CN217581234U - Water and electricity line box construction structures and wall structure - Google Patents

Water and electricity line box construction structures and wall structure Download PDF

Info

Publication number
CN217581234U
CN217581234U CN202221338305.XU CN202221338305U CN217581234U CN 217581234 U CN217581234 U CN 217581234U CN 202221338305 U CN202221338305 U CN 202221338305U CN 217581234 U CN217581234 U CN 217581234U
Authority
CN
China
Prior art keywords
plate body
line box
water
connecting piece
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221338305.XU
Other languages
Chinese (zh)
Inventor
杨凌云
王建徽
张槟
张�诚
王滔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Construction Fifth Construction Engineering Co ltd
Original Assignee
Chengdu Construction Fifth Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Construction Fifth Construction Engineering Co ltd filed Critical Chengdu Construction Fifth Construction Engineering Co ltd
Priority to CN202221338305.XU priority Critical patent/CN217581234U/en
Application granted granted Critical
Publication of CN217581234U publication Critical patent/CN217581234U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a water and electricity line box construction structures and wall structure. The water and electricity line box construction structure comprises a template assembly and a line box fixing assembly; the template assembly comprises: the wall body comprises a first plate body and a second plate body which are oppositely arranged, wherein the distance between the first plate body and the second plate body is matched with the thickness of the wall body; a notch matched with the length and the height of the wire box is arranged on the first plate body; the third plate body and the fourth plate body are oppositely arranged, and the width of the third plate body and the width of the fourth plate body are matched with the thickness of the wall body; the line box fixed subassembly includes: the fifth plate body is positioned on the outer side of the hydroelectric line box; the first connecting piece is used for connecting the fifth plate body with the first plate body; and the second connecting piece is used for connecting the fifth plate body with the water and electricity wire box. The utility model has the advantages of simple structure, preparation and simple installation, the cost is low, can show saving time limit for a project and construction cost, and fixed effectual, installation quality is high, has avoided the secondary to pick to beat the destruction to the wall body structure, has extremely strong practicality, is suitable for and uses widely.

Description

Water and electricity line box construction structures and wall structure
Technical Field
The utility model relates to a technical field of water and electricity line box construction particularly, relates to water and electricity line box construction structures and wall structure.
Background
Along with the increasing of the building structure, the requirements on the quality, technology, environmental protection, energy conservation and consumption reduction of building engineering are continuously improved, and higher requirements are provided for the installation process of the water and electricity wire box on the filler wall masonry. At present, the following two methods are mainly adopted for the water and electricity line box:
one conventional way is: after the construction of the filler wall masonry project is finished, a cutting machine is adopted to cut the pipeline and the junction box hole, and after the box is arranged, fine aggregate concrete is used for filling and leveling the groove and the hole. The construction method is time-consuming, labor-consuming, material-consuming, high in cost and not environment-friendly, and influences later-stage construction.
Another conventional approach is: the construction method needs a manufacturer to shape and produce U-shaped bricks, and still needs a small amount of cutting machines to cut and reserve wire box holes and a small amount of fine aggregate concrete for repairing.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a mounting quality is high, reduces the secondary and picks water and electricity line box construction structures and wall structure of beating the destruction to wall structure.
In order to realize the above-mentioned purpose, according to the utility model discloses an aspect provides water and electricity line box construction structures, technical scheme as follows:
the water and electricity line box construction structure comprises a template assembly and a line box fixing assembly; the template assembly comprises: the wall body comprises a first plate body and a second plate body which are oppositely arranged, wherein the distance between the first plate body and the second plate body is matched with the thickness of the wall body; a gap matched with the length and the height of the wire box is arranged on the first plate body; the third plate body and the fourth plate body are oppositely arranged, and the width of the third plate body and the width of the fourth plate body are matched with the thickness of the wall body; the line box fixing assembly includes: the fifth plate body is positioned on the outer side of the hydroelectric line box; the first connecting piece is used for connecting the fifth plate body with the first plate body; and the second connecting piece is used for connecting the fifth plate body with the water and electricity wire box.
In the utility model, the concrete is poured in the template component to realize one-time forming of the water and electricity line box and reach the quality acceptance standard, thereby obviously improving the construction efficiency; the template component can be repeatedly utilized, so that the usage amount of shale bricks, construction slag generated by cutting the shale bricks, the usage amount of materials such as fine aggregate concrete repair and the like are effectively saved, and a good resource-saving effect is achieved; the template assembly is easy to manufacture and build, the one-time forming is qualified, the construction progress of the brick masonry and the installation can be accelerated, the construction matching difficulty is reduced, and the subsequent process construction is not influenced; the slotting and the hole punching of a cutting machine and the repair of fine aggregate concrete are not needed, and the labor and material cost is effectively saved.
As a further improvement of the present invention, the formwork assembly further comprises a positioning component, the positioning component comprises a steel bar pre-embedded in the floor slab, and the steel bar is located outside the formwork assembly; and/or the formwork assembly further comprises a screw connecting adjacent plates or a split bolt connecting two opposite plates. Therefore, the formwork assembly is fixed and prevented from moving in the concrete pouring process.
As a further improvement of the utility model, at least two steel bars are arranged outside each side surface of the template component; and/or the height of the steel bars extending out of the floor slab is 5-20 cm. From this, location effect is good, and can install fast when the floor construction.
As a further improvement of the utility model, the positioning part further comprises a U-shaped connecting piece for connecting the steel bar and the template component. From this, promote the location effect of reinforcing bar.
As a further improvement of the utility model, the distance between the third plate body and the fourth plate body is 15-25 cm. From this, be convenient for the setting up of template component and the installation of water and electricity line box.
As a further improvement of the utility model, the wire box fixing component further comprises an L-shaped connecting piece, and the L-shaped connecting piece is connected with the upper surface and the fifth plate body of the water and electricity wire box. Therefore, under the pressure of the L-shaped connecting piece, the gap between the bottom of the water wire box and the first plate body can be reduced, and concrete is prevented from flowing out.
As a further improvement of the present invention, the first connecting member is a bolt; the second connecting piece is an iron nail. From this, easily acquire, convenient to use and fixed effectual.
As a further improvement, the inner wall of the water and electricity wire box is provided with a bulge, the bulge is provided with a through hole matched with the second connecting piece, and the second connecting piece is connected with the fifth plate body and the bulge. From this, be convenient for connect, and can not destroy the main part of water and electricity line box.
As a further improvement of the utility model, the distance between the fifth plate body and the first plate body is 1.5-3.5 cm; the length of the fifth plate body is 12-18 cm, and the height is 3-7 cm; the water and electricity line box is flush with the upper end of the first plate body. Therefore, the installation and fixation of the water and electricity line box and the pouring of concrete are facilitated.
In order to achieve the above object, according to another aspect of the present invention, a wall structure is further provided, the technical solution is as follows:
the wall structure is provided with a water and electricity wire box, concrete poured in the template assembly and a brick masonry installed outside the concrete after the template assembly and the wire box fixing assembly are detached.
It can be seen that, the utility model discloses a water and electricity line box construction structures and wall structure's simple structure, preparation and simple installation, the cost is low, not only can show saving time limit for a project and construction cost to fixed effectual, the installation quality is high, has avoided the secondary to pick beat the destruction to wall structure, has extremely strong practicality, is suitable for using widely.
Additional aspects and advantages of embodiments of the inventions provided herein will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of embodiments of the inventions provided herein.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and, together with the description, serve to explain the embodiments of the invention and are not intended to limit the invention. In the drawings:
fig. 1 is a plan view of a first embodiment of a water and electricity line box construction structure of the present invention.
Fig. 2 is a front view of a first embodiment of the utility model of a water and electricity line box construction structure.
Fig. 3 is a side view of the first embodiment of the utility model discloses a water and electricity line box construction structures.
Fig. 4 is a plan view of a second embodiment of the utility model discloses a water and electricity line box construction structure.
Fig. 5 is a side view of a third embodiment of the utility model of a water and electricity line box construction structure.
Fig. 6 is a top view of a first embodiment of the wall structure of the present invention.
Fig. 7 is a front view of a first embodiment of the wall structure of the present invention.
Fig. 8 is a side view of a first embodiment of the wall structure of the present invention.
The relevant references in the above figures are:
100-a water wire box, 110-a bulge, 210-a first plate body, 220-a second plate body, 230-a third plate body, 240-a fourth plate body, 250-a fifth plate body, 310-a first connecting piece, 320-a second connecting piece, 410-a reinforcing steel bar, 420-a U-shaped connecting piece, 430-an L-shaped connecting piece, 510-concrete, 520-brickwork and 530-a floor slab.
Detailed Description
The embodiments of the invention provided in this specification will be described clearly and completely with reference to the accompanying drawings. Those skilled in the art will be able to implement the embodiments of the invention provided in this specification based on these descriptions. Before the embodiments of the invention provided in this specification are explained with reference to the drawings, it is to be noted that:
the technical solutions and the technical features provided in the embodiments of the invention provided in the present specification in each part including the following description may be combined with each other without conflict.
Furthermore, the embodiments of the invention provided in this specification and referred to in the following description are generally only a subset of the embodiments of the invention provided in this specification and not all of them, so that all other embodiments obtained by those skilled in the art without any inventive work based on the embodiments of the invention provided in this specification and referred to in the claims of the invention provided in this specification shall fall within the scope of the protection of the embodiments of the invention provided in this specification.
With respect to the terms and units in the examples of the invention provided in this specification: the terms "comprising," "including," "having," and any variations thereof in the description and claims and their derivatives of the embodiments of the invention provided in this specification are intended to cover non-exclusive inclusions. In addition, other related terms and units in the embodiments of the invention provided in the specification can be reasonably interpreted based on the related contents of the embodiments of the invention provided in the specification.
Fig. 1 is a plan view of a first embodiment of a water and electricity line box construction structure of the present invention. Fig. 2 is a front view of a first embodiment of the utility model discloses a water and electricity line box construction structure. Fig. 3 is a side view of the first embodiment of the utility model of a water and electricity line box construction structure.
As shown in fig. 1 to 3, the water and electricity line box construction structure includes a formwork assembly and a line box fixing assembly.
The template assembly comprises a first plate body 210 and a second plate body 220 which are arranged oppositely, a third plate body 230 and a fourth plate body 240 which are arranged oppositely, a positioning part and a screw for connecting adjacent plate bodies or a split bolt for connecting two opposite plate bodies; the distance between the first plate body 210 and the second plate body 220 is matched with the thickness of the wall body; a gap matched with the length and height of the water and electricity wire box 100 is formed in the first plate body 210, and the upper end of the water and electricity wire box 210 is flush with the upper end of the first plate body 210; the widths of the third plate body 230 and the fourth plate body 240 are matched with the thickness of the wall body, and the distance between the third plate body 230 and the fourth plate body 240 is 15-25 cm; the positioning part comprises steel bars 410 pre-embedded in the floor slab 530, at least two steel bars 410 are arranged outside each side surface of the template assembly, and the height of the steel bars 410 extending out of the floor slab 530 is 5-20 cm.
The wire box fixing assembly includes a fifth plate 250, a first connector 310 and a second connector 320; the fifth plate body 250 is positioned on the outer side of the water and electricity line box 100, the distance between the fifth plate body 250 and the first plate body 210 is 1.5-3.5 cm, the length of the fifth plate body 250 is 12-18 cm, and the height of the fifth plate body 250 is 3-7 cm; the first connecting member 310 is used for connecting the fifth board body 250 and the first board body 210, and the first connecting member 310 is a bolt; the 100 inner walls of water and electricity line box are equipped with arch 110, be equipped with on the arch 110 with the through-hole of second connecting piece 320 adaptation, fifth plate body 250 and arch 110 are connected to second connecting piece 320, second connecting piece 320 is the iron nail.
Fig. 4 is a plan view of a second embodiment of the utility model discloses a water and electricity line box construction structure.
Compared with embodiment 1, the water electric junction box construction structure of the present embodiment further has the following settings: as shown in fig. 4, the positioning member further includes a U-shaped connector 420 connecting the reinforcing bars 410 and the formwork assembly.
Fig. 5 is a side view of a third embodiment of the utility model discloses a water and electricity line box construction structures.
Compared with embodiment 1, the water electric junction box construction structure of the present embodiment further has the following settings: as shown in fig. 5, the line box fixing assembly further includes an L-shaped connector 430, and the L-shaped connector 430 connects the upper surface of the hydroelectric line box 100 and the fifth plate body 250.
Fig. 6 is a top view of a first embodiment of the wall structure of the present invention. Fig. 7 is a front view of a first embodiment of the wall structure of the present invention. Fig. 8 is a side view of a first embodiment of the wall structure of the present invention.
As shown in fig. 6 to 8, the wall structure is constructed by using the construction structure of the hydroelectric line box 100 according to any one of the above embodiments, and the wall structure has the hydroelectric line box 100, concrete 510 poured into the above-mentioned formwork assembly, and brickwork 520 installed outside the concrete 510 after the formwork assembly and the line box fixing assembly are removed.
The contents of the embodiments of the invention provided in the present specification are explained above. Those skilled in the art will be able to implement the embodiments of the invention provided in this specification based on these descriptions. Based on the above description of the embodiments of the invention provided in this specification, all other preferred embodiments and examples obtained by those skilled in the art without any inventive work should fall within the scope of the protection of the embodiments of the invention provided in this specification.

Claims (10)

1. Water and electricity line box construction structures, its characterized in that: the wire box fixing device comprises a template component and a wire box fixing component;
the template assembly comprises:
the wall body comprises a first plate body (210) and a second plate body (220) which are oppositely arranged, wherein the distance between the first plate body (210) and the second plate body (220) is matched with the thickness of the wall body; a gap matched with the length and the height of the wire box is arranged on the first plate body (210);
the third plate body (230) and the fourth plate body (240) are oppositely arranged, and the width of the third plate body (230) and the width of the fourth plate body (240) are matched with the thickness of the wall body;
the line box fixing component comprises:
a fifth plate body (250), wherein the fifth plate body (250) is positioned at the outer side of the water electric wire box (100);
a first connecting member (310) for connecting the fifth plate body (250) and the first plate body (210);
and a second connector (320) for connecting the fifth plate body (250) with the water electric junction box (100).
2. The hydroelectric line box construction structure of claim 1, wherein: the formwork assembly further comprises a positioning component, the positioning component comprises a steel bar (410) pre-embedded in the floor slab (530), and the steel bar (410) is located on the outer side of the formwork assembly; and/or the formwork assembly further comprises a screw for connecting adjacent plate bodies or a split bolt for connecting two opposite plate bodies.
3. The hydroelectric line box construction structure of claim 2, wherein: at least two rebars (410) are disposed outside each side of the form assembly; and/or the height of the steel bar (410) extending out of the floor slab (530) is 5-20 cm.
4. A water electric line box construction structure according to claim 3, characterized in that: the positioning member further includes a U-shaped connector (420) connecting the reinforcing bar (410) and the formwork assembly.
5. The hydroelectric line box construction structure of claim 1, wherein: the distance between the third plate body (230) and the fourth plate body (240) is 15-25 cm.
6. The hydroelectric line box construction structure of claim 1, wherein: the line box fixing assembly further comprises an L-shaped connecting piece (430), and the L-shaped connecting piece (430) is connected with the upper surface of the water and electricity line box (100) and the fifth plate body (250).
7. The water electric junction box construction structure of claim 1, characterized in that: the first connecting piece (310) is a bolt nail; the second connecting piece (320) is an iron nail.
8. The hydroelectric line box construction structure of claim 1, wherein: water and electricity line box (100) inner wall is equipped with arch (110), is equipped with the through-hole with second connecting piece (320) adaptation on arch (110), fifth plate body (250) and arch (110) are connected in second connecting piece (320).
9. The hydroelectric line box construction structure of claim 1, wherein: the distance between the fifth plate body (250) and the first plate body (210) is 1.5-3.5 cm; the length of the fifth plate body (250) is 12-18 cm, and the height is 3-7 cm; the water and electricity line box (100) is flush with the upper end of the first plate body (210).
10. Wall structure has water and electricity line box (100), its characterized in that: there is also concrete (510) poured into the formwork assembly of any one of claims 1 to 9 and brickwork (520) mounted to the exterior of the concrete (510) after removal of the formwork assembly and the tie box securing assembly.
CN202221338305.XU 2022-05-31 2022-05-31 Water and electricity line box construction structures and wall structure Active CN217581234U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221338305.XU CN217581234U (en) 2022-05-31 2022-05-31 Water and electricity line box construction structures and wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221338305.XU CN217581234U (en) 2022-05-31 2022-05-31 Water and electricity line box construction structures and wall structure

Publications (1)

Publication Number Publication Date
CN217581234U true CN217581234U (en) 2022-10-14

Family

ID=83528656

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221338305.XU Active CN217581234U (en) 2022-05-31 2022-05-31 Water and electricity line box construction structures and wall structure

Country Status (1)

Country Link
CN (1) CN217581234U (en)

Similar Documents

Publication Publication Date Title
CN2883532Y (en) Partition board connection structure-centipede type locking tenon
CN110273466B (en) Fabricated shear wall and construction method thereof
CN210887275U (en) Concrete pile bearing platform template structure
CN108952148A (en) A kind of formwork reinforcement system and its construction method
CN217581234U (en) Water and electricity line box construction structures and wall structure
CN106994735A (en) Fabricated shear wall embeds window frame finishing die
CN206220132U (en) A kind of base plate and exterior wall junction construction typified form support
CN213143882U (en) Cast-in-place reinforced concrete stair construction joint pre-chiseling template
CN212104748U (en) Connection structure of firm installation of full precast floor
CN209478473U (en) A kind of distribution box reserved-hole die
CN208534032U (en) A kind of formwork reinforcement system
CN206982952U (en) Fabricated shear wall embeds window frame finishing die
CN217680533U (en) Detachable water supply pipe groove pressing device
CN220414529U (en) Modularized integrated building structure
CN218622561U (en) Prefabricated strong and weak current case concrete frame
CN212026781U (en) Connecting structure of prefabricated floor slab and steel beam
CN215889358U (en) Instrument formula stairstepping stereotype template
CN217207238U (en) High stability rag bolt
CN215830076U (en) Non-bearing partition wall stable structure of back step
CN220705259U (en) Two-section screw anchor bar for masonry structure reinforcement
CN213477371U (en) Reinforced concrete anti-cracking plate
CN216920995U (en) Do benefit to two p boards of concatenation installation
CN219794303U (en) Combined shear wall
CN218028146U (en) Prefabricated assembled template that foundation engineering used
CN219431085U (en) Connection structure of assembled energy-saving interior wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant