CN211923483U - Climb a support and increase device - Google Patents

Climb a support and increase device Download PDF

Info

Publication number
CN211923483U
CN211923483U CN202020093034.0U CN202020093034U CN211923483U CN 211923483 U CN211923483 U CN 211923483U CN 202020093034 U CN202020093034 U CN 202020093034U CN 211923483 U CN211923483 U CN 211923483U
Authority
CN
China
Prior art keywords
steel
vertical
channel
bolt
welded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020093034.0U
Other languages
Chinese (zh)
Inventor
吴长顺
陈浩
周洌铖
陆人华
罗家煌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN202020093034.0U priority Critical patent/CN211923483U/en
Application granted granted Critical
Publication of CN211923483U publication Critical patent/CN211923483U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a climb a support and increase device, include: the wall-attached part comprises a vertical channel steel, a stiffening steel plate and a first bolt, wherein the vertical channel steel is fixed on the building main body through the first bolt, and the stiffening steel plate and the vertical channel steel are welded into a whole; the support component comprises two vertical steel pipes arranged side by side, a vertical steel plate and at least two transverse steel pipes which are fixedly welded between the two vertical steel pipes, and a second bolt and a third bolt which are used for connecting the support component and the climbing frame support; adapting unit, including horizontal channel-section steel, bracing steel pipe, the both ends of horizontal channel-section steel respectively with the welded fastening of vertical channel-section steel and vertical steel sheet, the slope of bracing steel pipe sets up and is located the top of horizontal channel-section steel, the both ends of bracing steel pipe respectively with vertical channel-section steel and horizontal channel-section steel welded fastening. The utility model discloses can play the bridge effect of being connected with the building main part, and stable in structure, it is convenient to install, and the turnover rate is high.

Description

Climb a support and increase device
Technical Field
The utility model relates to a construction technical field especially relates to climb a technical field.
Background
The fixation of the existing climbing frame at the position of the bay window is extremely difficult to handle, a pull rod is generally adopted as a main fixing support, and the pull rod fixing support is complex to install and poor in safety and stability, so that great potential safety hazards are caused.
SUMMERY OF THE UTILITY MODEL
In order to overcome prior art pull rod fixing support installation loaded down with trivial details, the safety and stability is poor, causes the problem of very big potential safety hazard, the utility model aims to solve the technical problem that a climb a support increase device is provided for connect between climbing a support and the building main part, prevent to climb and can't will climb a support installation on the building main part because of the luffer boards is overhanging when window portion erection support that wafts.
In order to solve the technical problem, the utility model adopts the following technical scheme: the utility model provides a climb a support and increase device, connect and climb a support and building main part, includes:
the wall-attached component comprises a vertical channel steel, a stiffening steel plate and a first bolt, wherein the vertical channel steel is fixed on the building main body through the first bolt, and the stiffening steel plate and the vertical channel steel are welded into a whole and used for enhancing the structural strength of the wall-attached component;
the support component comprises two vertical steel pipes arranged side by side, a vertical steel plate and at least two transverse steel pipes which are fixedly welded between the two vertical steel pipes, and a second bolt and a third bolt which are used for connecting the support component and the climbing frame support, wherein a support groove is formed between the at least two transverse steel pipes, and the second bolt and the third bolt penetrate through the support groove;
adapting unit, including horizontal channel-section steel, bracing steel pipe, the both ends of horizontal channel-section steel respectively with the welded fastening of vertical channel-section steel and vertical steel sheet, the slope of bracing steel pipe sets up and is located the top of horizontal channel-section steel, the both ends of bracing steel pipe respectively with vertical channel-section steel and horizontal channel-section steel welded fastening.
Preferably, the opening of vertical channel-section steel is towards building main part one side, and upside and downside hug closely building main part department and are equipped with a reinforcing steel plate, be equipped with the square steel between reinforcing steel plate and the vertical channel-section steel inner wall.
Preferably, side stiffening rib plates are welded on the left side surface and the right side surface of the vertical channel steel, and diagonal bracing stiffening rib plates are welded between the two side stiffening rib plates and the diagonal bracing steel pipes.
Preferably, the number of the transverse steel pipes is four, the transverse steel pipes are parallel up and down, the two transverse steel pipes below are respectively welded and fixed with the upper end and the lower end of the vertical steel plate, and the two transverse steel pipes above are arranged in parallel and form the support groove between the two transverse steel pipes.
Preferably, stiffening steel plates are welded at the connecting parts of the transverse channel steel and the vertical channel steel and the connecting parts of the transverse channel steel and the vertical steel plates.
The utility model discloses a technical scheme, attach the wall part and be fixed in the building main part through first bolt, support part climbs a support through second bolt and third bolted connection, adapting unit connects and attaches wall part and support part, when climbing a support and being located the window portion that wafts, should climb a support increase device and can play the bridge effect of being connected with the building main part, and stable in structure, it is convenient to install, and the turnover rate is high.
The specific technical solution and the advantages of the present invention will be described in detail in the following detailed description with reference to the accompanying drawings.
Drawings
The invention will be further described with reference to the accompanying drawings and specific embodiments:
fig. 1 is a front view of a supporting seat heightening device of a climbing frame of the present invention;
fig. 2 is a top view of a supporting seat heightening device of the climbing frame of the present invention;
fig. 3 is a three-dimensional view of the supporting seat heightening device of the climbing frame of the present invention.
Parts name and its number list in the figure
Figure BDA0002369690670000021
Figure BDA0002369690670000031
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. The following description of at least one exemplary embodiment is merely illustrative in nature and is in no way intended to limit the invention, its application, or uses. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
It will be appreciated by those skilled in the art that features from the examples and embodiments described below may be combined with each other without conflict.
The terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. Words such as "upper," "lower," "left," "right," and the like, which indicate orientation or positional relationship, are used solely to facilitate description of the invention and to simplify description, and do not indicate or imply that the referenced devices/elements must have a particular orientation or be constructed and operated in a particular orientation, and therefore should not be construed as limiting the invention.
Referring to fig. 1 to 3, a climbing stand heightening device, which connects a climbing stand support 2 and a building body 1, includes:
the wall-attached component A comprises a vertical channel steel 5, a stiffening steel plate and a first bolt 71, wherein the vertical channel steel 5 is fixed on the building main body 1 through the first bolt 71, and the stiffening steel plate and the vertical channel steel 5 are welded into a whole and used for enhancing the structural strength of the wall-attached component;
the support component C comprises two vertical steel pipes arranged side by side, a vertical steel plate 99 and at least two transverse steel pipes which are fixedly welded between the two vertical steel pipes, and a second bolt 72 and a third bolt 73 which are used for connecting the support component and the climbing frame support, wherein a support groove is formed between the at least two transverse steel pipes, and the second bolt 72 and the third bolt 73 penetrate through the support groove;
adapting unit B, including horizontal channel-section steel 3, bracing steel pipe 4, the both ends of horizontal channel-section steel respectively with the welded fastening of vertical channel-section steel and vertical steel sheet, the slope of bracing steel pipe sets up and is located the top of horizontal channel-section steel, the both ends of bracing steel pipe respectively with vertical channel-section steel and horizontal channel-section steel welded fastening.
The opening of vertical channel-section steel is towards building main part one side, and upside and downside hug closely building main part department and are equipped with a reinforcing steel plate, reinforcing steel plate 92 promptly, reinforcing steel plate two 93, be equipped with square steel 11 between reinforcing steel plate and the vertical channel-section steel inner wall.
Furthermore, side stiffening rib plates, namely a first stiffening rib plate 93 and a third stiffening rib plate 95, are welded on the left side surface and the right side surface of the vertical channel steel 5, and diagonal bracing stiffening rib plates, namely a second stiffening rib plate 94 and a fourth stiffening rib plate 96, are welded between the stiffening rib plates on the two sides and the diagonal bracing steel pipe 4.
In the support component C, the transverse steel pipes are four and are parallel up and down, namely a first transverse steel pipe 63, a second transverse steel pipe 64, a third transverse steel pipe 65 and a fourth transverse steel pipe 66, wherein the two transverse steel pipes below are respectively welded and fixed with the upper end and the lower end of the vertical steel plate, and the two transverse steel pipes above are arranged in parallel to form the support groove between the two transverse steel pipes. The two vertical steel pipes are a first vertical steel pipe 61 and a second vertical steel pipe 62 respectively.
In addition, a stiffening steel plate, namely a stiffening steel plate I97 and a stiffening steel plate II 98, is welded at the connecting part of the transverse channel steel and the vertical channel steel and the connecting part of the transverse channel steel and the vertical steel plate.
It will be appreciated that the first, second and third bolts 71, 72, 73 described above each comprise a nut 10 and a washer 8.
The above description is only for the specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto, and those skilled in the art should understand that the present invention includes but is not limited to the contents described in the above specific embodiments. Any modification which does not depart from the functional and structural principles of the present invention is intended to be included within the scope of the claims.

Claims (5)

1. The utility model provides a climb a support and increase device, connects and climbs a support and building main part, its characterized in that: the method comprises the following steps: the wall-attached component comprises a vertical channel steel, a stiffening steel plate and a first bolt, wherein the vertical channel steel is fixed on the building main body through the first bolt, and the stiffening steel plate and the vertical channel steel are welded into a whole and used for enhancing the structural strength of the wall-attached component;
the support component comprises two vertical steel pipes arranged side by side, a vertical steel plate and at least two transverse steel pipes which are fixedly welded between the two vertical steel pipes, and a second bolt and a third bolt which are used for connecting the support component and the climbing frame support, wherein a support groove is formed between the at least two transverse steel pipes, and the second bolt and the third bolt penetrate through the support groove;
adapting unit, including horizontal channel-section steel, bracing steel pipe, the both ends of horizontal channel-section steel respectively with the welded fastening of vertical channel-section steel and vertical steel sheet, the slope of bracing steel pipe sets up and is located the top of horizontal channel-section steel, the both ends of bracing steel pipe respectively with vertical channel-section steel and horizontal channel-section steel welded fastening.
2. The scaffold stand heightening device according to claim 1, wherein: the opening of vertical channel-section steel is towards building main part one side, and upside and downside hug closely building main part department and are equipped with a reinforcing steel plate, be equipped with the square steel between reinforcing steel plate and the vertical channel-section steel inner wall.
3. The scaffold stand heightening device according to claim 2, wherein: and side stiffening rib plates are welded on the left side surface and the right side surface of the vertical channel steel, and diagonal bracing stiffening rib plates are welded between the two side stiffening rib plates and the diagonal bracing steel pipe.
4. The scaffold stand heightening device according to claim 1, wherein: the transverse steel pipes are four and parallel up and down, wherein the two transverse steel pipes below are respectively welded and fixed with the upper end and the lower end of the vertical steel plate, and the two transverse steel pipes above are arranged in parallel and form the support groove between the two transverse steel pipes.
5. The scaffold stand heightening device according to claim 1, wherein: and stiffening steel plates are welded at the connecting parts of the transverse channel steel and the vertical channel steel and the connecting parts of the transverse channel steel and the vertical steel plates.
CN202020093034.0U 2020-01-16 2020-01-16 Climb a support and increase device Expired - Fee Related CN211923483U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020093034.0U CN211923483U (en) 2020-01-16 2020-01-16 Climb a support and increase device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020093034.0U CN211923483U (en) 2020-01-16 2020-01-16 Climb a support and increase device

Publications (1)

Publication Number Publication Date
CN211923483U true CN211923483U (en) 2020-11-13

Family

ID=73329680

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020093034.0U Expired - Fee Related CN211923483U (en) 2020-01-16 2020-01-16 Climb a support and increase device

Country Status (1)

Country Link
CN (1) CN211923483U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112593698A (en) * 2020-12-02 2021-04-02 胡凤华 Heightening device structurally connected with building structure
CN113338607A (en) * 2021-06-29 2021-09-03 北京住总集团有限责任公司 Climbing frame fixing node and method for assembled ceramic plate reverse beating and decoration surface integrated outer wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112593698A (en) * 2020-12-02 2021-04-02 胡凤华 Heightening device structurally connected with building structure
CN112593698B (en) * 2020-12-02 2022-07-05 胡凤华 Heightening device for connection of climbing frame and building structure
CN113338607A (en) * 2021-06-29 2021-09-03 北京住总集团有限责任公司 Climbing frame fixing node and method for assembled ceramic plate reverse beating and decoration surface integrated outer wall

Similar Documents

Publication Publication Date Title
CN211923483U (en) Climb a support and increase device
CN101694126B (en) Mechanism for attaching building integral elevating scaffold to steel beam
CN202954553U (en) Full assembly tool type attachment lifting scaffold
CN111379319A (en) Assembled light steel building anti-seismic structure and anti-seismic system
CN216196494U (en) Climb a bracing piece and climb frame
CN211923467U (en) Lower lifting point truss structure of attached lifting scaffold
CN215889318U (en) Wall-attached support mounting device for attached lifting scaffold
CN214462401U (en) Double-layer protection frame with novel structure
CN211923470U (en) Upper lifting point truss structure of attached lifting scaffold
CN212562432U (en) Connecting device of automatic lifting scaffold
CN210012463U (en) Car frame stand welding piece with high stability
CN209924415U (en) Steel beam holding reinforcing member for attached lifting scaffold
CN210086782U (en) All-aluminum alloy climbing frame
CN217353500U (en) Wall-attached support reinforcing connecting piece
CN216340087U (en) Assembled light steel structure with antidetonation function
CN215167760U (en) Detachable scaffold frame bearing structure
CN217500995U (en) Anti-tilting device for building side column protection platform
CN210887566U (en) Cladding steel structure beam column
CN219794615U (en) Wall-attached heightening piece for attached lifting scaffold
CN220954543U (en) Lifting connecting device for pavement plate
CN219411759U (en) Assembled lower hanging operation platform based on sliding mode lifting system
CN216616844U (en) Auxiliary supporting device for hydraulic climbing formwork frame body of super high-rise building
CN221277359U (en) Large-scale unsettled steel vestibule bed-jig structure
CN212836653U (en) Step ladder for climbing frame
CN220451395U (en) Structural climbing frame attaching supporting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201113

Termination date: 20220116