CN217734067U - Integrated pile cap hanging box capable of being constructed quickly - Google Patents
Integrated pile cap hanging box capable of being constructed quickly Download PDFInfo
- Publication number
- CN217734067U CN217734067U CN202221970168.1U CN202221970168U CN217734067U CN 217734067 U CN217734067 U CN 217734067U CN 202221970168 U CN202221970168 U CN 202221970168U CN 217734067 U CN217734067 U CN 217734067U
- Authority
- CN
- China
- Prior art keywords
- plate
- plate body
- screw
- hole
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Revetment (AREA)
Abstract
The utility model provides an integration pile cap hanging box of quick construction, two bottom plates including relative setting, the bottom plate includes the first plate body, first plate body one side is equipped with the length adjustment unit, the length adjustment unit includes two slides of parallel arrangement, be equipped with the hoop board of partly embracing on the slide, the both sides of partly embracing the hoop board are equipped with the connecting plate respectively, two relative connecting plates pass through the screw connection, the upper portion symmetry of first plate body is equipped with two curb plates and a backplate, two curb plates set up in relative one side, the bottom of first plate body is equipped with the crossbeam, it has the telescopic link to articulate on the crossbeam, the upper portion and the curb plate of telescopic link are articulated. The utility model discloses the device is ingenious, and the construction that the steel-pipe pile deviation that exists when can adapt to the pile brought is inconvenient, and whole ann tears the convenience open simultaneously, and construction turnover reuse rate is high, and can guarantee sealed effect and the quality of pouring, has good economic benefits.
Description
Technical Field
The utility model belongs to the technical field of the high stake pier construction technique and specifically relates to an integration pile cover hanging box of quick construction is related to.
Background
Along with the continuous increase of transportation's demand, the process of pier construction is also accelerating rapidly, in the construction of pier, because the state of the surface of water is changeable, it is relatively complicated to cause the construction, the altitude variation of tide is big, engineering construction window phase is shorter, consequently, the scheme that needs the adjustment construction to deal with, at present, traditional construction process generally is support such as welding bracket and bottom steel sheet on the steel-pipe pile, in the time of low tide level, steel-pipe pile upper end exposes and robs time construction, nevertheless holistic construction progress is slower and engineering cost is higher, the quality of construction also is difficult to guarantee.
And it should be pointed out that, because of the requirement of the support load of the wharf, the upper part of the wharf supports the track beam, the single pile can not meet the requirement of the bearing capacity, and the single piles can not be spliced simply, if splicing is adopted, the force transmitted from the upper heavy rail can not be evenly distributed, and the problem of failure due to overlarge stress and unbalanced load of a certain single pile exists, so that double pile caps are needed, during construction, the double piles need to be poured synchronously, otherwise, the requirement of the integral bearing capacity can not be ensured. When the double-pile is constructed, because deviation exists in the piling process, and the deviation is difficult to correct, great inconvenience is brought to the construction process of follow-up double-pile pouring. Chinese patent document CN 114703829A describes an assembled dense water hanging box template for underwater cast-in-place concrete pile cap and a construction method, but the method can only adapt to the construction of a single pile, and still cannot solve the problems that the deviation exists during piling and the distance between two piles is not fixed, so that the size of the whole template cannot be correspondingly adjusted, and the defect exists in use, and needs to be improved.
SUMMERY OF THE UTILITY MODEL
The utility model provides an integration pile cap hanging box of quick construction has solved traditional steel hanging box construction and has been loaded down with trivial details relatively, and the efficiency of construction is low, can't in time adjust according to the change of twin pile driving position, and can't guarantee the problem of construction quality and progress.
In order to solve the technical problem, the utility model discloses the technical scheme who adopts is: the utility model provides an integration pile cap hanging box of quick construction, including two relative bottom plates that set up, the bottom plate includes first plate body, first plate body one side is equipped with the length adjustment unit, the length adjustment unit includes two slides of parallel arrangement, be equipped with half hoop board on the slide, half hoop board's both sides are equipped with the connecting plate respectively, two relative connecting plates pass through the screw connection, the upper portion symmetry of first plate body is equipped with two curb plates and a backplate, two curb plates set up in relative one side, the bottom of first plate body is equipped with the crossbeam, it has the telescopic link to articulate on the crossbeam, the upper portion and the curb plate of telescopic link are articulated.
In the preferred scheme, the outside of first plate body is equipped with first otic placode, the upper portion of crossbeam is equipped with the third otic placode, the telescopic link includes the solid fixed cylinder, gu the fixed cylinder both sides are equipped with the articulated seat of first articulated seat and second respectively, the curb plate includes the second plate body, second plate body upper portion is equipped with the second otic placode, the bottom of second plate body is equipped with the couple, the couple is inserted and is established in the first otic placode, first articulated seat is articulated through articulated nail and third otic placode, the articulated seat of second is articulated through articulated nail and second otic placode.
In the preferred scheme, be equipped with the spout in the first plate body, the outside of spout is equipped with the sunshade, runs through in the spout and is equipped with first through-hole, is equipped with positive and negative silk screw rod in the first through-hole, positive and negative silk screw rod and two slide threaded connection, the screw thread of two slides is turned around to opposite, is equipped with sealed heavy platform on the slide, and sealed heavy platform laminating is at the downside of sunshade.
In the preferred scheme, a plurality of first threaded holes are formed in the first plate body, the back plate comprises a third plate body, a plurality of second reinforcing ribs are arranged on the third plate body, second through holes are formed in the bottom of the third plate body, and the third plate body is connected with the first plate body through screws.
In the preferred scheme, the middle part of spout still is equipped with sealed unit, sealed unit includes the backup pad, the backup pad passes through the screw and is connected with first plate body, be equipped with a plurality of baffles in the backup pad, the symmetry is equipped with the second chamfer on the baffle, baffle one side is equipped with the second terrace, slide one side is equipped with first chamfer, first chamfer and second chamfer slope equal, baffle and slide cooperation form the bottom basis, the bottom of first plate body is equipped with the second screw hole, the threaded screw that is equipped with of second, the bottom of slide is equipped with the spacing groove, the screw is located the spacing inslot.
In a preferred scheme, two straight plates are symmetrically arranged on one side of a supporting plate, fourth through holes are formed in the straight plates, a sinking groove is formed in the supporting plate, a plurality of third threaded holes are formed in the bottom of a first plate body, the straight plates are connected with the first plate body through screws, a plurality of sixth through holes are formed between the third threaded holes, a first stud is detachably arranged on a partition plate and penetrates through the sixth through holes, a spring is sleeved on the first stud and is positioned outside the first plate body, and a nut is further arranged on the first stud;
the straight plate is provided with a first step, the supporting plate is provided with a plurality of fourth threaded holes, the fourth threaded holes are connected with locking nails in an internal thread mode, and the locking nails are used for providing supporting force for the partition plates.
In the preferred scheme, a fifth through hole is further formed in the supporting plate, a cylinder is arranged on the partition plate, and the cylinder penetrates through the fifth through hole;
and a counter bore is formed in one side opposite to the fourth threaded hole, the locking nail comprises a second stud, the second stud is in threaded connection with the fourth threaded hole, a round table is arranged on the upper portion of the second stud and is positioned in the counter bore, a spring is arranged on the upper portion of the round table, and a hexagonal table is arranged on the lower portion of the second stud.
In the preferred scheme, positive and negative silk screw rod is equipped with first screw thread portion including the relative first body of rod and the second body of rod that sets up on the first body of rod, is equipped with second screw thread portion on the second body of rod, first screw thread portion and second screw thread portion screw thread opposite direction, and first body of rod one side is equipped with the circular cone platform, and second body of rod one side is equipped with the circular cone hole, and circular cone platform and circular cone hole plug and shut are connected.
In the preferred scheme, be equipped with first fixed station between first screw thread portion and the circular cone, be equipped with the second fixed station between second screw thread portion and the arch, be equipped with a plurality of archs on the first fixed station, be equipped with a plurality of recesses on the second fixed station, protruding and recess cooperation are equipped with first mounting hole on the circular cone, are equipped with the second mounting hole on the circular cone, wear to be equipped with the lockpin in first mounting hole and the second mounting hole.
The beneficial effects of the utility model are that: the bottom plate and the anchor ear are combined into a whole, so that the process flow of pouring the bottom sealing concrete is omitted, and the construction quality is improved; the bottom plate and the side plates are connected into a whole, and when the lifting box is detached, the lifting box is divided into two half lifting boxes which can be communicated with the bottom plate to be detached together, so that the material utilization rate is improved. At the in-process of construction, can change the staple bolt through length adjustment unit and sealed unit and embrace the position to the position change that the deviation of adaptation twin pile changed and brings, and the telescopic link that sets up is when guaranteeing that the side direction holding power is stable, and holistic ann tears the convenience open, and the efficiency of construction is high.
1) The quality is reliable: the construction process of pouring underwater concrete is omitted, and the construction quality is guaranteed.
2) The structure is stable: through the rational arrangement of bolt, guarantee the waterproof nature and the stability of structure.
3) Construction is efficient: the installation and the disassembly use half hanging boxes as units, and the bottom plate and the side plates do not need to be repeatedly disassembled and assembled.
4) The transportation is convenient: each component passes through bolted connection, has avoided because the too big relatively complicated problem of transportation that leads to of volume, consequently has also improved the operating efficiency, after finishing using, can directly break apart each part and transport to next work point.
Drawings
The invention will be further described with reference to the following drawings and examples:
fig. 1 is an overall use schematic diagram of the utility model when the deviation of the double piles is maximum;
FIG. 2 is a schematic top view of FIG. 1;
FIG. 3 is a schematic front view of FIG. 1;
FIG. 4 is a schematic left side view of FIG. 1;
FIG. 5 is a schematic bottom view of FIG. 1;
FIG. 6 is a schematic view of the structure of the half of the hanging box of the present invention;
FIG. 7 is a first state of the exploded view of FIG. 6;
FIG. 8 is the exploded view of FIG. 6, state two;
FIG. 9 is state three of the exploded structure schematic of FIG. 6;
FIG. 10 is a first view showing an overall construction of the base plate installation length adjusting unit and the sealing unit;
FIG. 11 is a second structural view showing the overall structure of the bottom plate mounted length adjusting unit and the sealing unit;
FIG. 12 is a third view showing an overall structure of the bottom plate installation length adjusting unit and the sealing unit;
fig. 13 is a fourth structural state of the entire base plate installation length adjusting unit and the sealing unit;
FIG. 14 is a schematic view of a first state of the mounting structure of the base plate and the sealing unit;
FIG. 15 is a view showing a second state of the mounting structure of the base plate and the sealing unit;
FIG. 16 is an enlarged view of the structure at A in FIG. 15;
fig. 17 is a schematic structural view of the screw with forward and backward threads of the present invention;
FIG. 18 is the exploded view of FIG. 19 illustrating state one;
FIG. 19 is the second exploded view of FIG. 19;
fig. 20 is a schematic half-use state one of the present invention when the double pile deviation is minimal;
fig. 21 is a second schematic view of the half-use state of the present invention when the deviation of the double pile is minimized.
In the figure: a base plate 1; a first plate 101; a chute 102; a first through hole 103; a shutter 104; a first threaded hole 105; a first ear plate 106; a second threaded hole 107; a third threaded hole 108; a sixth through hole 109; a side plate 2; a second plate body 201; a second ear plate 202; a hook 203; a first stopper plate 204; a first reinforcing rib 205; a back plate 3; a third plate body 301; a second stiffening rib 302; a second limit plate 303; a second through-hole 304; a cross beam 4; a telescopic rod 5; a fixed cylinder 501; a first hinge base 502; a second hinge base 503; a length adjusting unit 6; a slide plate 601; a semi-encircling band plate 602; a connecting plate 603; a third through hole 604; a notch 605; a first chamfer 606; a limiting groove 607; a clamping area 608; a seal sink stand 609; a screw 7; a hinge pin 8; a third ear panel 9; a sealing unit 10; a support plate 1001; a straight plate 1002; a fourth through hole 1003; a first stage 1004; a sink tank 1005; a fourth threaded hole 1006; a fifth through hole 1007; a partition 1008; a second stage 1009; a cylinder 1010; a first stud 1011; a spring 1012; a nut 1013; a counterbore 1014; locking nails 1015; a second stud 1016; a round platform 1017; a hexagonal stand 1018; a second chamfer 1019; a positive and negative screw rod 11; a first shaft 1101; a second stick 1102; a first threaded portion 1103; a second threaded portion 1104; a truncated cone 1105; a projection 1106; a first mounting hole 1107; a first stationary stage 1108; a conical bore 1109; a groove 1110; a second mounting hole 1111; a second stationary stage 1112; a locking pin 12.
Detailed Description
As in fig. 1-21, an integrated pile cap hanging box for rapid construction, including two bottom plates 1 that are arranged relatively, bottom plate 1 includes first plate 101, first plate 101 one side is equipped with length adjustment unit 6, length adjustment unit 6 includes two slide plates 601 of parallel arrangement, be equipped with half-encircling hoop plate 602 on slide plate 601, the both sides of half-encircling hoop plate 602 are equipped with connecting plate 603 respectively, two relative connecting plates 603 pass through screw 7 to be connected, the upper portion symmetry of first plate 101 is equipped with two curb plates 2 and a backplate 3, two curb plates 2 set up in one side relatively, the bottom of first plate 101 is equipped with crossbeam 4, it has telescopic link 5 to articulate on crossbeam 4, the upper portion and the curb plate 2 of telescopic link 5 are articulated. Be provided with a plurality of third through holes 604 on connecting plate 603, from this structure, so that bottom plate 1, curb plate 2 and backplate 3 form holistic confined space, the equipment is accomplished the back, form dry area with the water pump drainage of inside, can deal with the water level variation of hanging the outside tidal water of case, thereby can the efficient accomplish the process of pouring, when lateral bracing power has then been guaranteed to telescopic link 5, and convenient for operation, can bring very big convenience, crossbeam 4 provides stable support basis, the 5 actions of telescopic link of being convenient for simultaneously, high durability and convenient operation.
In the preferred scheme, the outside of first plate body 101 is equipped with first otic placode 106, the upper portion of crossbeam 4 is equipped with third otic placode 9, telescopic link 5 includes fixed cylinder 501, fixed cylinder 501 both sides are equipped with articulated seat 502 of first articulated seat 502 and second respectively 503, curb plate 2 includes second plate body 201, second plate body 201 upper portion is equipped with second otic placode 202, the bottom of second plate body 201 is equipped with couple 203, couple 203 is inserted and is established in first otic placode 106, first articulated seat 502 is articulated through articulated nail 8 and third otic placode 9, the articulated seat 503 of second is articulated through articulated nail 8 and second otic placode 202. From this structure, so that convenient operation when equipment curb plate 2 is to first plate body 101, alignment that can be quick through couple 203, and the atress is stable, couple 203 has guaranteed that the convenient and whole repeated installation degree of accuracy of step is high, bottom detachable at second plate body 201 is provided with first limiting plate 204, it has guaranteed the rigidity stability of support to set up a plurality of first stiffening ribs 205 between the second plate body 201, when the installation, press close to the lateral wall of first plate body 101 with first limiting plate 204, thereby be convenient for couple 203 disect insertion in first otic placode 106, when concrete maintenance accomplishes needs to be dismantled, demolish first limiting plate 204, thereby shrink telescopic link 5, open curb plate 2, guarantee that the convenience of construction is quick.
In a preferable scheme, a sliding groove 102 is formed in the first plate body 101, a shielding plate 104 is arranged on the outer side of the sliding groove 102, a first through hole 103 penetrates through the sliding groove 102, a positive and negative screw rod 11 is arranged in the first through hole 103, the positive and negative screw rod 11 is in threaded connection with the two sliding plates 601, the thread turning directions of the two sliding plates 601 are opposite, a sealing sinking platform 609 is arranged on the sliding plate 601, and the sealing sinking platform 609 is attached to the lower side of the shielding plate 104. Sealed heavy platform 609 one side is provided with breach 605, from this structure, so that can adjust just reverse screw rod 11, thereby position between two slide boards 601 of adjustment does benefit to the position that semi-circular hoop board 602 adapts to the steel-pipe pile, convenience when having guaranteed the installation, and overall seal is more stable, breach 605 does benefit to slide board 601 and dodges when adjusting the position in spout 102, sealed heavy platform 609 laminating guarantees that overall seal effect is better in the bottom of sunshade 104.
In a preferred scheme, a plurality of first threaded holes 105 are formed in the first plate body 101, the back plate 3 includes a third plate body 301, a plurality of second reinforcing ribs 302 are formed in the third plate body 301, a second through hole 304 is formed in the bottom of the third plate body 301, and the third plate body 301 is connected with the first plate body 101 through a screw 7. The third plate body 301 bottom of backplate 3 is provided with second limiting plate 303, structure from this to it is more convenient during making the installation, and second limiting plate 303 increases sealed area, has guaranteed that sealed effect is better.
In the preferred scheme, the middle part of spout 102 still is equipped with sealed unit 10, sealed unit 10 includes backup pad 1001, backup pad 1001 passes through screw 7 and first plate body 101 and connects, be equipped with a plurality of baffles 1008 on the backup pad 1001, the symmetry is equipped with second chamfer 1019 on the baffle 1008, baffle 1008 one side is equipped with second step 1009, slide 601 one side is equipped with first chamfer 606, first chamfer 606 and second chamfer 1019 slope equal, baffle 1008 and slide 601 cooperation form the bottom basis, the bottom of first plate body 101 is equipped with second screw hole 107, be equipped with screw 7 in the second screw hole 107, the bottom of slide 601 is equipped with spacing groove 607, screw 7 is located spacing groove 607. From this structure, so that the backup pad 1001 provides the support foundation for baffle 1008, when being located screw 7 of spacing groove 607 and playing the supporting role to slide 601, the range of motion of slide 601 has been restricted, when two slide 601 relative motion think to cut off, baffle 1008 enters into the wall in, the lateral wall of baffle 1008 and the laminating of the lateral wall of slide 601, thereby guaranteed that the wall is effectively filled, let the slide 601 after the adjustment, still have sealed support foundation between the first plate body 101, thereby when pouring, overall performance is stable.
In a preferable scheme, two straight plates 1002 are symmetrically arranged on one side of a supporting plate 1001, a fourth through hole 1003 is arranged on each straight plate 1002, a sinking groove 1005 is arranged on each supporting plate 1001, a plurality of third threaded holes 108 are formed in the bottom of a first plate body 101, the straight plates 1002 are connected with the first plate body 101 through screws 7, a plurality of sixth through holes 109 are formed between the third threaded holes 108, a first stud 1011 is detachably arranged on a partition plate 1008, the first stud 1011 is arranged in the sixth through hole 109 in a penetrating mode, a spring 1012 is sleeved on the first stud 1011, the spring 1012 is located outside the first plate body 101, and a nut 1013 is further arranged on the first stud 1011;
the straight plate 1002 is provided with a first stage 1004, the supporting plate 1001 is provided with a plurality of fourth threaded holes 1006, the fourth threaded holes 1006 are in threaded connection with locking nails 1015, and the locking nails 1015 are used for providing supporting force for the partition plate 1008. With the structure, in an initial state, the partition plate 1008 can be attached to the bottom of the inner side of the sliding groove 102 through the adjusting nut 1013, at the moment, the two sliding plates 601 are attached to adapt to a scene that double piles are closest to each other, when the sliding plates 601 are separated, the partition plate 1008 is filled to adapt to a scene that double piles are farthest from each other, and during construction of double piles, the following two problems that pile tops are not flat are cut, which is a common problem in the construction process, so that the flatness of pile caps is difficult to adjust, and the central axis of the double piles is difficult to straighten, the horizontal steering operation difficulty is high, and during general operation, leveling is performed first and then is adjusted, and in the alignment process, a certain angle is pulled to cause leveling rework, so that the problems can be solved more quickly through the matching of the two sliding plates 601.
In a preferred scheme, a fifth through hole 1007 is further formed in the support plate 1001, a cylinder 1010 is arranged on the partition plate 1008, and the cylinder 1010 is arranged in the fifth through hole 1007 in a penetrating manner;
a counter bore 1014 is arranged on one side opposite to the fourth threaded hole 1006, the locking nail 1015 comprises a second stud 1016, the second stud 1016 is in threaded connection with the fourth threaded hole 1006, a round table 1017 is arranged on the upper portion of the second stud 1016, the round table 1017 is located in the counter bore 1014, a spring 1012 is arranged on the upper portion of the round table 1017, and a hexagonal table 1018 is arranged on the lower portion of the second stud 1016. From this structure, thereby make through the quick hexagonal platform 1018 of twisting of spanner and changed the position of second double-screw bolt 1016, and when slide 601 disconnect-type, the spring 1012 of setting on round platform 1017 can give the ascending elasticity of baffle 1008 earlier, thereby can let baffle 1008 react fast in the certain limit, continue to adjust hexagonal platform 1018 until the laminating of the top of second double-screw bolt 1016 is in the bottom of baffle 1008, the laminating of the top of baffle 1008 is in spout 102 this moment, wholly guarantee sealed effect, reach simultaneously and support stably, and the cylinder 1009 that sets up cooperates first double-screw bolt 1011, guaranteed that the baffle 1008 only moves on the upper and lower direction, holistic removal precision is high, it is sealed effectual, the used repeatedly degree of accuracy is high.
In a preferred scheme, the positive and negative screw 11 comprises a first rod 1101 and a second rod 1102 which are oppositely arranged, the first rod 1101 is provided with a first thread portion 1103, the second rod 1102 is provided with a second thread portion 1104, the thread directions of the first thread portion 1103 and the second thread portion 1104 are opposite, one side of the first rod 1101 is provided with a conical frustum 1105, one side of the second rod 1102 is provided with a conical hole 1109, and the conical frustum 1105 is in inserted connection with the conical hole 1109. From this structure to it is more convenient when making slide 601 to pack into spout 102, circular truncated cone 1105 can adopt interference fit's mode and conical bore 1109 to be connected, and whole contact is stable, when having guaranteed through first body of rod 1101 or second body of rod 1102, the slide 601 of both sides removes accurately, and the effect is better.
In a preferable scheme, a first fixing table 1108 is arranged between the first thread part 1103 and the truncated cone 1105, a second fixing table 1112 is arranged between the second thread part 1104 and the protrusion 1106, the first fixing table 1108 is provided with a plurality of protrusions 1106, the second fixing table 1112 is provided with a plurality of grooves 1110, the protrusions 1106 are matched with the grooves 1110, the truncated cone 1105 is provided with a first mounting hole 1107, the conical hole 1109 is provided with a second mounting hole 1111, and the first mounting hole 1107 and the second mounting hole 1111 are internally provided with the lock pin 12 in a penetrating manner. With the structure, the whole installation and disassembly are convenient, the torque resistance is better, the protrusion 1106 is matched with the groove 1110, the positioning is quick and convenient, and the lock pin 12 can bring better stabilizing effect.
A construction method of an integrated pile cap hanging box for rapid construction comprises the following steps:
step1, respectively processing a bottom plate 1, a side plate 2 and a back plate 3, and respectively assembling two half hanging boxes;
step2, transferring the hanging box to a construction site;
step3, temporarily fixing the half hanging box at a design position, and initially positioning;
step4, accurately adjusting the position, and connecting the two half hanging boxes to form a whole after the completion;
step5, completing clamping and fixing of the double piles in Step4 through the length adjusting unit 6 and the sealing unit 10, and ensuring sealing;
step6, binding steel bars, pouring pile cap concrete, and maintaining to the designed strength;
step7, dismantling connecting bolts between the two half hanging boxes, and dismantling the connection between the side plate 2 and the back plate 3;
step8, contracting the telescopic rod 5, enabling the side plate 2 to rotate around a hinge point, and enabling the top of the side plate 2 to be separated from the poured concrete surface;
step9, pulling out the half hanging boxes from two sides, transporting to an operation platform, and assembling to a Step2 state after overhauling;
and Step10, circularly operating S3-S8 until all pile caps are constructed.
The deviation that steel-pipe pile driving process brought can be eliminated through foretell construction, during actual construction, only the deviation of steel-pipe pile can continue subsequent construction process in 10cm, otherwise need to pull out the pile and redraw, nevertheless face the changeable tidal water scene at sea, the absolute synchronization of double pile and the unity of axle center are hardly guaranteed during the pile driving, the existence of deviation also is ubiquitous, consequently, need lean on the volume from a plurality of comprehensive factors such as the economy of construction ageing and construction, through setting up length adjustment unit 6 and sealing unit 10 better completion the process of pouring, and the construction is high-efficient.
The above-mentioned embodiments are merely preferred technical solutions of the present invention, and should not be considered as limitations of the present invention, and the protection scope of the present invention should be defined by the technical solutions described in the claims, and equivalents including technical features in the technical solutions described in the claims. Namely, equivalent alterations and modifications within the scope of the invention are also within the scope of the invention.
Claims (9)
1. The utility model provides an integration pile cover hanging box of quick construction which characterized by: including two bottom plates (1) that set up relatively, bottom plate (1) includes first plate body (101), first plate body (101) one side is equipped with length adjustment unit (6), length adjustment unit (6) are including two slide (601) of parallel arrangement, be equipped with semi-encircling hoop board (602) on slide (601), the both sides of semi-encircling hoop board (602) are equipped with connecting plate (603) respectively, two relative connecting plate (603) are connected through screw (7), the upper portion symmetry of first plate body (101) is equipped with two curb plates (2) and a backplate (3), two curb plate (2) set up in relative one side, the bottom of first plate body (101) is equipped with crossbeam (4), it has telescopic link (5) to articulate on crossbeam (4), the upper portion and curb plate (2) of telescopic link (5) are articulated.
2. The fast-construction integrated pile cap hanging box of claim 1, which is characterized in that: the outside of first plate body (101) is equipped with first otic placode (106), the upper portion of crossbeam (4) is equipped with third otic placode (9), telescopic link (5) are including fixed section of thick bamboo (501), fixed section of thick bamboo (501) both sides are equipped with first articulated seat (502) and the articulated seat of second (503) respectively, curb plate (2) are including second plate body (201), second plate body (201) upper portion is equipped with second otic placode (202), the bottom of second plate body (201) is equipped with couple (203), couple (203) are inserted and are established in first otic placode (106), first articulated seat (502) are articulated through articulated nail (8) and third otic placode (9), the articulated seat of second (503) is articulated through articulated nail (8) and second otic placode (202).
3. The fast-construction integrated pile cap hanging box of claim 1, which is characterized in that: be equipped with spout (102) in first plate body (101), the outside of spout (102) is equipped with sunshade (104), runs through in spout (102) and is equipped with first through-hole (103), is equipped with positive and negative screw rod (11) in first through-hole (103), and positive and negative screw rod (11) and two slide (601) threaded connection, the screw thread of two slide (601) is turned round to on the contrary, is equipped with sealed heavy platform (609) on slide (601), and sealed heavy platform (609) laminating is at the downside of sunshade (104).
4. The fast-construction integrated pile cap hanging box of claim 1, which is characterized in that: be equipped with a plurality of first screw holes (105) on the first plate body (101), backplate (3) are equipped with a plurality of second stiffening ribs (302) including third plate body (301) on the third plate body (301), and the bottom of third plate body (301) is equipped with second through-hole (304), and third plate body (301) are connected through screw (7) and first plate body (101).
5. The integrated pile cap hanging box for rapid construction according to claim 3, which is characterized in that: the middle part of spout (102) still is equipped with sealed unit (10), sealed unit (10) are including backup pad (1001), backup pad (1001) are connected with first plate body (101) through screw (7), be equipped with a plurality of baffles (1008) on backup pad (1001), the symmetry is equipped with second chamfer (1019) on baffle (1008), baffle (1008) one side is equipped with second terrace (1009), slide (601) one side is equipped with first chamfer (606), first chamfer (606) and second chamfer (1019) slope equal, baffle (1008) and slide (601) cooperation form the bottom basis, the bottom of first plate body (101) is equipped with second screw hole (107), be equipped with screw (7) in second screw hole (107), the bottom of slide (601) is equipped with spacing groove (607), screw (7) are located spacing groove (607).
6. The fast-construction integrated pile cap hanging box of claim 5, which is characterized in that: two straight plates (1002) are symmetrically arranged on one side of a supporting plate (1001), a fourth through hole (1003) is formed in each straight plate (1002), a sinking groove (1005) is formed in each supporting plate (1001), a plurality of third threaded holes (108) are formed in the bottom of each first plate body (101), each straight plate (1002) is connected with the corresponding first plate body (101) through a screw (7), a plurality of sixth through holes (109) are formed between the corresponding third threaded holes (108), a first stud (1011) is detachably arranged on each partition plate (1008), each first stud (1011) penetrates through the corresponding sixth through hole (109), each first stud (1011) is sleeved with a spring (1012), each spring (1012) is located outside each first plate body (101), and each first stud (1011) is further provided with a nut (1013);
the straight plate (1002) is provided with a first step (1004), the supporting plate (1001) is provided with a plurality of fourth threaded holes (1006), the fourth threaded holes (1006) are internally threaded with locking nails (1015), and the locking nails (1015) are used for providing supporting force for the partition plate (1008).
7. The fast-construction integrated pile cap hanging box of claim 6, which is characterized in that: a fifth through hole (1007) is further formed in the supporting plate (1001), a cylinder (1010) is arranged on the partition plate (1008), and the cylinder (1010) penetrates through the fifth through hole (1007);
one side that fourth screw hole (1006) is relative is equipped with counter bore (1014), and locking nail (1015) include second double-screw bolt (1016), second double-screw bolt (1016) and fourth screw hole (1006) threaded connection, and the upper portion of second double-screw bolt (1016) is equipped with round platform (1017), and round platform (1017) is located counter bore (1014), and the upper portion of round platform (1017) is equipped with spring (1012), and the lower part of second double-screw bolt (1016) is equipped with hexagonal platform (1018).
8. The integrated pile cap hanging box for rapid construction according to claim 3, which is characterized in that: positive and negative silk screw rod (11) are including the relative first body of rod (1101) and the second body of rod (1102) that sets up, be equipped with first screw portion (1103) on the first body of rod (1101), be equipped with second screw portion (1104) on the second body of rod (1102), first screw portion (1103) and second screw portion (1104) screw thread opposite direction, first body of rod (1101) one side is equipped with circular truncated cone (1105), second body of rod (1102) one side is equipped with circular conical bore (1109), circular truncated cone (1105) and circular conical bore (1109) are inserted and are closed the connection.
9. The fast-constructing integrated pile cap hanging box of claim 8, which is characterized in that: be equipped with first fixed station (1108) between first screw thread portion (1103) and circular cone platform (1105), be equipped with second fixed station (1112) between second screw thread portion (1104) and arch (1106), be equipped with a plurality of protruding (1106) on first fixed station (1108), be equipped with a plurality of recesses (1110) on second fixed station (1112), protruding (1106) and recess (1110) cooperation, be equipped with first mounting hole (1107) on circular cone platform (1105), be equipped with second mounting hole (1111) on circular cone hole (1109), wear to be equipped with lockpin (12) in first mounting hole (1107) and the second mounting hole (1111).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221970168.1U CN217734067U (en) | 2022-07-28 | 2022-07-28 | Integrated pile cap hanging box capable of being constructed quickly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221970168.1U CN217734067U (en) | 2022-07-28 | 2022-07-28 | Integrated pile cap hanging box capable of being constructed quickly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217734067U true CN217734067U (en) | 2022-11-04 |
Family
ID=83813988
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221970168.1U Active CN217734067U (en) | 2022-07-28 | 2022-07-28 | Integrated pile cap hanging box capable of being constructed quickly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217734067U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115162381A (en) * | 2022-07-28 | 2022-10-11 | 中交二航局第一工程有限公司 | Integrated pile cap hanging box and construction method |
-
2022
- 2022-07-28 CN CN202221970168.1U patent/CN217734067U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115162381A (en) * | 2022-07-28 | 2022-10-11 | 中交二航局第一工程有限公司 | Integrated pile cap hanging box and construction method |
CN115162381B (en) * | 2022-07-28 | 2024-04-26 | 中交二航局第一工程有限公司 | Integrated pile cap hanging box and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN217734067U (en) | Integrated pile cap hanging box capable of being constructed quickly | |
CN202187547U (en) | Light and high-strength alloy early-removed template system | |
CN215331429U (en) | Triangular plate structure movably connected with back ridges and internal corners in aluminum alloy template system | |
CN106223980A (en) | A kind of construction method of tunnel ditch cable trough construction trolley | |
CN108590177A (en) | K plates bracing means and its reinforcement means | |
CN207608925U (en) | Piping lane box type telescopic internal model | |
CN210737376U (en) | Bent cap template with adjustable side direction angle | |
CN115162381A (en) | Integrated pile cap hanging box and construction method | |
CN212176530U (en) | Assembled building construction template | |
CN208379847U (en) | A kind of building prefabrication wallboard concrete pouring structure | |
CN106089256A (en) | Ditch cable trench construction trolley and construction method, tunnel cable die set device | |
CN214834773U (en) | Beam wall fast-assembling early beam structure of tearing open convenient to beam bottom is adjusted and is fixed a position | |
CN211816363U (en) | Reinforcing device for plant pile foundation | |
CN215254596U (en) | Wall column template device capable of being spliced | |
CN212024559U (en) | Hoisting tool for precast concrete box culvert | |
CN213269065U (en) | A building bearing diagonal structure for construction | |
CN218405792U (en) | Truss connection structure device | |
CN207004010U (en) | A kind of building bearing post pours mould | |
CN110565689B (en) | Special clamp for hoisting waterstop module | |
CN109262820A (en) | A kind of Side turning machine | |
CN220814900U (en) | V-shaped and A-shaped plate seam integrated reinforcement for oblique column and oblique splicing template | |
CN217028077U (en) | Corner structure post template reinforcing apparatus | |
CN214459703U (en) | Bridge pier inner mold | |
CN215106582U (en) | Steel construction engineering support column | |
CN208730017U (en) | A kind of square pile pours positioning device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |