CN217517819U - Rapid Assembly formula building components based on steel construction - Google Patents
Rapid Assembly formula building components based on steel construction Download PDFInfo
- Publication number
- CN217517819U CN217517819U CN202221644655.9U CN202221644655U CN217517819U CN 217517819 U CN217517819 U CN 217517819U CN 202221644655 U CN202221644655 U CN 202221644655U CN 217517819 U CN217517819 U CN 217517819U
- Authority
- CN
- China
- Prior art keywords
- fixed
- spacing
- spacing box
- linkage groove
- seted
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to an assembly type building component technical field specifically is a rapid Assembly type building component based on steel construction. The connector link of a plurality of U type is fixed with from top to bottom on the right flank of prefabricated wallboard, the linkage groove has been seted up on the left surface of prefabricated wallboard, the spout has all been seted up to the top and the bottom of linkage inslot chamber, sliding connection has the slider in the spout, the spacing box of fixedly connected with between two sliders, a plurality of socket has been seted up on the left surface of spacing box and the dorsal surface respectively, be fixed with the downward sleeve of opening on the inside top surface of spacing box, telescopic inner chamber top is fixed with the spring, the bottom of spring is connected with downwardly extending's slide bar, the body of rod left side of slide bar is fixed with the spacing of a plurality of and is the type of falling L, the left surface and the dorsal surface of spacing are the inclined plane of leanin, be provided with ejection mechanism between spacing box and the linkage groove. The structure effectively saves manpower and improves the construction efficiency.
Description
Technical Field
The utility model relates to an assembly type building component technical field specifically is a rapid Assembly type building component based on steel construction.
Background
The prefabricated building is a building which is formed by transferring a large amount of field operation work in the traditional construction mode to a factory, processing and manufacturing building components and accessories in the factory, transporting the building components and accessories to a building construction site, and assembling and installing the building components and the accessories on the site in a reliable connection mode.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the above problem to a can make the rapid Assembly formula building element based on steel construction of prefabricated wallboard quick butt joint is provided.
The utility model provides a problem, the technical scheme who adopts is:
the utility model provides a rapid Assembly formula building element based on steel construction, including prefabricated wallboard, the connector link of a plurality of U type is fixed with from top to bottom on the right flank of prefabricated wallboard, the linkage groove has been seted up on the left surface of prefabricated wallboard, the spout has all been seted up to the top and the bottom of linkage inslot chamber, sliding connection has the slider in the spout, the spacing box of fixedly connected with between two sliders, a plurality of socket has been seted up respectively from top to bottom on the left surface of spacing box and the dorsal surface, be fixed with the sleeve that the opening is downward on the inside top surface of spacing box, telescopic inner chamber top is fixed with the spring, the bottom of spring is connected with downwardly extending's slide bar, the body of rod left side of slide bar is fixed with the spacing of a plurality of type of falling L from top to bottom, the left surface and the dorsal surface of spacing bar are the inclined plane of leanin, be provided with ejection mechanism between spacing box and the linkage groove.
Adopt above-mentioned technical scheme the utility model discloses, compare with prior art, its outstanding characteristics are:
placing two prefabricated wallboards side by side, will be located left prefabricated wallboard and move right, prefabricated wallboard moves and drives the connector link and removes, the connector link gets into spacing box inside through the left side socket of the prefabricated wallboard that is located the right side, the connector link extrudees the inclined plane of spacing strip behind getting into spacing box and makes the slide bar rise, the slide bar rises and compresses the spring, after the inclined plane of spacing strip breaks away from the connector link, the elasticity of spring makes spacing strip descend and block in the connector link, the effect of carrying out quick plane concatenation to two prefabricated wallboards has been reached this moment, ejection mechanism is behind the ejecting prefabricated wallboard of spacing box, the connector link gets into inside the spacing box through the dorsal part socket that is located the prefabricated wallboard on right side, can splice two mutually perpendicular prefabricated wallboards, this structure has effectively saved the manpower, the efficiency of construction has been improved simultaneously.
Preferably, the present invention further provides:
the ejection mechanism includes that the level fixes the threaded rod on spacing box right flank, the right side threaded connection of threaded rod has an internal thread section of thick bamboo, the right-hand member of internal thread section of thick bamboo passes through the bearing piece and is connected with the inner wall rotation of linkage groove, the cover is equipped with first bevel gear on the internal thread section of thick bamboo, set up the square hole that communicates with the linkage groove on the front of prefabricated wallboard, the swivelling joint has the telescopic link in the square hole rotation, the one end of telescopic link stretches into in the linkage groove and fixedly connected with and the second bevel gear of first bevel gear engaged with, be fixed with the stopper with square hole shape adaptation on the other end of telescopic link, the body of rod of slide bar openly is fixed with the traction lever, set up the expansion joint that supplies the traction lever to remove on the front of spacing box.
Sealing rubber pads are arranged on the right side face and the left side face of the back side face of the prefabricated wall board.
Drawings
Fig. 1 is a schematic front view of a prefabricated wall panel of a rapid assembly building component based on a steel structure according to an embodiment of the present invention;
fig. 2 is a schematic structural view of a main view cross section when prefabricated wall panels of a steel structure-based rapid assembly type building component are spliced side by side according to an embodiment of the present invention;
fig. 3 is a schematic top view of a sectional structure of prefabricated wall panels of a steel structure-based rapid-assembly building component during vertical splicing;
fig. 4 is a schematic side view of a stop strip in a steel structure-based rapid-assembly building component according to an embodiment of the present invention;
fig. 5 is a schematic structural view of a limiting box in a steel structure-based rapid-assembly building component according to an embodiment of the present invention;
fig. 6 is a schematic side view of a position-limiting box in a steel structure-based rapid-assembly building component according to an embodiment of the present invention;
labeled as: 1. prefabricating a wallboard; 2. a connecting buckle; 3. a linkage groove; 4. a chute; 5. a slider; 6. a limiting box; 7. a sleeve; 8. a spring; 9. a slide bar; 10. a limiting strip; 11. a socket; 12. a draw bar; 13. a movable opening; 14. an internal threaded barrel; 15. a threaded rod; 16. a first bevel gear; 17. a square hole; 18. a telescopic rod; 19. a second bevel gear; 20. a limiting block; 21. and sealing the rubber gasket.
Detailed Description
The invention will be further described with reference to the following examples, which are intended only for better understanding of the invention and therefore do not limit the scope of the invention.
A rapid assembly type building assembly based on a steel structure comprises a prefabricated wall plate 1, a plurality of U-shaped connecting buckles 2 are fixed on the right side surface of the prefabricated wall plate 1 from top to bottom, a linkage groove 3 is formed in the left side surface of the prefabricated wall plate 1, the height of the linkage groove 3 is slightly smaller than that of the prefabricated wall plate 1, sliding grooves 4 are formed in the top and the bottom of an inner cavity of the linkage groove 3, sliding blocks 5 are connected in the sliding grooves 4 in a sliding mode, a limiting box 6 is fixedly connected between the two sliding blocks 5, a plurality of inserting ports 11 are formed in the left side surface and the back side surface of the limiting box 6 from top to bottom respectively, a sleeve 7 with a downward opening is fixed on the top surface inside the limiting box 6, a spring 8 is fixed on the top of the inner cavity of the sleeve 7, the bottom end of the spring 8 is connected with a sliding rod 9 extending downwards, a plurality of limiting strips 10 in an inverted L shape are fixed on the left side surface and the left side surface of a rod body of the sliding rod 9 from top to bottom, the left side surface and the back side surface of each limiting strip 10 are inclined surfaces inclining inwards, an ejection mechanism is arranged between the limit box 6 and the linkage groove 3.
The ejection mechanism comprises a threaded rod 15 horizontally fixed on the right side surface of the limiting box 6, the right side of the threaded rod 15 is in threaded connection with an internal thread cylinder 14, the right end of the internal thread cylinder 14 is rotatably connected with the inner wall of the linkage groove 3 through a bearing piece, a first bevel gear 16 is sleeved on the internal thread cylinder 14, a square hole 17 communicated with the linkage groove 3 is formed in the front surface of the prefabricated wallboard 1, a telescopic rod 18 is rotatably connected in the rotation of the square hole 17, one end of the telescopic rod 18 extends into the linkage groove 3 and is fixedly connected with a second bevel gear 19 meshed with the first bevel gear 16, a limiting block 20 matched with the square hole 17 in shape is fixed at the other end of the telescopic rod 18, a traction rod 12 is fixed on the front surface of the sliding rod 9, a movable opening 13 for the traction rod 12 to move is formed in the front surface of the limiting box 6, the limiting block 20 is positioned on the same horizontal plane with the prefabricated wallboard 1 when not working, the limiting block 20 is pulled out together with the telescopic rod 18 when working, the telescopic rod 18 is rotated to drive the second bevel gear 19 to rotate, the second bevel gear 19 rotates to drive the internal thread cylinder 14 to rotate through the meshed first bevel gear 16, the internal thread cylinder 14 rotates to drive the threaded rod 15 to move outwards, the threaded rod 15 drives the limiting box 6 to move to the outside of the prefabricated wallboard 1, the limiting strip 10 can be separated from the connecting buckle 2 by upwards pulling the traction rod 12 at the moment, two prefabricated wallboards 1 side by side are disassembled, the connecting buckle 2 is inserted from the socket 11 on the rear side face of the limiting box 6 after the limiting box 6 moves to the outside of the prefabricated wallboard 1, the prefabricated wallboard 1 can be spliced vertically, after the four prefabricated wallboards 1 are spliced into a closed structure, the threaded rod 15 can drive the limiting box 6 to move towards the inside of the linkage groove 3 by rotating the plurality of telescopic rods 18, and the fastening effect is achieved.
Sealing rubber gaskets 21 are arranged on the right side surface and the left side surface of the back side surface of the prefabricated wall panel 1, and the contact surfaces between the prefabricated wall panels 1 can be sealed through the sealing rubber gaskets 21.
Place two prefabricated wallboard 1 side by side, to be located left prefabricated wallboard 1 and remove right, prefabricated wallboard 1 removes and drives connector link 2 and removes, connector link 2 gets into spacing box 6 inside through the socket 11 that is located the prefabricated wallboard 1 left surface on right side, connector link 2 gets into inside the spacing box 6 the inclined plane of back extrusion spacing 10 makes slide bar 9 rise, slide bar 9 rises and compresses spring 8, after the inclined plane of spacing 10 breaks away from connector link 2, spring 8's elasticity makes spacing 10 descend and block into in the connector link 2, the effect of carrying out quick plane concatenation to two prefabricated wallboard 1 has been reached this moment, the manpower has effectively been saved to this structure, the efficiency of construction has been improved simultaneously.
The above description is only a preferred and practical embodiment of the present invention, and not intended to limit the scope of the present invention, and all equivalent variations made by using the contents of the specification and the drawings are included in the scope of the present invention.
Claims (3)
1. The utility model provides a rapid Assembly formula building element based on steel construction, includes prefabricated wallboard, its characterized in that: the connector link of a plurality of U type is fixed with from top to bottom on the right flank of prefabricated wallboard, the linkage groove has been seted up on the left surface of prefabricated wallboard, the spout has all been seted up to the top and the bottom of linkage inslot chamber, sliding connection has the slider in the spout, the spacing box of fixedly connected with between two sliders, a plurality of socket has been seted up respectively from top to bottom on the left surface of spacing box and the dorsal surface, be fixed with the downward sleeve of opening on the top surface of spacing box inside, telescopic inner chamber top is fixed with the spring, the bottom of spring is connected with downwardly extending's slide bar, the body of rod left side of slide bar is fixed with the spacing of a plurality of type of falling L from top to bottom, the left surface and the dorsal surface of spacing strip are the inclined plane of leanin, be provided with ejection mechanism between spacing box and the linkage groove.
2. The steel structure based quick-fit building component of claim 1, wherein: the ejection mechanism includes that the level fixes the threaded rod on spacing box right flank, the right side threaded connection of threaded rod has an internal thread section of thick bamboo, the right-hand member of internal thread section of thick bamboo passes through the bearing piece and is connected with the inner wall rotation of linkage groove, the cover is equipped with first bevel gear on the internal thread section of thick bamboo, set up the square hole that communicates with the linkage groove on the front of prefabricated wallboard, the swivelling joint has the telescopic link in the square hole rotation, the one end of telescopic link stretches into in the linkage groove and fixedly connected with and the second bevel gear of first bevel gear engaged with, be fixed with the stopper with square hole shape adaptation on the other end of telescopic link, the body of rod of slide bar openly is fixed with the traction lever, set up the expansion joint that supplies the traction lever to remove on the front of spacing box.
3. The steel structure based quick-fit building component of claim 1, wherein: sealing rubber pads are arranged on the right side face and the left side face of the back side face of the prefabricated wall board.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221644655.9U CN217517819U (en) | 2022-06-29 | 2022-06-29 | Rapid Assembly formula building components based on steel construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221644655.9U CN217517819U (en) | 2022-06-29 | 2022-06-29 | Rapid Assembly formula building components based on steel construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217517819U true CN217517819U (en) | 2022-09-30 |
Family
ID=83394381
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221644655.9U Active CN217517819U (en) | 2022-06-29 | 2022-06-29 | Rapid Assembly formula building components based on steel construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217517819U (en) |
-
2022
- 2022-06-29 CN CN202221644655.9U patent/CN217517819U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111075128B (en) | Assembled wallboard coupling assembling | |
CN110978169B (en) | Automatic patching device of wooden furniture | |
CN112127578A (en) | Energy-saving environment-friendly building wallboard installation structure and construction method | |
CN217517819U (en) | Rapid Assembly formula building components based on steel construction | |
CN116220239A (en) | Assembled shear wall building structure and construction method thereof | |
CN114991312A (en) | Rapid Assembly formula building components based on steel construction | |
CN210164269U (en) | A perps mortar laying device for building construction is built by laying bricks or stones | |
CN211495630U (en) | Hydraulic lifting conveying frame | |
CN214302234U (en) | Quick connecting piece for assembly type building | |
CN113718986A (en) | Simplify assembled wall component of construction | |
CN219032964U (en) | Steel form for bridge concrete | |
CN108637979B (en) | Portable hardware hammer | |
CN113931302B (en) | Anti-seismic support column for assembled building | |
CN217814320U (en) | Spliced hollow plate gasket | |
CN206054629U (en) | Flat push type synchronous clamping and the linear module with flat push type synchronous clamping | |
CN214739243U (en) | Wallboard structure of assembled factory building | |
CN219411305U (en) | Assembled steel construction outer wall connection structure | |
CN214738931U (en) | Assembled building structure heat-insulation board | |
CN118167177A (en) | Composite solid wood door component and composite solid wood manufacturing method thereof | |
CN220318779U (en) | Low-carbon energy-saving steel structure integrated house | |
CN213268682U (en) | Anti-seepage splicing structure for mosaic paving and pasting base layer unit | |
CN205564881U (en) | Full -automatic sealing machine | |
CN218716265U (en) | Mortise and tenon structure assembled door of being convenient for | |
CN212892809U (en) | Small storage bin for jig | |
CN220014098U (en) | Composite wall structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |