CN217811569U CN202221738173.XU CN202221738173U CN217811569U CN 217811569 U CN217811569 U CN 217811569U CN 202221738173 U CN202221738173 U CN 202221738173U CN 217811569 U CN217811569 U CN 217811569U
Authority
CN
China
Prior art keywords
prefabricated
prefabricated plate
filling
pouring
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221738173.XU
Other languages
Chinese (zh)
Inventor
杜立伟
张辉
王家龙
刘志龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Tiancheng Steel Structure Co ltd
Original Assignee
Shandong Tiancheng Steel Structure Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Tiancheng Steel Structure Co ltd filed Critical Shandong Tiancheng Steel Structure Co ltd
Priority to CN202221738173.XU priority Critical patent/CN217811569U/en
Application granted granted Critical
Publication of CN217811569U publication Critical patent/CN217811569U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model discloses an assembled reinforced concrete building major structure, including the ground, be provided with on the ground and pour the layer, be equipped with the preformed groove on pouring the layer, pour the prefabricated plate that is provided with a plurality of and preformed groove cooperation installation on the layer, the symmetry is provided with two with prefabricated plate complex connecting pieces on the preformed groove, filling hole two has been seted up to one side that the prefabricated plate surface is close to corresponding connecting piece two, filling hole one has been seted up to one side that the prefabricated plate surface is close to filling hole two, pre-buried in the prefabricated plate have with two complex filling section of thick bamboos of connecting piece, set up two filling interfaces that are used for the watering on the filling section of thick bamboo, preset the connecting piece three that runs through the prefabricated plate upper surface in the prefabricated plate. The utility model discloses a pour and be provided with the preformed groove on the layer and divide installation area, be convenient for install the prefabricated plate in appointed position, through pouring in connecting the mouth to two, make and pour and fix fixed connection between connecting piece two on the layer and the prefabricated plate, have the advantage of the installation of being convenient for.

Description

Assembled reinforced concrete building major structure
Technical Field
The utility model relates to a building major structure technical field, concretely relates to assembled reinforced concrete building major structure.
Background
The reinforced concrete constructional column is manufactured by adopting a traditional mode, namely, the concrete column is arranged at a specified position of a house wall body according to the structure, is manufactured according to the construction sequence of building a wall and pouring the concrete constructional column, and is connected with a masonry body through reinforcing steel bars. There is a relatively high cost of conventional construction columns, and therefore, fabricated reinforced concrete structures are increasingly used.
The assembled reinforced concrete structures on the market are various, the using requirements of people can be basically met, certain defects still exist, the existing reinforced concrete structures are inconvenient to splice in the assembling process, and therefore the assembled reinforced concrete building main body structure is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an assembled reinforced concrete building major structure possesses the installation of being convenient for, and the problem of proposing in the background art has been solved to the advantage that stability is good.
In order to achieve the above object, the utility model provides a following technical scheme: the prefabricated reinforced concrete building main body structure comprises a foundation, wherein a pouring layer is arranged on the foundation, a preformed groove is formed in the pouring layer, a plurality of prefabricated plates which are matched with the preformed groove are arranged on the pouring layer, connecting pieces II matched with the prefabricated plates are symmetrically arranged on the preformed groove, a filling hole II is formed in one side, close to the corresponding connecting piece II, of the surface of each prefabricated plate, a filling hole I is formed in one side, close to the filling hole II, of the surface of each prefabricated plate, a filling cylinder matched with the connecting piece II is pre-buried in each prefabricated plate, two filling interfaces for pouring are formed in each filling cylinder, and a connecting piece III penetrating through the upper surface of each prefabricated plate is pre-buried in each prefabricated plate.
Preferably, the pouring layer is formed by pouring criss-cross reinforcing steel bars and cement, at least two groups of connecting pieces are arranged on each connecting piece two, each group of connecting pieces two is formed by four reinforcing steel bars, and the bottom ends of the four reinforcing steel bars penetrate through the pouring layer and are fixedly connected with the foundation.
Preferably, two groups of first connecting pieces penetrating through two sides of the prefabricated slab are preset in the prefabricated slab, each group of first connecting pieces is composed of at least eight transversely arranged reinforcing steel bars, and two ends of the two groups of first connecting pieces are bent oppositely at 90 degrees.
Preferably, the prefabricated plates are arranged in a rectangular mode, at least six prefabricated plates are arranged, the end portions of every two adjacent prefabricated plates, which are 90 degrees, are provided with a first reinforcing cage, each first reinforcing cage comprises at least six reinforcing steel bars, and the adjacent two prefabricated plates, which are 90 degrees, are connected through the first reinforcing cage in a pouring mode.
Preferably, the end parts of the two adjacent horizontally arranged precast slabs are provided with a second reinforcing cage, and the second reinforcing cage comprises at least four reinforcing steel bars.
Preferably, the two filling ports on the filling cylinder are respectively communicated with the first filling hole and the second filling hole on the prefabricated slab, and the contact part between the lower surface of the prefabricated slab and the upper surface of the pouring layer is filled with sealing cement.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model divides the installation area through the preformed groove arranged on the pouring layer, thereby facilitating the installation of the precast slab at the appointed position, and the fixed connection between the second connecting piece on the pouring layer and the precast slab is realized through pouring in the two pouring connecting ports, thereby having the advantage of convenient installation;
2. the utility model discloses a reinforcement cage I is provided with through the tip of two adjacent prefabricated plates that are 90 degrees, through setting up reinforcement cage and connecting with the connecting piece I on the prefabricated plate through the steel wire together, then carry out the integrated casting shaping through cement, be convenient for carry out the fixed connection between two adjacent prefabricated plates that are 90 degrees, can increase holistic intensity;
3. the utility model discloses a prefabricated plate has sealed cement with the contact site packing of pouring the layer, seals prefabricated plate and the contact site of pouring between the layer, and the follow-up filling processing that carries on from down up through to a filling section of thick bamboo of being convenient for.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic view of the structure of the pouring layer of the present invention;
FIG. 3 is a schematic diagram of the structure of the prefabricated panel of the present invention;
fig. 4 is a schematic sectional view of the prefabricated slab of the present invention.
In the figure: 1. a foundation; 2. pouring a layer; 3. prefabricating a slab; 4. a first connecting piece; 5. filling a first hole; 6. filling holes II; 7. reserving a groove; 8. a second connecting piece; 9. sealing cement; 10. a third connecting piece; 11. filling the cylinder; 12. filling an interface; 13. a first reinforcement cage; 14. and a second reinforcement cage.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Referring to fig. 1 to 4, the present invention provides a technical solution: the utility model provides an assembled reinforced concrete building major structure, including ground 1, be provided with on the ground 1 and pour layer 2, it is equipped with preformed groove 7 on the layer 2 to pour, it is provided with a plurality of prefabricated plate 3 of installing with preformed groove 7 cooperation on the layer 2 to pour, the symmetry is provided with two 8 with prefabricated plate 3 complex connecting pieces on the preformed groove 7, filling hole two 6 has been seted up to one side that prefabricated plate 3 surface is close to corresponding connecting piece two 8, filling hole one 5 has been seted up to one side that prefabricated plate 3 surface is close to filling hole two 6, pre-buried in the prefabricated plate 3 have with two 8 complex filling section of thick bamboo 11 of connecting piece, set up two filling interfaces 12 that are used for the watering on the filling section of thick bamboo 11, preset in the prefabricated plate 3 and run through the connecting piece three 10 of prefabricated plate 3 upper surface.
The installation area is divided by the reserved grooves 7 arranged on the pouring layer 2, the prefabricated plate 3 is convenient to install at an appointed position, the pouring cylinder 11 matched with the second connecting piece 8 is pre-embedded in the prefabricated plate 3, and the two pouring interfaces 12 are poured to fixedly connect the second connecting piece 8 on the pouring layer 2 and the prefabricated plate 3, so that the prefabricated plate has the advantage of convenience in installation.
Pour layer 2 and pour with cement by criss-cross reinforcing bar and form, two 8 connecting pieces are provided with and are no less than two sets of, and two 8 settings of every group connecting piece comprise four reinforcing bars, and the bottom of four reinforcing bars runs through and pours layer 2 and ground 1 fixed connection.
And each group of second connecting pieces 8 is matched with the two filling cylinders 11 for use, and the prefabricated slab 3 and the pouring layer 2 are fixed by matching the second connecting pieces 8 with the filling cylinders 11 through inserting the second connecting pieces 8 into the bottoms of the filling cylinders 11 pre-embedded in the prefabricated slab 3.
Two sets of connecting pieces 4 penetrating through two sides of the prefabricated plate 3 are preset in the prefabricated plate 3, each set of connecting piece 4 is composed of at least eight transversely arranged steel bars, and two ends of the two sets of connecting pieces 4 are bent in opposite directions by 90 degrees.
Two groups of connecting pieces I4 are arranged to facilitate the fixed connection between two adjacent prefabricated plates 3.
The prefabricated plate 3 is provided with and is no less than six and be the rectangle and arrange, and two adjacent prefabricated plate 3's that are 90 degrees tip is provided with steel reinforcement cage 13, and steel reinforcement cage 13 is including being no less than six reinforcing bars, and two adjacent prefabricated plate 3 that are 90 degrees pour through steel reinforcement cage 13 and connect.
Be 90 degrees prefabricated plate 3's tip through adjacent two and be provided with steel reinforcement cage 13, through setting up steel reinforcement cage 13 and being connected through connecting piece 4 on steel wire and the prefabricated plate 3, then carry out the integrated into one piece through cement and pour the shaping, be convenient for carry out fixed connection between two adjacent prefabricated plates 3 that are 90 degrees, can increase holistic intensity.
Two adjacent prefabricated plate 3's that are the level setting tip is provided with steel reinforcement cage two 14, and steel reinforcement cage two 14 includes not less than four reinforcing bars. .
Be the tip of the prefabricated plate 3 of level setting through adjacent two and be provided with steel reinforcement cage two 14, insert the connecting piece 4 inboards on two adjacent prefabricated plates 3 with the reinforcing bar, then fix reinforcing bar and stirrup and with steel reinforcement cage two 14 through the steel wire, be convenient for carry out fixed connection between two adjacent prefabricated plates 3 that are the level setting, can increase holistic intensity.
Two filling interfaces 12 on the filling cylinder 11 are respectively communicated with a first filling hole 5 and a second filling hole 6 on the precast slab 3, and the contact part of the lower surface of the precast slab 3 and the upper surface of the pouring layer 2 is filled with sealing cement 9.
The contact position between the precast slab 3 and the pouring layer 2 is filled with the sealing cement 9, the contact position between the precast slab 3 and the pouring layer 2 is sealed, and the filling cylinder 11 is conveniently filled from bottom to top in the follow-up process.
The working principle is as follows: this assembled reinforced concrete building major structure pours the formation through cement on ground 1 during the use and pours layer 2, then divides the reservation groove 7 to the upper surface of pouring layer 2, divides the installation region through being provided with reservation groove 7 on pouring layer 2, is convenient for install prefabricated plate 3 in appointed position.
The filling cylinders 11 matched with the second connecting pieces 8 are pre-embedded in the prefabricated plates 3, the second connecting pieces 8 of each group are matched with the two filling cylinders 11 for use, the second connecting pieces 8 are inserted into the bottoms of the pre-embedded filling cylinders 11 in the prefabricated plates 3, then the contact parts of the prefabricated plates 3 and the pouring layers 2 are filled with sealing cement 9, the contact parts between the prefabricated plates 3 and the pouring layers 2 are sealed, the first filling holes 5 are plugged, and then the filling holes 6 are filled from bottom to top, so that the filling cylinders 11 can be fully filled. And the prefabricated plate 3 and the pouring layer 2 are fixed by matching the second connecting piece 8 with the filling cylinder 11.
Be the tip of 90 degrees prefabricated plate 3 through adjacent two and be provided with steel reinforcement cage 13, be connected through setting up steel reinforcement cage 13 and through connecting piece 4 on steel wire and the prefabricated plate 3, then carry out the integrated into one piece through cement and pour the shaping, be convenient for carry out fixed connection between two adjacent prefabricated plates 3 that are 90 degrees, the tip that is the prefabricated plate 3 of level setting through two adjacent is provided with steel reinforcement cage two 14, insert connecting piece 4 inboards on two adjacent prefabricated plates 3 with the reinforcing bar, then fix reinforcing bar and stirrup and steel reinforcement cage two 14 through the steel wire, be convenient for carry out fixed connection between two adjacent prefabricated plates 3 that are the level setting, can increase holistic intensity.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. An assembled reinforced concrete building main body structure, includes ground (1), its characterized in that: the prefabricated slab pouring device is characterized in that a pouring layer (2) is arranged on the foundation (1), a reserved groove (7) is formed in the pouring layer (2), a plurality of prefabricated slabs (3) matched with the reserved groove (7) are arranged on the pouring layer (2), connecting pieces II (8) matched with the prefabricated slabs (3) are symmetrically arranged on the reserved groove (7), a filling hole II (6) is formed in one side, close to the corresponding connecting piece II (8), of the surface of each prefabricated slab (3), a filling hole I (5) is formed in one side, close to the filling hole II (6), of the surface of each prefabricated slab (3), a filling cylinder (11) matched with the connecting piece II (8) is pre-buried in each prefabricated slab (3), two filling interfaces (12) used for pouring are formed in each filling cylinder (11), and a connecting piece III (10) penetrating through the upper surfaces of the prefabricated slabs (3) is pre-buried in each prefabricated slab (3).
2. An assembled reinforced concrete building body structure according to claim 1, characterized in that: the pouring layer (2) is formed by pouring criss-cross reinforcing steel bars and cement, at least two groups of connecting pieces are arranged on each connecting piece II (8), each group of connecting pieces II (8) is composed of four reinforcing steel bars, and the bottom ends of the reinforcing steel bars penetrate through the pouring layer (2) and are fixedly connected with the foundation (1).
3. An assembled reinforced concrete building body structure according to claim 1, characterized in that: two groups of first connecting pieces (4) penetrating through two sides of the prefabricated plate (3) are preset in the prefabricated plate (3), each group of first connecting pieces (4) is composed of at least eight transversely arranged reinforcing steel bars, and two ends of the two groups of first connecting pieces (4) are bent in opposite directions at 90 degrees.
4. An assembled reinforced concrete building body structure according to claim 1, characterized in that: the prefabricated plate (3) is provided with and is no less than six and be the rectangle and arrange, and adjacent two are 90 degrees the tip of prefabricated plate (3) is provided with steel reinforcement cage one (13), steel reinforcement cage one (13) are including being no less than six reinforcing bars, and adjacent two are 90 degrees prefabricated plate (3) pour through steel reinforcement cage one (13) and connect.
5. An assembled reinforced concrete building body structure according to claim 1, characterized in that: and a second reinforcing cage (14) is arranged at the end parts of the two adjacent prefabricated plates (3) which are horizontally arranged, and the second reinforcing cage (14) comprises not less than four reinforcing steel bars.
6. An assembled reinforced concrete building body structure according to claim 1, characterized in that: two filling interfaces (12) on the filling cylinder (11) are respectively communicated with a first filling hole (5) and a second filling hole (6) on the precast slab (3), and sealing cement (9) is filled at the contact part of the lower surface of the precast slab (3) and the upper surface of the pouring layer (2).
CN202221738173.XU 2022-07-07 2022-07-07 Assembled reinforced concrete building main body structure Active CN217811569U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221738173.XU CN217811569U (en) 2022-07-07 2022-07-07 Assembled reinforced concrete building main body structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221738173.XU CN217811569U (en) 2022-07-07 2022-07-07 Assembled reinforced concrete building main body structure

Publications (1)

Publication Number Publication Date
CN217811569U true CN217811569U (en) 2022-11-15

Family

ID=83963627

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221738173.XU Active CN217811569U (en) 2022-07-07 2022-07-07 Assembled reinforced concrete building main body structure

Country Status (1)

Country Link
CN (1) CN217811569U (en)

Similar Documents

Publication Publication Date Title
CN107558603B (en) Assembled building structure system and construction method thereof
CN106381923A (en) Multilayer architectural structure adopting prefabricated panel and construction method thereof
CN110344530B (en) Local laminated slab connecting joint and construction method thereof
CN211690988U (en) Concrete precast slab with waterproof function
CN113417364A (en) Precast concrete beam column connection structure and construction method thereof
CN215166634U (en) Assembly type building wallboard connecting structure
CN217811569U (en) Assembled reinforced concrete building main body structure
CN111155677B (en) Raw soil brick masonry structure with core column and construction method thereof
CN205617419U (en) Novel combination formula reinforced earth retaining wall structure
CN205669211U (en) A kind of prefabricated Gravity Retaining Wall
CN110735492A (en) Connecting structure of prestressed hollow composite slabs and construction method thereof
CN216664671U (en) High-strength energy-saving prefabricated member for assembly type building
CN216239326U (en) Vertical half grout sleeve grout connects full assembled RC wallboard structure
CN212715463U (en) Assembled wall body
CN111411732A (en) Construction process for assembling vertical hole grouting type building blocks in flush joint mode
CN111411731A (en) Vertical hole grouting type building block and construction process thereof
CN215670399U (en) Prefabricated coincide floor
CN212867119U (en) Assembled enclosure for permanent use
CN212984354U (en) Stand module of prefabricated building
CN206512852U (en) A kind of multi-layer construction structure of use preformed material
CN216552608U (en) Prefabricated superimposed sheet is used in house construction
CN217325939U (en) Prefabricated shear wall structure with good water-proof effects
CN218713715U (en) Prefabricated pin-connected panel UHPC escape canal structure
CN220666601U (en) Wet-type connection structure of laminated slab and integral partition plate
CN215888780U (en) Close formula connected node that pieces together of one-way coincide floor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant