CN217810556U - High mound automatic spray curing means - Google Patents

High mound automatic spray curing means Download PDF

Info

Publication number
CN217810556U
CN217810556U CN202222068485.0U CN202222068485U CN217810556U CN 217810556 U CN217810556 U CN 217810556U CN 202222068485 U CN202222068485 U CN 202222068485U CN 217810556 U CN217810556 U CN 217810556U
Authority
CN
China
Prior art keywords
spray
frame
high mound
construction platform
water tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222068485.0U
Other languages
Chinese (zh)
Inventor
王占强
黄玉卯
刘丙强
官茂林
杨恒钢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cccc Southwest Engineering Co ltd
CCCC First Highway Engineering Co Ltd
Original Assignee
Cccc Southwest Engineering Co ltd
CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cccc Southwest Engineering Co ltd, CCCC First Highway Engineering Co Ltd filed Critical Cccc Southwest Engineering Co ltd
Priority to CN202222068485.0U priority Critical patent/CN217810556U/en
Application granted granted Critical
Publication of CN217810556U publication Critical patent/CN217810556U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a high mound automatic spray curing means, spray the frame including installing the multilayer at high mound outer wall, the multilayer sprays and connects through many suspension wires that evenly set up between the frame, all installs the round shower on every layer of spraying frame, and installs a plurality of export orientation high mound's shower nozzle on the shower, many showers communicate in proper order through the delivery pipe, the high mound top outside is equipped with construction platform, the last storage water tank that provides the water source for the delivery pipe of installing of construction platform, install the water pump on the delivery pipe in the storage water tank, the storage water tank outside is equipped with the controller of control water pump work. The utility model discloses a set up the multilayer and spray the frame on high mound, the multilayer sprays the frame and connects gradually through the delivery pipe, under the effect of delivery pipe, can spray the water in the storage water tank on the outer wall of high mound through spraying the frame to realize the automatic maintenance of high mound, pass through the controller simultaneously, the mode of controllable water pump, in order to deal with the use of different environment.

Description

High mound automatic spray curing means
Technical Field
The utility model relates to a high mound maintenance field especially relates to a high mound automatic spray curing means.
Background
The high pier is the bearing structure of bridge, road, and its main application is complicated in ground environment, unsuitable road construction's the condition under, and high pier mainly adopts concrete placement to form, but the concrete placement back of accomplishing, needs to be maintained, thereby otherwise the concrete pulverizes easily, breaks and influences the life of high pier, and high pier maintenance needs to satisfy following requirement: 1. the operation is convenient and safe; 2. the attention is paid to environmental protection; 3. can follow construction operation platform's promotion and carry out the maintenance in step, current high mound maintenance sprays high mound through the watering lorry at the road, or carries out the tectorial membrane maintenance on high mound, and such maintenance makes the maintenance inhomogeneous, from last down spraying in addition, has increased high altitude construction's risk to in the water after spraying can directly flow in the river, has certain influence to the ecological environment along the road.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a high mound automatic spray curing means, this automatic spray curing means can be convenient carry out automatic maintenance to high mound to the process of manual maintenance has been removed from, the maintenance of high mound has been guaranteed.
The utility model aims at realizing through the following technical scheme:
the utility model provides a high mound automatic spray curing means, spray the frame including installing the multilayer at high mound outer wall, the multilayer sprays and connects through many suspension wires that evenly set up between the frame, all install the round shower on every layer of spray frame, and install a plurality of export orientation high mound's shower nozzle on the shower, many showers communicate in proper order through the delivery pipe, high mound top outside is equipped with construction platform, the last storage water tank that provides the water source for the delivery pipe that installs of construction platform, install the water pump on the delivery pipe in the storage water tank, the storage water tank outside is equipped with the controller of control water pump work.
The spray frame is including many articulated hollow square pipes in proper order, spray the pipe suit in hollow square pipe, hollow square pipe is close to high mound one side processing and has the opening that supplies the shower nozzle to stretch out, and hollow square pipe middle part processing has the latch hook of being connected with the suspension wire.
The suspension wire is provided with a plurality of knots, and the latch hook is hooked on the knots.
The construction platform is provided with hanging wheels in one-to-one correspondence with the hanging wires, the top ends of the hanging wires are wound on the hanging wheels, the construction platform is provided with a motor for driving the hanging wheels to rotate, and the construction platform on one side of the hanging wheels is provided with a hook for hooking the spraying frame in a hanging mode.
And a temporary water tank is arranged at the bottom of the high pier.
The utility model provides a high mound automatic spray curing means has beneficial effect is:
(1) The multi-layer spraying frames are arranged on the high pier and are sequentially connected through the water supply pipe, water in the water storage tank can be sprayed on the outer wall of the high pier through the spraying frames under the action of the water supply pipe, so that automatic maintenance of the high pier is realized, and meanwhile, the working mode of the water pump can be controlled through the controller so as to deal with the use in different environments;
(2) The construction platform is arranged at the top of the high pier, the water storage tank is arranged on the construction platform, water can be conveniently supplemented to the water storage tank, and meanwhile, the temporary water tank is arranged at the bottom of the high pier, so that the high pier can be initialized and maintained in advance under the condition that a bridge is not laid after the high pier is cast;
(3) The spraying frame is formed by splicing the hollow square tubes, the spraying tubes are sleeved in the hollow square tubes, the hollow square tubes can be used for supporting the spraying frame, the spraying tubes can be kept in a horizontal state to ensure the spraying area, and meanwhile, the spraying tubes can be protected by the hollow square tubes to prolong the service life of the spraying tubes;
(4) Through set up the hanging wheel on construction platform, utilize the hanging wheel can be in the later stage can be convenient dismantlement spray the frame, spray and can transport to the bridge surface from construction platform after the frame dismantles, make it be convenient for transport, removed the process of removing high pier bottom and collecting from.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are required to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention, and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
Fig. 1 is a schematic structural diagram provided by an embodiment of the present invention.
Fig. 2 is a schematic structural view of the spray rack provided by the embodiment of the present invention.
Fig. 3 is a schematic structural view of a hanging wheel provided by the embodiment of the present invention.
Reference numerals: 1. high pier; 2. a spray rack; 21. hollow square tubes; 22. a port; 23. a latch hook; 3. a shower pipe; 31. a spray head; 4. a construction platform; 5. a water storage tank; 6. a water pump; 61. a water supply pipe; 7. a controller; 8. hanging wires; 81. knotting; 9. a hoisting wheel; 91. a motor; 10. hooking; 11. the water tank is used temporarily.
Detailed Description
Examples
As shown in fig. 1 to 3, the automatic spraying maintenance device for high piers provided by this embodiment includes a multi-layer spray rack 2 installed on the outer wall of the high pier 1, the multi-layer spray rack 2 is connected with each other by a plurality of suspension wires 8 uniformly arranged, the spray rack 2 includes a plurality of hollow square pipes 21 hinged in sequence, the plurality of hollow square pipes 21 are connected to form a shape adapted to the contour of the high pier 1, a circle of spray pipes 3 are installed in the hollow square pipes 21, under the support of the hollow square pipes 21, the spraying range of the spray pipes 3 can be controlled, meanwhile, the hollow square pipes 21 can also provide support and protection for the spray pipes 3 to prevent the spray pipes 3 from being damaged, a plurality of spray heads 31 with outlets facing the high pier 1 are installed on the spray pipes 3, through holes 22 for the spray heads 31 to extend out are processed on the side of the high pier 1, under the action of the through holes 22, the spray heads 31 can be limited to ensure that the spray heads 31 always face the high pier 1, thereby ensuring the maintenance effect of the high pier 1, the middle part of the hollow square tube 21 is provided with a latch hook 23 connected with the suspension wire 8, the suspension wire 8 is provided with a plurality of knots 81, the latch hook 23 is hooked on the knots 81, the distance between the spray frames 2 can be conveniently adjusted by tying the knots 81 on the suspension wire 8 so as to avoid the condition that the high pier 1 has maintenance dead angles, the construction platform 4 is provided with the hanging wheels 9 which are in one-to-one correspondence with the suspension wire 8, the top end of the suspension wire 8 is wound on the hanging wheels 9, the construction platform 4 is provided with a motor 91 which drives the hanging wheels 9 to rotate, the spray frames 2 and the spray pipes 3 can be collected to the top of the construction platform 4 on the construction platform 4 after the maintenance is finished under the action of the motor 91, the collected spray frames 2 and the spray pipes 3 can be conveniently transferred to the surface of the bridge, and then the spray frames 2 and the spray pipes 3 can be collected by a transfer vehicle at one time, in order to collect the spray frame 2 conveniently, a hook 10 for hooking the spray frame 2 is hung on the construction platform 4 on one side of the hanging wheel 9, the spray frame 2 which moves upwards can be hooked through the hook 10, the spray frame 2 which moves upwards can be detached again after the spray frame 2 is collected, the detachment efficiency of the spray frame 2 can be improved, the plurality of spray pipes 3 are sequentially communicated through a water supply pipe 61, the construction platform 4 is arranged on the outer side of the top of the high pier 1, a water storage tank 5 which provides a water source for the water supply pipe 61 is installed on the construction platform 4, the water storage tank 5 is installed on the construction platform 4, the water replenishing operation of a water replenishing vehicle can be facilitated, a water pump 6 is installed on the water supply pipe 61 in the water storage tank 5, a controller 7 which controls the water pump 6 to work is arranged outside the water storage tank 5, a temperature and humidity sensor can be installed on the controller 7 to control the working mode of the water pump 6, the rotary continuous spraying or intermittent spraying is carried out, so as to guarantee the effect of the high pier 1, meanwhile, the maintenance controller 7 can control the spraying water amount of the spray head 31, and when the high pier 1 is maintained, excessive water can not permeate into the earth surface and pollute rivers.
In the early casting period of the high pier 1, as shown in fig. 1, a temporary water tank 11 is arranged at the bottom of the high pier 1, and the temporary water tank 11 can supply maintenance water after the casting of the high pier 1 is completed and before the bridge is erected, so as to ensure the maintenance effect of the high pier 1.
The utility model discloses a use method is:
during the use, after 1 formwork stripping of high mound, build construction platform 4 at 1 top of high mound, then install hanging wheel 9 on construction platform 4, this moment suspension wire 8 is around putting on hanging wheel 9, install spray rack 2 on suspension wire 8 after that, spray rack 2 installation back, pull out suspension wire 8 from hanging wheel 9, make it move down, through the delivery pipe intercommunication between the adjacent spray rack 2, until spray rack 2 installation is accomplished, install water pump 6 in temporary water tank 11 afterwards, water pump 6 provides the maintenance water for shower 3 through delivery pipe 61, treat the bridge at 1 top of high mound and erect the completion back, install storage water tank 5 on construction platform 4, shift water pump 6 to in storage water tank 5 after that, can make things convenient for later stage maintenance device to dismantle like this.
When the maintenance device is disassembled, the hanging wheels 9 are driven to rotate through the motor 91, the spraying frame 2 is enabled to continuously move upwards, after the spraying frame 2 moves upwards to the top, the spraying frame 2 is hooked through the hooks 10, then the water supply pipe is disassembled, after the spraying frame 2 is completely retracted, the spraying frame 2 is disassembled, the maintenance device is transported to the surface of the bridge from the construction platform 4, and then the maintenance device is transported by the transport vehicle for next use.
The above is only the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any modification and replacement based on the technical solution and the utility model should be covered in the protection scope of the present invention. It should be noted that the structures or components illustrated in the drawings are not necessarily drawn to scale, and descriptions of well-known components and processing techniques and technologies are omitted so as to not unnecessarily limit the invention.

Claims (5)

1. The utility model provides a high mound automatic spray curing means which characterized in that: including installing the multilayer spray rack at high mound outer wall, the multilayer spray rack is connected through many suspension wires of even setting between the frame, all install the round shower on every layer of spray rack, and install a plurality of exports on the shower towards the shower nozzle of high mound, many showers communicate in proper order through the delivery pipe, the high mound top outside is equipped with construction platform, the last storage water tank that provides the water source for the delivery pipe of installing of construction platform, install the water pump on the delivery pipe in the storage water tank, the storage water tank outside is equipped with the controller of control water pump work.
2. The automatic high pier spraying and curing device according to claim 1, wherein: the spray frame is including many hollow square pipes of articulated in proper order, it is intraductal to spray the pipe suit in hollow square, and hollow square pipe is close to high mound one side processing and has the opening that supplies the shower nozzle to stretch out, and hollow square pipe middle part processing has the latch hook of being connected with the suspension wire.
3. The automatic spray maintenance device for high piers according to claim 2, characterized in that: the suspension wire is provided with a plurality of knots, and the lock hook is hooked on the knots.
4. The automatic spray maintenance device for high piers according to claim 1, characterized in that: the construction platform is provided with hanging wheels in one-to-one correspondence with the hanging wires, the top ends of the hanging wires are wound on the hanging wheels, the construction platform is provided with a motor for driving the hanging wheels to rotate, and the construction platform on one side of the hanging wheels is provided with a hook for hooking the spraying frame in a hanging mode.
5. The automatic high pier spraying and curing device according to claim 1, wherein: the high pier bottom is equipped with temporary water tank.
CN202222068485.0U 2022-08-05 2022-08-05 High mound automatic spray curing means Active CN217810556U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222068485.0U CN217810556U (en) 2022-08-05 2022-08-05 High mound automatic spray curing means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222068485.0U CN217810556U (en) 2022-08-05 2022-08-05 High mound automatic spray curing means

Publications (1)

Publication Number Publication Date
CN217810556U true CN217810556U (en) 2022-11-15

Family

ID=83972030

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222068485.0U Active CN217810556U (en) 2022-08-05 2022-08-05 High mound automatic spray curing means

Country Status (1)

Country Link
CN (1) CN217810556U (en)

Similar Documents

Publication Publication Date Title
CN104264995B (en) Automatic spraying conservation system for high-rise building shear wall structure
CN103260493B (en) Robot device for cleaning iron metal structures
CN206941416U (en) A kind of road and bridge high pier automatic concrete spraying curing system
CN207468504U (en) A kind of mobile spray curing system of pier stud
JP7444662B2 (en) Watering equipment for concrete curing
CN206690295U (en) A kind of precasting yard automatic spray health recirculated water utilizes construction system
CN108487077A (en) A kind of pier stud automatic spray health promotion system
CN110206319B (en) Concrete column pouring construction method based on telescopic cylinder stringing device
CN211171635U (en) Automatic maintenance device for bridge pier column
CN109013120B (en) Bridge bottom surface coating device and construction method thereof
CN109958290A (en) A kind of full-automatic autotrophy protecting system of building green
CN106758832A (en) A kind of bridge pier shaft concrete spray maintenance device and its construction method
CN217810556U (en) High mound automatic spray curing means
CN108552025A (en) A kind of application method of self-suction hydraulic sprinkler with reel
CN207379672U (en) A kind of window for building rain-proof sprays detection machine
CN206462072U (en) Moveable greenhouse spray system
CN211025579U (en) Green construction intelligent spraying dust suppression system
CN110792038A (en) Self-propelled mold hanging tool and method for high-altitude cast-in-place of tie rod arch bridge beam
CN207554073U (en) The light-duty convenient self-propelled two in tunnel serves as a contrast health rack
CN214266061U (en) Concrete prefabricated part evaporates foster device with humidification structure
CN217924979U (en) Automatic concrete curing means of elevartor shaft inner wall
CN210482086U (en) Concrete spraying and curing device for high-pier hanging basket construction
CN201362571Y (en) Equipment of cross beam for hoisting arch-first and girder-late tied bars arch bridge
CN211368397U (en) Formwork support system
CN107879261A (en) Inclined type arched trash rack hoisting device and hoisting method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant