CN217840349U - Pre-buried part of fixed stair rail - Google Patents

Pre-buried part of fixed stair rail Download PDF

Info

Publication number
CN217840349U
CN217840349U CN202221822934.XU CN202221822934U CN217840349U CN 217840349 U CN217840349 U CN 217840349U CN 202221822934 U CN202221822934 U CN 202221822934U CN 217840349 U CN217840349 U CN 217840349U
Authority
CN
China
Prior art keywords
stair
buried
fixing
plate
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221822934.XU
Other languages
Chinese (zh)
Inventor
倪小建
黎鹤鸣
陈宗飞
程成
王超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Northwest Construction Investment Group Co ltd
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Northwest Construction Investment Group Co ltd
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Northwest Construction Investment Group Co ltd, Zhongtian Construction Group Co Ltd filed Critical Zhongtian Northwest Construction Investment Group Co ltd
Priority to CN202221822934.XU priority Critical patent/CN217840349U/en
Application granted granted Critical
Publication of CN217840349U publication Critical patent/CN217840349U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

A pre-buried component for fixing a stair fence comprises a pre-buried plate and fixed sleeves, wherein the inner side of the pre-buried plate is fixedly provided with a plurality of fixed sleeves, and the cross section of the pre-buried plate is L-shaped; the tail end of the fixed sleeve is of a closed structure; a plugging piece is hermetically arranged at the port of the fixed sleeve; the embedded plate is fixedly connected with the stair template through a connecting piece. This pre-buried part of fixed stair rail pours the in-process, and pre-buried board is fixed with the stair template, has realized firm location, has improved the degree of accuracy of location, makes things convenient for the installation of follow-up stair rail, prevents effectively that the skew from appearing in the pre-buried board under the concrete thick liquid is crowded. The utility model discloses simple structure, low cost, good reliability, easily installation can ensure that the stair rail firmly fixes on stair, effectively avoid pre-buried part to take place the skew to bring the difficulty for follow-up installation procedure pouring the in-process.

Description

Pre-buried part of fixed stair rail
Technical Field
The utility model belongs to the technical field of the construction, especially, pre-buried part of fixed stair rail.
Background
In the building construction, due to safety considerations, stair fences need to be installed on two sides of a building after stair pouring is completed, and the stair fences are usually fixed by embedded parts. Publication No. CN 207846906U's patent application discloses an assembled prefabricated reinforced concrete slab stair, wherein relates to the structure of handrail stair built-in fitting: the fixing plate is characterized by comprising a fixing plate, wherein a pre-buried rib is welded on the lower side surface of the fixing plate; the fixing plate is provided with a positioning hole.
The embedded part has the following technical problems: 1. in the pouring process, the embedded part is fixed through the reinforcing bars, and because the contact area between the reinforcing bars and the embedded part is limited, firm positioning is difficult to realize, and the embedded part is easy to deviate under the extrusion of concrete slurry in the pouring process; 2. when the handrail is installed, the embedded parts are connected with the bottom end face of the handrail, the shearing resistance is poor, the connection is not firm enough, and the handrail is easy to be separated from the stairs, so that potential safety hazards are caused.
SUMMERY OF THE UTILITY MODEL
The utility model provides a pre-buried part of fixed stair rail to solve the above-mentioned problem that exists among the prior art.
The utility model provides a pre-buried part of fixed stair rail, including pre-buried board and fixed sleeve, a plurality of fixed sleeves are fixed admittedly to the inboard of pre-buried board, the pre-buried board cross-section is the L type; the tail end of the fixed sleeve is of a closed structure; a plugging piece is hermetically arranged at the port of the fixed sleeve; the embedded plates are fixedly connected with the stair template through connecting pieces.
Preferably, the blocking piece is a bolt or a rubber plug.
Preferably, the connecting piece is an iron nail, the iron nail is arranged on the embedded plate outside the fixing sleeve in a penetrating mode, the nail cap of the iron nail is located on the inner side of the embedded plate, and the tail end portion of the iron nail is located on the outer side of the embedded plate.
Preferably, the connecting piece comprises a limiting plate and a fixing rod, and the limiting plate is positioned on the top end face of the embedded plate and extends outwards; and the fixed rod is fixedly arranged on the inner end surface of the embedded plate.
Preferably, the connecting piece is a double-faced adhesive tape, and the outer end face of the embedded plate is attached with the double-faced adhesive tape.
The utility model has the advantages that:
1. this pre-buried part of fixed stair rail pours the in-process, and pre-buried board is fixed with the stair template, has realized firm location, has improved the degree of accuracy of location, makes things convenient for the installation of follow-up stair rail, prevents effectively that the skew from appearing in the pre-buried board under the concrete thick liquid is crowded.
2. In this pre-buried part of fixed stair rail, the pre-buried board is installed on the terminal surface before the stair, and the resistance to shear force can be strong, can firmly fix the stair rail on stair, effectively avoids the stair rail not hard up, stops the potential safety hazard.
3. This pre-buried part of fixed stair rail pours the in-process and carries out the shutoff through the shutoff piece to fixed sleeve, prevents that the concrete thick liquid from getting into fixed sleeve and causing the jam, ensures that the stair rail can install smoothly.
4. The utility model discloses simple structure, low cost, good reliability, easily installation can ensure that the stair rail firmly fixes on stair, effectively avoid pre-buried part to take place the skew to bring the difficulty for follow-up installation procedure pouring the in-process.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a cross-sectional view of a first embodiment of the present invention;
fig. 3 is a sectional view of a second embodiment of the present invention;
fig. 4 is a schematic installation diagram of a third embodiment of the present invention (the blocking member is not shown);
fig. 5 is a schematic installation diagram of a fourth embodiment of the present invention (the blocking member is not shown);
fig. 6 is an installation schematic diagram of a fifth embodiment of the present invention (the blocking member is not shown);
fig. 7 is a schematic structural view of the stair railing of the present invention.
In the figure, 1 is a pre-embedded plate, 2 is a fixed sleeve, 4 is an iron nail, 5 is a stair template, 6 is a double faced adhesive tape, 7 is a limit plate, 8 is a fixed rod, 3A is a bolt, and 3B is a rubber plug.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings.
The utility model provides a pre-buried part of fixed stair rail, as shown in figure 1, including pre-buried board 1 and fixed sleeve 2, a plurality of fixed sleeve 2 are fixed admittedly to the inboard of pre-buried board 1, the pre-buried board 1 cross-section is the L type; the tail end of the fixed sleeve 2 is of a closed structure; a plugging piece is hermetically arranged at the port of the fixed sleeve 2; the embedded plate 1 is fixedly connected with the stair template 5 through a connecting piece. During construction, a stair template 5 is installed firstly, then the embedded plate 1 is fixedly installed in the stair template 5, and after the embedded plate 1 is fixed, a stair is poured; the sealing and blocking piece is arranged in the fixed sleeve 2, so that the concrete slurry can be prevented from flowing into the fixed sleeve 2 to cause blockage; preferably, the number of the fixing sleeves 2 is two; preferably, the fixing sleeve 2 is welded on the embedded plate 1. And after pouring is finished, the plugging piece in the fixed sleeve 2 is taken out, and the stair fence is fixed on the outer end face of the embedded plate 1 through the fixed bolt. In the pouring process, the embedded plate 1 is fixed with the stair template 5, so that firm positioning is realized, the positioning accuracy is improved, the subsequent stair fence can be conveniently installed, and the embedded plate 1 is effectively prevented from deviating under the extrusion of concrete slurry. The embedded plate 1 is installed on the front end face of the stair, is high in shearing resistance, and can firmly fix the stair fence on the stair, so that the stair fence is effectively prevented from loosening, and potential safety hazards are avoided.
Example one
As shown in fig. 1 and 2, the plugging piece is a bolt 3A. The internal system of fixed sleeve 2 has corresponding internal thread, twists plug bolt 3A into fixed sleeve 2 before pouring, realizes fixed sleeve 2 sealed, prevents to pour in-process concrete slurry and flows into fixed sleeve 2 and cause the jam, pours the reuse screwdriver and unscrews plug bolt 3A out after accomplishing.
Example two
As shown in fig. 3, the blocking member is a rubber plug 3B, and the rubber plug 3B is embedded in an opening at the outer side of the fixing sleeve 2. And plugging the fixed sleeve 2 by using the rubber plug 3B before pouring, and prying out the rubber plug 3B by using a tool after pouring.
EXAMPLE III
As shown in fig. 4, the connecting member is an iron nail 4, the iron nail 4 is installed on the embedded plate 1 outside the fixing sleeve 2 in a penetrating manner, a nail head of the iron nail 4 is located inside the embedded plate 1, and a tail end of the iron nail 4 is located outside the embedded plate 1. When the stair template 5 is installed, the iron nails 4 are embedded into the stair template 5 but do not penetrate through the stair template 5, so that the stair template 5 can be reused subsequently. After pouring is finished, the redundant part of the iron nail 4 is cut off, and workers are prevented from being accidentally injured in the subsequent installation process. Preferably, there are two nails 4.
Example four
As shown in fig. 5, the connecting member includes a limiting plate 7 and a plurality of fixing rods 8, and the limiting plate 7 is located on the top end surface of the embedded plate 1 and extends outward; the limiting plate 7 is arranged on the stair template 5 in a lapping mode; the fixed rod 8 is fixedly installed on the inner end face of the embedded plate 1; the end part of the fixed rod 8 is fixedly connected with the stair steel bar. Preferably, the number of the fixed rods 8 is two, the fixed rods 8 are reinforcing steel bars, the end portions of the fixed rods 8 are welded with the embedded plate 1, the other ends of the fixed rods are welded with the reinforcing steel bars of the stairs, the limiting plate 7 and the embedded plate 1 are integrally manufactured to form an L-shaped cross section, and the thickness of the limiting plate 7 is 1-2mm. Limiting plate 7 cooperation dead lever 8 is fixed a position pre-buried plate 1, prevents to pour in-process pre-buried plate 1 and takes place the skew, pours the completion back, takes off stair template 5, amputates limiting plate 7.
EXAMPLE five
As shown in fig. 6, the connecting member is a double-sided adhesive tape 6, and the double-sided adhesive tape 6 is attached to the outer end face of the embedded board 1. The embedded plate 1 is pasted on the inner side of the stair template 5 through the double faced adhesive tape 6, and the stair template 5 can be directly removed from the embedded plate 1 after pouring is finished. Preferably, the double-sided adhesive tape is a 3M double-sided adhesive tape.
The utility model discloses simple structure, low cost, good reliability, easily installation can ensure that the stair rail firmly fixes on stair, effectively avoid pre-buried part to take place the skew to bring the difficulty for follow-up installation procedure pouring the in-process.
It should be understood that the above examples are only for clarity of illustration and are not intended to limit the embodiments. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. And obvious changes and modifications can be made without departing from the scope of the invention.

Claims (6)

1. The embedded part for fixing the stair fence is characterized by comprising an embedded plate (1) and fixing sleeves (2), wherein the fixing sleeves (2) are fixedly installed on the inner side of the embedded plate (1), and the cross section of the embedded plate (1) is L-shaped; the tail end of the fixed sleeve (2) is of a closed structure; a sealing and plugging piece is hermetically arranged at the port of the fixed sleeve (2); the embedded plate (1) is fixedly connected with the stair template (5) through a connecting piece.
2. A pre-buried member for fixing a stair railing according to claim 1, wherein the blocking member is a bolt (3A) or a rubber plug (3B).
3. The embedded part for fixing the stair fence according to claim 1, wherein the connecting pieces are iron nails (4), the iron nails (4) are installed on the embedded plate (1) outside the fixing sleeve (2) in a penetrating manner, nail caps of the iron nails (4) are positioned on the inner side of the embedded plate (1), and tail ends of the iron nails (4) are positioned on the outer side of the embedded plate (1).
4. The embedded part for fixing the stair fence as claimed in claim 1, wherein the connecting member comprises a limiting plate (7) and a plurality of fixing rods (8), and the limiting plate (7) is located on the top end face of the embedded plate (1) and extends outwards; and a plurality of fixing rods (8) are fixedly arranged on the inner end surface of the embedded plate (1).
5. The embedded part for fixing the stair fence as claimed in claim 1, wherein the connecting member is a double-faced adhesive tape (6), and the outer end face of the embedded plate (1) is attached to the double-faced adhesive tape (6).
6. A pre-buried member for fixing a stair railing according to claim 4, characterized in that the number of the fixing rods (8) is two.
CN202221822934.XU 2022-07-14 2022-07-14 Pre-buried part of fixed stair rail Expired - Fee Related CN217840349U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221822934.XU CN217840349U (en) 2022-07-14 2022-07-14 Pre-buried part of fixed stair rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221822934.XU CN217840349U (en) 2022-07-14 2022-07-14 Pre-buried part of fixed stair rail

Publications (1)

Publication Number Publication Date
CN217840349U true CN217840349U (en) 2022-11-18

Family

ID=84036892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221822934.XU Expired - Fee Related CN217840349U (en) 2022-07-14 2022-07-14 Pre-buried part of fixed stair rail

Country Status (1)

Country Link
CN (1) CN217840349U (en)

Similar Documents

Publication Publication Date Title
CN106836548A (en) Precast shear wall insert-type steel board connecting structure and its construction method
CN110886422B (en) Connecting member for outer wall and floor support plate of steel structure integrally-assembled building body
CN111236647A (en) Constructional column oblique split bolt and construction method of fixed template thereof
CN113152339A (en) Concrete guardrail attached type fixed die pouring construction method
CN203701436U (en) Lap joint structure of vertical reinforcements and steel sleeve of assembled wall
CN217840349U (en) Pre-buried part of fixed stair rail
CN110820985A (en) Cast-in-place section of assembled shear force wall splices mould for a short time and pours construction system
CN212224604U (en) Wall connecting assembly for connecting outer wall scaffold and wall structure
CN211499291U (en) Cast-in-place section of assembled shear force wall splices mould for a short time and pours construction system
CN216240663U (en) Composite lining segment for tunnel portal of connecting passage
CN108104281A (en) It is a kind of to be used for side form way of the fabricated construction exterior wall without tongue and groove composite beam
CN215368006U (en) Pouring basin formula assembled concrete shear force wall
CN215519942U (en) Assembly template applied to super high-rise dual-core barrel structure
CN205382595U (en) Integral shear force wall of steel pipe concrete edge constraint coincide
CN210857692U (en) Splicing structure of prestressed bidirectional stress laminated slab
CN209670134U (en) Assembled wall right angle connecting structure
CN215888977U (en) Laminated plate screw lock connection anchoring rib assembly
CN212128889U (en) Formwork assembly
CN219731794U (en) Perforation anchor formula precast concrete guardrail structure
CN217054329U (en) Reverse bank template of floor edge
CN208899819U (en) Column week flooring construction joint aluminum corner brace corner protection structure
CN217810512U (en) Prefabricated plate assembling and connecting assembly and connecting structure thereof
CN215291052U (en) Assembled stair connecting piece
CN214785987U (en) Integral stair aluminum formwork
CN210737791U (en) Novel pre-buried lath device capable of replacing steel bar for anchoring

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221118