CN217699515U - Intelligent recovery plant that fitment engineering rubbish was used - Google Patents

Intelligent recovery plant that fitment engineering rubbish was used Download PDF

Info

Publication number
CN217699515U
CN217699515U CN202221414311.9U CN202221414311U CN217699515U CN 217699515 U CN217699515 U CN 217699515U CN 202221414311 U CN202221414311 U CN 202221414311U CN 217699515 U CN217699515 U CN 217699515U
Authority
CN
China
Prior art keywords
crushing
room
box
install
broken
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221414311.9U
Other languages
Chinese (zh)
Inventor
陈锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuhe (Fujian) Construction and Development Co.,Ltd.
Original Assignee
Fujian Zunyang Construction Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Zunyang Construction Development Co ltd filed Critical Fujian Zunyang Construction Development Co ltd
Priority to CN202221414311.9U priority Critical patent/CN217699515U/en
Application granted granted Critical
Publication of CN217699515U publication Critical patent/CN217699515U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/58Construction or demolition [C&D] waste

Landscapes

  • Crushing And Pulverization Processes (AREA)

Abstract

The utility model relates to a finishing work technical field especially relates to an intelligent recovery plant that finishing work rubbish was used. The technical scheme comprises the following steps: the recovery box with handle the case, broken room is installed to top one side in the recovery box, the bottom deviates from broken room one side and installs crushing room in the recovery box, install in the middle of the recovery box top and handle the case, the recovery box top is located broken room position department and installs the feeder hopper, all install the hydro-cylinder in the middle of the broken room both sides, the hydro-cylinder output shaft is located the inside both sides of broken room and all installs the broken plate, the inside broken plate lower surface mounting that is located of broken room has the screening net. The utility model provides a current device can't carry out multiple shredding to building rubbish, and building rubbish is bulky, and recycle ratio is not good, and can't handle the recovery dust, and the dust very easily discharges to the air, causes air pollution's problem, has improved building rubbish's crushing rate, and then has improved building rubbish's recycle ratio.

Description

Intelligent recovery plant that fitment engineering rubbish was used
Technical Field
The utility model relates to a finishing work technical field specifically is an intelligent recovery plant that finishing work rubbish was used.
Background
The decoration engineering has the functions of protecting various members of the building from being eroded by natural wind, rain and moisture, improving the functions of heat insulation, sound insulation and moisture prevention, improving the durability of the building, prolonging the service life of the building, creating good production, life and working environments for people, easily producing engineering garbage in the decoration engineering and needing to be recycled by using recycling equipment.
Through mass retrieval, the intelligent garbage recycling device for decoration engineering, such as the garbage recycling device disclosed in the publication number CN113926537A, of the recycling device in the prior art is found, the grinding wheel rotates to be matched with the matching seat to grind garbage, so that the garbage can be conveniently separated and recycled at the later stage, and the mounting groove plate can be covered by the sealing cover plate, so that dust is prevented from floating out, and the bodies of workers are protected; the cam rotates to drive the sorting net to move rightwards, and the sorting net is reset under the action of the third reset spring, so that garbage fragments with different sizes can be sorted back by the left-right reciprocating movement of the sorting net.
The existing recovery device cannot perform multiple smashing treatment on construction waste, the construction waste is large in size and poor in recovery rate, the recovered dust cannot be treated, the dust is extremely easy to discharge to the air, air pollution is caused, and therefore the intelligent recovery device for the decoration engineering waste is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an intelligent recovery plant that finishing work rubbish was used possesses multiple kibbling advantage, has solved current device and can't carry out multiple shredding to building rubbish, and building rubbish is bulky, and recycle ratio is not good, and can't handle the recovery dust, and the dust very easily discharges to the air, causes air pollution's problem.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides an intelligent recovery plant that finishing work rubbish was used, includes collection box and processing case, wherein broken room is installed to top one side in the collection box, the bottom deviates from broken room one side in the collection box and installs crushing room, install the processing case in the middle of the collection box top, the collection box top is located broken room position department and installs the feeder hopper, all install the hydro-cylinder in the middle of the broken room both sides, the hydro-cylinder output shaft is located the inside both sides of broken room and all installs the broken plate, the inside broken plate that is located of broken room lower surface mounting has the screening net, all install crushing roller in the middle of the top both sides of crushing room, the collection box is close to crushing room one side bottom and installs the storage case, install the rose box in the middle of the processing incasement bottom, the processing incasement portion is located rose box one side and installs dust exhausting fan.
Preferably, the recycling bin and the crushing chamber are close to one side of the storage bin and are provided with guide plates, the guide plates are obliquely arranged towards one side of the storage bin, and the recycling waste materials are conveniently conveyed to the storage bin through the guide plates.
Preferably, the dust removal fan input passes through the exhaust column and connects in the rose box, the dust removal fan output passes through the blast pipe and connects in handling the case, conveniently with the inside dirty air water conservancy diversion of collection box to rose box inside.
Preferably, the rubber seats are arranged at four angular positions of the lower surface of the recycling bin, and the use stability of the recycling bin is improved by arranging the rubber seats.
Preferably, the crushing teeth are installed on the adjacent sides of the crushing plates on two sides, and the construction waste is preliminarily crushed by the crushing teeth.
Preferably, the filter screen is installed to the inside centre of rose box, install the dust removal pipe in the middle of rose box one side, the dust removal pipe end is located collection box internally mounted and has the dust excluding hood, through setting up the filter screen, filters the dust.
Preferably, the inside crushing room bottom that is located of collection box installs the conveyer belt, the conveyer belt end sets up in crushing room top, through setting up the conveyer belt, conveniently carries broken material to crushing room.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a set up broken room and crushing room, reach and carry out multiple kibbling effect to building rubbish, it is closed to drive the breaker through the both sides hydro-cylinder, through breaker and broken tooth, carry out the breakage to fitment rubbish, rubbish after the breakage falls to the conveyer belt through the screening net, the rethread conveyer belt is carried broken rubbish to crushing room, smash broken waste material through crushing indoor portion crushing roller, can't carry out multiple shredding to building rubbish in order to solve, building rubbish is bulky, the not good problem of recycle ratio, building rubbish's crushing rate has been improved, and then building rubbish's recycle ratio has been improved.
2. The utility model discloses a set up rose box and dust exhausting fan, reach the effect that the convenience was handled the inside dust of collection box, set up the rose box in the middle of handling the incasement bottom, it sets up dust exhausting fan to be located rose box one side in the processing incasement portion, set up the filter screen in the middle of the rose box is inside, set up the dust removal pipe in the middle of rose box one side, it sets up the dust excluding hood to be located collection box inside at the dust removal pipe end, in order to solve and to handle the recovery dust, the dust very easily discharges to the air, cause air pollution's problem, the discharge rate of recovery dust has been reduced, thereby recovery unit's environmental protection in use effect has been improved.
Drawings
Fig. 1 is a schematic view of the structure of the present invention;
FIG. 2 is a schematic cross-sectional view of the present invention;
FIG. 3 is an enlarged view of A in FIG. 2;
fig. 4 is an enlarged structural diagram of B in fig. 2.
Reference numerals are as follows: 1. a material storage box; 2. a recycling bin; 3. a rubber seat; 4. a feed hopper; 5. a treatment box; 6. a stock guide; 7. a crushing chamber; 8. a conveyor belt; 9. a crushing chamber; 10. screening the net; 11. a crushing roller; 12. a crushing plate; 13. crushing teeth; 14. an oil cylinder; 15. a filter screen; 16. a dust hood; 17. a dust removal pipe; 18. a filter box; 19. an exhaust pipe; 20. a dust removal fan; 21. and (4) exhausting the gas.
Detailed Description
The technical solution of the present invention will be further explained with reference to the accompanying drawings and specific embodiments.
Example one
As shown in fig. 1-4, in order to achieve the above purpose, the present invention provides the following technical solutions: the utility model provides an intelligent recovery plant that finishing work rubbish was used, including collection box 2 and treatment box 5, crushing room 9 is installed to top one side in collection box 2, the bottom deviates from crushing room 9 one side in collection box 2 and installs crushing room 7, collection box 2 top is located crushing room 9 position department and installs feeder hopper 4, all install hydro-cylinder 14 in the middle of the crushing room 9 both sides, the inside both sides that are located crushing room 9 of hydro-cylinder 14 output shaft all install crushing board 12, crushing tooth 13 is all installed to the adjacent one side of both sides crushing board 12, crushing room 9 inside is located crushing board 12 lower surface and installs screening net 10, all install crushing roller 11 in the middle of the top both sides in crushing room 7, collection box 2 is close to crushing room 7 one side bottom and installs storage tank 1, collection box 2 and crushing room 7 are close to storage tank 1 one side and install stock guide 6, stock guide 6 sets up to 1 side slope in collection box, four angular position departments of collection box 2 lower surface all install rubber seat 3, collection box 2 inside is located crushing room 9 bottom and installs conveyer belt 8, 8 end sets up in crushing room 7 top.
The working principle of the intelligent recycling equipment for decoration engineering garbage based on the embodiment 1 is as follows: will the utility model discloses install the back, carry fitment rubbish to broken room 9 through feeder hopper 4, restart both sides hydro-cylinder 14, it is closed to drive broken board 12 through both sides hydro-cylinder 14, through broken board 12 and broken tooth 13, break fitment rubbish, rubbish after the breakage falls to conveyer belt 8 after screening through screening net 10, restart conveyer belt 8, carry broken rubbish to crushing room 7 through conveyer belt 8, smash broken material through crushing 7 inside crushing roller 11 in room, waste material whereabouts to stock guide 6 after smashing, waste material water conservancy diversion to storage tank 1 after will smashing through stock guide 6, to this point, this equipment work flow is accomplished.
Example two
As shown in fig. 1-4, the utility model provides an intelligent recovery plant that fitment engineering rubbish was used compares in embodiment one, and this embodiment still includes: install in the middle of 2 tops of collection box and handle case 5, handle and install rose box 18 in the middle of the bottom in case 5, handle the inside rose box 18 one side that is located of case 5 and install dust exhausting fan 20, dust exhausting fan 20 input passes through exhaust column 19 and connects in rose box 18, dust exhausting fan 20 output passes through blast pipe 21 and connects in handling case 5, filter screen 15 is installed to the inside centre of rose box 18, install dust removal pipe 17 in the middle of 18 one sides of rose box, dust removal pipe 17 end is located 2 internally mounted of collection box has dust excluding hood 16.
In this embodiment, when rubbish waste material is smashed, start dust exhausting fan 20, take out 2 top dust in collection box through dust exhausting fan 20 through dust excluding hood 16, carry to rose box 18 inside through dust removal pipe 17, advance to filter the dust through the inside filter screen 15 of rose box 18, exhaust after the filtration is discharged through blast pipe 21.
The above embodiments are merely some preferred embodiments of the present invention, and many alternative modifications and combinations can be made to the above embodiments by those skilled in the art based on the technical solution of the present invention and the related teachings of the above embodiments.

Claims (7)

1. The utility model provides an intelligent recovery plant that fitment engineering rubbish was used, includes collection box (2) and handles case (5), its characterized in that: broken room (9) is installed to top one side in collection box (2), bottom deviates from broken room (9) one side and installs crushing room (7) in collection box (2), install in the middle of collection box (2) top and handle case (5), collection box (2) top is located broken room (9) position department and installs feeder hopper (4), all install hydro-cylinder (14) in the middle of broken room (9) both sides, hydro-cylinder (14) output shaft is located broken room (9) inside both sides and all installs crushing plate (12), crushing chamber (9) inside is located crushing plate (12) lower surface mounting has screening net (10), all install crushing roller (11) in the middle of top both sides in crushing room (7), collection box (2) are close to crushing room (7) one side bottom and install storage tank (1), handle the middle rose box (18) of case (5) bottom and install dust exhausting fan (20), handle case (5) inside being located rose box (18) one side and installing.
2. The intelligent recycling equipment for decoration engineering garbage according to claim 1, characterized in that: and a material guide plate (6) is arranged on one side, close to the material storage box (1), of the recovery box (2) and the crushing chamber (7), and the material guide plate (6) is obliquely arranged towards one side of the material storage box (1).
3. The intelligent recycling device for finishing engineering garbage according to claim 1, characterized in that: the input end of the dust removing fan (20) is connected to the filter box (18) through an exhaust pipe (19), and the output end of the dust removing fan (20) is connected to the treatment box (5) through an exhaust pipe (21).
4. The intelligent recycling device for finishing engineering garbage according to claim 1, characterized in that: rubber seats (3) are installed at four corner positions of the lower surface of the recycling box (2).
5. The intelligent recycling device for finishing engineering garbage according to claim 1, characterized in that: and crushing teeth (13) are arranged on the adjacent sides of the crushing plates (12) on the two sides.
6. The intelligent recycling device for finishing engineering garbage according to claim 1, characterized in that: install filter screen (15) in the middle of rose box (18) inside, install dust removal pipe (17) in the middle of rose box (18) one side, dust removal pipe (17) end is located collection box (2) internally mounted and is had dust excluding hood (16).
7. The intelligent recycling device for finishing engineering garbage according to claim 1, characterized in that: the inside crushing room (9) bottom that is located of collection box (2) is installed conveyer belt (8), conveyer belt (8) end sets up in crushing room (7) top.
CN202221414311.9U 2022-06-08 2022-06-08 Intelligent recovery plant that fitment engineering rubbish was used Active CN217699515U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221414311.9U CN217699515U (en) 2022-06-08 2022-06-08 Intelligent recovery plant that fitment engineering rubbish was used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221414311.9U CN217699515U (en) 2022-06-08 2022-06-08 Intelligent recovery plant that fitment engineering rubbish was used

Publications (1)

Publication Number Publication Date
CN217699515U true CN217699515U (en) 2022-11-01

Family

ID=83800801

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221414311.9U Active CN217699515U (en) 2022-06-08 2022-06-08 Intelligent recovery plant that fitment engineering rubbish was used

Country Status (1)

Country Link
CN (1) CN217699515U (en)

Similar Documents

Publication Publication Date Title
CN208177648U (en) A kind of building waste separation recoverer with environment-friendly function
KR102218865B1 (en) Methods and systems for selection of compression cut-fracture for fueling combustible waste
CN106733098B (en) A kind of environment-friendly type building decoration refuse disposal installation
CN111282966A (en) Slag treatment system
CN114309015A (en) Building decoration garbage co-processing technology without manual sorting
CN113369143A (en) Decoration and building waste resource utilization and classification equipment and manufacturing method thereof
CN110903044A (en) System and method for cooperatively treating construction waste by using cement kiln
CN101658855A (en) Integrated machine for sorting domestic garbage
CN217699515U (en) Intelligent recovery plant that fitment engineering rubbish was used
CN113751465A (en) Resource disposal process for construction waste and decoration waste
CN212310067U (en) A grit sieving mechanism for engineering construction
CN208373249U (en) A kind of recycled aggregate trimmer
CN217856619U (en) High-efficient dust removal mineral processing equipment
CN111266150A (en) Engineering construction waste treatment device with environment-friendly dust removal function and processing method thereof
CN216322490U (en) Building rubbish breaker
CN215389921U (en) Civil engineering construction waste material environmental protection processing apparatus
CN212915785U (en) Mummification mud breaker
CN110586290A (en) Large-scale building rubbish collection smashes system
CN212167722U (en) Environment-friendly smashing device for recycling and processing colored metal waste catalyst
CN109351450B (en) Waste plate crushing, grinding and recycling system
CN108273828B (en) Comprehensive sorting system for municipal domestic waste
CN109834043B (en) Waste sand recycling assembly line
CN209998080U (en) classified processing comprehensive utilization system for household garbage
CN2532585Y (en) Machine for recovering and treating waste battery
CN205165186U (en) Novel dust removal device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 12 storefront, 1st floor, Building 124, Sansheng Nanxiang Lake, No. 33 Wulongjiang South Avenue, Nanyu Town, Minhou County, Fuzhou City, Fujian Province, 350109

Patentee after: Fuhe (Fujian) Construction and Development Co.,Ltd.

Address before: 12 storefront, 1st floor, Building 124, Sansheng Nanxiang Lake, No. 33 Wulongjiang South Avenue, Nanyu Town, Minhou County, Fuzhou City, Fujian Province, 350109

Patentee before: Fujian Zunyang Construction Development Co.,Ltd.