CN217419672U CN202123390546.7U CN202123390546U CN217419672U CN 217419672 U CN217419672 U CN 217419672U CN 202123390546 U CN202123390546 U CN 202123390546U CN 217419672 U CN217419672 U CN 217419672U
Authority
CN
China
Prior art keywords
device shell
side device
gas pipeline
fixedly connected
pipeline construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123390546.7U
Other languages
Chinese (zh)
Inventor
康永
杨兴元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongchuan Zhiyuan Gas Engineering Co ltd
Original Assignee
Tongchuan Zhiyuan Gas Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongchuan Zhiyuan Gas Engineering Co ltd filed Critical Tongchuan Zhiyuan Gas Engineering Co ltd
Priority to CN202123390546.7U priority Critical patent/CN217419672U/en
Application granted granted Critical
Publication of CN217419672U publication Critical patent/CN217419672U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model relates to the technical field of gas pipeline laying, in particular to an earthing backfilling device for gas pipeline construction, which comprises a left device shell, a right device shell and a solid roller, a left side device shell is arranged on the left side of the right side device shell, a solid roller is arranged between the right side device shell and the left side device shell, the middle of the solid roller is fixedly connected with a fixed shaft, the outer sides of the two ends of the fixed shaft are rotatably connected with the fixed bracket, in the utility model, after the pipeline is laid by the crushing impeller, the solid roller, the left device shell and the right device shell, the backfilled covering soil can be crushed in time while the backfilled covering soil is backfilled quickly, so that the gallery is compacted conveniently, can improve the efficiency and the effect of earthing backfill, has good practical value and is worth to be widely popularized and used.

Description

Gas pipeline construction is with earthing backfill device
Technical Field
The utility model relates to a gas pipeline lays technical field, specifically is a gas is earthing backfill device for pipeline construction.
Background
The gas pipeline is a pipeline for conveying natural gas (including associated gas produced by an oil field) from an exploitation place or a processing plant to an urban gas distribution center or an industrial enterprise user, which is also called a gas conveying pipeline, the natural gas pipeline is used for conveying the natural gas, the natural gas pipeline is a way for conveying a large amount of natural gas on land, the natural gas pipeline accounts for about half of the total length of the world pipeline, and the application of the earthing backfill device for gas pipeline construction is increasingly wide, so the demand of the earthing backfill device for gas pipeline construction is increasing, most of the gas pipelines in the market do not have earthing backfill devices in the laying process, the earthing backfill needs to be manually or mechanically backfilled in the earthing backfill process of the gas pipeline, the efficiency is low, and the earthing backfill cannot be crushed in the earthing backfill process, so the situation that gaps in the backfilled soil can cause the automatic subsidence after a period of the backfilled soil occurs, therefore, a covering soil backfilling device for gas pipeline construction is provided for solving the problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a gas is earthing backfill device for pipeline construction to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above purpose, the utility model provides a following technical scheme:
the utility model provides a device is backfilled with earthing for gas pipeline construction, includes left side device shell, right side device shell and solid running roller, right side device shell left side is equipped with left side device shell, be equipped with solid running roller between right side device shell and the left side device shell, fixedly connected with fixed axle in the middle of the solid running roller, rotate between the fixed axle both ends outside and the fixed bolster and link together, the equal sliding connection of one end that right side device shell and left side device shell are close to solid running roller has the baffle, the one end inboard that right side device shell and left side device shell are close to solid running roller all is equipped with crushing impeller.
Preferably, the right side device shell is fixedly connected with the screw hole through a threaded rod, the left side device shell is fixedly connected with the screw hole through a threaded rod, and the middle position of the threaded rod is fixedly connected with a fixing nut.
Preferably, the left side device shell and the right side device shell are both fixedly connected with a driving motor, and the top ends of the crushing impellers are both fixedly connected with a main shaft of the driving motor.
Preferably, the fixing support is arranged in a U shape, a handle is fixedly connected to the middle of the fixing support, and the handle is made of rubber.
Preferably, the discharge gate has all been seted up to the one end that left side device shell and right side device shell are close to solid running roller, the discharge gate inboard all is equipped with the baffle, the spacing post of the equal fixedly connected with in left side device shell and right side device shell bottom, be parallel setting between the spacing post, the position of spacing toe end is conical setting.
Preferably, the bottom end faces of the left device shell and the right device shell are both arranged in a slope, and the bottom end faces of the left device shell and the right device shell are arranged at 30 degrees with the ground.
Compared with the prior art, the beneficial effects of the utility model are that:
1. in the utility model, after the pipeline is laid, the backfilled earth can be quickly backfilled and the backfilled earth can be timely crushed at the same time through the arranged crushing impeller, the solid roller, the left device shell and the right device shell, so that the gallery can be conveniently compacted, the backfilling efficiency and effect of the earth can be improved, and the device has good practical value and is worth of being widely popularized and used;
2. the utility model discloses in, threaded rod, screw hole and the spacing post through setting up, fixed with ground when being convenient for assemble left side device shell and right side shell at the in-process that uses, have good stability and convenience.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the structure of the installation position of the threaded rod of the present invention;
fig. 3 is the structure schematic diagram of the installation position of the driving motor of the present invention.
In the figure: 1-left side device shell, 2-right side device shell, 3-crushing impeller, 4-baffle, 5-spacing column, 6-discharge port, 7-threaded hole, 8-solid roller, 9-fixed shaft, 10-fixed bracket, 11-grip, 12-driving motor, 13-fixed nut and 14-threaded rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution:
the utility model provides a gas pipeline is earthing backfill device for construction, including left side device shell 1, right side device shell 2 and solid running roller 8, 2 left sides of right side device shell are equipped with left side device shell 1, be equipped with solid running roller 8 between right side device shell 2 and the left side device shell 1, fixedly connected with fixed axle 9 in the middle of the solid running roller 8, rotate between the 9 both ends outsides of fixed axle and the fixed bolster 10 and link together, right side device shell 2 and left side device shell 1 are close to the equal sliding connection of one end of solid running roller 8 and have baffle 4, right side device shell 2 and left side device shell 1 all are equipped with crushing impeller 3 near the one end inboard of solid running roller 8.
The right device shell 2 is fixedly connected with the threaded hole 7 through the threaded rod 14, the left device shell 1 is fixedly connected with the threaded hole 7 through the threaded rod 14, and the fixing nuts 13 are fixedly connected with the middle positions of the threaded rods 14, so that the device shells arranged on one side of the tunnel can be stably connected together in the using process; the left device shell 1 and the right device shell 2 are both fixedly connected with a driving motor 12, and the top ends of the crushing impellers 3 are both fixedly connected with a main shaft of the driving motor 12 and can provide corresponding power for the rotation of the crushing impellers 3; the fixing support 10 is arranged in a U shape, a handle 11 is fixedly connected to the middle of the fixing support 10, and the handle 11 is made of rubber and can drive the solid roller 8 to move; the left side device shell 1 and the right side device shell 2 are respectively provided with a discharge port 6 at one end close to the solid roller 8, the inner sides of the discharge ports 6 are respectively provided with a baffle 4, the bottom ends of the left side device shell 1 and the right side device shell 2 are respectively and fixedly connected with a limiting column 5, the limiting columns 5 are arranged in parallel, the bottom ends of the limiting columns 5 are arranged in a conical shape, and the left side device shell 1 and the right side device shell 2 can be conveniently and stably installed in the using process; the bottom end faces of the left device shell 1 and the right device shell 2 are arranged in a slope, and the bottom end faces of the left device shell 1 and the right device shell 2 are arranged at 30 degrees with the ground, so that soil in the left device shell 1 and the right device shell 2 can be guided into the tunnel through the discharge port 6 to bury the gas pipeline.
The working process is as follows: in the process of installing and using the earthing backfill device for the gas pipeline construction, firstly, when excavating a tunnel of an installed gas pipeline, a worker needs to respectively place the left device shell 1 and the right device shell 2 at the positions on two sides of the tunnel and fix and limit the left device shell 1 and the right device shell 2 through the limiting columns 5, then the worker needs to connect the left device shell 1 and the right device shell 2 through the threaded rods 14 according to the length of the tunnel, after the integral installation is completed, the worker needs to place soil for excavating the tunnel at the positions on the inner sides of the left device shell 1 and the right device shell 2, after the tunnel is excavated, the worker can lay the gas pipeline, after the laying is completed, the worker needs to take out the baffle 4 from the left device shell 1 and the right device shell 2 and electrify the driving motor 12 at the same time, soil in the left side device shell 1 and the right side device shell 2 can be smashed through the smashing impeller 3 that sets up like this and get into the gallery through discharge gate 6, then the staff can carry out the round trip movement through fixed bolster 10 and handle 11 pulling solid running roller 8 on the earthing of gallery and carry out the compaction, solid running roller 8 can carry out stable spacing to it through the left side device shell 1 and the right side device shell 2 that set up at the in-process that removes, has good practical value, last staff can install after the construction is accomplished and collect and install the use to next section gallery, such setting can improve the efficiency and the effect that the earthing was backfilled at the in-process that uses, has good practical value, be worth carrying out extensive popularization and use.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a gas is earthing backfill device for pipeline construction, includes left side device shell (1), right side device shell (2) and solid running roller (8), its characterized in that: right side device shell (2) left side is equipped with left side device shell (1), be equipped with solid running roller (8) between right side device shell (2) and left side device shell (1), fixedly connected with fixed axle (9) in the middle of solid running roller (8), rotate between fixed axle (9) both ends outside and fixed bolster (10) and link together, the equal sliding connection of one end that right side device shell (2) and left side device shell (1) are close to solid running roller (8) has baffle (4), the one end inboard that right side device shell (2) and left side device shell (1) are close to solid running roller (8) all is equipped with crushing impeller (3).
2. The soil covering and backfilling device for gas pipeline construction according to claim 1, wherein: through threaded rod (14) and screw hole (7) fixed connection together between right side device shell (2), through threaded rod (14) and screw hole (7) fixed connection together between left side device shell (1), equal fixedly connected with fixation nut (13) of threaded rod (14) intermediate position.
3. The soil covering and backfilling device for gas pipeline construction according to claim 1, wherein: the crushing device is characterized in that a driving motor (12) is fixedly connected to the left side device shell (1) and the right side device shell (2), and the positions of the top ends of the crushing impellers (3) are fixedly connected with a main shaft of the driving motor (12).
4. The soil covering and backfilling device for gas pipeline construction according to claim 1, characterized in that: the fixing support (10) is U-shaped, a handle (11) is fixedly connected to the middle of the fixing support (10), and the handle (11) is made of rubber.
5. The soil covering and backfilling device for gas pipeline construction according to claim 1, wherein: discharge gate (6) have all been seted up to one end that left side device shell (1) and right side device shell (2) are close to solid running roller (8), discharge gate (6) inboard all is equipped with baffle (4), the spacing post of the equal fixedly connected with in left side device shell (1) and right side device shell (2) bottom (5), be parallel setting between spacing post (5), the position of spacing post (5) bottom is conical setting.
6. The soil covering and backfilling device for gas pipeline construction according to claim 1, characterized in that: the device is characterized in that the bottom end faces of the left side device shell (1) and the right side device shell (2) are both arranged on a slope, and the bottom end faces of the left side device shell (1) and the right side device shell (2) and the ground are arranged at 30 degrees.
CN202123390546.7U 2021-12-30 2021-12-30 Gas pipeline construction is with earthing backfill device Active CN217419672U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123390546.7U CN217419672U (en) 2021-12-30 2021-12-30 Gas pipeline construction is with earthing backfill device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123390546.7U CN217419672U (en) 2021-12-30 2021-12-30 Gas pipeline construction is with earthing backfill device

Publications (1)

Publication Number Publication Date
CN217419672U true CN217419672U (en) 2022-09-13

Family

ID=83175943

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123390546.7U Active CN217419672U (en) 2021-12-30 2021-12-30 Gas pipeline construction is with earthing backfill device

Country Status (1)

Country Link
CN (1) CN217419672U (en)

Similar Documents

Publication Publication Date Title
CN1948639A (en) Water taking gallery of self flow type for underground reservoir
CN209011140U (en) A kind of excavation slope safeguard structure
CN206835769U (en) A kind of rainwater-collecting irrigation rig
CN2823340Y (en) Weather ditching device
CN217419672U (en) Gas pipeline construction is with earthing backfill device
CN216108560U (en) Slope reinforcing apparatus for building municipal works
CN209218586U (en) A kind of plantation of shaddock, which is digged pit, fills equipment
CN203441529U (en) Shaft multiple section parallel interception device
CN206903581U (en) One kind is used for coal mining device
CN210504331U (en) Electromechanical transportation transmission in colliery
CN202124863U (en) Screw anchor excavated composite foundation
CN204676538U (en) Electric water punching stake groover
JP2013113010A (en) Connecting fitting for u-shaped groove and pipe, and vertical drainage method for slope using the same
CN212129169U (en) Protective slope structure for geotechnical engineering treatment
CN202370539U (en) Front tunnel face excavated soil pre-reinforcing structure of tunnel
CN204510861U (en) Whole building mobile route ground anti-settling structure
CN202510838U (en) Small-size rotation type underground buried pipe jacking device
CN208486292U (en) A kind of waterproof open cut piping lane equipment suitable for rich water soft stratum
CN215563157U (en) Pipeline reinforcing structure of hydraulic and hydroelectric engineering
CN221874136U (en) Transfer tool for paving buried drainage pipeline
CN218175952U (en) Electric power engineering construction is with device of sunkening cord
CN210482272U (en) Grass square protection construction auxiliary device
CN206267871U (en) A kind of porous pre-buried channel flow
CN201660879U (en) Environment-friendly sewage isolation material implanter
CN216865101U (en) Foundation reinforcing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant