CN209523408U - A kind of Novel staircase and the building including it - Google Patents

A kind of Novel staircase and the building including it Download PDF

Info

Publication number
CN209523408U
CN209523408U CN201920197550.5U CN201920197550U CN209523408U CN 209523408 U CN209523408 U CN 209523408U CN 201920197550 U CN201920197550 U CN 201920197550U CN 209523408 U CN209523408 U CN 209523408U
Authority
CN
China
Prior art keywords
construction joint
stair
joint
construction
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920197550.5U
Other languages
Chinese (zh)
Inventor
刘琦峰
李名仿
张洪涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dangdai Energy-Saving House Purchasing Co Ltd
Original Assignee
Dangdai Energy-Saving House Purchasing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dangdai Energy-Saving House Purchasing Co Ltd filed Critical Dangdai Energy-Saving House Purchasing Co Ltd
Priority to CN201920197550.5U priority Critical patent/CN209523408U/en
Application granted granted Critical
Publication of CN209523408U publication Critical patent/CN209523408U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of Novel staircase and including its building, belong to building field, including stair stringer, is equipped with construction joint in 2/3 eminence of the stair stringer, the joint face of the construction joint is parallel to horizontal plane.The utility model at stair stringer by being arranged construction joint, with the joint face of prior art construction joint perpendicular to stair axially compared with, stair construction joint indwelling is in 2/3 eminence of stair stringer, downlink gangboard has poured, uplink gangboard reserves part plate muscle with terraced beam intersection and wouldn't pour, and in subsequent construction, subsequent casting forms construction joint, and construction joint is made to be staggered at Bearing Seat Force, there is no problem for stair stress, and seam crossing rubbish is also easier to clear up.

Description

A kind of Novel staircase and the building including it
Technical field
The utility model relates to building fields, more particularly to a kind of Novel staircase and including its building.
Background technique
With the continuous development of building structure, the architectural mode in China is mostly using frame-shear structure and the mixed knot of brick at present Based on structure, therefore, it is typically all the construction method being segmented during stair construction, is easy for go out in this course The phenomenon that now staying seam due to the problem of constructing, if processing is inappropriate, whole stair will be weaker, gives building building body Use bring very big security risk, seriously threaten the life security of people.
Cranked slab stairs will prop up, reinforcing bar while constructing This floor framework from the bed die of the cranked slab stairs of this layer of starting It is reserved away from plate end carriage (to landing beam), concrete is poured together with this layer of structural concrete, until position in plate span centre 1/3 It sets, stays construction joint.When upper one layer of structure to be onstructed, in the template for installing remaining stair to the structural elevation constructed now, simultaneously The look-ahead portion described above is paid, casting concrete is recycled down with this.
But the setting-up of construction joint of the prior art is at root (at support), less meets that (but specification is nor must with specification Must be located at smallest shearing force), if management disagrees, joint bar, node reinforcement certainly will be increased;Joint bar setting-out is difficult, it is necessary to first match Plate plugs muscle hole, otherwise may template steel pipe, can not stay at lumps of wood reinforcing and set joint bar, pullout tests are done in bar planting after causing; Expense increases.Secondly:
1. it is not in place that reinforced concrete stairs construction joint new-old concrete contacts surface treatment.The defect is to concrete surface Intensity and the globality of new-old concrete contact surface be affected.
2. thickness of protection tier does not meet code requirement.Protective layer thickness is excessive, will affect the performance of reinforcement property;And It is too small to be easy to aoxidize reinforcing bar, it has a certain impact to the durability of stair.
3. there are saggings for young concrete.The phenomenon will affect perception, make troubles to follow-up work, cause people Work picks the waste of chisel and material.4. the bottom of new-old concrete contact surface there are sandstone slag inclusion, with the presence of even construction joint The defect.After form removable, stone, the grains of sand touch to fall with boring tool one is picked, reinforcing steel bars exposed, come to staircase structure safety belt hidden Suffer from.
5. concrete surface moistens degree deficiency before pouring, it is easy to produce contraction fissure.
6. conserving undesirable, concreting is finished, and takes effective maintenance measure not in time, makes newly to pour coagulation Native dehydration is too early, generates the defects of reducing concrete strength and construction joint there are contraction fissures.
Utility model content
The technical problem to be solved by the present invention is to provide a kind of construction joints that can reduce to the new of stair stressing influence Type stair and building including it.
In order to solve the above technical problems, the technical scheme that the utility model is provided is as follows:
On the one hand, the utility model provides a kind of Novel staircase, including stair stringer, sets in 2/3 eminence of the stair stringer There is construction joint, the joint face of the construction joint is parallel to horizontal plane.
Further, the height of the joint face is higher than the height of downlink gangboard.
Further, the construction joint connects stubble by carrying out again after pouring after downlink gangboard has poured to stair stringer part Pour the construction joint to be formed.
Further, it connects under batch position upper layer is controlled with mould along length in 100mm~150mm.
Further, batch concrete is connect to match identical mortar at construction joint.
On the other hand, a kind of building is provided, equipped with the Novel staircase.
By adopting such a design, the utility model at least has the following advantages:
The utility model at stair stringer by being arranged construction joint, and the joint face with prior art construction joint is perpendicular to stair It axially compares, stair construction joint indwelling has been poured in 2/3 eminence of stair stringer, downlink gangboard, uplink gangboard and terraced beam intersection Reserving part plate muscle wouldn't pour, and in subsequent construction, subsequent casting forms construction joint, so that construction joint is staggered at Bearing Seat Force, building There is no problem for terraced stress, and seam crossing rubbish is also easier to clear up.
Detailed description of the invention
Above-mentioned is only the general introduction of technical solutions of the utility model, in order to better understand the technology hand of the utility model Section, below in conjunction with attached drawing, the utility model is described in further detail with specific embodiment.
Fig. 1 is the structural schematic diagram of the stair construction joint of the prior art;
Fig. 2 is stair inclined plate by shear diagram;
Fig. 3 is the structural schematic diagram of the stair construction joint of the utility model;
Fig. 4 is the stair construction joint position view of the utility model.
Specific embodiment
The exemplary embodiment of the utility model is more fully described below with reference to accompanying drawings.Although showing this in attached drawing The exemplary embodiment of utility model, it being understood, however, that may be realized in various forms the utility model without should be by here The embodiment of elaboration is limited.It is to be able to thoroughly understand the utility model, and energy on the contrary, providing these embodiments It is enough that the scope of the utility model is communicated completely into those skilled in the art.
The utility model provides a kind of Novel staircase, as shown in Figures 2 to 4, including stair stringer 1, the 2/3 of stair stringer 1 Eminence is equipped with construction joint 11, and the joint face of construction joint 11 is parallel to horizontal plane.
The use of the new type is equipped with construction joint in 2/3 eminence of stair stringer, has poured in downlink gangboard, uplink gangboard and terraced beam Intersection reserves part plate muscle and wouldn't pour, in subsequent construction subsequent casting formed construction joint, make construction joint be staggered support by At power, there is no problem for stair stress, and seam crossing rubbish is also easier to clear up.
The construction joint of the prior art such as Fig. 1, the joint face of the construction joint 10 of the prior art are oblique perpendicular to stair inclined plate Axial, construction joint makes the weak spot in structural elements, if construction joint malposition, it is possible to cause safely to overall structure Certain influence, and the construction joint of the utility model is located on stair stringer, as shown in figure 3, having been poured in downlink gangboard, uplink ladder Plate reserves part plate muscle with terraced beam intersection and wouldn't pour, and in subsequent construction, subsequent casting forms construction joint, keeps construction joint wrong It opens at Bearing Seat Force, there is no problem for stair stress, and seam crossing rubbish is also easier to clear up.
Further, the height of joint face is higher than the height of downlink gangboard, about the 1/3 of step height.
Further, construction joint 11 after pouring 1 part of stair stringer after downlink gangboard has poured by carrying out connecing stubble again Pour the construction joint to be formed.It is the primary cast-in-place concrete 111 of lower layer's floor in the lower section of construction joint, is in the top of construction joint The concrete 112 of after-pouring, makes it form horizontal construction joint at stair stringer.
Further, it connects under batch position upper layer is controlled with mould 2 along length A in 100mm~150mm, as shown in figure 3, matching mould 2 It is lower along length A between 100mm~150mm.Downward too long, it is inadequate to connect the lateral fastening force in batch position, and it is swollen to be easy to produce root Mould phenomenon, it is downward it is too short then may because template have enough to meet the need repeatedly, edge breakage generate dew slurry, phenomenon of shedding tears.
Further, batch concrete is connect to match identical mortar at construction joint 11.
On the other hand, a kind of building is provided, equipped with the Novel staircase.
The construction joint of the utility model be horizontal construction joint, influence of the construction joint to stair stress can be reduced, by Indwelling construction joint on stair stringer makes the once cast-in-place completion of lower layer's staircase boards, reduces influence of the construction joint to stair stress.
The processing of construction joint includes: 1) reinforcement: being arranged by drawing slab muscle every a cloth one at construction joint position.Every end is protruded into Concrete 500mm.2) processing of concrete junction: after 1. standing the concrete final set of seam surface dabbing method, when allowing demoulding gently by the gear in the face of stitching Plate is removed, and with axe or steel pole is cut by surface dabbing, cleaning loosens stone, and concrete strength is very low at this time, is dug deep 20~30MM and is easier to, When it is secondary pour concrete when, seam face is rinsed well with pressure water in advance, when pouring brush plain-water slurry together, to enhance bite force. 2. removing laitance method when the concrete scale of construction is smaller, simple method, which is plasterer's trowel, scrapes off one layer, depth < 25MM for the laitance on surface, and It digs and extrudes striated, the bond quality of horizontal construction joint can be improved, new and old concrete is combined advantageous.
Compared with disposable cast-in-place structural, construction joint brings certain harm to the globality of structure for the harm of construction joint, This is because the final set of the first subsurface is poured for the second time there are cold seam on the section Shi Yuan, new and old section cohesive force is cut It is weak, the bearing capacity of structure is reduced, so strictly to construct as required to following common problem in the construction process.
In treatment of construction joints it should be noted that 1) beam because arrangement of reinforcement it is more, the fixed difficulty of plug plate is big, and supporting is not tight, often Construction joint forms the R-joining of approximate step, and irregular portion outstanding is divided into weakness.From its surface analysis, part outstanding is more Loosely lack coarse aggregate, intensity bottom for the mortar promoted when vibration;When pouring again for the second time, newly enter the concrete self weight and punching of mould Power is hit, the lower protrusion of rigidity can be made vacantly locally to crush or generate crack, forms stealthy internal injury.In the construction of beam, plate The external crack to extend out is very easy to find at seam, so plug plate must strictly fixed and supporting as required.2) it constructs Stitch indwelling position inaccuracy.Do not construct by the specific size of arrangement and method for construction.Cause construction joint not at the smallest position of stress Indwelling causes a hidden trouble safely to structure, so site construction management personnel are to construction worker strictly by arrangement and method for construction requirement.3) it connects When stubble pours, construction joint sundries is not cleaned out;Dabbing is not thorough, and concrete surface laitance is not cleared up in place;It waters inabundant It is wet, cause the reduction of new-old concrete bite force.So site administrator requires construction worker in strict accordance with arrangement and method for construction. 4) stair construction joint connects batch position and determines: stair connect stubble when constructing on beam, and stair are considered that plate is at both ends in beam by board member Upper is support, snaps into half in beam, is also convenient for constructing in this way, herein not supergage requirement.
The above descriptions are merely preferred embodiments of the present invention, not makees in any form to the utility model Limitation, those skilled in the art make a little simple modification, equivalent variations or modification using the technology contents of the disclosure above, It falls within the protection scope of the present utility model.

Claims (6)

1. a kind of Novel staircase, including stair stringer, which is characterized in that it is equipped with construction joint in 2/3 eminence of the stair stringer, it is described The joint face of construction joint is parallel to horizontal plane.
2. Novel staircase according to claim 1, which is characterized in that the height of the joint face is higher than the height of downlink gangboard Degree.
3. Novel staircase according to claim 1, which is characterized in that the construction joint passes through after downlink gangboard has poured The construction joint of subsequent casting formation is carried out after pouring to stair stringer part again.
4. Novel staircase according to claim 3, which is characterized in that connect under batch position upper layer is controlled with mould and exist along length 150mm~200mm.
5. Novel staircase according to any one of claims 1 to 4, which is characterized in that at construction joint connect batch concrete be with Than identical mortar.
6. a kind of building, which is characterized in that equipped with any Novel staircase of claim 1 to 5.
CN201920197550.5U 2019-02-14 2019-02-14 A kind of Novel staircase and the building including it Expired - Fee Related CN209523408U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920197550.5U CN209523408U (en) 2019-02-14 2019-02-14 A kind of Novel staircase and the building including it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920197550.5U CN209523408U (en) 2019-02-14 2019-02-14 A kind of Novel staircase and the building including it

Publications (1)

Publication Number Publication Date
CN209523408U true CN209523408U (en) 2019-10-22

Family

ID=68230697

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920197550.5U Expired - Fee Related CN209523408U (en) 2019-02-14 2019-02-14 A kind of Novel staircase and the building including it

Country Status (1)

Country Link
CN (1) CN209523408U (en)

Similar Documents

Publication Publication Date Title
CN103615053B (en) Monolithic reinforced concrete structure post empiricism engineering method
CN108915725B (en) A kind of small template lining construction method in double -side approach tunnel
CN103266767A (en) Construction method for preventing and treating cracks between concrete structure and filler wall
CN106801517B (en) External reinforcing and reinforcing method for school shed with prefabricated porous plate brick mixed structure
CN105484391A (en) Construction method for manufacturing heat-preservation waterproof wall through light heat-preservation GRC disassembling-free formworks
CN109025268A (en) Kitchen and toilet concrete flanging construction method
CN110396937A (en) The asynchronous construction of hollow thin-walled high pier binder pier beam
CN109648696A (en) Side slope precast lattice beam of reinforcing bar connection and preparation method thereof and construction method
CN105780976A (en) Compound concrete shear wall structure and concrete pouring method thereof
CN212613903U (en) Brick-concrete structure old building body composite reinforcement structure
CN105672690B (en) Load bearing wall reinforcing method
CN111042569B (en) Construction method for additionally building linear accelerator machine room in limited space of hospital basement
CN108330902B (en) Construction method for cast-in-situ lower cross beam of high-pile wharf
CN206667459U (en) A kind of pre-splicing Standard formula building of prefabrication type reinforced concrete shear wall
CN105780992A (en) Construction method of orthogonal and ortho-laid steel concrete vierendeel sandwich plate floor
CN205976167U (en) Based on cast -in -place floor structures of detachable positioning control spare
CN104846745B (en) Urban high-pier support-free formwork turnover construction method
CN209523408U (en) A kind of Novel staircase and the building including it
CN106337530B (en) A kind of construction of frame beam seams stifled construction method
CN104675138B (en) A kind of slab balcony reinforcement means for sound insulation and noise reducing transformation
CN108130889B (en) Manufacturing method of stepped construction joint between main bottom plate of pump brake and side wall of runner layer
CN102767284B (en) Semi-prefabricating construction process for concrete thin-wall lower return eave
CN211949044U (en) Infilled wall masonry structure
CN211079899U (en) Precast block for bridge expansion joint
CN105019656B (en) Construction method for floor system concrete post-cast strip suspended formwork

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191022