CN217461548U - High-fluidity mortar paving device - Google Patents

High-fluidity mortar paving device Download PDF

Info

Publication number
CN217461548U
CN217461548U CN202221043156.4U CN202221043156U CN217461548U CN 217461548 U CN217461548 U CN 217461548U CN 202221043156 U CN202221043156 U CN 202221043156U CN 217461548 U CN217461548 U CN 217461548U
Authority
CN
China
Prior art keywords
material frame
plate
front side
high fluidity
limit baffle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221043156.4U
Other languages
Chinese (zh)
Inventor
庄中海
张斌
徐海峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Bohong New Material Co ltd
Original Assignee
Zhejiang Bohong New Material Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Bohong New Material Co ltd filed Critical Zhejiang Bohong New Material Co ltd
Priority to CN202221043156.4U priority Critical patent/CN217461548U/en
Application granted granted Critical
Publication of CN217461548U publication Critical patent/CN217461548U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a high fluidity mortar device that paves, including the material frame, the material frame is the rectangular frame structure, the front side of material frame is equipped with the fixed plate, the front side of fixed plate is connected with the clamp plate, the rear side of material frame is equipped with the gyro wheel, the gyro wheel has two and bilateral symmetry to set up, the left and right sides of material frame is equipped with limit baffle, two respectively limit baffle's interval and the width phase-match of brick wall, the structure of this device is comparatively simple so manufacturing cost is lower, and the user mode is comparatively convenient simultaneously, can help the workman to accomplish the mortar of brick wall aspect and pave, paves evenly, raises the efficiency greatly in addition, reduces workman intensity of labour.

Description

High-fluidity mortar paving device
Technical Field
The utility model relates to a construction machinery technical field specifically is a high fluidity mortar device that paves.
Background
The wall body of present construction is built by laying bricks or stones and is mainly relied on artifically, the workman's successive layer piles up the wall brick and builds a wall, need the mortar of paving between the upper and lower two-layer brick wall, constructor carries out the mortar on the brick wall of lower floor with simple and easy instruments such as shovel usually by hand and paves, lean on the range estimation and the mode of paining by hand leads to the thickness that the mortar paved and the homogeneous degree all to produce great error easily, the quality is built by laying bricks or stones in the influence, this kind of mode also comparatively consumes workman's physical power in addition, make whole wall efficiency of building lower, consequently, it paves the device in order to solve above technical problem to be necessary to design a mortar.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model relates to a high mobility mortar device of paving, this simple structure, reliable has effectively solved above-mentioned technical problem, is fit for using widely, in order to realize above-mentioned purpose, the utility model discloses a following technical scheme realizes:
the utility model provides a high fluidity mortar device that paves, includes the material frame, the material frame is the rectangular frame structure, the front side of material frame is equipped with the fixed plate, the front side of fixed plate is connected with the clamp plate, the rear side of material frame is equipped with the gyro wheel, the gyro wheel has two and bilateral symmetry to set up, the left and right sides of material frame is equipped with limit baffle, two respectively limit baffle's interval and the width phase-match of brick wall.
On the basis of the above scheme and as a preferable scheme of the scheme: the front side of the material frame is also provided with a handle, the handle is fixed on the front side of the material frame in a welding mode, and the handle is positioned above the fixing plate.
On the basis of the above scheme and as a preferable scheme of the scheme: the left side and the right side of the material frame are symmetrically provided with extension plates, each extension plate is provided with two threaded holes at intervals, a connecting plate is arranged above each extension plate and provided with two adjusting holes, each adjusting hole is internally provided with a bolt in an inserted manner, a screw rod of each bolt penetrates through the adjusting hole and then is in threaded connection with one threaded hole, and the top of each limit baffle is fixedly connected with the corresponding extension plate.
On the basis of the above scheme and as a preferable scheme of the scheme: a funnel part is arranged above the material frame.
On the basis of the above scheme and as a preferable scheme of the scheme: the bottom of the pressing plate is provided with an inclined part which inclines to one side far away from the frame.
Compared with the prior art, the utility model outstanding and profitable technological effect is: the structure of this device is comparatively simple consequently manufacturing cost is lower, and the using-way is comparatively convenient simultaneously, can help the workman to accomplish the mortar of brick wall aspect and pave, paves evenly, raises the efficiency greatly in addition, reduces workman intensity of labour.
Drawings
FIG. 1 is a schematic view of a first perspective of the overall structure;
FIG. 2 is a schematic view of the overall structure from a second perspective;
FIG. 3 is a schematic cross-sectional view of a platen;
fig. 4 is a schematic diagram of a process of use.
Detailed Description
In order to make the purpose, technical solutions and advantages of the present application clearer, the technical solutions in the embodiments will be clearly and completely described below with reference to the drawings in the embodiments, however, the specific embodiments and embodiments described below are only for illustrative purposes and are not intended to limit the present invention.
In the description of the present invention, it is to be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the directions or positional relationships shown in fig. 1, and are only for convenience of description of the present invention, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the description of the present application, the terms "first", "second", and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implying any number of technical features indicated.
The wall body masonry of the present building construction mainly depends on manual work, workers pile up wall bricks layer by layer to build a wall, mortar needs to be paved between an upper layer of brick wall and a lower layer of brick wall, constructors generally pave the mortar on the lower layer of brick wall by simple tools such as a shovel and the like manually, the mode of leaning on visual inspection and manual painting causes that great errors are easily generated on the thickness and the uniformity of the mortar pavement, the masonry quality is influenced, in addition, the mode also consumes the physical strength of the workers, the whole wall building efficiency is lower, in order to solve the technical problems, as shown in figures 1-4, the utility model relates to a high-fluidity mortar paving device, which comprises a material frame 1, wherein the material frame 1 is in a rectangular frame structure, the material frame 1 is made of metal materials, the structural strength is ensured, and the material frame 1 has good anti-deformation capacity, a fixed plate 2 is arranged at the front side of the material frame 1, and a pressing plate 3 is connected at the front side of the fixed plate 2, the clamp plate 3 is preferably connected with the fixed plate 2 through the mode of screwed connection, the dismouting of the clamp plate 3 of being convenient for to be convenient for change the clamp plate 3 that has different width, the rear side of material frame 1 is equipped with gyro wheel 4, gyro wheel 4 has two and bilateral symmetry to set up, and gyro wheel 4 installs in the support, and the removal of the device of being convenient for of setting up of gyro wheel 4 reduces the resistance, the left and right sides of material frame 1 is equipped with limit baffle 5 respectively, and limit baffle 5 and clamp plate 3 mutually perpendicular, two limit baffle 5's interval and brick wall 7's width phase-match, therefore two limit baffle 5 can just in time laminate and carry on spacingly at the both sides face of brick wall 7, thereby prescribe a limit to the moving direction of this device on brick wall 7, avoid moving askewly.
In this embodiment, it is further preferable that a handle 6 is further disposed on the front side of the material frame 1, the handle 6 is fixed on the front side of the material frame 1 by welding, the handle 6 is located above the fixing plate 2, and when the material frame is used, a worker can advance the front end of the material frame 1 by the handle 6, so that a gap can be left between the front side of the material frame 1 and the brick wall 7.
In this embodiment, it is further preferable that the left and right sides of the material frame 1 are symmetrically provided with extension plates 8, each extension plate 8 is provided with two threaded holes at intervals, a connecting plate 9 is arranged above the extending plate 8, the connecting plate 9 is provided with two adjusting holes 10, a bolt 11 is inserted into each adjusting hole 10, the screw of the bolt 11 is connected with a threaded hole after passing through the adjusting hole 10, the top of the limit baffle 5 is fixedly connected with the extension plate 8, the connecting plate 9 can move along the length direction of the adjusting hole 10 by loosening the bolt 11, the bolt 11 can be screwed to fix the position of the connecting plate 9 after the distance between the two limit baffles 5 is adjusted to adapt to the width of the brick wall 7, thereby make limit baffle 5's rigidity, prevent its removal, it is convenient to adjust, increases this device's adaptability.
In the embodiment, it is further preferable that a funnel part 12 is arranged above the material frame 1, a flared opening is arranged above the funnel part 12, and the arrangement of the funnel part 12 facilitates the mortar adding process and prevents leakage.
In this embodiment, it is further preferable that the bottom of the pressing plate 3 is provided with an inclined portion 13, the inclined portion 13 is inclined to a side away from the frame, and since the paving device moves backward when in use, the inclined portion 13 is arranged in such a manner that the resistance during movement can be reduced.
In this embodiment, it is further preferable that the front side of the pressing plate 3 is further provided with a plurality of reinforcing ribs to ensure the structural strength of the pressing plate 3 and prevent the pressing plate from deforming under stress.
The specific use method comprises the following steps: as shown in figure 4, the device is placed on a lower-layer brick wall 7 which is well piled up, the limiting baffle plates 5 on two sides are attached to the side faces of the brick wall 7, a worker can add mortar into the inner side of the material frame 1 from the funnel part 12, after the mortar is added, the worker can lift the front side of the material frame 1 through the handle 6 to leave a gap, then the worker can pull the device backwards to move, the mortar can be uniformly spread on the brick wall 7 through the pressing plate 3, and the paving efficiency is greatly improved.
It should be noted that the technical features of the roller, the threaded connection, etc. related to the present invention should be regarded as the prior art, and the specific structure, the operation principle, the control mode and the spatial arrangement mode of these technical features may be selected conventionally in the field, and should not be regarded as the invention of the present invention, and the detailed description of the present invention is not further specifically made.
The above-mentioned embodiment is only the preferred embodiment of the present invention, and does not limit the protection scope of the present invention according to this, so: all equivalent changes made by the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (5)

1. The utility model provides a high fluidity mortar paving device which characterized in that: including the material frame, the material frame is the rectangular frame structure, the front side of material frame is equipped with the fixed plate, the front side of fixed plate is connected with the clamp plate, the rear side of material frame is equipped with the gyro wheel, the gyro wheel has two and bilateral symmetry to set up, the left and right sides of material frame is equipped with limit baffle, two respectively limit baffle's interval and the width phase-match of brick wall.
2. A high fluidity mortar paving apparatus according to claim 1, wherein: the front side of the material frame is also provided with a handle, the handle is fixed on the front side of the material frame in a welding mode, and the handle is positioned above the fixing plate.
3. A high fluidity mortar paving apparatus according to claim 1, wherein: the left side and the right side of the material frame are symmetrically provided with extension plates, each extension plate is provided with two threaded holes at intervals, a connecting plate is arranged above each extension plate and provided with two adjusting holes, each adjusting hole is internally provided with a bolt in an inserted manner, a screw rod of each bolt penetrates through the adjusting hole and then is in threaded connection with one threaded hole, and the top of each limit baffle is fixedly connected with the corresponding extension plate.
4. A high fluidity mortar paving apparatus according to claim 1, wherein: a funnel part is arranged above the material frame.
5. A high fluidity mortar paving apparatus according to claim 1, wherein: the bottom of the pressing plate is provided with an inclined part which inclines to one side far away from the frame.
CN202221043156.4U 2022-04-29 2022-04-29 High-fluidity mortar paving device Active CN217461548U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221043156.4U CN217461548U (en) 2022-04-29 2022-04-29 High-fluidity mortar paving device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221043156.4U CN217461548U (en) 2022-04-29 2022-04-29 High-fluidity mortar paving device

Publications (1)

Publication Number Publication Date
CN217461548U true CN217461548U (en) 2022-09-20

Family

ID=83274484

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221043156.4U Active CN217461548U (en) 2022-04-29 2022-04-29 High-fluidity mortar paving device

Country Status (1)

Country Link
CN (1) CN217461548U (en)

Similar Documents

Publication Publication Date Title
CN110656783A (en) High-precision portable horizontal laying device for masonry mortar
CN105672632A (en) Adjustable distance and perpendicularity based exposed corner guard board sand-lime dressing system and construction method
CN110397291A (en) A kind of fast placing box-shaped spatula tool
CN217461548U (en) High-fluidity mortar paving device
CN211037802U (en) All-steel support reinforced template system
CN207032897U (en) A kind of brick wall cement quickly lays instrument
CN112324168B (en) Wall building method and system based on cooperative plastering and brick building
CN110607905A (en) All-steel support reinforced formwork system and construction method
CN212154211U (en) Adjustable slurry spreading device
CN217680664U (en) Device for paving mortar
CN216305437U (en) Masonry mortar laying hopper car
CN207295770U (en) A kind of finished product concrete fetal membrane and molding die
JPH0586729A (en) Concrete tamping and leveling robot
CN106958353B (en) Spread thick liquid device with reel
CN205369858U (en) External corner backplate sand -lime system of maintaining based on but roll adjustment and straightness that hangs down
CN211974408U (en) Mortar paving device
CN110984598A (en) Ash paving device for different masonry structures
CN211775929U (en) Ash paving device for different masonry structures
CN209620638U (en) A kind of accurate control mold of masonry project horizontal mortar joint
CN210659150U (en) Trowel with mud
CN215212460U (en) Mortar spreading equipment for building brick wall
CN212715999U (en) Plastering mould
CN216109562U (en) Novel plastering and groove scraping tool
CN112302354A (en) Building auxiliary fixtures that lays bricks
CN212613857U (en) Brick-laying mortar paver

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant