CN208899819U - Column week flooring construction joint aluminum corner brace corner protection structure - Google Patents
Column week flooring construction joint aluminum corner brace corner protection structure Download PDFInfo
- Publication number
- CN208899819U CN208899819U CN201821428071.1U CN201821428071U CN208899819U CN 208899819 U CN208899819 U CN 208899819U CN 201821428071 U CN201821428071 U CN 201821428071U CN 208899819 U CN208899819 U CN 208899819U
- Authority
- CN
- China
- Prior art keywords
- corner brace
- aluminum corner
- aluminum
- construction joint
- item
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model belongs to the realm of building construction, specifically disclose column week flooring construction joint aluminum corner brace corner protection structure, including L-shaped aluminum corner brace item, the inner corner trim of aluminum corner brace item is bonded with construction joint corner angle, aluminum corner brace item includes horizontal limb and vertical limb, is connected with aluminum corner brace fixing piece between aluminum corner brace item and secondary construction concrete.Before the construction of column week flooring second coagulation soil, concrete construction joint corner angle are handled the utility model using aluminum corner brace item package, are protected by aluminum corner brace item to construction joint corner angle, construction joint corner angle are firm survivable, beautiful and generous.
Description
Technical field
The utility model relates to the realm of building construction, and in particular to column week flooring construction joint aluminum corner brace corner protection structure.
Background technique
With the high speed development of economic construction, big basement, garage, workshop and other etc. concrete and wear-resisting building
Face is increasing, higher and higher to concrete building ground floor quality requirement.Traditional flooring construction is all that primary construction is completed
, in order to avoid crack or crackle occurs in ground, people need after flooring concrete construction is complete, and cutting is stretched on the ground
Contracting seam.
During flooring concrete shrinkage, shrinkage stress can be generated, during avoiding flooring concrete shrinkage
Column has an impact, and traditional way is that expansion joint is cut around column, to provide stress for the contraction of concrete
Area is discharged, but since existing cutting technique can not completely cut through concrete block, at the bottom at the expansion joint that cutting is formed
Portion still has the interconnecting piece of a concrete, and during concrete shrinkage, stress concentrates on interconnecting piece release, necessarily will cause
Interconnecting piece is cracked, and crackle can be extended out with expansion joint direction, is then easy to form crackle in the surrounding of column, influence
The aesthetics of entire flooring.
To solve the above-mentioned problems, existing way is as follows: concrete pavement on the outside of column week template installation → template →
Demoulding → concrete extension joint cutting → column week flooring concrete anticracking reinforcing bar binding → column week flooring second coagulation soil is applied
Work.The diamond shape space for forming a sealing in column week by template, reserves secondary construction, construction joint is as expansion joint, the building Zhu Zhou
Ground diamond-shaped area construction joint docks perforation with big surface expansion joint, so that column week crack be avoided to generate.
But in above-mentioned way, construction joint edges and corners unprotect structure after demoulding, in column Zhou Erci concrete construction,
Construction joint edges and corners concrete is easy to be damaged, irregular so as to cause construction joint after the completion of the construction of second coagulation soil, influences ground
Level ground entirety impression quality and effect.
Utility model content
The purpose of this utility model is to provide column week flooring construction joint aluminum corner brace corner protection structures, to construction joint edges and corners
Protection is formed, construction joint edges and corners concrete is avoided to be destroyed the problem for causing construction joint irregular.
In order to achieve the above objectives, the utility model adopts the following technical solution:
Column week flooring construction joint aluminum corner brace corner protection structure, including L-shaped aluminum corner brace item, the inner corner trim of aluminum corner brace item and construction
Corner angle fitting is stitched, aluminum corner brace item includes horizontal limb and vertical limb, is connected with aluminum corner brace item between aluminum corner brace item and secondary construction concrete and fixes
Part.
The principle and beneficial effect of this programme are:
1, before the construction of column week flooring second coagulation soil, concrete construction joint corner angle are handled using aluminum corner brace item package, are passed through
Aluminum corner brace item protects construction joint corner angle, and construction joint corner angle are firm survivable, beautiful and generous.
2, after the completion of the construction of second coagulation soil, along aluminum corner brace bar shaped at regular construction joint, terrace impression quality and effect are improved,
Aluminum corner brace item is also used as the column week secondary Construction control benchmark of flooring.
3, it is connected with aluminum corner brace fixing piece between aluminum corner brace item and secondary construction concrete, guarantees that aluminum corner brace firmly installs, after preventing
Aluminum corner brace item is rolled loosening repeatedly and is detached from during continuous flooring use, improves the useful life longevity of aluminum corner brace item.
Further, aluminum corner brace number is four, and four aluminum corner brace item diamondwise regions around column.By constructing in diamond shape
Four edges and corners of seam are respectively mounted aluminum corner brace item and carry out comprehensive protection to construction joint, can guarantee that entire construction joint is protected
Shield and it is survivable.
Further, aluminum corner brace fixing piece includes several through-holes along vertical limb genesis analysis, is equipped with steel wire in through-hole,
Steel wire one end is located on the inside of vertical limb, the other end is located on the outside of vertical limb and anchors into column Zhou Erci casting concrete.Aluminum corner brace item
Between second coagulation soil in such a way that steel wire connect anchoring, the bonding strength between aluminum corner brace item and second coagulation soil is big, i.e.,
Firmness of the connection is high between aluminum corner brace item and second coagulation soil.
Further, the horizontal limb of aluminum corner brace item is equipped with temporary fixing piece, and temporary fixing piece includes coated in horizontal limb bottom
Structure glue.The horizontal limb of aluminum corner brace item is pasted on the flooring to have completed by structure glue, to realize the interim solid of aluminum corner brace item
It is fixed, it avoids pouring the displacement of second coagulation soil hour angle aluminum strip.
Further, the specification of aluminum corner brace item is L20x30x2.The specification of aluminum corner brace item is preferable specification.
Further, spliced between the horizontal limb of adjacent angular aluminum strip using 45° angle splicing seams.The splicing seams with cut it is big
Surface expansion joint alignment, can be avoided aluminum corner brace stitching portion and big surface expansion joint can not penetrate through and the displacement of aluminum corner brace item is induced even to deform
The problem of.
Detailed description of the invention
Fig. 1 is the top view of the utility model embodiment;
Fig. 2 is Section A-A figure in Fig. 1.
Specific embodiment
It is further described below by specific embodiment:
Appended drawing reference in Figure of description include: column 1, aluminum corner brace item 2, splicing seams 20, horizontal limb 21, vertical limb 22,
Construction joint 3, steel wire 4.
Embodiment one
As depicted in figs. 1 and 2, the aluminum corner brace corner protection structure of the present embodiment includes four L-shaped aluminum corner brace items 2, and four
A aluminum corner brace item 2 surrounds a diamond-shaped area on the outside of column 1, and the inner corner trim of aluminum corner brace item 2 is bonded with 3 corner angle of construction joint, to construction joint 3
Corner angle form package protection, the specification of aluminum corner brace item 2 is L20x30x2, uses 45° angle between the horizontal limb 21 of adjacent angular aluminum strip 2
Splicing seams 20 splice, which is aligned with the big surface expansion joint cut.Aluminum corner brace item 2 includes horizontal limb 21 and vertical limb
22, multiple through-holes along vertical 22 genesis analysis of limb are offered on the vertical limb 22 of aluminum corner brace item 2, and the spacing between adjacent through-holes is
300mm, through-hole internal diameter are 3.5mm, and the steel wire 4 that diameter is 2mm is equipped in through-hole, and 4 length of steel wire is 100mm, 4 one end of steel wire
It is located at vertical 22 outside of limb positioned at vertical 22 inside of limb, the other end.
Detailed process is as follows for established angle aluminum strip 2:
The inner corner trim of aluminum corner brace item 2 is adjacent in 3 edges and corners of construction joint, the horizontal limb 21 of aluminum corner brace item 2 is pasted on using structure glue
On the flooring to have completed, to realize being fixed temporarily for aluminum corner brace item 2, aluminum corner brace item 2 is installed, due to 3 corner angle of construction joint
Package and protection are formed, the corner angle of construction joint 3 are firm survivable, beautiful and generous.It is secondary that subsequent column week flooring is carried out again
Concrete construction, to realize the anchoring between steel wire 4 and second coagulation soil, after the completion of the construction of second coagulation soil, along 2 shape of aluminum corner brace item
At regular expansion joint, terrace impression quality and effect are improved, aluminum corner brace item 2 is also used as the secondary Construction control benchmark of column week flooring.
Connection between aluminum corner brace item 2 and second coagulation soil by the way of the connection anchoring of steel wire 4, between aluminum corner brace item 2 and second coagulation soil
Intensity is big, i.e., firmness of the connection is high between aluminum corner brace item 2 and second coagulation soil, can prevent aluminum corner brace item during subsequent flooring use
2 are rolled loosening repeatedly is detached from, and improves the useful life longevity of aluminum corner brace item 2.Splicing seams 20 between adjacent angular aluminum strip 2 with cut
The big surface expansion joint alignment cut, can be avoided 2 stitching portion of aluminum corner brace item and big surface expansion joint can not penetrate through and aluminum corner brace item 2 is induced to shift
The problem of even deforming.
Embodiment two
The difference between this embodiment and the first embodiment lies in: 2 number of aluminum corner brace item is two, and two aluminum corner brace items 2 are mounted on water chestnut
On two adjacent seamed edges of shape construction joint 3.
Embodiment three
The difference between this embodiment and the first embodiment lies in: 2 number of aluminum corner brace item is two, and two aluminum corner brace items 2 are mounted on water chestnut
On two opposite seamed edges of shape construction joint 3.
Example IV
The difference between this embodiment and the first embodiment lies in: 2 number of aluminum corner brace item is three, and two aluminum corner brace items 2 are mounted on water chestnut
On three seamed edges of shape construction joint 3.
Above-described is only the embodiments of the present invention, and the common sense such as well known specific structure and characteristic are herein in scheme
It does not describe excessively.It should be pointed out that for those skilled in the art, in the premise for not departing from the utility model structure
Under, several modifications and improvements can also be made, these also should be considered as the protection scope of the utility model, these all will not influence
The effect and patent practicability that the utility model is implemented.This application claims protection scope should be with the content of its claim
Subject to, the records such as specific embodiment in specification can be used for explaining the content of claim.
Claims (6)
1. column week flooring construction joint aluminum corner brace corner protection structure, it is characterised in that: including L-shaped aluminum corner brace item, the aluminum corner brace
The inner corner trim of item is bonded with construction joint corner angle, and the aluminum corner brace item includes horizontal limb and vertical limb, and the aluminum corner brace item and secondary construction are mixed
Aluminum corner brace fixing piece is connected between solidifying soil.
2. column week flooring construction joint aluminum corner brace corner protection structure according to claim 1, it is characterised in that: the aluminum corner brace item
Number is four, and four aluminum corner brace item diamondwise regions around column.
3. column week flooring construction joint aluminum corner brace corner protection structure according to claim 2, it is characterised in that: the aluminum corner brace item
Fixing piece includes several through-holes along vertical limb genesis analysis, and steel wire is equipped in through-hole, and steel wire one end is located in vertical limb
Side, the other end are located on the outside of vertical limb and anchor into column Zhou Erci casting concrete.
4. column week flooring construction joint aluminum corner brace corner protection structure according to claim 3, it is characterised in that: the aluminum corner brace item
Horizontal limb be equipped with temporary fixing piece, the temporary fixing piece includes the structure glue coated in horizontal limb bottom.
5. column week flooring construction joint aluminum corner brace corner protection structure according to claim 4, it is characterised in that: the aluminum corner brace item
Specification be L20x30x2.
6. column week flooring construction joint aluminum corner brace corner protection structure according to claim 5, it is characterised in that: adjacent angular aluminum strip
Horizontal limb between using 45° angle splicing seams splice.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821428071.1U CN208899819U (en) | 2018-08-31 | 2018-08-31 | Column week flooring construction joint aluminum corner brace corner protection structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821428071.1U CN208899819U (en) | 2018-08-31 | 2018-08-31 | Column week flooring construction joint aluminum corner brace corner protection structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208899819U true CN208899819U (en) | 2019-05-24 |
Family
ID=66571155
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821428071.1U Active CN208899819U (en) | 2018-08-31 | 2018-08-31 | Column week flooring construction joint aluminum corner brace corner protection structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208899819U (en) |
-
2018
- 2018-08-31 CN CN201821428071.1U patent/CN208899819U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205604473U (en) | Assembled shear force wall tooth's socket formula connection structure who combines coincide floor | |
CN105735351B (en) | Piping lane installation foundation structure, pipe gallery and construction method of installation | |
CN106168054A (en) | Connecting structure with dry shaped connecting piece precast shear wall plate and construction method thereof | |
CN110424763B (en) | Steel-clad structure of stand column and using method thereof | |
CN209670120U (en) | A kind of precast shear wall | |
CN203684108U (en) | Fully-precast assembly type reinforced concrete bridge assembling structure | |
CN205712204U (en) | A kind of multiple waterstop and waterproof construction thereof | |
CN106193474A (en) | The light-weight metal binding structure of cornice and construction method thereof | |
CN104947662B (en) | A kind of soil-nail wall support system based on the recyclable technique of assembled | |
CN208899819U (en) | Column week flooring construction joint aluminum corner brace corner protection structure | |
CN205917839U (en) | Connected node of wallboard and floor | |
KR101469603B1 (en) | Pipe for piperoof with multipurpose solidarizing tube and construction method using this pipe | |
CN105821908A (en) | Multiple water stop belt, waterproof structure and construction method of waterproof structure | |
CN205917863U (en) | Connected node of wallboard and floor | |
CN211201169U (en) | Prefabricated assembled window that wafts | |
CN110258368A (en) | Using the prefabricated box culvert type of attachment and construction method of spiral | |
CN205917873U (en) | Connected node of prefab | |
CN109372133A (en) | In buried rubber fastening band positioning construction method is installed | |
CN2469046Y (en) | Prefabricated steel bar reinforced concrete bulk head for piles | |
CN210947346U (en) | Floor cracking prevention and control structure | |
CN211774825U (en) | High-strength corner connecting structure | |
CN107119808A (en) | Induce crack structure and its construction method | |
CN209670134U (en) | Assembled wall right angle connecting structure | |
CN207331394U (en) | The embedded prefabricated roads plate in safe edge angle | |
CN209603196U (en) | Sole plate post-poured strip structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |