork support system
CN218715076U (en) Formwork support frame
CN220365137U (en) Steel structural member for architectural design
CN117071944A (en) A column-free temporary support device for factory buildings
CN218374447U (en) Assembled ring beam and constructional column connection structure
CN216276897U (en) Adjustable shaping template in deformation joint
CN215168313U (en) Building historical relic restoration reinforcing apparatus
CN108798070A (en) A kind of support system suitable for assembled architecture and bridge construction
CN219866618U (en) Large-span steel girder comprehensive supporting and hanging bracket device for steel structure factory building
CN221722281U (en) Building support frame
CN221810639U (en) A bottom mounting structure for a steel structure column
CN220225695U (en) A positioning installation structure
CN222782201U (en) Assembled large-span prefabricated steel structural member
CN218375532U (en) Supporting device convenient to disassemble
CN216277009U (en) Tool for prefabricated plate base film top support
CN219638473U (en) Reinforcing structure suitable for old building
CN222949543U (en) Reinforcing device for reinforced concrete beam column
CN223867666U (en) Bottom installation external member of steel construction post
CN222391013U (en) Adjustable diagonal bracing for formwork reinforcement
CN220014370U (en) Full scaffold using bailey frame as supporting platform
CN219808741U (en) Building wall body bearing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221118

CF01 Termination of patent right due to non-payment of annual fee