CN217781898U
CN217781898U CN202221318191.2U CN202221318191U CN217781898U CN 217781898 U CN217781898 U CN 217781898U CN 202221318191 U CN202221318191 U CN 202221318191U CN 217781898 U CN217781898 U CN 217781898U
Authority
CN
China
Prior art keywords
gabion
retaining wall
net
assembled
flower bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221318191.2U
Other languages
Chinese (zh)
Inventor
耿勇
吴烨君
于宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongyifeng Suzhou Urban Construction And Development Co ltd
Original Assignee
Suzhou Zhonghengtong Road And Bridge Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Zhonghengtong Road And Bridge Group Co ltd filed Critical Suzhou Zhonghengtong Road And Bridge Group Co ltd
Priority to CN202221318191.2U priority Critical patent/CN217781898U/en
Application granted granted Critical
Publication of CN217781898U publication Critical patent/CN217781898U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model belongs to the technical field of the design and the construction of sponge city river course revetment barricade, especially, assembled gabion barricade and flower pond integrated configuration, to current traditional gabion barricade net expose, the corruption scheduling problem of metal is comparatively serious, it is pleasing to the eye to use, the part that exposes the net simultaneously is destroyed easily, outside loose stone falls out the net easily in the net, influence the bearing capacity of retaining wall, increase the probability that the river bank suffered to erode, destroy river course both sides soil and water and ecological balance and influence the problem of sponge city footpath flow control, the scheme is put forward now, it includes the gabion, a plurality of through-hole has been seted up on the gabion. The utility model can improve the construction efficiency of the river revetment, increase the durability of the retaining wall structure, prevent the river bank from being damaged by the invasion of water flow and wind wave, maintain the natural convection exchange function between the water body and the soil body under the slope, and realize ecological balance; not only protects the dike slope, but also adds greening landscape.

Description

Assembled gabion retaining wall and flower bed integrated configuration
Technical Field
The utility model relates to a design and construction technical field of sponge city river course revetment barricade especially relate to an assembled gabion barricade and flower bed integrated configuration.
Background
At present, the construction footsteps of sponge urban infrastructures are accelerated, the building assembly type concept is more and more emphasized, and people have higher and higher requirements on the infrastructures, particularly greening landscape engineering in municipal public works. One of the important embodiments of the river course revetment retaining wall as a sponge urban landscaping landscape is the most direct landscape line entering the eyes of citizens, and the craftsmen of design and construction units are required to have more exquisite design schemes and construction technologies. Revetment barricade and the design scheme of aquatic afforestation combination call out based on assembled theory.
And the traditional method is to use a gabion landscape retaining wall or a common reinforced concrete retaining wall. The stone cage retaining wall grids are exposed, the problems of metal corrosion and the like are serious, the use is not attractive, meanwhile, the local exposed grids are easily damaged, loose stones in the grids easily fall out of the grids, the bearing capacity of the retaining wall is influenced, the probability that the river bank is scoured is increased, the water and soil and ecological balance on the two sides of the river channel are damaged, and the control of the runoff of the sponge city is influenced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving and having traditional gabion barricade net among the prior art and expose, the corruption scheduling problem of metal is comparatively serious, it is not pleasing to the eye to use, the part that exposes the net simultaneously is destroyed easily, loose stone falls out outside the net easily in the net, influence the bearing capacity of retaining wall, increase the probability that the river bank suffered to erode, destroy river course both sides soil and water and ecological balance and influence the problem of sponge city footpath flow control, and an assembled gabion barricade and flower bed integrated configuration who provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides an assembled gabion barricade and flower bed integrated configuration, includes the gabion, a plurality of through-hole has been seted up on the gabion.
Preferably, four mounting blocks are symmetrically and fixedly mounted on the gabion.
Preferably, the four mounting blocks are provided with first mounting holes.
Preferably, four second mounting holes are symmetrically formed in the gabion.
Preferably, the bottom of the gabion is provided with a construction groove.
The utility model discloses in, an assembled gabion barricade and flower bed integrated configuration's beneficial effect:
(1) According to the technical scheme, the through holes, the mounting blocks, the first mounting holes and the second mounting holes are formed, so that the gabions can be conveniently and horizontally connected and mounted;
(2) This scheme is owing to set up the structure groove, the installation connection in the vertical direction between the gabion of being convenient for.
The utility model can improve the construction efficiency of the river revetment, increase the durability of the retaining wall structure, prevent the river bank from being damaged by the invasion of water flow and wind wave, maintain the natural convection exchange function between the water body and the soil body under the slope, and realize ecological balance; not only protects the embankment slope, but also adds greening landscape. The quality and the road performance are improved.
Drawings
Fig. 1 is a schematic perspective view of a combined structure of an assembled gabion retaining wall and a flower bed according to the present invention;
fig. 2 is a schematic top sectional view of the assembled gabion retaining wall and flower bed combination structure according to the present invention;
fig. 3 is a side view, sectional and schematic structural view of a part of the structure of the assembled gabion retaining wall and flower bed combined structure provided by the present invention.
In the figure: 1. a gabion; 2. a through hole; 3. mounting a block; 4. a first mounting hole; 5. a second mounting hole; 6. a slot is constructed.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1, the assembled gabion retaining wall and flower bed combined structure comprises a gabion 1, wherein a plurality of through holes 2 are formed in the gabion 1.
Referring to figure 2, the provision of the first and second mounting holes 4, 5 facilitates horizontal assembly of the gabion 1.
With reference to figure 3, the provision of the constructional grooves 6 allows the gabion 1 to be assembled in a vertical orientation.
In this embodiment, the gabion retaining wall is prefabricated concrete structure, assembles the use through gabion 1, and the upper and lower three-layer assembled connected mode, the gabion is as for on the concrete subbase foundation. Specifically, the method comprises the following steps: the gabion 1 is connected in the horizontal direction through the first mounting hole 4 and the second mounting hole 5 by bolts. In the vertical direction of the gabion, the structural grooves 6 are adopted for socket connection, and pebbles are filled in the two-layer, two-layer and three-layer gabions 1. Holes are arranged on the outer side of the prefabricated gabion 1 below the river bank line, and holes are not arranged on the outer side of the prefabricated gabion 1 above the river bank line. A hollow plant water culture layer is embedded and fixed on the three gabions 1.
The above, only be the embodiment of the preferred of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, which are designed to be replaced or changed equally, all should be covered within the protection scope of the present invention.

Claims (5)

1. The utility model provides an assembled gabion barricade and flower bed integrated configuration, includes gabion (1), its characterized in that, a plurality of through-hole (2) have been seted up on gabion (1).
2. The assembled gabion retaining wall and flower bed combined structure as claimed in claim 1, wherein four mounting blocks (3) are symmetrically and fixedly mounted on the gabion (1).
3. The assembled gabion retaining wall and flower bed combined structure as claimed in claim 2, wherein the four mounting blocks (3) are provided with first mounting holes (4).
4. The assembled gabion retaining wall and flower bed combined structure as claimed in claim 1, wherein four second mounting holes (5) are symmetrically formed in the gabion (1).
5. The assembled gabion retaining wall and flower bed combined structure as claimed in claim 1, wherein the bottom of the gabion (1) is provided with a constructional groove (6).
CN202221318191.2U 2022-05-30 2022-05-30 Assembled gabion retaining wall and flower bed combined structure Active CN217781898U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221318191.2U CN217781898U (en) 2022-05-30 2022-05-30 Assembled gabion retaining wall and flower bed combined structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221318191.2U CN217781898U (en) 2022-05-30 2022-05-30 Assembled gabion retaining wall and flower bed combined structure

Publications (1)

Publication Number Publication Date
CN217781898U true CN217781898U (en) 2022-11-11

Family

ID=83920886

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221318191.2U Active CN217781898U (en) 2022-05-30 2022-05-30 Assembled gabion retaining wall and flower bed combined structure

Country Status (1)

Country Link
CN (1) CN217781898U (en)

Similar Documents

Publication Publication Date Title
JP4972754B2 (en) Seismic storage dike and its installation method
CN112391997B (en) Ecological river bank structure for sponge city construction
CN204849680U (en) Novel ecological shore protection system
CN111809565B (en) Ecological bank protection of hydraulic engineering
CN2340807Y (en) Wave dissipation breakwater
CN111719500A (en) Ecological slope protection system based on building engineering
CN215925848U (en) Van-type building embankment
CN113152354B (en) Structure and method for pre-positioned in-situ water ecological restoration of tidal river reach
CN217781898U (en) Assembled gabion retaining wall and flower bed combined structure
CN216864997U (en) Multistage unrestrained seawall structure that disappears
KR20090129617A (en) Construction method of improved eco-friendly gabion
CN210177445U (en) Regulation and waterlogging prevention system for increasing water storage capacity of urban river
CN209384193U (en) Breathing pattern gravity type prefabricated box ecological revetment structure suitable for soft soil foundation
CN109338988B (en) Single-side wing wall type ecological type spur dike
CN112942245A (en) Ecological buffering and purifying system for gradient rainfall runoff of steep slope hard bank side belt
CN219118069U (en) City river compound ecological bank protection with structure and landscape requirements
CN110952500A (en) Retaining wall structure for city environmental protection construction
CN115162269B (en) Ecological box applied to reconstruction of vertical hard revetment and ecological restoration method of hard revetment
CN218466451U (en) Ecological straddle type flood prevention wall revetment
CN105804005B (en) A kind of wall-hanging eco-concrete dyke and its construction method
CN219653637U (en) Ecological slope structure applied to river bank
CN213328904U (en) Ecological river course shore protection side slope
CN220977880U (en) Ecological unrestrained slope protection structure that disappears
CN219195513U (en) Novel soft soil foundation structure
CN220953210U (en) Hard revetment ecological reconstruction structure with view re-greening and hydrophilic accessibility

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 215000 No.1, Nanhuan East Road, Suzhou City, Jiangsu Province

Patentee after: Zhongyifeng (Suzhou) Urban Construction and Development Co.,Ltd.

Address before: 215000 No.1, Nanhuan East Road, Suzhou City, Jiangsu Province

Patentee before: SUZHOU ZHONGHENGTONG ROAD AND BRIDGE GROUP Co.,Ltd.