CN217601325U - Concrete gate pier slip form hydraulic construction equipment - Google Patents

Concrete gate pier slip form hydraulic construction equipment Download PDF

Info

Publication number
CN217601325U
CN217601325U CN202220936631.4U CN202220936631U CN217601325U CN 217601325 U CN217601325 U CN 217601325U CN 202220936631 U CN202220936631 U CN 202220936631U CN 217601325 U CN217601325 U CN 217601325U
Authority
CN
China
Prior art keywords
gate pier
hydraulic
construction equipment
collar tie
slip form
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220936631.4U
Other languages
Chinese (zh)
Inventor
谢小晨
杨丹涛
李小峰
马文振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Corp Engineering Bureau 15 Co Ltd
Original Assignee
Sinohydro Corp Engineering Bureau 15 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Corp Engineering Bureau 15 Co Ltd filed Critical Sinohydro Corp Engineering Bureau 15 Co Ltd
Priority to CN202220936631.4U priority Critical patent/CN217601325U/en
Application granted granted Critical
Publication of CN217601325U publication Critical patent/CN217601325U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

The utility model provides a concrete gate pier slipform hydraulic construction equipment, be provided with the collar tie beam outside the gate pier, the collar tie beam encircles the gate pier and forms confined whole, collar tie beam top is provided with the platform steel sheet, collar tie beam upper portion is provided with a plurality of groups beam holders about the width direction symmetry, be provided with overhead beam on every group beam holder, be provided with the template on the collar tie beam inside wall, collar tie beam upper portion interval is provided with a plurality of groups hoisting frames, be provided with punching hydraulic jack on the hoisting frame, the one end of climbing rod is buried underground in concreting, the other end passes punching hydraulic jack's through-hole, the hydraulic control platform sets up on overhead beam and communicates with punching hydraulic jack mutually. After the slipform is adopted, a support is not needed, and only the upper and lower crawling ladders are additionally arranged at the door slot part to meet the requirement of the passage of constructors, so that the occupation and consumption of turnover materials are reduced.

Description

Hydraulic construction equipment for concrete gate pier slip form
Technical Field
The utility model belongs to the technical field of hydraulic engineering construction equipment or device, concretely relates to concrete gate pier slipform hydraulic construction equipment.
Background
The water outlet building in the hydraulic engineering is a common water conservancy facility, the gate pier is an important water conservancy structure, the concrete pouring of the water conservancy engineering gate pier is generally constructed in a mode of combining a standard template and a special-shaped template, but for the riverbed type dam, the general overflow dam section occupies a wider structural range of the dam body, the number of the gate piers is large, the riverbed type dam mostly adopts stage diversion, the requirement on the diversion and closure construction period is strict, and the construction speed of the mode is low, so that the construction progress is influenced.
Due to the fact that the splicing templates are adopted, seams exist among the templates, the position of each template needs to be corrected during template correction, the templates need to be firmly reinforced, the pull rods are adopted for fixing the templates, and the phenomenon that the appearance quality of concrete is affected due to the fact that the templates move due to vibration is avoided.
The mode that the support was generally set up to bearing structure, the support need be set up all around to the gate pier for place construction material, concreting, turnover template, maintenance, constructor about gate pier etc. the support risees along with the promotion of gate pier height, occupy a large amount of materials, if a plurality of gate piers are under construction simultaneously, it is huge more to occuping of turnover material, great to construction cost influence.
Disclosure of Invention
The utility model aims to solve the technical problem that overcome above-mentioned defect, provide a reasonable in design, degree of mechanization height, easy operation, save the cost, accelerate the concrete gate mound slipform hydraulic construction equipment of construction progress, resource rational arrangement.
The technical scheme for solving the technical problems is as follows: the utility model provides a concrete gate pier slipform hydraulic construction equipment, be provided with the collar tie beam outside the gate pier, the collar tie beam encircles the gate pier and forms confined whole, collar tie beam top is provided with the platform steel sheet, collar tie beam upper portion is provided with a plurality of groups beam brace about the width direction symmetry, be provided with overhead beam on every group beam brace, be provided with the template on the collar tie beam inside wall, collar tie beam upper portion interval sets up a plurality of groups hoisting frames, punching hydraulic jack installs on the hoisting frame, the one end of climbing rod is buried underground in concreting, the other end passes punching hydraulic jack's through-hole, the hydraulic control platform sets up on overhead beam and communicates with punching hydraulic jack mutually.
The utility model discloses a hoisting frame top is provided with the slip track, and the sunshade that hides rain sets up on the slip track.
The utility model discloses a lower part of collar tie beam is provided with auxiliary platform and maintenance water pipe.
The utility model discloses a circle roof beam top outside is provided with protector.
The utility model discloses a gate pier one side is provided with someone cat ladder.
The utility model discloses a hoisting frame is for falling L shape structure, is provided with the stiffening rib between the long arm of L shape structure and the forearm, and processing has the through-hole on the forearm, and is corresponding with feed-through hydraulic jack's through-hole, and the climbing rod passes wherein.
Because the utility model discloses a hydraulic means promotes, according to resource allocation and designing requirement, to the adjustment of concrete mix proportion, chooses suitable concrete setting time for use, and the speed of sliding-lifting is adjusted, ensures the speed and the stability of construction progress under the prerequisite of guaranteeing the quality. The gate pier concrete pouring is continuously poured, after the construction is completed, the device is directly transferred to another gate pier, and the sliding form main body is integrally circulated without being disassembled. According to the gate pier body structure, the templates are welded into a whole and rigidly connected with the device ring beam, the reinforcement density of the joint and the thickness of the templates meet the deformation requirement, the circular curve is smooth, the inner sides of the templates are polished smoothly, and the appearance quality of concrete is ensured. After the device adopts the slipform, no longer need the support, only need arrange separately in door slot position about the cat ladder satisfy constructor current can, reduce occupation and the consumption of turnover material.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a sectional view along the overhead girder 2.
Fig. 3 is a sectional view at the non-elevated beam 2.
Fig. 4 is a schematic structural view of the hoisting frame 6.
Fig. 5 is a top view of fig. 4.
In the figure, 1, a ring beam, 2, an overhead beam, 3, a beam support, 4, a template, 5, a hydraulic control table, 6, a lifting frame, 7, a through hydraulic jack, 8, an auxiliary platform, 9, a protective device, 10, a rain and sun shelter, 11, a maintenance water pipe, 12, a climbing rod and 13, a platform steel plate are arranged.
Detailed Description
The present invention will be described in further detail with reference to the drawings and examples, but the present invention is not limited to these examples.
Example 1
In fig. 1-5, the utility model relates to a concrete gate mound slipform hydraulic construction equipment is provided with collar tie 1 outside the gate mound of pouring in advance, and collar tie 1 encircles the gate mound and forms confined whole, is the main part of whole device, highly confirms according to concrete setting time and glide time, and the width satisfies the construction work space, need widen at overhead beam 2 position, and platform steel sheet 13 is installed at collar tie 1 top. A plurality of groups of beam supports 3 are installed on 1 upper portion of collar tie beam about the width direction symmetry, and beam supports 3 are the structure of connecting overhead beam 2 and collar tie beam 1, respectively with overhead beam 2 and 1 welding of collar tie beam together for improve 2 department heights of overhead beam, be convenient for construct in the storehouse, the 3 positions of beam supports of this embodiment are in gate pier quartering department. And each group of beam supports 3 is fixedly welded with an elevated beam 2 for oppositely pulling the ring beams 1 on the two sides and increasing the stability of the ring beams 1. And a template 4 is arranged on the inner side wall of the ring beam 1, the straight line section of the template 4 is welded with the ring beam 1, the outer side of the steel plate at the arc position is reinforced into a rib by using angle steel, and then the rib is connected with the ring beam 1. The thickness of the steel plate is determined according to factors such as lateral pressure, vibration and sliding of concrete, in order to facilitate the sliding and lifting demoulding, the template 4 is designed into a conical shape, namely the upper opening of the template 4 is smaller than the design size in the vertical direction, the lower opening is larger than the design size, the gradient of a conical slope is strictly controlled, and the phenomenon that the concrete is locally uneven in the horizontal direction after being demoulded is avoided.
A plurality of groups of lifting frames 6 are arranged on the upper part of the ring beam 1 at intervals, the lifting frames 6 of the embodiment are of an inverted L-shaped structure, reinforcing ribs are arranged between a long arm and a short arm of the L-shaped structure, through holes are processed on the short arm and correspond to through holes of the through hydraulic jacks 7, and the climbing rods 12 penetrate through the through holes. Install on 6 short arms of hoisting frame and wear-type hydraulic jack 7, hoisting frame 6 is as the base of wear-type hydraulic jack 7, transmits the load of whole device for wear-type hydraulic jack 7, according to the total load of device and the bearing capacity of climbing rod 12, calculates the quantity of required wear-type hydraulic jack 7, and even symmetric distribution is around collar tie 1, connects climbing rod 12 and hoisting frame 6, transmits the smooth load of whole device for climbing rod 12. One end of the climbing rod 12 is buried in the poured concrete according to a set position to serve as a slip form supporting rod, the other end of the climbing rod penetrates through a through hole of the through hydraulic jack 7, the hydraulic control platform 5 is installed on the middle elevated beam 2 and communicated with the through hydraulic jack 7, all the through hydraulic jacks 7 are synchronously controlled to synchronously and stably slide up along the climbing rod 12, and therefore the ring beam 1 and the structure arranged on the ring beam are driven to slide upwards.
Further, the slip track is installed at 6 tops of hoisting frame, sunshade 10 hides rain sets up on the slip track, auxiliary platform 8 and maintenance water pipe 11 are installed to the lower part of circle roof beam 1, the steel sheet reinforcement is used to auxiliary platform 8 bottoms, the side is equipped with protection railing and protection network, 1 top outside of circle roof beam is provided with protector 9, protector 9 is for satisfying safety requirement's rail guard, skirting board, protection network etc., gate pier one side is provided with the people cat ladder, this design is convenient for fix, adopt the assembled, be convenient for install and dismantle. The measuring devices are arranged according to the construction condition, and the measuring devices are symmetrically arranged, so that comparison is facilitated. The fixed point position of the template 4 is measured mainly through a total station, the sliding state is judged, and then the position of the device is slowly adjusted by adjusting the pressure of the through hydraulic jack 7, so that the designed position is reached.

Claims (6)

1. The utility model provides a concrete gate pier slip form hydraulic construction equipment which characterized in that: be provided with circle roof beam (1) outside the gate pier, circle roof beam (1) encircles the gate pier and forms confined whole, circle roof beam (1) top is provided with platform steel sheet (13), circle roof beam (1) upper portion is provided with a plurality of groups beam brace (3) about the width direction symmetry, be provided with overhead beam (2) on every group beam brace (3), be provided with template (4) on circle roof beam (1) inside wall, circle roof beam (1) upper portion interval sets up a plurality of groups hoisting frame (6), straight-through hydraulic jack (7) are installed on hoisting frame (6), the one end of climbing rod (12) is buried underground in having pour the concrete, the other end passes the through-hole of straight-through hydraulic jack (7), hydraulic control platform (5) set up on overhead beam (2) and are linked together with straight-through hydraulic jack (7).
2. The hydraulic concrete gate pier slip form construction equipment as set forth in claim 1, characterized in that: the top of the lifting frame (6) is provided with a sliding track, and the rain and sun shelter (10) is arranged on the sliding track.
3. The hydraulic concrete gate pier slip form construction equipment as set forth in claim 1, characterized in that: the lower part of the ring beam (1) is provided with an auxiliary platform (8) and a maintenance water pipe (11).
4. The hydraulic concrete gate pier slip form construction equipment as claimed in claim 1, wherein: and a protective device (9) is arranged on the outer side of the top of the ring beam (1).
5. The hydraulic concrete gate pier slip form construction equipment as set forth in claim 1, characterized in that: and a manned ladder is arranged on one side of the gate pier.
6. The hydraulic concrete gate pier slip form construction equipment as claimed in claim 1, wherein: the lifting frame (6) is of an inverted L-shaped structure, reinforcing ribs are arranged between a long arm and a short arm of the L-shaped structure, through holes are formed in the short arm and correspond to through holes of the through hydraulic jack (7), and the climbing rod (12) penetrates through the through holes.
CN202220936631.4U 2022-04-21 2022-04-21 Concrete gate pier slip form hydraulic construction equipment Active CN217601325U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220936631.4U CN217601325U (en) 2022-04-21 2022-04-21 Concrete gate pier slip form hydraulic construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220936631.4U CN217601325U (en) 2022-04-21 2022-04-21 Concrete gate pier slip form hydraulic construction equipment

Publications (1)

Publication Number Publication Date
CN217601325U true CN217601325U (en) 2022-10-18

Family

ID=83566147

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220936631.4U Active CN217601325U (en) 2022-04-21 2022-04-21 Concrete gate pier slip form hydraulic construction equipment

Country Status (1)

Country Link
CN (1) CN217601325U (en)

Similar Documents

Publication Publication Date Title
CN108019076B (en) Construction method of large-diameter reinforced concrete silo and device for conical shell construction
CN108729354B (en) Downstream bridge movable formwork and construction method thereof
CN201943045U (en) Automatic-moving hydraulic cantilever gantry concrete placement device for wave wall
CN109267487A (en) A kind of long big section bent cap bracket system of overhanging
CN114770706B (en) Light T-beam prefabrication equipment and prefabrication installation construction method
CN112359779B (en) Inclined concrete turnover construction integrated device and construction process thereof
CN103074871B (en) Arc-shaped slope concrete sliding and lifting template
CN107882060A (en) Two prefabricated cabin assembly Pipe racks of superposed type and its construction method
CN109139050B (en) Self-propelled integrated tunnel inverted arch device
CN213418186U (en) Circular roofing steel truss structure
CN217601325U (en) Concrete gate pier slip form hydraulic construction equipment
CN212642115U (en) Clear water concrete indent arc roofing inner side roof beam hangs mould system
CN109610354B (en) Cast-in-situ slab culvert template system and construction method applying same
CN108951699B (en) Festival segmentation removal centre form and support of utility tunnel
CN109629465A (en) It is a kind of for cover board culvert or the trolley of passage construction
CN113833495B (en) Equipment for slope tunnel inverted arch construction and construction method thereof
CN210256628U (en) Self-adaptive outer mold system for prefabricating concrete
CN214993219U (en) Concrete placement platform truck is contained to apron
CN115506272A (en) Installation and construction method for regular octagonal steel ladle concrete cable tower
CN209854576U (en) Trolley for construction of cover plate culvert or channel
CN214573768U (en) Self-climbing sliding formwork pouring system for second-stage concrete pouring of gate slot
CN114837137B (en) Hydraulic construction method for concrete gate pier sliding mode
CN208563131U (en) A kind of ground line mobile formwork
CN110761323A (en) Underground comprehensive pipe gallery sliding formwork construction method
CN112412152A (en) Construction method of underslung derrick-free variable-section rectangular chimney supporting system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant