CN217703839U - Pouring device for prefabricated building wallboard - Google Patents
Pouring device for prefabricated building wallboard Download PDFInfo
- Publication number
- CN217703839U CN217703839U CN202220890768.0U CN202220890768U CN217703839U CN 217703839 U CN217703839 U CN 217703839U CN 202220890768 U CN202220890768 U CN 202220890768U CN 217703839 U CN217703839 U CN 217703839U
- Authority
- CN
- China
- Prior art keywords
- pouring
- pulley
- groove
- recess
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000007599 discharging Methods 0.000 claims description 5
- 238000003860 storage Methods 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 4
- 238000005266 casting Methods 0.000 description 8
- 230000005484 gravity Effects 0.000 description 5
- 239000002699 waste material Substances 0.000 description 4
- 239000011435 rock Substances 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a device of pouring of prefabricated wallboard of building, including backup pad, recess and pulley, the top in the backup pad is seted up to the recess, the pulley setting is at the inner chamber of recess. This device of pouring of prefabricated wallboard of building, cooperation through pulley, recess, movable block and unloading pipe can drive the back-and-forth movement of movable block when the pulley in the in-process of back-and-forth movement in the recess to drive the back-and-forth movement of bottom unloading pipe, thereby realize pouring to pouring the groove. Because the pouring flow is kept constant, when the moving time and the stopping time of the pulley keep corresponding rules, the uniform pouring of the pouring groove can be ensured. The movable block is sleeved on the outer ring of the movable rod, so that the movable block can move left and right on the movable rod, the position of the bottom blanking pipe is adjusted, the accurate position of the pouring groove is aligned, and pouring is completed.
Description
Technical Field
The utility model relates to a construction technical field specifically is a device of pouring of prefabricated wallboard of building.
Background
Under the promotion of national policies of building energy conservation and wall material reformation, the building is greatly popularized, wherein the prefabricated wall boards are used as important components of the building, the market demand is large, and the development prospect is good.
However, the production methods and devices of most prefabricated wallboard production enterprises still fall behind. In the process of using the moulding concrete for forming, attention needs to be paid to the consumption of the concrete at any time so as to avoid uneven thickness of the cast wall plate. Secondly, the start-stop time of the device is matched with the length of the prefabricated wall panel, otherwise, concrete waste occurs and a part of pouring grooves are not poured.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a device of pouring of building prefabricated wallboard to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a device of pouring of prefabricated wallboard of building, includes backup pad, recess and pulley, the top in the backup pad is seted up to the recess, the pulley sets up the inner chamber at the recess.
Preferably, a rotating shaft seat is arranged at the top of the pulley, through holes are formed in two sides of the rotating shaft seat, a moving rod is arranged in an inner cavity of each through hole, a moving block is sleeved on an outer ring of the moving rod and is of a hollow structure, and a storage bin is arranged at the top of the moving block.
Preferably, the bottom of the moving block is provided with a blanking pipe, and the front and the back of the blanking pipe are provided with signal receivers.
Preferably, the bottom of the blanking pipe is provided with a discharge valve.
Preferably, a base is arranged between the supporting plates, a hydraulic telescopic rod is arranged at the top of the base, a frame is arranged at the top of the hydraulic telescopic rod, and a pouring groove is formed in the top of the frame.
Preferably, the edge of the top of the frame is provided with a signal generator, and the signal generator is arranged on two sides of the pouring groove.
Preferably, the diameter of the blanking pipe is smaller than that of the pouring groove.
Compared with the prior art, the beneficial effects of the utility model are that:
1. this device of pouring of prefabricated wallboard of building, cooperation through pulley, recess, movable block and unloading pipe, the in-process of pulley back-and-forth movement in the recess can drive the back-and-forth movement of movable block to drive the back-and-forth movement of bottom unloading pipe, thereby realize pouring to pouring the groove. Because the pouring flow rate is kept constant, when the moving time and the stopping time of the pulley keep corresponding rules, the uniform pouring of the pouring groove can be ensured. The movable block is sleeved on the outer ring of the movable rod, so that the movable block can move left and right on the movable rod, the position of the bottom blanking pipe is adjusted, the accurate position of the pouring groove is aligned, and pouring is completed.
2. This device of pouring of prefabricated wallboard of building, through discharge valve, unloading pipe and hydraulic telescoping rod's cooperation, the discharge valve can control the switching of unloading pipe, and when needs pour, the discharge valve is opened, and the concrete is pour through the unloading pipe because gravity. When the pouring is stopped, the discharge valve is closed, the concrete cannot be discharged from the discharge pipe, and the pouring is stopped. The prefabricated wall board is placed into the frame, the opening in the top of the prefabricated wall board is consistent with the pouring groove in position, and pouring work is facilitated. After pouring the completion, start hydraulic telescoping rod, hydraulic telescoping rod can stretch out and draw back from top to bottom, drives the concrete and rocks from top to bottom, prevents the inhomogeneous condition of concrete placement.
3. This device of pouring of prefabricated wallboard of building, through the cooperation of signal generator and signal receiver, signal generator sets up the both sides at the marginal groove of pouring. When the signal generator at the initial position sends out a signal, the signal receivers at the two sides of the blanking pipe receive the corresponding signal and control the discharging valve to carry out blanking. After all pouring troughs are poured, the signal generator positioned at the tail end sends a signal to control the discharge valve to be closed, and pouring can be stopped at the moment. Under the cooperation of the signal generator and the signal receiver, the starting and the ending of the blanking are finished, and the waste of concrete is avoided.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a front view of the present invention.
Fig. 3 is a right side view of the present invention.
Fig. 4 is a top view of the present invention.
In the figure: 1. a support plate; 2. a groove; 3. a pulley; 4. a rotating shaft seat; 5. a through hole; 6. a travel bar; 7. a moving block; 8. a storage bin; 9. a discharging pipe; 10. a signal receiver; 11. a discharge valve; 12. a base; 13. a hydraulic telescopic rod; 14. a frame; 15. pouring a groove; 16. a signal generator.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a device of pouring of prefabricated wallboard of building, includes backup pad 1, recess 2 and pulley 3, and recess 2 sets up at the top of backup pad 1, and pulley 3 sets up the inner chamber at recess 2.
Wherein, the top of pulley 3 is provided with pivot seat 4, and through-hole 5 has been seted up to the both sides of pivot seat 4, is provided with carriage release lever 6 in the inner chamber of through-hole 5, and the outer lane cover of carriage release lever 6 is equipped with movable block 7, and movable block 7 is hollow structure, and the top of movable block 7 is provided with feed bin 8.
In this embodiment, in the process of the pulley 3 moving back and forth in the groove 2, the moving block 7 is driven to move back and forth, so as to drive the bottom blanking pipe 9 to move back and forth, and thus the pouring of the pouring groove 15 is realized. Because the pouring flow rate is kept constant, when the moving time and the stopping time of the pulley 3 keep corresponding rules, the uniform pouring of the pouring groove 15 can be ensured. The moving block 7 is sleeved on the outer ring of the moving rod 6, so that the moving block 7 can move left and right on the moving rod 6, the position of the bottom blanking pipe 9 is adjusted, the accurate position of the pouring groove 15 is aligned, and pouring is completed.
Wherein, the bottom of the moving block 7 is provided with a blanking pipe 9, and the front and the back of the blanking pipe 9 are provided with signal receivers 10.
In this embodiment, the feed bin 8 is filled with concrete to be used, the moving block 7 is of a hollow structure, and the concrete enters the moving block 7 from the feed bin 8 due to gravity and then enters the discharging pipe 9 from the moving block 7 for pouring.
Wherein, the bottom of the blanking pipe 9 is provided with a discharge valve 11.
In this embodiment, discharge valve 11 can control the switching of unloading pipe 9, and when needs pour, discharge valve 11 is opened, and the concrete pours through unloading pipe 9 because of gravity. When pouring is stopped, the discharge valve 11 is closed, concrete cannot be discharged from the discharge pipe 9, and pouring is stopped.
Wherein, be provided with base 12 between the backup pad 1, the top of base 12 is provided with hydraulic telescoping rod 13, and hydraulic telescoping rod 13's top is provided with frame 14, and the top of frame 14 has seted up pours groove 15.
In this embodiment, the prefabricated wall panel is placed inside the frame 14, and the opening at the top of the prefabricated wall panel is consistent with the position of the pouring groove 15, so that pouring work is facilitated. After pouring, start hydraulic telescoping rod 13, hydraulic telescoping rod 13 can stretch out and draw back from top to bottom, and it rocks from top to bottom to drive the concrete, prevents the inhomogeneous condition of concrete placement.
Wherein, the edge of the top of the frame 14 is provided with a signal generator 16, and the signal generator 16 is arranged at two sides of the pouring groove 15.
In this embodiment, the signal generator 16 is arranged on both sides of the casting trough 15 at the edge. When the signal generator 16 at the initial position sends a signal, the signal receivers 10 at the two sides of the blanking pipe 9 receive the corresponding signal, and the discharge valve 11 is controlled to carry out blanking. When all the casting troughs 15 are finished casting, the signal generator 16 at the tail end sends out a signal to control the discharge valve 11 to close, and the casting is stopped at the moment. Under the cooperation of the signal generator 16 and the signal receiver 10, the starting and the ending of the blanking are completed, and the waste of concrete is avoided.
Wherein the diameter of the blanking pipe 9 is smaller than that of the pouring groove 15.
In this embodiment, the diameter of the blanking pipe 9 is smaller than the diameter of the pouring groove 15, so that the concrete of the blanking pipe 9 does not overflow, and corresponding resources are saved.
The working principle is as follows: when the pulley 3 moves back and forth in the groove 2, the moving block 7 is driven to move back and forth, so that the bottom blanking pipe 9 is driven to move back and forth, and the pouring of the pouring groove 15 is realized. Because the pouring flow rate is kept constant, when the moving time and the stopping time of the pulley 3 keep corresponding rules, the uniform pouring of the pouring groove 15 can be ensured. The moving block 7 is sleeved on the outer ring of the moving rod 6, so that the moving block 7 can move left and right on the moving rod 6, the position of the bottom blanking pipe 9 is adjusted, the accurate position of the pouring groove 15 is aligned, and pouring is completed. The feed bin 8 is filled with concrete to be used, the moving block 7 is of a hollow structure, and the concrete enters the moving block 7 from the feed bin 8 due to gravity and then enters the discharging pipe 9 from the moving block 7 for pouring. Discharge valve 11 can control the switching of unloading pipe 9, and when needs pour, discharge valve 11 opens, and the concrete is because gravity pours through unloading pipe 9. When pouring is stopped, the discharge valve 11 is closed, concrete cannot be discharged from the discharge pipe 9, and pouring is stopped. The prefabricated wall board is placed inside the frame 14, the position of the opening at the top of the prefabricated wall board is consistent with that of the pouring groove 15, and pouring work is facilitated. After pouring the completion, start hydraulic telescoping rod 13, hydraulic telescoping rod 13 can stretch out and draw back from top to bottom, drives the concrete and rocks from top to bottom, prevents the inhomogeneous condition of concrete placement. Signal generators 16 are arranged on both sides of the edge casting groove 15. When the signal generator 16 at the initial position sends a signal, the signal receivers 10 at the two sides of the blanking pipe 9 receive the corresponding signal, and the discharge valve 11 is controlled to carry out blanking. When all the casting troughs 15 are finished casting, the signal generator 16 at the tail end sends out a signal to control the discharge valve 11 to close, and the casting is stopped at the moment. Under the cooperation of the signal generator 16 and the signal receiver 10, the starting and the ending of the blanking are completed, and the waste of concrete is avoided.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. The utility model provides a device of pouring of prefabricated wallboard of building, includes backup pad (1), recess (2) and pulley (3), its characterized in that: the groove (2) is formed in the top of the supporting plate (1), and the pulley (3) is arranged in an inner cavity of the groove (2).
2. The pouring device for the building prefabricated wall panel according to claim 1, characterized in that: the pulley is characterized in that a rotating shaft seat (4) is arranged at the top of the pulley (3), through holes (5) are formed in two sides of the rotating shaft seat (4), a moving rod (6) is arranged in an inner cavity of each through hole (5), a moving block (7) is sleeved on an outer ring of each moving rod (6), each moving block (7) is of a hollow structure, and a storage bin (8) is arranged at the top of each moving block (7).
3. The pouring device for the building prefabricated wall panel according to claim 2, characterized in that: a blanking pipe (9) is arranged at the bottom of the moving block (7), and signal receivers (10) are arranged on the front surface and the back surface of the blanking pipe (9).
4. The pouring device for the building prefabricated wall panel according to claim 3, is characterized in that: and a discharge valve (11) is arranged at the bottom of the discharging pipe (9).
5. The pouring device for the building prefabricated wall panel according to claim 1, characterized in that: be provided with base (12) between backup pad (1), the top of base (12) is provided with hydraulic telescoping rod (13), the top of hydraulic telescoping rod (13) is provided with frame (14), the top of frame (14) has been seted up and has been pour groove (15).
6. The pouring device for the building prefabricated wall panel according to claim 5, is characterized in that: the edge of the top of the frame (14) is provided with a signal generator (16), and the signal generator (16) is arranged on two sides of the pouring groove (15).
7. The pouring device of the building prefabricated wall panel according to claim 3, characterized in that: the diameter of the blanking pipe (9) is smaller than that of the pouring groove (15).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220890768.0U CN217703839U (en) | 2022-04-18 | 2022-04-18 | Pouring device for prefabricated building wallboard |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220890768.0U CN217703839U (en) | 2022-04-18 | 2022-04-18 | Pouring device for prefabricated building wallboard |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217703839U true CN217703839U (en) | 2022-11-01 |
Family
ID=83789015
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220890768.0U Expired - Fee Related CN217703839U (en) | 2022-04-18 | 2022-04-18 | Pouring device for prefabricated building wallboard |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217703839U (en) |
-
2022
- 2022-04-18 CN CN202220890768.0U patent/CN217703839U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211104669U (en) | Concrete prefabricated part curing and spraying device | |
CN217703839U (en) | Pouring device for prefabricated building wallboard | |
CN108908653B (en) | Cement brick making machine | |
CN212022748U (en) | A discharge apparatus for construction | |
CN101434090B (en) | Double face lattice type wall heat preserving shuttering forming machine | |
CN117266039A (en) | Bridge concrete pouring device and application method thereof | |
CN207828978U (en) | New Type Aerated Concrete pours into a mould blanking buffer device | |
CN201874242U (en) | Quantitative foam concrete pouring machine | |
CN213710409U (en) | Concrete pouring device convenient to control pouring amount | |
CN210450941U (en) | Casting device is used in production of high temperature mould steel | |
CN212983527U (en) | Concrete pouring device | |
CN210308317U (en) | Building rubbish regeneration building block brick device | |
CN212764875U (en) | Artificial stone plate forming device | |
CN208375567U (en) | A kind of concrete pipe sheet pours the system of smashing | |
CN201317043Y (en) | Double-faced lattice wall heat preservation formwork forming machine | |
CN112265107A (en) | Building block casting molding system | |
CN221094765U (en) | Curb back rest make-up machine | |
CN216707847U (en) | Concrete member pouring template | |
CN219705565U (en) | Energy-saving environment-friendly assembled wallboard mold pouring device | |
CN221291831U (en) | Pouring device for autoclaved aerated concrete plate production | |
CN213703929U (en) | City piping lane comprehensive mould convenient to material loading | |
CN220807915U (en) | Tubular pile concrete spreader | |
CN220428767U (en) | Pouring anti-overflow device | |
CN217679920U (en) | Machine wrapped thick liquid ribbed floor core mold | |
CN221321799U (en) | Building floor slab concrete placement operation rack |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20221101 |