CN217840830U - Hang rail installation work platform - Google Patents

Hang rail installation work platform Download PDF

Info

Publication number
CN217840830U
CN217840830U CN202221875602.8U CN202221875602U CN217840830U CN 217840830 U CN217840830 U CN 217840830U CN 202221875602 U CN202221875602 U CN 202221875602U CN 217840830 U CN217840830 U CN 217840830U
Authority
CN
China
Prior art keywords
bottom plate
plate
main part
hanger plate
guardrail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221875602.8U
Other languages
Chinese (zh)
Inventor
梁鑫
李艳龙
刘波
谭孙男
万春光
贾进勇
徐光远
匡建国
刘继红
蔡书洪
舒承兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Ninth Bureau Group No1 Construction Co ltd
Original Assignee
China Railway Ninth Bureau Group No1 Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Ninth Bureau Group No1 Construction Co ltd filed Critical China Railway Ninth Bureau Group No1 Construction Co ltd
Priority to CN202221875602.8U priority Critical patent/CN217840830U/en
Application granted granted Critical
Publication of CN217840830U publication Critical patent/CN217840830U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a hang rail installation work platform, including the pier main part, the lateral wall of pier main part is connected with the hanger plate through a plurality of triangular supports frame, the fixed surface of bottom plate is equipped with the second guardrail, the bottom plate passes through limit structure and links to each other with the hanger plate, guarantee the connection effect of equipment through the triangular supports frame, and guarantee the stability of hanger plate installation, through the staff's of operation regulation structure safety on the first guardrail protection hanger plate, through the effect of adjusting the structure, and limit structure's cooperation, the staff can use the rising and the decline of regulation structure control bottom plate, and through the stability of limit structure restriction bottom plate motion, the staff who carries out the construction to the pier main part stands on the bottom plate, guarantee the convenience of construction, avoid setting up scaffold waste time repeatedly, guarantee constructor's security through the second guardrail, high durability and convenient use, and strong practicability.

Description

Hang rail installation work platform
Technical Field
The utility model relates to a construction technical field, concretely relates to hang rail installation work platform.
Background
The hanging basket is a construction machine for high-altitude operation in construction engineering, and is used for curtain wall installation and outer wall cleaning. The hanging basket is a novel high-altitude operation device which can replace a traditional scaffold, reduce labor intensity, improve working efficiency and be repeatedly used. The use of the construction hanging basket gradually becomes a trend, and the construction hanging basket is widely accepted in high-rise operations such as outer wall construction, curtain wall installation, heat preservation construction, maintenance and cleaning of outer walls and the like of high-rise multi-storey buildings, and can be used for operation of large-scale tank bodies, bridges, dams and other projects.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a hang rail installation work platform to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a hang rail installation work platform, includes the pier main part, the lateral wall of pier main part is connected with the hanger plate through a plurality of triangular supports frame, the fixed surface of hanger plate is equipped with first guardrail, the equal fixed assembly in both sides of hanger plate has the regulation structure, every the regulation structure all runs through the hanger plate and is connected with the bottom plate, the bottom plate cup joints in the outside of pier main part, the fixed surface of bottom plate is equipped with the second guardrail, the bottom plate passes through limit structure and links to each other with the hanger plate.
Preferably, the adjusting structure comprises a winch, the winch is fixedly assembled on the surface of the hanging plate, a steel cable is fixedly wound on the outer wall of a roller of the winch, the steel cable penetrates through the hanging plate and is connected with a connecting block, and the connecting block is connected with the bottom plate.
Preferably, limit structure includes a section of thick bamboo and a connecting rod, a section of thick bamboo fixed mounting is in the lateral wall of hanger plate, a connecting rod fixed mounting is in the lateral wall of bottom plate, a section of thick bamboo is run through to the connecting rod, just the connecting rod closely laminates with the inner wall of a section of thick bamboo.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model provides a hang rail installation work platform, guarantee the connection effect of equipment through the triangular supports frame, and guarantee the stability of hanger plate installation, through the staff's of operation regulation structure safety on the first guardrail protection hanger plate, through the effect of adjusting the structure, and limit structure's cooperation, the staff can use the rising and the decline of adjusting the structure control bottom plate, and through the stability of limit structure restriction bottom plate motion, the staff who carries out the construction to the pier main part stands on the bottom plate, guarantee the convenience of construction, avoid setting up scaffold waste time repeatedly, guarantee constructor's security through the second guardrail, high durability and convenient use, therefore, the clothes hanger is strong in practicability.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a bottom view of the present invention;
fig. 3 is an enlarged schematic view of a structure shown in fig. 1 according to the present invention.
In the figure: the bridge pier comprises a hanging plate 1, a first guardrail 2, a triangular support frame 3, a bottom plate 4, a second guardrail 5, an adjusting structure 6, a winch 61, a steel cable 62, a connecting block 63, a limiting structure 7, a supporting cylinder 71, a connecting rod 72 and a bridge pier main body 8.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Please refer to fig. 1-3, the utility model provides a hang rail installation work platform, including pier main part 8, pier main part 8's lateral wall is connected with hanger plate 1 through a plurality of triangular supports frame 3, hanger plate 1's fixed surface is equipped with first guardrail 2, hanger plate 1's the equal fixed regulation structure 6 that is equipped with in both sides, every is adjusted structure 6 and all is run through hanger plate 1 and is connected with bottom plate 4, bottom plate 4 cup joints in pier main part 1's outside, bottom plate 4's fixed surface is equipped with second guardrail 5, bottom plate 4 passes through limit structure 7 and links to each other with hanger plate 1.
Through the linkage effect of 3 assurance equipment of triangular supports frame, and guarantee the stability of hanger plate 1 installation, through the security of the staff of operation regulation structure 6 on the protection hanger plate 1 of first guardrail 2, through the effect of adjusting structure 6, and limit structure 7's cooperation, the staff can use the rising and the decline of adjusting structure 6 control bottom plate 4, and through the stability of limit structure 7 restriction bottom plate 4 motion, the staff who carries out the construction to pier main part 8 stands on the bottom plate, guarantee the convenience of construction, avoid setting up scaffold waste time repeatedly, guarantee constructor's security through second guardrail 5, high durability and convenient use, therefore, the clothes hanger is strong in practicability, bottom plate 4 is the quadrangle simultaneously, the centre is equipped with logical groove, around the outside in pier main part 8, make things convenient for constructor multi-position construction.
The adjusting structure 6 comprises a winch 61, the winch 61 is fixedly assembled on the surface of the hanging plate 1, a steel cable 62 is fixedly wound on the outer wall of a roller of the winch 61, the steel cable 62 penetrates through the hanging plate 1 and is connected with a connecting block 63, and the connecting block 63 is connected with the bottom plate 4.
When the adjusting structure 6 is needed, the winch 61 is first turned on to drive the roller to wind or unwind the steel cable 62, and the steel cable 62 and the connecting block 63 are used to adjust the ascending and descending of the bottom plate 4.
The limiting structure 7 comprises a supporting cylinder 71 and a connecting rod 72, wherein the supporting cylinder 71 is fixedly assembled on the side wall of the hanging plate 1, the connecting rod 72 is fixedly assembled on the side wall of the bottom plate 4, the connecting rod 72 penetrates through the supporting cylinder 71, and the connecting rod 72 is tightly attached to the inner wall of the supporting cylinder 71.
When the bottom plate 4 moves, the connecting rod 72 is driven to cling to the inner wall of the supporting cylinder 71 to keep fixed vertical movement, and meanwhile, the bottom plate 4 is limited to keep fixed vertical movement, and the movement stability of the bottom plate 4 is guaranteed.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (3)

1. The utility model provides a hang rail installation work platform which characterized in that: including pier main part (8), the lateral wall of pier main part (8) is connected with hanger plate (1) through a plurality of triangular supports frame (3), the fixed surface of hanger plate (1) is equipped with first guardrail (2), the equal fixed regulation structure (6) that is equipped with in both sides of hanger plate (1), every adjust structure (6) and all run through hanger plate (1) and be connected with bottom plate (4), bottom plate (4) cup joint in the outside of pier main part (8), the fixed surface of bottom plate (4) is equipped with second guardrail (5), bottom plate (4) link to each other with hanger plate (1) through limit structure (7).
2. A hanging rail mounting and working platform as claimed in claim 1, wherein: the adjusting structure (6) comprises a winch (61), the winch (61) is fixedly assembled on the surface of the hanging plate (1), a steel cable (62) is fixedly wound on the outer wall of a roller of the winch (61), the steel cable (62) penetrates through the hanging plate (1) and is connected with a connecting block (63), and the connecting block (63) is connected with the bottom plate (4).
3. A hanging rail mounting and working platform as claimed in claim 1, wherein: limiting structure (7) are including a section of thick bamboo (71) and connecting rod (72), a section of thick bamboo (71) fixed mounting is in the lateral wall of hanger plate (1), connecting rod (72) fixed mounting is in the lateral wall of bottom plate (4), connecting rod (72) run through a section of thick bamboo (71), just connecting rod (72) closely laminates with the inner wall of a section of thick bamboo (71).
CN202221875602.8U 2022-07-09 2022-07-09 Hang rail installation work platform Active CN217840830U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221875602.8U CN217840830U (en) 2022-07-09 2022-07-09 Hang rail installation work platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221875602.8U CN217840830U (en) 2022-07-09 2022-07-09 Hang rail installation work platform

Publications (1)

Publication Number Publication Date
CN217840830U true CN217840830U (en) 2022-11-18

Family

ID=84039053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221875602.8U Active CN217840830U (en) 2022-07-09 2022-07-09 Hang rail installation work platform

Country Status (1)

Country Link
CN (1) CN217840830U (en)

Similar Documents

Publication Publication Date Title
CN201286669Y (en) Folding type window cleaning device
CN208122264U (en) A kind of external wall finishing hanging basket
CN217840830U (en) Hang rail installation work platform
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN206844431U (en) A kind of curtain wall construction support
CN205758443U (en) The low concealed window cleaning equipment of high flexion-extension
CN105520681B (en) Flexion-extension formula folding arm window cleaning equipment
CN110654472A (en) Self-adaptive flexible holding climbing platform of wind power tower cylinder frame type
CN215331383U (en) Hanging basket structure for high-rise building construction
CN218521633U (en) Spraying maintenance device for variable-diameter bridge high pier
CN209429566U (en) A kind of fixed bracket of steel structure high-altitude operation safety rope
CN214942249U (en) Novel indoor wall construction device
CN212478492U (en) Hanging basket fixing device for curtain wall construction
CN210886924U (en) Maintenance platform in retractable double-cable-plane cable-stayed bridge tower stay cable area
CN213597518U (en) Crossbeam steel construction
CN210194448U (en) A hanging flower basket during removal for bridge construction
CN208934392U (en) Construction mould bases
CN208361837U (en) A kind of Lifting basket of no suspension mechanism
CN215558540U (en) Movable hanging basket
CN207609158U (en) A kind of movable altitude job engineering hanging basket
CN2128653Y (en) Multi-function mutual rise and fall framing scaffold
CN220100593U (en) Construction hanging basket
CN112112413A (en) Self-locking type hanging basket heavy hammer
CN213623178U (en) Hanging basket type transportation system
CN215484555U (en) Hanging basket for maintaining steel structure roof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant