CN217840840U - Steel springboard for scaffold - Google Patents

Steel springboard for scaffold Download PDF

Info

Publication number
CN217840840U
CN217840840U CN202221217265.3U CN202221217265U CN217840840U CN 217840840 U CN217840840 U CN 217840840U CN 202221217265 U CN202221217265 U CN 202221217265U CN 217840840 U CN217840840 U CN 217840840U
Authority
CN
China
Prior art keywords
loading board
plate
baffle
steel
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221217265.3U
Other languages
Chinese (zh)
Inventor
王永生
刘丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Jinxing Construction Co.,Ltd.
Original Assignee
Guangzhou Anbao Electromechanical Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Anbao Electromechanical Engineering Co ltd filed Critical Guangzhou Anbao Electromechanical Engineering Co ltd
Priority to CN202221217265.3U priority Critical patent/CN217840840U/en
Application granted granted Critical
Publication of CN217840840U publication Critical patent/CN217840840U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model provides a steel springboard for scaffold relates to construction scaffolding technical field, this steel springboard for scaffold, include: the bearing board and be located the curb plate of bearing board both sides, the curb plate is the L template that bearing board both sides limit bent downwards and formed, the end plate is all installed at the bottom both ends of bearing board, and the bottom fixed mounting of one of them end plate has first baffle, and the equal fixed mounting in bottom both ends of another end plate has the second baffle, bearing board one side top middle part fixed mounting is kept away from to first baffle has L type connecting plate, the riser of L type connecting plate is towards the top of bearing board, the arc wall has all been seted up to one side that the bearing board was kept away from to first baffle and second baffle. The steel springboard is prevented from being bent and deformed easily due to the hand wheel when in use, and the connection strength between the steel springboard and the scaffold is improved, so that the stability and the safety of the installation of the steel springboard are enhanced.

Description

Steel springboard for scaffold
Technical Field
The utility model relates to a construction scaffolding technical field specifically is a steel springboard for scaffold.
Background
The steel springboard has the characteristics of high structural strength, reusability, safety, stability and the like, and is widely applied to construction of building installation engineering and the like. The steel springboard is usually fixed on a scaffold and used for standing people or placing objects, and can play a certain safety protection role, the steel springboard which is used most at present adopts an arc-shaped hook to be connected with the scaffold, namely, the arc-shaped hooks are welded at the two ends of the steel springboard, and the hooks are hung on a small cross rod of the scaffold during installation to realize the installation of the steel springboard. The arc-shaped hook structure limits the connection area of the hook and the end sealing plate, so that the connection strength of the steel springboard and the scaffold is reduced.
The Chinese patent with the publication number of CN215055210U discloses a steel springboard for a scaffold, which comprises a stamped steel springboard panel, vertical side plates, lower side plates, anti-skidding flange circular holes and groove-shaped longitudinal reinforcing ribs, wherein end sealing plates are arranged at two ends of the steel springboard panel, and an L-shaped cross-section hook and a baffle which are matched with a small cross bar of the scaffold are arranged at the upper ends of the end sealing plates.
However, the technical scheme also has the defect that the hook of the steel springboard is easy to bend and deform after being stressed, so that the connection strength between the steel springboard and a scaffold is low, and the installation stability and safety of the steel springboard are influenced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a steel springboard for scaffold frame aims at solving the easy bending deformation of couple of the steel springboard among the prior art after the atress for joint strength between steel springboard and the scaffold frame is lower, thereby influences the problem of the stability and the security of steel springboard installation.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the steel gangboard for scaffold includes: the bearing plate and be located the curb plate of bearing plate both sides, the curb plate is the L template of bearing plate both sides limit downwardly bending formation, the end plate is all installed at the bottom both ends of bearing plate, and the bottom fixed mounting of one of them end plate has first baffle, and the equal fixed mounting in bottom both ends of another end plate has the second baffle, bearing plate one side top middle part fixed mounting is kept away from to first baffle has L type connecting plate, the riser of L type connecting plate is towards the top of bearing plate, the arc wall has all been seted up to one side that the bearing plate was kept away from to first baffle and second baffle.
The utility model discloses a further technical scheme does, two at least flange round holes have been seted up at the top of loading board, and are a plurality of the flange round hole is the top of rectangle equipartition at the loading board.
The utility model discloses a further technical scheme does, two at least water drainage tank have been seted up along the length direction of loading board, a plurality of at the top of loading board water drainage tank is along loading board width direction equipartition.
The utility model discloses a further technical scheme does, the length direction fixed mounting of loading board is followed to the bottom of loading board has two at least strengthening ribs, and is a plurality of the strengthening rib is along loading board width direction equipartition.
The utility model discloses a further technical scheme does, the top and the both sides wall of end plate weld with the bottom and the curb plate of loading board respectively, the top of first baffle and second baffle weld with the bottom of two curb plates respectively, L type connecting plate is kept away from one side middle part of loading board by first baffle and is upwards bent the processing and form.
The utility model discloses a further technical scheme does, two distance between the second baffle is the same with the width of L type connecting plate, the riser top of L type connecting plate and the bottom parallel and level of loading board.
The beneficial effects of the utility model are that:
when the steel springboard is used, one of the bearing plates is placed between two bearing pipes of the scaffold, the first baffle and the second baffle at the bottom of the scaffold bearing plate are respectively inconsistent with the appearances of the two bearing pipes, then the other bearing plate is placed between the other two bearing pipes in the same mode, the end, provided with the second baffle, of the bearing plate is inconsistent with the end, provided with the first baffle, of the first bearing plate, the side plate at one end of the bearing plate is connected between the side plate of the first bearing plate and the L-shaped connecting plate, the contact area between the steel springboard and the scaffold bearing pipe can be increased, the steel springboard is prevented from being easily bent and deformed due to a hand wheel when the steel springboard is used, the connection strength between the steel springboard and the scaffold is improved, and the stability and the safety of the installation of the steel springboard are enhanced.
Drawings
Fig. 1 is a schematic front view of an embodiment of the present invention.
Fig. 2 is a schematic bottom view of an embodiment of the present invention.
Fig. 3 is a schematic diagram of a connection structure according to an embodiment of the present invention.
Fig. 4 is a schematic diagram of the connection explosion structure according to the embodiment of the present invention.
In the figure: 1. carrying a plate; 2. a flange circular hole; 3. a water discharge tank; 4. a side plate; 5. an end plate; 6. a first baffle plate; 7. an L-shaped connecting plate; 8. a second baffle; 9. and (5) reinforcing ribs.
Detailed Description
The following description will further describe embodiments of the present invention with reference to the accompanying drawings.
As shown in fig. 1 to 4, a steel ramp for scaffolding, comprising: the bearing plate comprises a bearing plate 1 and side plates 4 located on two sides of the bearing plate 1, wherein the side plates 4 are L-shaped plates formed by bending two side edges of the bearing plate 1 downwards, end plates 5 are mounted at two ends of the bottom of the bearing plate 1, a first baffle 6 is fixedly mounted at the bottom of one of the end plates 5, a second baffle 8 is fixedly mounted at two ends of the bottom of the other one of the end plates 5, an L-shaped connecting plate 7 is fixedly mounted in the middle of the top end of one side, far away from the bearing plate 1, of the first baffle 6, a vertical plate of the L-shaped connecting plate 7 faces the upper side of the bearing plate 1, and arc-shaped grooves are formed in one sides, far away from the bearing plate 1, of the first baffle 6 and the second baffle 8.
In this embodiment, when the steel springboard is used, place one of them loading board 1 between two bearing pipes of scaffold, make first baffle 6 and second baffle 8 of scaffold loading board 1 bottom inconsistent with the outward appearance of two bearing pipes respectively, then place another loading board 1 between two other bearing pipes according to the same mode, and make the one end that second baffle 8 was installed to this loading board 1 inconsistent with the one end that first baffle 6 was installed to first loading board 1, 4 joints of curb plate of this loading board 1 one end are between curb plate 4 and the L type connecting plate 7 of first loading board 1 this moment, thereby can increase the area of contact between steel springboard and the scaffold bearing pipe, avoided the steel springboard to take place bending deformation because of the hand wheel easily when using, the joint strength between steel springboard and the scaffold has been improved, thereby the stability and the security of steel springboard installation have been strengthened.
Specifically, at least two flange circular holes 2 are opened at the top of the bearing plate 1, and the plurality of flange circular holes 2 are uniformly distributed on the top of the bearing plate 1 in a rectangular shape.
Further, at least two water drainage grooves 3 have been seted up along the length direction of loading board 1 at the top of loading board 1, and a plurality of water drainage grooves 3 are along 1 width direction equipartition of loading board, can avoid 1 surface area of loading board to stay the rainwater.
Further, the bottom of loading board 1 has two at least strengthening ribs 9 along loading board 1's length direction fixed mounting, and a plurality of strengthening ribs 9 can strengthen loading board 1's bending resistance along loading board 1 width direction equipartition.
Further, the top and the both sides wall of end plate 5 weld with the bottom and the curb plate 4 of loading board 1 respectively, and the top of first baffle 6 and second baffle 8 welds with the bottom of two curb plates 4 respectively, and L type connecting plate 7 is bent upwards by the one side middle part that loading board 1 was kept away from to first baffle 6 and is processed and form.
Further, the distance between two second baffles 8 is the same as the width of the L-shaped connecting plate 7, and the top of the vertical plate of the L-shaped connecting plate 7 is flush with the bottom of the bearing plate 1.
In the description of the present invention, unless otherwise expressly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present specification describes embodiments, not every embodiment includes only a single embodiment, and such description is for clarity purposes only, and it is to be understood that all embodiments may be combined as appropriate by one of ordinary skill in the art to form other embodiments as will be apparent to those of skill in the art from the description herein.

Claims (6)

1. A steel ramp for scaffolding, comprising: loading board (1) and curb plate (4) that are located loading board (1) both sides, its characterized in that, curb plate (4) are the L template of loading board (1) both sides limit downward bending formation, end plate (5) are all installed at the bottom both ends of loading board (1), and the bottom fixed mounting of one of them end plate (5) has first baffle (6), and the equal fixed mounting in bottom both ends of another end plate (5) has second baffle (8), loading board (1) one side top middle part fixed mounting has L type connecting plate (7) is kept away from in first baffle (6), the riser of L type connecting plate (7) is towards the top of loading board (1), the arc wall has all been seted up to one side that loading board (1) was kept away from in first baffle (6) and second baffle (8).
2. The steel gangboard for scaffolds as claimed in claim 1, wherein the top of the bearing plate (1) is provided with at least two flange circular holes (2), and a plurality of flange circular holes (2) are uniformly distributed on the top of the bearing plate (1) in a rectangular shape.
3. The steel diving board for scaffold according to claim 2, wherein the top of the loading board (1) is provided with at least two drainage grooves (3) along the length direction of the loading board (1), and a plurality of the drainage grooves (3) are uniformly distributed along the width direction of the loading board (1).
4. The steel diving board for scaffold according to claim 3, wherein the bottom of said loading board (1) is fixedly installed with at least two reinforcing ribs (9) along the length direction of the loading board (1), and a plurality of said reinforcing ribs (9) are uniformly distributed along the width direction of the loading board (1).
5. The steel gangboard for scaffold according to any one of claims 1-4, wherein the top and both side walls of the end plate (5) are welded with the bottom of the loading plate (1) and the side plates (4), respectively, the top of the first apron (6) and the second apron (8) are welded with the bottom of the two side plates (4), respectively, and the L-shaped connecting plate (7) is formed by bending the middle of one side of the first apron (6) away from the loading plate (1) upwards.
6. The scaffold steel springboard according to claim 5, characterized in that the distance between two said second stops (8) is the same as the width of the L-shaped connecting plate (7), the top of the riser of the L-shaped connecting plate (7) is flush with the bottom of the loading plate (1).
CN202221217265.3U 2022-05-20 2022-05-20 Steel springboard for scaffold Active CN217840840U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221217265.3U CN217840840U (en) 2022-05-20 2022-05-20 Steel springboard for scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221217265.3U CN217840840U (en) 2022-05-20 2022-05-20 Steel springboard for scaffold

Publications (1)

Publication Number Publication Date
CN217840840U true CN217840840U (en) 2022-11-18

Family

ID=84020398

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221217265.3U Active CN217840840U (en) 2022-05-20 2022-05-20 Steel springboard for scaffold

Country Status (1)

Country Link
CN (1) CN217840840U (en)

Similar Documents

Publication Publication Date Title
CN207048306U (en) Sliding formwork flexibility platform
CN110318487A (en) The method of the cladding close spelling of metal curtain wall
CN217840840U (en) Steel springboard for scaffold
CN206015880U (en) The attachment structure of beam column of steel structure
CN209011402U (en) A kind of type steel bar truss floor support plate
CN211923483U (en) Climb a support and increase device
CN210086782U (en) All-aluminum alloy climbing frame
CN208633520U (en) A kind of steel girder with end hook
CN212105025U (en) Vertical rod for building climbing frame
CN215055210U (en) Steel gangplank for scaffold
CN111255223A (en) Hook pedal
CN109057152B (en) Beam structure of integrated steel type house
CN210797987U (en) Horizontal aluminum plate line structure
CN210597636U (en) Connection structure of cross shaped steel post and post stirrup
CN215212284U (en) Welding-free galvanized steel springboard
CN207160549U (en) Flanging welded type scaffold walkway board
CN217517373U (en) Novel prefabricated T beam platform base bottom plate unloads device
CN215829807U (en) Secondary beam for box room
CN212613040U (en) Embedded self-heat-preservation energy-saving steel structure house
CN215759871U (en) Curtain main joist department lightning protection construction node
CN220705100U (en) Movable well word scaffold frame
CN211736323U (en) Auxiliary device for installing PC board on steel arch
CN214574906U (en) Shear wall structure with high bearing capacity
CN220666620U (en) Vertical grid decorative board mount pad of curtain
CN216552371U (en) Hang basket type integrated steel reinforcement cage balcony skeleton

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240716

Address after: Room 402, Yonghong Building, No. 132 Donghuan Road, Panyu District, Guangzhou City, Guangdong Province 510000

Patentee after: Tan Jinxing

Country or region after: China

Address before: 510000 1-112, building 1, No. 388, Kangnan Road, Huangpu District, Guangzhou, Guangdong Province

Patentee before: Guangzhou AnBao Electromechanical Engineering Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right

Effective date of registration: 20240924

Address after: 510000 Rooms 2603 and 2604, 2191 Guangyuan East Road, Tianhe District, Guangzhou City, Guangdong Province (for office use only)

Patentee after: Guangdong Jinxing Construction Co.,Ltd.

Country or region after: China

Address before: Room 402, Yonghong Building, No. 132 Donghuan Road, Panyu District, Guangzhou City, Guangdong Province 510000

Patentee before: Tan Jinxing

Country or region before: China