CN108952148A - A kind of formwork reinforcement system and its construction method - Google Patents

A kind of formwork reinforcement system and its construction method Download PDF

Info

Publication number
CN108952148A
CN108952148A CN201810758201.6A CN201810758201A CN108952148A CN 108952148 A CN108952148 A CN 108952148A CN 201810758201 A CN201810758201 A CN 201810758201A CN 108952148 A CN108952148 A CN 108952148A
Authority
CN
China
Prior art keywords
side form
template
steel bars
fixed steel
buckle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810758201.6A
Other languages
Chinese (zh)
Inventor
李炳尧
周业强
吴沛聪
范懿文
杨渊
韦卫平
谢江美
黄深红
韦燕萍
梁朝权
郑毅
陆玉龙
郑秋霞
韦宏雷
莫林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Engineering Group No1 Construction Engineering Co Ltd
Original Assignee
Guangxi Construction Engineering Group No1 Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Construction Engineering Group No1 Construction Engineering Co Ltd filed Critical Guangxi Construction Engineering Group No1 Construction Engineering Co Ltd
Priority to CN201810758201.6A priority Critical patent/CN108952148A/en
Publication of CN108952148A publication Critical patent/CN108952148A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/12Tying means; Spacers ; Devices for extracting or inserting wall ties with arms engaging the forms

Abstract

The invention discloses a kind of formwork reinforcement systems, including template buckle, the first side form, the second side form, fixed steel bars and concrete protective layer pad item;First side form is parallel to each other with the second side form;Template buckle is undercut font structure, is buckled in the top of the first side form and the second side form, and plate face of the both ends inside of template buckle respectively with the first side form and the second side form fits closely;Fixed steel bars are perpendicularly fixed on the surface of floor or wall between the first side form and the second side form, and part is exposed outside floor or wall;Concrete protective layer pad is supported between the first side form and the second side form, and middle part is abutted with fixed steel bars.Construction method of the present invention is easily understood, and speed of application is fast, and formwork is reinforced securely and reliably, and the structure perception after demoulding is good, and template buckle uses the prefabricated processing of waste and old template, saves the duration, environmentally protective.

Description

A kind of formwork reinforcement system and its construction method
Technical field
The invention belongs to architectural furniture technical fields, and in particular to a kind of formwork reinforcement system and its mold method.
Background technique
Usually there are two types of construction method, a kind of method is that formwork adds simultaneously with caisson of toilet for traditional toilet flange Gu concrete one-time-concreting forms;Another method is that flange concrete is carried out second pouring.The one-time-concreting method of forming is being applied Often occur swollen mould in work, run the problems such as mould, deviation, construction quality is difficult to ensure, therefore the flange construction of most engineering take it is secondary Casting method.
Traditional flange concrete secondary casting method formwork reinforcement process, needs to follow closely the lumps of wood, reinforcing bar to support or iron wire to drawing, Even with step fastener reinforcing etc., trivial operations, construction efficiency is lower.For collar tie beam, lintel formwork pours and two sides The small bore isolated beam formwork of non-floor pours, and similarly there is above-mentioned technical problem.
Summary of the invention
It is an object of the invention to be directed to the above problem in the prior art, a kind of formwork reinforcement system and its construction are provided Method, can omit the installation lumps of wood, reinforcing bar to support or iron wire to drawing the step of, construction efficiency is high.
For achieving the above object, present invention employs following technical solutions:
A kind of formwork reinforcement system, including template buckle, the first side form, the second side form, fixed steel bars and concrete protective Layer cushion block item;First side form is parallel to each other with the second side form;Template buckle is undercut font structure, is buckled in the first side The top of mould and the second side form, plate face of the both ends inside of template buckle respectively with the first side form and the second side form fit closely; Fixed steel bars are perpendicularly fixed on the surface of floor or wall between the first side form and the second side form, and building is exposed in part Outside plate or wall;Concrete protective layer pad is supported between the first side form and the second side form, and middle part and fixed steel bars It abuts.
A kind of above-mentioned formwork reinforcement system, further includes bed die, which is set to above the hole on wall, and both ends The two sides with hole fit closely respectively;First side form and the second side form are installed in the top of bed die, and are built in respectively The two sides of bed die.
The quantity of above-mentioned template buckle, fixed steel bars and concrete protective layer pad item is multiple;Template buckles and consolidates Determine spacing of reinforcement to be alternately arranged on the first side form and the second side form;Every a fixed steel bars, a piece concrete protective is set Layer cushion block item.
The spacing between spacing and adjacent two fixed steel bars between above-mentioned two neighboring template buckle is 500~ 700mm。
Above-mentioned template buckle is made of wood materials.
Above-mentioned fixed steel bars are made of screw-thread steel, a diameter of 7~9mm, and length is 130mm~170mm.
The length of above-mentioned concrete protective layer pad item is equal to the distance between the first side form and the second side form, and section is The rectangle of 20mm × 20mm.
A kind of construction method of formwork reinforcement system, includes the following steps:
(1) snap the line positions: the line of ink marker in flange or girder construction region is popped up in floor;
(2) dabbing and cleaning: using impact drill dabbing flange or the concrete of girder construction region surface, roughened surface pine is cleared up Scattered concrete fragment;
(3) steel planting: the midline drilling between the position to be installed of the first side form and the second side form, it is every along middle line Compartment bores a hole away from c, and cleans up the dust in hole, clast, and anchoring adhesive is injected into hole, is inserted into fixed steel bars;
(4) the first side form and the second side form are installed: respectively installing the first side form and the second side form in flange or girder construction The two sides in region;
(5) it places cushion block item: between the first side form and the second side form, filling in a coagulation every a fixed steel bars Protective soil layer cushion block item, and make the both ends of the concrete protective layer pad item inside plate face with the first side form and the second side form respectively It holds out against, and middle part abuts fixed steel bars;
(6) installation template buckles: downwards by the opening of template buckle, template clip buckle being buckled in the every spacing c The top of one side form and the second side form, template buckle is arranged with fixed steel bars interleaved, and makes in the both ends of template buckle Outside plate face of the side respectively with the first side form and the second side form fits closely;
(7) watering is wet: the inside plate face and roughened surface of watering wetting the first side form and the second side form;
(8) concreting, vibrate, conserve: spade is entered in the gap between the first side form and the second side form, and Abundant vibrated concrete carries out maintenance work.
Compared with the prior art, present invention has an advantage that
A kind of formwork reinforcement system and its construction method that the present invention discloses, using template buckle two side forms of constraint not to Outside is toppled over, and is recycled concrete protective layer pad item to constrain two side forms and is not inwardly toppled over, so that two side forms are fixed on and turn over The two sides in side or girder construction region, then using the method for dabbing and bar planting improve flange or girder construction respectively with floor/wall Overall stability, last disturbing concrete, achieve the purpose that formwork reinforce.The formwork that the present invention adapts to various structures is reinforced Operating condition, in addition to can apply to the secondary formwork casting operating condition of the flange such as toilet, kitchen, moreover it is possible to the collar tie beam formwork suitable for masonry wall The side form of the small bore isolated beam of two sides non-floor reinforces operating condition in reinforcing operating condition, main structure, and construction method is easily understood, applies Work speed is fast, and formwork is reinforced securely and reliably, and the structure perception after demoulding is good, and template buckle uses the prefabricated processing of waste and old template, It saves the duration, it is environmentally protective.
Detailed description of the invention
Fig. 1 is a kind of schematic diagram of the formwork reinforcement system of the embodiment of the present invention 1.
Fig. 2 is a kind of schematic diagram of the formwork reinforcement system of the embodiment of the present invention 2.
Fig. 3 is a kind of top view of formwork reinforcement system of Fig. 1 and Fig. 2.
Fig. 4 is the structural schematic diagram that template buckles in Fig. 3.
Appended drawing reference: 1-template buckle, the 2-the first side form, the 3-the second side form, 4-fixed steel bars, 5-concrete are protected Sheath cushion block item, 6-floors, 61-flange, 62-floor plate faces, 63-drop plate plate faces, 7-bed dies, 8-walls, 81-circles Beam, 9-holes.
Specific embodiment
With reference to embodiments and its attached drawing is described in detail the present invention.
Embodiment 1
When the present invention is used for flange formwork pouring construction, as shown in Fig. 1,3 and 4, a kind of formwork reinforcement system, including template Buckle the 1, first side form 2, the second side form 3, fixed steel bars 4 and concrete protective layer pad item 5;First side form 2 and the second side form 3 It is parallel to each other, the plate face of the first side form 2 and the second side form 3 is each perpendicular to floor plate face 62;First side form 2 is located at floor plate face 62 On, highly with flange 61 with high;Second side form 3 is located in drop plate plate face 63, is highly drop plate plate face 63 to flange top surface Distance;Template buckle is undercut font structure, and the width on every one side is 100mm, is buckled in the first side form 2 and the second side form 3 top, outside plate face of the both ends inside of template buckle 1 respectively with the first side form 2 and the second side form 3 fit closely;It is fixed Reinforcing bar 4 is perpendicularly fixed on the surface of floor 6 between the first side form 2 and the second side form 3, and part is exposed outside floor 6 Portion;Concrete protective layer pad 5 is supported between the first side form 2 and the second side form 3, and the two of concrete protective layer pad item 5 End is held out against with the first side form 2 and 3 inside plate face of the second side form respectively, and middle part is abutted with fixed steel bars 4.
The quantity of template buckle 1, fixed steel bars 4 and concrete protective layer pad item 5 is multiple;Template buckles 1 and consolidates It is arranged on the first side form 2 and the second side form 3 with determining 4 interleaved of reinforcing bar;Every a fixed steel bars 4, a concrete is set Protective layer cushion block item 5.
The spacing between spacing and adjacent two fixed steel bars 4 between two neighboring template buckle 1 is 500~ 700mm。
Template buckle 1 is made of wood materials;The waste and old template manufacturing and precasting at working site of one piece of rectangle can be used, herein waste and old mould The notch of a rectangle is cut into any a line of plate, every size of notch is as follows: the lateral length of notch is x, is lacked The vertical extension of mouth is y, and template thickness a, flange width is b, and flange height h then has: x=b+2a, y=h.
Fixed steel bars 4 are made of HRB400 grades of screw-thread steels (hot rolled ribbed bars), a diameter of 7~9mm, and length is 130mm~170mm.
The length of concrete protective layer pad item 5 is equal to the distance between the first side form 2 and the second side form 3, and section is The rectangle of 20mm × 20mm.
A kind of construction method of above-mentioned formwork reinforcement system, includes the following steps:
(1) snap the line positions: popping up the line of ink marker in flange region in floor according to design drawing;
(2) dabbing and cleaning: using the concrete of impact drill dabbing flange region surface, dabbing depth is 20mm, cleaning The loose concrete fragment of roughened surface;
(3) steel planting: the midline drilling between the position to be installed of the first side form and the second side form, it is every along middle line Compartment bores a hole away from c, and c is 500~700mm, and the diameter in hole is 10mm, depth 50mm, and is cleaned up with small blower Dust, clast in hole, anchoring adhesive is injected into hole, is inserted into fixed steel bars;
(4) the first side form and the second side form are installed: on the concrete floor poured, respectively by the first side form and second Side form branch is located at the two sides in flange region, and the first side form is located in floor plate face, highly with flange with high;Second side form installs It drops in plate plate face, highly the distance for drop plate plate face to flange top surface;
(5) it places cushion block item: between the first side form and the second side form, filling in a coagulation every a fixed steel bars Protective soil layer cushion block item, and make the both ends of the concrete protective layer pad item inside plate face with the first side form and the second side form respectively It holds out against, and middle part abuts fixed steel bars;
(6) installation template buckles: downwards by the opening of template buckle, template clip buckle being buckled in the every spacing c The top of one side form and the second side form, c are 500~700mm, and template buckle is arranged with fixed steel bars interleaved, and makes mould Outside plate face on the inside of the both ends of board button respectively with the first side form and the second side form fits closely, while it is scarce to buckle template Top edge of the mouth top edge respectively with the first side form and the second side form fits closely, and the plate face of template buckle and floor keeps hanging down Directly;
(7) watering is wet: the inside plate face and roughened surface of watering wetting the first side form and the second side form, de- to guarantee The apparent mass and flange and floor structure of structure stablizes connection when mould;
(8) concreting, vibrate, conserve: spade is entered in the gap between the first side form and the second side form, and Timely abundant vibrated concrete guarantees that concrete compaction, full, do not box out gap, bubble-free are emerged, and the concrete finished that vibrates is done Surface is closed flat work and maintenance work, i.e. the completion secondary formwork pouring construction of flange.
The present invention is poured for the formwork casting construction method of the small bore isolated beam of two sides non-floor and the formwork of flange Construction method is similar.
Embodiment 2
When the present invention is used for collar tie beam formwork pouring construction, as shown in Figures 2 to 4, a kind of formwork reinforcement system, including template clip Detain the 1, first side form 2, the second side form 3, fixed steel bars 4 and concrete protective layer pad item 5;First side form 2 and 3 phase of the second side form It is mutually parallel, and the plate face of the first side form 2 and the second side form 3 is each perpendicular to the upper surface of wall 8;First side form 2 and the second side form 3 Height it is equal with the height of collar tie beam 81 (girder construction);Template buckle 1 is undercut font structure, and the width on every one side is 100mm, is buckled in the top of the first side form 2 and the second side form 3, on the inside of the both ends of template buckle 1 respectively with the first side form 2 and The outside plate face of second side form 3 fits closely;Fixed steel bars 4 are perpendicularly fixed between the first side form 2 and the second side form 3 The upper surface of wall 8, and part is exposed outside wall 8;Concrete protective layer pad 5 is supported on the first side form 2 and second side Between mould 3, the both ends of concrete protective layer pad item 5 are held out against on the inside of the first side form 2 and the second side form 3 respectively, and middle part with Fixed steel bars 4 abut.
It further include bed die 7, bed die 7 is set to the top at hole 8, and both ends are distinguished when offering hole 9 on wall 8 It is fitted closely with the two sides at hole 8;First side form 2 and the second side form 3 are installed in the top of bed die 7, and are built in respectively The two sides of bed die 7.
The quantity of template buckle 1, fixed steel bars 4 and concrete protective layer pad item 5 is multiple;Template buckles 1 and consolidates It is arranged on the first side form 2 and the second side form 3 with determining 4 interleaved of reinforcing bar;Every a fixed steel bars 4, a concrete is set Protective layer cushion block item 5.
The spacing between spacing and adjacent two fixed steel bars 4 between two neighboring template buckle 1 is 500~ 700mm。
Template buckle 1 is made of wood materials;The waste and old template manufacturing and precasting at working site of one piece of rectangle can be used, herein waste and old mould The notch of a rectangle is cut into any a line of plate, every size of notch is as follows: the lateral length of notch is x, is lacked The vertical extension of mouth is y, and template thickness a, collar tie beam width is b ', and collar tie beam height is h ', then has: x=b '+2a, y=h '.
Fixed steel bars 4 are made of HRB400 grades of screw-thread steels (hot rolled ribbed bars), a diameter of 7~9mm, and length is 130mm~170mm.
The length of concrete protective layer pad item 5 is equal to the distance between the first side form 2 and the second side form 3, and section is The rectangle of 20mm × 20mm.
A kind of construction method of above-mentioned formwork reinforcement system, includes the following steps:
(1) snap the line positions: popping up the line of ink marker in girder construction region in floor according to design drawing;
(2) dabbing and cleaning: using the concrete of impact drill dabbing girder construction region surface, dabbing depth is 20mm, clearly Manage the loose concrete fragment of roughened surface;
(3) steel planting: the midline drilling between the position to be installed of the first side form and the second side form, it is every along middle line Compartment bores a hole away from c, and c is 500~700mm, and the diameter in hole is 10mm, depth 50mm, and is cleaned up with small blower Dust, clast in hole, anchoring adhesive is injected into hole, is inserted into fixed steel bars;
(4) the first side form and the second side form are installed: in the top of wall, respectively being installed the first side form and the second side form The height of the two sides in girder construction region, the first side form and the second side form is equal with the height of girder construction;
If offering hole on wall, bed die is installed in the top at hole, make the both ends of bed die respectively with hole two Side fits closely;First side form and the second side form are installed in the top of bed die, and are built in the two sides of bed die respectively;
(5) it places cushion block item: between the first side form and the second side form, filling in a coagulation every a fixed steel bars Protective soil layer cushion block item, and make the both ends of the concrete protective layer pad item inside plate face with the first side form and the second side form respectively It holds out against, and middle part abuts fixed steel bars;
(6) installation template buckles: downwards by the opening of template buckle, template clip buckle being buckled in the every spacing c The top of one side form and the second side form, c are 500~700mm, and template buckle is arranged with fixed steel bars interleaved, and makes mould Outside plate face on the inside of the both ends of board button respectively with the first side form and the second side form fits closely, while it is scarce to buckle template Mouth top edge is fitted closely with the top edge of the first side form and the second side form respectively, and template buckle and the upper surface of wall are kept Vertically;
(7) watering is wet: the inside plate face and roughened surface of watering wetting the first side form and the second side form, de- to guarantee The apparent mass and wall of structure stablizes connection when mould;
(8) concreting, vibrate, conserve: spade is entered in the gap between the first side form and the second side form, and Timely abundant vibrated concrete guarantees that concrete compaction, full, do not box out gap, bubble-free are emerged, and the concrete finished that vibrates is done Surface is closed flat work and maintenance work, i.e. completion collar tie beam formwork pouring construction.
Formwork casting construction method of the present invention for lintel is similar with the formwork casting construction method of collar tie beam.
The above embodiments are only a part of the embodiment of the present invention, instead of all the embodiments.Based in the present invention Embodiment, those of ordinary skill in the art's every other implementation obtained without creative labor Example, shall fall within the protection scope of the present invention.

Claims (8)

1. a kind of formwork reinforcement system, it is characterised in that: including template buckle, the first side form, the second side form, fixed steel bars and mix Solidifying protective soil layer cushion block item;First side form is parallel to each other with the second side form;Template buckle is undercut font structure, buckle It is tight with the plate face of the first side form and the second side form respectively on the inside of the both ends of template buckle in the top of the first side form and the second side form Closely connected conjunction;Fixed steel bars are perpendicularly fixed on the surface of floor or wall between the first side form and the second side form, and part Expose outside floor or wall;Concrete protective layer pad is supported between the first side form and the second side form, and middle part and solid Determine reinforcing bar to abut.
2. a kind of formwork reinforcement system according to claim 1, it is characterised in that: further include bed die, which is set to Above hole on wall, and two sides of the both ends respectively with hole fit closely;First side form and the second side form are installed in bottom The top of mould, and it is built in the two sides of bed die respectively.
3. a kind of formwork reinforcement system according to claim 1, it is characterised in that: template buckle, fixed steel bars and The quantity of concrete protective layer pad item is multiple;Template buckle with fixed steel bars interleaved be arranged in the first side form and On second side form;Every a fixed steel bars, a piece concrete protective layer pad item is set.
4. a kind of formwork reinforcement system according to claim 3, it is characterised in that: between the two neighboring template buckle Spacing and adjacent two fixed steel bars between spacing be 500~700mm.
5. a kind of formwork reinforcement system according to claim 1, it is characterised in that: the template buckle is by wood materials system At.
6. a kind of formwork reinforcement system according to claim 1, it is characterised in that: the fixed steel bars are by screw thread steel At a diameter of 7~9mm, length is 130mm~170mm.
7. a kind of formwork reinforcement system according to claim 1, it is characterised in that: the concrete protective layer pad item Length is equal to the distance between the first side form and the second side form, and section is the rectangle of 20mm × 20mm.
8. a kind of construction method of formwork reinforcement system, which comprises the steps of:
(1) snap the line positions: the line of ink marker in flange or girder construction region is popped up in floor;
(2) using impact drill dabbing flange or the concrete of girder construction region surface, it is loose dabbing and cleaning: to clear up roughened surface Concrete fragment;
(3) steel planting: the midline drilling between the position to be installed of the first side form and the second side form, along the every compartment of middle line A hole is bored away from c, and cleans up the dust in hole, clast, anchoring adhesive is injected into hole, is inserted into fixed steel bars;
(4) the first side form and the second side form are installed: respectively installing the first side form and the second side form in flange or girder construction region Two sides;
(5) it places cushion block item: between the first side form and the second side form, filling in a concrete every a fixed steel bars and protect Sheath cushion block item, and make the both ends of the concrete protective layer pad item inside plate face top with the first side form and the second side form respectively Tightly, and middle part abuts fixed steel bars;
(6) installation template buckles: downwards by the opening of template buckle, template clip buckle being buckled in the first side every spacing c The top of mould and the second side form, template buckle are arranged with fixed steel bars interleaved, and the both ends inside point for buckling template Outside plate face not with the first side form and the second side form fits closely;
(7) watering is wet: the inside plate face and roughened surface of watering wetting the first side form and the second side form;
(8) concreting, vibrate, conserve: spade is entered in the gap between the first side form and the second side form, and sufficiently Vibrated concrete carries out maintenance work.
CN201810758201.6A 2018-07-11 2018-07-11 A kind of formwork reinforcement system and its construction method Pending CN108952148A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810758201.6A CN108952148A (en) 2018-07-11 2018-07-11 A kind of formwork reinforcement system and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810758201.6A CN108952148A (en) 2018-07-11 2018-07-11 A kind of formwork reinforcement system and its construction method

Publications (1)

Publication Number Publication Date
CN108952148A true CN108952148A (en) 2018-12-07

Family

ID=64482909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810758201.6A Pending CN108952148A (en) 2018-07-11 2018-07-11 A kind of formwork reinforcement system and its construction method

Country Status (1)

Country Link
CN (1) CN108952148A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109944441A (en) * 2019-03-25 2019-06-28 广东蕉岭建筑工程集团有限公司 A kind of construction method of the anti-bank mold of sealing and its anti-bank of installation method, sealing
CN113235919A (en) * 2021-05-31 2021-08-10 江苏永创建设有限公司 Adjustable through-floor sleeve fixing frame and installation method of through-floor sleeve
CN113700292A (en) * 2021-09-02 2021-11-26 上海建工七建集团有限公司 Formwork supporting device and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102691413A (en) * 2012-06-07 2012-09-26 浙江城建建设集团有限公司 Flanging concrete one-step molding formwork support device and construction method
CN202937004U (en) * 2012-07-11 2013-05-15 浙江天元建设(集团)股份有限公司 Multilayer board fixture
US20150204085A1 (en) * 2012-08-07 2015-07-23 Nandor Koszo Wall assembly and a building structure including the wall assembly
CN204662956U (en) * 2015-05-12 2015-09-23 中国十七冶集团有限公司 Movable sealing ridge template reinforcing device
CN205804376U (en) * 2016-07-14 2016-12-14 化学工业岩土工程有限公司 A kind of concreting template and reinforcement type template system
CN206299117U (en) * 2016-12-14 2017-07-04 山东电力建设第一工程公司 A kind of kitchen toilet water-stopping platform pours formwork support body with floor integrated
CN208534032U (en) * 2018-07-11 2019-02-22 广西建工集团第一建筑工程有限责任公司 A kind of formwork reinforcement system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102691413A (en) * 2012-06-07 2012-09-26 浙江城建建设集团有限公司 Flanging concrete one-step molding formwork support device and construction method
CN202937004U (en) * 2012-07-11 2013-05-15 浙江天元建设(集团)股份有限公司 Multilayer board fixture
US20150204085A1 (en) * 2012-08-07 2015-07-23 Nandor Koszo Wall assembly and a building structure including the wall assembly
CN204662956U (en) * 2015-05-12 2015-09-23 中国十七冶集团有限公司 Movable sealing ridge template reinforcing device
CN205804376U (en) * 2016-07-14 2016-12-14 化学工业岩土工程有限公司 A kind of concreting template and reinforcement type template system
CN206299117U (en) * 2016-12-14 2017-07-04 山东电力建设第一工程公司 A kind of kitchen toilet water-stopping platform pours formwork support body with floor integrated
CN208534032U (en) * 2018-07-11 2019-02-22 广西建工集团第一建筑工程有限责任公司 A kind of formwork reinforcement system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109944441A (en) * 2019-03-25 2019-06-28 广东蕉岭建筑工程集团有限公司 A kind of construction method of the anti-bank mold of sealing and its anti-bank of installation method, sealing
CN113235919A (en) * 2021-05-31 2021-08-10 江苏永创建设有限公司 Adjustable through-floor sleeve fixing frame and installation method of through-floor sleeve
CN113235919B (en) * 2021-05-31 2022-05-17 江苏永创建设有限公司 Adjustable through-floor sleeve fixing frame and installation method of through-floor sleeve
CN113700292A (en) * 2021-09-02 2021-11-26 上海建工七建集团有限公司 Formwork supporting device and construction method thereof
CN113700292B (en) * 2021-09-02 2023-11-10 上海建工七建集团有限公司 Formwork supporting device and construction method thereof

Similar Documents

Publication Publication Date Title
CN102003069B (en) Construction method and pouring device for framework masonry infill wall structure
CN108952148A (en) A kind of formwork reinforcement system and its construction method
CN106284789B (en) Construction technology for controlling cast-in-situ floor Forming Quality
CN208534032U (en) A kind of formwork reinforcement system
KR102034138B1 (en) beam form and construction method thereof
CN208685933U (en) A kind of post-cast strip template free of demolition
JP2006219838A (en) Reinforcing iron bar support, method of reinforcing concrete skeleton using reinforcing iron bar support, and reinforcing structure of concrete skeleton
CN111663770B (en) Quick and easy combination and shaping mold for post-cast strip of cast-in-place slab and construction method of quick and easy combination and shaping mold
CN108544655A (en) The curved beam prefabricated construction method of curved bridge
CN102121313B (en) Rebar planting-free formwork erecting method for masonry construction and device thereof
JP2010094914A (en) Formwork for precast concrete member integrating beam and column-beam joint section and production process of precast concrete member integrating beam and column-beam joint section using the formwork
KR20140139217A (en) Concrete protection wall with linear drainage functions and construction method thereof
CN207469596U (en) A kind of beam column outer rim is exempted to tear concrete mold open
CN110439002A (en) A kind of interim horizontal structure of inner support is used as the method for permanent structure beam slab
CN105019656B (en) Construction method for floor system concrete post-cast strip suspended formwork
CN209211890U (en) A kind of template positioning tool for steel poured that cornices for exterior wall concrete
CN113700157A (en) Concrete constructional column supporting method for roof post-cast strip
CN206090939U (en) Brickwork wall drawknot muscle connecting tool
CN106193578B (en) It is a kind of that modular system and construction technology are matched somebody with somebody based on groove type quarter bend
CN104846753A (en) Bridge deck opening maintaining method
CN210216882U (en) Control block for controlling thickness of floor slab and pouring template thereof
CN217151225U (en) Secondary structure constructional column serrated raft plugging structure
CN214739890U (en) Steel form for concrete constructional column construction
CN219973893U (en) Constructional column formwork device
CN209523408U (en) A kind of Novel staircase and the building including it

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181207

WD01 Invention patent application deemed withdrawn after publication