CN217379721U - External handling frame of structure assembled - Google Patents

External handling frame of structure assembled Download PDF

Info

Publication number
CN217379721U
CN217379721U CN202221111767.8U CN202221111767U CN217379721U CN 217379721 U CN217379721 U CN 217379721U CN 202221111767 U CN202221111767 U CN 202221111767U CN 217379721 U CN217379721 U CN 217379721U
Authority
CN
China
Prior art keywords
supporting pieces
handling frame
pieces
assembled external
mounting hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221111767.8U
Other languages
Chinese (zh)
Inventor
杨伟
姚荣辉
高振华
郭二虎
郭霏
路静茹
赵小娟
刘博�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Construction Engineering Group Co Ltd
Original Assignee
Shanxi Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Construction Engineering Group Co Ltd filed Critical Shanxi Construction Engineering Group Co Ltd
Priority to CN202221111767.8U priority Critical patent/CN217379721U/en
Application granted granted Critical
Publication of CN217379721U publication Critical patent/CN217379721U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model provides a structure assembled external operation frame, which comprises a plurality of pre-embedded fixing parts, a plurality of supporting pieces, a plurality of guard rail upright stanchions, a plurality of wooden scaffold boards and a protective net, wherein the pre-embedded fixing parts are pre-embedded on the structure at intervals and are all exposed on the surface of the structure; the plurality of supporting pieces are arranged corresponding to the plurality of embedded fixing pieces, one end of each supporting piece is provided with a mounting hole, and the supporting pieces are sleeved on the outer sides of the embedded fixing pieces through the mounting holes and fixed on the structure; the guard rail upright posts are correspondingly arranged at the other ends of the plurality of supporting pieces and extend vertically upwards; the plurality of wood scaffold boards are sequentially erected and fixed on every two adjacent supporting pieces along the length direction of the supporting pieces; the protection network fixed connection is on the rail guard pole setting, and protection network, rail guard pole setting, support piece and wooden scaffold board enclose to close and form the operation space. The utility model discloses an outer handling frame can provide sufficient construction space and security guarantee for operating personnel.

Description

External handling frame of structure assembled
Technical Field
The utility model belongs to the technical field of the construction, concretely relates to outer handling frame of structure assembled.
Background
The civil engineering unit and the installation unit are different construction units in the industrial building, the requirement on the construction period of the industrial building is strict, and the site needs to be handed over to the installation unit in time after the civil engineering construction is completed, so that the installation unit can not install the frame body of the civil engineering unit, the civil engineering unit can encounter the problems that the maintenance is difficult to operate after the frame body is dismantled, and the construction space and the safety can not be guaranteed.
Therefore, there is a need to provide an improved solution to the above-mentioned deficiencies of the prior art.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an outer handling frame of structure assembled to solve the construction space that exists among the prior art and the problem that can't obtain the guarantee safely.
In order to achieve the above object, the present invention provides the following technical solutions:
a structure-assembled external handling frame, comprising:
the embedded fixing pieces are embedded on the structure at intervals and exposed out of the surface of the structure;
the supporting pieces are arranged corresponding to the embedded fixing pieces, one end of each supporting piece is provided with a mounting hole, and the supporting pieces are sleeved on the outer sides of the embedded fixing pieces through the mounting holes and fixed on the structure;
the protective guard vertical rods are correspondingly arranged at the other ends of the supporting pieces and extend vertically upwards;
the wood scaffold boards are sequentially erected and fixed on every two adjacent supporting pieces along the length direction of the supporting pieces;
the protective net is fixedly connected to the protective fence vertical rod, and the protective net, the protective fence vertical rod, the supporting piece and the wooden scaffold board are enclosed to form an operation space.
Optionally, the height of the guard rail vertical rod is not less than 1.2 m.
Optionally, the height of the protective net is 1.5-2 m.
Optionally, the support member includes two splicing welded angle steels, the mounting hole is opened at the end of one of the angle steels, and the guard rail upright stanchion is welded and fixed at the end of one of the angle steels far away from the mounting hole.
Optionally, the mounting hole and the guard rail vertical rod are located on the same angle steel.
Optionally, the angle steel is provided with a limiting cylinder at the mounting hole for limiting the pre-buried fixing element, and the pre-buried fixing element is inserted into the mounting hole and the limiting cylinder and exposed out of the limiting cylinder.
Optionally, the limiting cylinder is a square steel pipe, and the square steel pipe is welded and fixed at one end of the angle steel.
Optionally, the length of the support is 0.6-0.8 m; the distance between two adjacent supporting pieces is 2-3 m.
Optionally, a plurality of the wooden scaffold boards are bound and fixed on every two adjacent supporting pieces.
Optionally, the structure is a concrete column-shaped structure, the embedded fasteners are embedded at intervals along the circumferential direction of the concrete column-shaped structure, and the protective net is cylindrical and is arranged around the outer side of the concrete column-shaped structure.
Has the advantages that:
the utility model discloses a structure assembled external operation frame, including a plurality of pre-buried mountings, a plurality of support piece, a plurality of rail guard pole setting, a plurality of wooden scaffold boards and protection network, wherein, a plurality of pre-buried mountings interval are pre-buried on the structure, and all expose in the surface of structure, a plurality of support piece correspond a plurality of pre-buried mounting settings, the mounting hole has been seted up to one end of support piece, support piece cup joints in the outside of pre-buried mounting through the mounting hole and fixes on the structure; the guard rail upright posts are correspondingly arranged at the other ends of the plurality of supporting pieces and extend vertically upwards; the plurality of wood scaffold boards are sequentially erected and fixed on every two adjacent supporting pieces along the length direction of the supporting pieces; the protection network fixed connection is on the rail guard pole setting, and protection network, rail guard pole setting support piece, wooden scaffold board enclose jointly and close and form the operation space to supply the workman to use. The utility model discloses an outer handling frame of structure assembled can improve the rate of utilization of pre-buried mounting greatly, provides space and security assurance for operating personnel, has saved the secondary support body and has set up required manpower and time, has promoted the construction progress greatly.
Drawings
The accompanying drawings, which form a part of the specification, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the invention without unduly limiting the scope of the invention. Wherein:
fig. 1 is a schematic structural diagram of an assembled external handling frame of a structure according to some embodiments of the present invention;
FIG. 2 is a schematic cross-sectional view taken along line A-A of FIG. 1;
fig. 3 is a schematic structural diagram of a support member in an assembled external handling frame of a structure according to some embodiments of the present invention.
Reference numbers in the figures: 1, pre-embedding a fixing piece; 2-a support; 21-angle steel; 22-mounting holes; 23-a limiting cylinder; 3-upright bars of guard rails; 4-wooden scaffold boards; 5-protective screening; 6-construction.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely below, and it should be understood that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art all belong to the protection scope of the present invention.
The present invention will be described in detail with reference to examples. It should be noted that, in the present invention, the embodiments and features of the embodiments may be combined with each other without conflict.
The problem that construction space and safety can't be ensured to exist among the prior art, the utility model provides a 6 assembled outer handling frame of structure can improve pre-buried mounting 1's rate of utilization greatly, provides space and security assurance for operating personnel, has saved the secondary support body and has set up required manpower and time, has promoted the construction progress greatly.
As shown in fig. 1 to fig. 3, in an embodiment of the present invention, the assembled external handling frame of the structure 6 includes a plurality of pre-buried fixing members 1, a plurality of supporting members 2, a plurality of guard rail upright stanchions 3, a plurality of wooden scaffold boards 4 and a guard net 5, wherein the pre-buried fixing members 1 are pre-buried on the structure 6 at intervals and are exposed on the surface of the structure 6, the supporting members 2 are disposed corresponding to the pre-buried fixing members 1, a mounting hole 22 is opened at one end of the supporting member 2, and the supporting member 2 is sleeved on the outer side of the pre-buried fixing member 1 through the mounting hole 22 and fixed on the structure 6; the guard rail upright posts 3 are correspondingly arranged at the other ends of the support members 2, and the guard rail upright posts 3 extend vertically upwards; the plurality of wood scaffold boards 4 are sequentially erected and fixed on every two adjacent supporting pieces 2 along the length direction of the supporting pieces 2; the protective net 5 is fixedly connected to the protective fence upright stanchion 3, and the protective net 5, the protective fence upright stanchion 3, the supporting piece 2 and the wooden scaffold board 4 jointly enclose to form an operation space for workers to use.
In this embodiment, pre-buried mounting 1 can select for pre-buried bolt, and pre-buried bolt in general civil engineering in earlier stage can improve pre-buried bolt's rate of utilization like this greatly. And a wood scaffold board 4 is erected on each two adjacent supporting pieces 2 to provide a working surface for operators. The side adopts protection network 5 to protect, can provide safety protection for operating personnel, and can prevent effectively that the hand instrument from dropping, promotes construction security and construction progress greatly.
The utility model discloses in the embodiment, the height of rail guard pole setting 3 is not less than 1.2m to guarantee that the operation space has appropriate height, effectively play the guard action to construction operation personnel.
In the embodiment of the present invention, the protection net 5 is a steel wire net, and the height of the protection net 5 can be selected to be 1.5-2m (for example, 1.5m, 1.6m, 1.7m, 1.8m, 1.9m, 2m, and the interval value between any two endpoint values). The protection net 5 designed in the height range can more effectively protect the construction operators.
It should be noted that, the size of the steel wire mesh is a fixed size, and in actual operation, if the working space is large, the protection net 5 may be formed by splicing a plurality of steel wire meshes.
The utility model discloses in the concrete embodiment, support piece 2 includes two amalgamation welded angle steel 21, and the tip at one of them angle steel 21 is seted up to mounting hole 22, and rail guard pole setting welded fastening keeps away from the tip of mounting hole 22 at one of them angle steel 21. In this embodiment, two angle steels 21 are the same in size, and support member 2 is obtained by split welding.
The mounting hole 22 can be selected to be the circular port, slightly is greater than buried bolt's external diameter, can guarantee effectively like this that support piece 2 fixes on structure 6 through the outside that buried bolt was located to mounting hole 22 cover to effectively guarantee the setting steadiness of the outer handling frame of assembled, guarantee operating personnel's security.
The utility model discloses in the optional embodiment, mounting hole 22 and rail guard pole setting are located same root angle steel 21, and such setting can be favorable to widening the working face, and then provides sufficient operation space for operating personnel.
Further, the angle steel 21 is provided with a limiting cylinder 23 at the mounting hole 22 for limiting the embedded fixing member 1, and the embedded fixing member 1 is inserted into the mounting hole 22 and the limiting cylinder 23 and exposed out of the limiting cylinder 23. The setting steadiness of the outer operation frame of assembled can be guaranteed more effectively to such setting to guarantee operating personnel's security more effectively.
Optionally, the limiting cylinder 23 is a square steel pipe, and the square steel pipe is welded and fixed at one end of the angle steel 21. The square steel pipe can be selected as the residual square steel pipe in the construction site, and the utilization rate of the square steel pipe is greatly improved.
In order to ensure that the outer operating frame has sufficient working space and to a certain extent saves production costs, the length of the support 2 is optionally 0.6-0.8m (e.g. 0.6m, 0.7m, 0.8m and the interval between any two end values). Of course, the length of the support 2 in a particular operation can be determined according to the actual circumstances.
Optionally, the distance between two adjacent supporting members 2 is 2-3m (such as 2m, 2.2m, 2.4m, 2.6m, 2.8m, 3m and the interval value between any two endpoint values). So setting up, can guarantee the setting steadiness of the outer handling frame of assembled effectively, also reduce the cost of manufacture to a certain extent simultaneously.
It should be noted that, the length of the wooden scaffold board 4 is determined according to the distance between two adjacent supporting pieces 2, after the assembly, the two end faces of the hand bakelite board respectively abut against the side faces of the angle steel 21, so that the setting stability of the assembled outer operation frame can be effectively ensured, and higher safety guarantee is provided for operators.
The utility model discloses in the embodiment, a plurality of wooden scaffold boards 4 adopt the steel wire to bind and fix on per two adjacent support piece 2, and the skew can not take place between a plurality of wooden scaffold boards 4 in such setting, guarantees the steadiness of operation face to provide higher safety guarantee for operating personnel.
In one embodiment of the present invention, the structure 6 is a concrete column-shaped structure 6, a plurality of embedded fasteners 1 (i.e. embedded bolts) are embedded along the circumferential direction of the concrete column-shaped structure 6 at intervals, a plurality of supporting members 2 are arranged corresponding to the plurality of embedded fasteners 1, one end of each supporting member 2 is provided with a mounting hole 22, and the supporting member 2 is sleeved on the outer side of the embedded fastener 1 through the mounting hole 22 and fixed on the structure 6; the guard rail upright posts 3 are correspondingly arranged at the other ends of the support members 2, and the guard rail upright posts 3 extend vertically upwards; the plurality of wood scaffold boards 4 are sequentially erected and fixed on every two adjacent supporting pieces 2 along the length direction of the supporting pieces 2; the protective net 5 is fixedly connected to the protective fence upright stanchion 3, and the protective net 5, the protective fence upright stanchion 3, the supporting piece 2 and the wooden scaffold board 4 jointly enclose to form an operation space. Because the concrete column-shaped structure 6 is cylindrical, the protective net 5 is cylindrical and is arranged around the outer side of the concrete column-shaped structure 6, and the finally enclosed working space is annular. Alternatively, the concrete column-shaped structure 6 is cylindrical, and the protection net 5 is cylindrical.
Preferably, a plurality of pre-buried mountings 1 are evenly pre-buried along the circumference of concrete column structure 6, also be a plurality of support piece 2 evenly distributed, can guarantee like this that the atress of each position department of working face is comparatively balanced to can effectively guarantee the steadiness of whole working face, provide higher safety guarantee for operating personnel.
The utility model discloses a method of setting up of structure 6 assembled outer handling frame as follows: the bolt is pre-buried in the civil engineering construction in earlier stage, after concrete pouring is finished, and intensity meets the requirement, with two angle steel 21 amalgamation welding become support piece 2 to offer mounting hole 22 with support piece 2's one end, the size of mounting hole 22 slightly is greater than the diameter of bolt, another end welding rail guard pole setting, with the mounting hole 22 cover establish in the pre-buried bolt's the outside, alright realize support piece 2's spacing fixed. Then, the wooden scaffold boards 4 are fully paved between every two adjacent supporting pieces 2, and the wooden scaffold boards 4 are bound and fixed by steel wires. Then, the protective net 5 is fixed on the protective fence upright stanchion 3 to serve as side protection, so that the erection of the working space can be completed.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. A structure-assembled external handling frame, comprising:
the embedded fixing pieces are embedded on the structure at intervals and exposed out of the surface of the structure;
the supporting pieces are arranged corresponding to the embedded fixing pieces, one end of each supporting piece is provided with a mounting hole, and the supporting pieces are sleeved on the outer sides of the embedded fixing pieces through the mounting holes and fixed on the structure;
the protective guard vertical rods are correspondingly arranged at the other ends of the supporting pieces and extend vertically upwards;
the wood scaffold boards are sequentially erected and fixed on every two adjacent supporting pieces along the length direction of the supporting pieces;
the protective net is fixedly connected to the protective fence vertical rod, and the protective net, the protective fence vertical rod, the supporting piece and the wooden scaffold board are enclosed to form an operation space.
2. The structure-assembled external handling frame of claim 1, wherein the height of the guard rail upright is not less than 1.2 m.
3. The structure-assembled external handling frame of claim 2, wherein the height of the protection net is 1.5-2 m.
4. A structure-assembled external handling frame as claimed in claim 1, wherein the support member comprises two split-welded angles, the mounting hole is provided at an end of one of the angles, and the guard rail upright is welded to an end of one of the angles remote from the mounting hole.
5. A structure-assembled external handling frame as claimed in claim 4, wherein the mounting holes and the guard rail uprights are located on the same angle.
6. A structure-assembled external handling frame as claimed in claim 5, wherein the angle steel is provided with a limiting cylinder at the mounting hole for limiting pre-embedded fasteners, and the pre-embedded fasteners are inserted into the mounting hole and the limiting cylinder and exposed out of the limiting cylinder.
7. The structure-assembled external handling frame of claim 6, wherein the limiting cylinder is a square steel tube, and the square steel tube is welded and fixed to one end of the angle steel.
8. A structure-assembled external handling frame as claimed in claim 1, in which the length of the support member is from 0.6 to 0.8 m;
the distance between two adjacent supporting pieces is 2-3 m.
9. A structure-assembled external workhorse according to claim 1, wherein a plurality of said wood scaffold boards are bound and fixed to each adjacent two of said support members.
10. A structure-assembled external handling frame as claimed in any of claims 1 to 9, wherein the structure is a concrete column-shaped structure, a plurality of the fastener inserts are inserted at intervals along the circumference of the concrete column-shaped structure, and the protective net is cylindrical and surrounds the outside of the concrete column-shaped structure.
CN202221111767.8U 2022-05-09 2022-05-09 External handling frame of structure assembled Active CN217379721U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221111767.8U CN217379721U (en) 2022-05-09 2022-05-09 External handling frame of structure assembled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221111767.8U CN217379721U (en) 2022-05-09 2022-05-09 External handling frame of structure assembled

Publications (1)

Publication Number Publication Date
CN217379721U true CN217379721U (en) 2022-09-06

Family

ID=83086135

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221111767.8U Active CN217379721U (en) 2022-05-09 2022-05-09 External handling frame of structure assembled

Country Status (1)

Country Link
CN (1) CN217379721U (en)

Similar Documents

Publication Publication Date Title
CN110512719B (en) Construction method of large-span interval corridor high-altitude formwork steel platform for high-rise residence
CN205063308U (en) Outer hanging protection frame and outer hanging protective structure
CN104372967B (en) A kind of cooling stack inclined strut structure and construction method thereof
CN217379721U (en) External handling frame of structure assembled
CN211498507U (en) Whole reassembling type protection rack
CN215978575U (en) Safety protection system for dismantling reinforced concrete water tower in limited space
CN210918762U (en) Reinforced concrete protective airtight door leaf
CN112211384B (en) Scaffold for building site
CN212897455U (en) Prevent portable scaffold frame that topples
CN215482374U (en) Continuous beam quick assembly disassembly faces limit protector
CN209874434U (en) Simple and easy scaffold frame of encorbelmenting of building high latitude
JP2015045131A (en) Underground beam bar arrangement method using vertically separable frame for underground beam bar arrangement and the frame
CN220245381U (en) Can have enough to meet need tower crane operation platform
CN213039059U (en) Personnel warning device for building safety protection
CN209011622U (en) The vertical ladder cage of construction
CN214365440U (en) Height-adjustable assembled guardrail
CN210768095U (en) Railway engineering protection fence
KR102370425B1 (en) The safety rail of the formwork
CN216240103U (en) Easy-to-disassemble, assemble and carry assembly type construction enclosure
CN220580041U (en) Open caisson formwork platform
CN220978730U (en) Lantern frame device for upright post construction
CN219010977U (en) Steel reinforcement cage erects dress and builds platform system for bridge
CN213204917U (en) Novel movable scaffold
CN219508419U (en) Bracket for marking poured pile foundation
CN217782795U (en) Safe operation platform for prefabricating construction of circular pipe culvert

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant