CN217501167U - Device is demolishd to scattered building - Google Patents

Device is demolishd to scattered building Download PDF

Info

Publication number
CN217501167U
CN217501167U CN202221235280.0U CN202221235280U CN217501167U CN 217501167 U CN217501167 U CN 217501167U CN 202221235280 U CN202221235280 U CN 202221235280U CN 217501167 U CN217501167 U CN 217501167U
Authority
CN
China
Prior art keywords
threaded rod
slider
guide rail
fixedly connected
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221235280.0U
Other languages
Chinese (zh)
Inventor
林飞
王琴
高贇芳
王展
游银花
余奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Xiangda Construction Co ltd
Original Assignee
Zhejiang Xiangda Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Xiangda Construction Co ltd filed Critical Zhejiang Xiangda Construction Co ltd
Priority to CN202221235280.0U priority Critical patent/CN217501167U/en
Application granted granted Critical
Publication of CN217501167U publication Critical patent/CN217501167U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a device is demolishd to sporadic building, including strutting arrangement, adjusting device, dust extraction, strutting arrangement is located the bottom, adjusting device is located strutting arrangement upper portion, dust extraction is fixed in the strutting arrangement edge, adjusting device includes upper and lower adjustment mechanism and front and back adjustment mechanism, upper and lower adjustment mechanism includes the backup pad, motor one, guide rail one, threaded rod one, slider one, guide rail one is fixed in backup pad upper portion and is vertical setting, motor one is located guide rail one bottom and with backup pad fixed connection, threaded rod one is vertical setting and threaded rod one bottom and a motor fixed connection, the top is rotated with a guide rail top and is connected, the threaded rod is located to slider one end cover and threaded rod threaded connection, slider one is located slide in guide rail one, front and back adjustment mechanism is located inside the slider. The utility model discloses an adjusting device makes the workman can be located the best position and demolishs the operation.

Description

Device is demolishd to sporadic building
Technical Field
The utility model relates to a building dismouting equipment, in particular to device is demolishd to sporadic building.
Background
With the continuous development of the industrialized modernization, the urbanization process is accelerated, and a plurality of cities have the problem of over-concentration of population, so that more and more buildings with higher heights have to be built to meet the living and working requirements of a large number of population. However, the urban expansion speed is limited, and many buildings become old and need to be eliminated, so that many old buildings need to be dismantled and rebuilt, such as reinforced concrete buildings, steel structure buildings, chimneys, cooling towers and the like.
The method is characterized in that the method commonly used in the process of demolishing the building comprises three forms of blasting demolition, mechanical demolition and manual demolition, wherein the blasting demolition is often used for demolishing a large-range or firm building, the mechanical demolition is used for fixed-point demolition in a compact building in an urban area, and for demolition of sporadic buildings, a manual demolition mode is often adopted, and in the process of manual demolition, the problem that how to enable a person to approach the building as far as possible and more easily demolish the building on the premise of ensuring the manual safety is urgently needed to be solved.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a device is demolishd to sporadic building has the effect of demolising swift efficient.
The above technical object of the present invention can be achieved by the following technical solutions:
a scattered building demolishing device comprises a supporting device, an adjusting device and a dust collecting device, wherein the supporting device is arranged at the bottom, the adjusting device is provided with a plurality of adjusting devices, the adjusting devices are equidistantly arranged on the upper portion of the supporting device, the dust collecting device is fixed at the edge of the supporting device, the adjusting device comprises an upper adjusting mechanism, a lower adjusting mechanism and a front adjusting mechanism, the upper adjusting mechanism and the lower adjusting mechanism comprise a supporting plate, a motor I, a guide rail I, a threaded rod I and a sliding block I, the supporting plate is fixed with the supporting device through bolts, the guide rail I is fixed on the upper portion of the supporting plate and is vertically arranged, the motor I is arranged at the bottom of the guide rail I and is fixedly connected with the supporting plate, the threaded rod I is vertically arranged, the bottom of the threaded rod I is fixedly connected with the motor I, the top of the guide rail I is rotatably connected, and the sliding block I is sleeved on the threaded rod I and is in threaded connection with the threaded rod, the first sliding block is located in the first guide rail to slide, and the front-back adjusting mechanism is located inside the first sliding block.
By adopting the technical scheme, the adjusting device is arranged for adjustment, the height of a worker is adjusted through the upper adjusting mechanism and the lower adjusting mechanism, and the distance between the worker and the dismounting device is adjusted through the front adjusting mechanism and the rear adjusting mechanism, so that the worker can always keep a proper position for dismounting, and the dismounting efficiency and the dismounting safety are improved.
As preferred, front and back adjustment mechanism includes motor two, threaded rod two, guide rail two, slider two, slide rail two has been seted up to slider one inside, motor two is located two one ends of slide rail and with two fixed connection of slide rail, the threaded rod is located inside the slide rail two, just threaded rod two is the level setting, two one ends of threaded rod with two fixed connection of motor, the other end with slide rail both ends rotate to be connected, two lower pot heads of slider are located threaded rod two and with two threaded connection of threaded rod, slider two is in slide on the slide rail two.
By adopting the technical scheme, the second motor drives the second sliding block to move, so that the second sliding block can adjust the distance between the second sliding block and a building in the horizontal direction, and a worker can be located at a proper position to remove the second sliding block more accurately and safely.
Preferably, the upper part of the second sliding block is in a groove shape for people to stand, and one end of the groove is provided with an elastic safety belt for protection.
By adopting the technical scheme, the groove is arranged for workers to stand, so that the workers can smoothly dismantle, and the safety of the workers during working is ensured by arranging the safety belt.
Preferably, the supporting device comprises two semicircular supporting frames, a connecting sheet, supporting sheets and a grounding bolt, the two semicircular supporting frames are fixedly connected through the connecting sheet bolt, the edge of each semicircular supporting frame is fixedly connected with the supporting sheets, and the supporting sheets are fixedly connected with the ground through the grounding bolt.
By adopting the technical scheme, the two semicircular supporting frames are fixedly connected to form a circular supporting area for the stable arrangement of the adjusting device on the upper part.
Preferably, the air cylinder further comprises an arc-shaped adjusting frame and two air cylinders, wherein the bottom of the semicircular supporting frame is provided with a groove, the two air cylinders are respectively positioned at two ends of the groove and fixedly connected with the groove, and the arc-shaped adjusting frame is positioned in the groove and fixedly connected with the air cylinder.
By adopting the technical scheme, the range of the supporting area is adjusted by arranging the arc-shaped adjusting frame, so that the distance between the adjusting device and a building can be adjusted.
Preferably, dust extraction includes dust absorption pipe, fan, the fan is located the outer edge of semicircle support frame and with semicircle support frame fixed connection, dust absorption pipe one end with fan fixed connection, the other end is located in the semicircle support frame circle, dust absorption pipe tip fixedly connected with filter screen.
Adopt above-mentioned technical scheme, in time absorb the dust that the object splashes that drops when dismantling through setting up dust extraction, avoid influencing the surrounding environment to set up the filter screen on the dust absorption pipe and filter debris such as small stone, avoid it to carry out dust absorption pipe and cause dust extraction's damage to influence dust collection effect.
Drawings
FIG. 1 is a schematic structural diagram of an embodiment;
FIG. 2 is a schematic view of the position of the support sheet;
FIG. 3 is a schematic view of an arc-shaped adjustment of valence position;
FIG. 4 is a schematic structural view of an up-down adjusting mechanism;
fig. 5 is a schematic structural view of the front-rear adjusting mechanism.
Reference numerals: 1. a support device; 2. a fan; 3. a dust collection pipe; 4. an adjustment device; 5. a filter screen; 6. a support sheet; 7. a ground bolt; 8. a semicircular supporting frame; 9. connecting sheets; 10. a groove; 11. an arc-shaped adjusting frame; 12. a cylinder; 13. a first motor; 14. a first threaded rod; 15. a first sliding block; 16. a first guide rail; 17. a support plate; 18. a second guide rail; 19. a second motor; 20. a second threaded rod; 21. a second sliding block; 22. a safety belt.
Detailed Description
The following is only the preferred embodiment of the present invention, the protection scope is not limited to this embodiment, and all technical solutions belonging to the idea of the present invention should belong to the protection scope of the present invention. It should also be noted that modifications and embellishments within the scope of the present disclosure may be made by those skilled in the art without departing from the principles of the present disclosure.
As shown in fig. 1 to 5, a device for demolishing a sporadic building comprises a supporting device 1, an adjusting device 4 and a dust suction device, wherein as shown in fig. 1, the supporting device 1 is positioned at the bottom, the adjusting device 4 is positioned at the upper part of the supporting device 1, the dust suction device is fixed at the edge of the supporting device 1, and the adjusting device 4 comprises an up-down adjusting mechanism and a front-back adjusting mechanism.
As shown in the attached drawing 4, the up-down adjusting mechanism comprises a supporting plate 17, a first motor 13, a first guide rail 16, a first threaded rod 14 and a first slider 15, the supporting plate 17 is fixed with the supporting device 1 through bolts, the first guide rail 16 is fixed on the upper portion of the supporting plate 17 and is vertically arranged, the first motor 13 is located at the bottom of the first guide rail 16 and is fixedly connected with the supporting plate 17, the first threaded rod 14 is vertically arranged, the bottom of the first threaded rod 14 is fixedly connected with the first motor 13, the top of the first guide rail 16 is rotatably connected with the top of the first guide rail, one end of the first slider 15 is sleeved on the threaded rod and is in threaded connection with the threaded rod, the first slider 15 is located in the first guide rail 16 to slide, and the front-back adjusting mechanism is located inside the first slider 15.
As shown in fig. 5, the front-back adjusting mechanism includes a second motor 19, a second threaded rod 20, a second guide rail 18 and a second slider 21, a second sliding rail is arranged inside the first slider 15, the second motor 19 is located at one end of the second sliding rail and fixedly connected with the second sliding rail, the threaded rod is located inside the second sliding rail, the second threaded rod 20 is horizontally arranged, one end of the second threaded rod 20 is fixedly connected with the second motor 19, the other end of the second threaded rod is rotatably connected with two end portions of the sliding rail, the second threaded rod 20 is sleeved on the lower portion of the second slider 21 and is in threaded connection with the second threaded rod 20, and the second slider 21 slides on the second sliding rail.
The upper portion of the second sliding block 21 is a groove 10 for a person to stand, one end of the groove 10 is provided with an elastic safety belt 22 for protection, the groove 10 is arranged for a worker to stand, the worker can be detached smoothly, and safety of the worker during working is ensured by arranging the safety belt 22.
With fig. 3, strutting arrangement 1 includes half support frame 8, connection piece 9, backing sheet 6, earth bolt 7, half support frame 8 is provided with two, and it is fixed through connection piece 9 bolted connection between two half support frames 8, a plurality of backing sheets 6 of 8 marginal fixedly connected with of half support frame, backing sheet 6 passes through earth bolt 7 and ground fixed connection, recess 10 has been seted up to half support frame 8 bottom, cylinder 12 is provided with two, be located respectively recess 10 both ends and with recess 10 fixed connection, arc alignment jig 11 is located recess 10 and 11 both ends of arc alignment jig and cylinder 12 fixed connection.
First, a circular supporting area is formed by fixedly connecting the two semicircular supporting frames 8, the adjusting device 4 on the upper portion of the circular supporting area can be stably arranged, and when the position of the adjusting device 4 is far away from the position of a building, the range of the supporting area is adjusted by arranging the arc-shaped adjusting frame 11, so that the distance between the adjusting device 4 and the building can be adjusted.
As shown in the attached drawing 1, the dust collection device comprises a dust collection pipe 3 and a fan 2, wherein the fan 2 is positioned at the outer edge of a semicircular support frame 8 and is fixedly connected with the semicircular support frame 8, one end of the dust collection pipe 3 is fixedly connected with the fan 2, the other end of the dust collection pipe is positioned in an 8-ring semicircular support frame, and the end part of the dust collection pipe 3 is fixedly connected with a filter screen 5; through setting up dust extraction and in time absorbing the dust that the object that drops splashes when demolising, avoid influencing the surrounding environment to set up filter screen 5 on dust absorption pipe 3 and filter debris such as small stone, avoid it to carry out dust absorption pipe 3 and cause dust extraction's damage to influence dust collection effect.
When needs demolish, with two semi-circular support frames reciprocal anchorage, rethread backing sheet 6 and earth bolt 7 are fixed in the bottom surface with semi-circular support frame, if the building takes up an area of lessly, can open arc adjusting bracket 11 through starting cylinder 12, be fixed in on arc adjusting bracket 11 adjusting device 4, if do not need then directly be fixed in on the semi-circular support frame adjusting device 4, adjust workman's upper and lower position and front and back position through first motor 13 and second motor 19 of adjusting device 4, make the workman can be in suitable position all the time and demolish the work, thereby set up a plurality of adjusting device 4 and realize multi-direction synchronous working, and the efficiency is improved.
The utility model discloses a set up adjusting device 4 and adjust, through upper and lower adjustment mechanism adjustment workman's height, adjustment mechanism adjusts the workman and demolishs the distance between the device through the front and back for the workman can remain suitable position throughout and demolish, thereby improves the efficiency and the security of demolising.

Claims (6)

1. A scattered building demolishing device comprises a supporting device (1), an adjusting device (4) and a dust collecting device, and is characterized in that the supporting device (1) is located at the bottom, the adjusting device (4) is provided with a plurality of adjusting devices, the adjusting devices are located on the upper portion of the supporting device (1) at equal intervals, the dust collecting device is fixed at the edge of the supporting device (1), each adjusting device (4) comprises an upper adjusting mechanism, a lower adjusting mechanism and a front and back adjusting mechanism, each upper adjusting mechanism and the lower adjusting mechanism comprise a supporting plate (17), a motor I (13), a guide rail I (16), a threaded rod I (14) and a sliding block I (15), the supporting plate (17) is fixed with the supporting device (1) through bolts, the guide rail I (16) is fixed on the upper portion of the supporting plate (17) and is vertically arranged, the motor I (13) is located at the bottom of the guide rail I (16) and is fixedly connected with the supporting plate (17), threaded rod one (14) is vertical setting just threaded rod one (14) bottom with motor one (13) fixed connection, the top with guide rail one (16) top is rotated and is connected, slider one (15) pot head is located the threaded rod and with threaded rod threaded connection, slider one (15) are located slide in guide rail one (16), front and back adjustment mechanism is located inside slider one (15).
2. The sporadic building demolishing device of claim 1, wherein the front and back adjustment mechanism includes a second motor (19), a second threaded rod (20), a second guide rail (18), and a second slider (21), the first slider (15) has a second slide rail, the second motor (19) is located at one end of the second slide rail and is fixedly connected to the second slide rail, the threaded rod is located inside the second slide rail, the second threaded rod (20) is horizontally disposed, one end of the second threaded rod (20) is fixedly connected to the second motor (19), the other end is rotatably connected to two end portions of the slide rail, the lower portion of the second slider (21) is sleeved on the second threaded rod (20) and is in threaded connection with the second threaded rod (20), and the second slider (21) slides on the second slide rail.
3. The sporadic building demolition device according to claim 2, wherein the upper part of the second sliding block (21) is in the shape of a groove (10) for people to stand, and one end of the groove (10) is provided with an elastic safety belt (22) for protection.
4. The sporadic building dismantling device according to claim 3, characterized in that said support device (1) comprises two semicircular support frames (8), two connecting pieces (9), two support pieces (6), and a grounding bolt (7), said two semicircular support frames (8) are connected and fixed by bolts through the connecting pieces (9), said edges of the semicircular support frames (8) are fixedly connected with the plurality of support pieces (6), and said support pieces (6) are fixedly connected with the ground through the grounding bolt (7).
5. The sporadic building demolishing device of claim 4, further comprising an arc-shaped adjusting bracket (11) and two air cylinders (12), wherein a groove (10) is formed in the bottom of the semicircular supporting frame (8), the two air cylinders (12) are respectively located at two ends of the groove (10) and fixedly connected with the groove (10), the arc-shaped adjusting bracket (11) is located in the groove (10), and two ends of the arc-shaped adjusting bracket (11) are fixedly connected with the air cylinders (12).
6. The sporadic building demolishing device of claim 5, wherein, dust extraction includes dust absorption pipe (3), fan (2) be located semicircle support frame (8) outer edge and with semicircle support frame (8) fixed connection, dust absorption pipe (3) one end with fan (2) fixed connection, the other end is located semicircle support frame (8) circle, dust absorption pipe (3) tip fixedly connected with filter screen (5).
CN202221235280.0U 2022-05-21 2022-05-21 Device is demolishd to scattered building Active CN217501167U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221235280.0U CN217501167U (en) 2022-05-21 2022-05-21 Device is demolishd to scattered building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221235280.0U CN217501167U (en) 2022-05-21 2022-05-21 Device is demolishd to scattered building

Publications (1)

Publication Number Publication Date
CN217501167U true CN217501167U (en) 2022-09-27

Family

ID=83354241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221235280.0U Active CN217501167U (en) 2022-05-21 2022-05-21 Device is demolishd to scattered building

Country Status (1)

Country Link
CN (1) CN217501167U (en)

Similar Documents

Publication Publication Date Title
CN217501167U (en) Device is demolishd to scattered building
CN212201580U (en) Safety warning identification means and safety protective guard for civil engineering thereof
CN111745488A (en) Movable multifunctional wall body finishing machine
CN213806482U (en) Combined scaffold for construction site
CN217151386U (en) Simple manual self-descending type chimney dismantling device
CN213703686U (en) Inclination perforating device with adjustable
CN213742193U (en) Support for house building engineering
CN217431124U (en) Air inlet of dust collector
CN218342530U (en) Municipal administration ceramic tile cutting device
CN216840611U (en) Stair template device for house construction
CN218658973U (en) Operation panel of bridge crane maintenance usefulness
CN210436348U (en) Use concrete block machine of environmental protection
CN218195639U (en) Punching device convenient to maintain
CN219672034U (en) Scaffold with automatic discharging function for building construction
CN219365338U (en) Supporting device
CN216540956U (en) Electrified helmet lens drilling equipment
CN219608209U (en) Protection device of noise detector for construction site
CN117245791B (en) Concrete block cutting device and method
CN217317322U (en) Deburring device for iron hammer production
CN217224940U (en) Building templates surface prosthetic devices
CN217166559U (en) Building engineering drilling equipment
CN211590807U (en) Ceramic tile cutting device for building engineering
CN209873464U (en) Novel guide rail for rapidly assembling machine head of relay well replacement pipe jacking machine
CN219630862U (en) Water-free dust treatment device
CN213016378U (en) Tunnel concrete defect renovates multi-functional equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A sporadic building demolition device

Effective date of registration: 20230821

Granted publication date: 20220927

Pledgee: Zhejiang Hecheng Rural Commercial Bank Co.,Ltd.

Pledgor: ZHEJIANG XIANGDA CONSTRUCTION Co.,Ltd.

Registration number: Y2023980053032

PE01 Entry into force of the registration of the contract for pledge of patent right