CN217352514U - Underground pipeline passes through a fender pile structure - Google Patents

Underground pipeline passes through a fender pile structure Download PDF

Info

Publication number
CN217352514U
CN217352514U CN202221293094.2U CN202221293094U CN217352514U CN 217352514 U CN217352514 U CN 217352514U CN 202221293094 U CN202221293094 U CN 202221293094U CN 217352514 U CN217352514 U CN 217352514U
Authority
CN
China
Prior art keywords
pipeline
pile structure
retaining wall
structure according
ribs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221293094.2U
Other languages
Chinese (zh)
Inventor
劳桂西
陆逊
石绍鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN202221293094.2U priority Critical patent/CN217352514U/en
Application granted granted Critical
Publication of CN217352514U publication Critical patent/CN217352514U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a structure for underground pipelines to pass through supporting piles, which comprises a retaining wall arranged between the supporting piles, wherein reserved pipeline mounting openings are formed among the retaining wall, the supporting piles and a crown beam; the reserved pipeline mounting port is provided with pipeline mounting grids for supporting the pipeline. The utility model discloses a retaining wall and a fender pile are connected and are under construction, through reserving the pipeline erection mouth, excavate the time zone upon zone during construction, the merogenesis is pour, also can protect the pipeline safety when guaranteeing the foundation ditch safety, solve the pipeline and pass through the difficult problem of strutting of foundation ditch; the pipeline is convenient to support and fix through the pipeline installation grids.

Description

Underground pipeline passes through fender pile structure
Technical Field
The utility model relates to a foundation ditch support technical field especially indicates an underground pipeline passes through a fender pile structure.
Background
The foundation pit support is a temporary support structure, and is a retaining, reinforcing and protecting measure adopted for the side wall of the foundation pit and the surrounding environment in order to ensure the safety of the construction of an underground structure and the surrounding environment of the foundation pit.
However, the underground pipe network around the foundation pit is complex, and the phenomenon that the pipeline passes through the support piles inevitably occurs, so that the safety of the foundation pit and the pipeline is influenced.
Disclosure of Invention
Not enough to among the above-mentioned background art, the utility model provides an underground pipeline passes through a fender pile structure has solved among the prior art problem that the pipeline passes through the safety that a fender pile influences foundation ditch and pipeline.
The technical scheme of the utility model is realized like this:
a structure of an underground pipeline crossing supporting pile comprises a retaining wall arranged among supporting piles, wherein a reserved pipeline mounting opening is formed among the retaining wall, the supporting piles and a crown beam; the reserved pipeline mounting port is provided with pipeline mounting grids for supporting the pipeline.
Further, the pipeline installation grids are connected with support piles and/or crown beams.
Further, the pipeline installation lattice comprises a transverse rib anchored into the support pile and a vertical rib connected to the transverse rib.
Further, the transverse ribs and the vertical ribs form an installation frame, and the pipeline is fixedly arranged in the installation frame in a penetrating mode.
Further, the vertical ribs are also connected with a crown beam or a retaining wall.
Furthermore, the retaining wall includes parallel arrangement roof and the bottom plate between the fender pile and is located the pre-buried muscle between roof and the bottom plate, and the anchor is gone into in the fender pile at pre-buried muscle both ends.
Furthermore, the embedded ribs are connected with longitudinal ribs.
Further, concrete is poured between the top plate and the bottom plate to form the retaining wall.
The utility model has the advantages that: the utility model discloses a retaining wall and a fender pile are connected and are under construction, through reserving the pipeline erection mouth, excavate the time zone upon zone during construction, the merogenesis is pour, also can protect the pipeline safety when guaranteeing the foundation ditch safety, solve the pipeline and pass through the difficult problem of strutting of foundation ditch; the pipeline is convenient to support and fix through the pipeline installation grids.
Drawings
In order to illustrate the embodiments of the present invention more clearly, the drawings that are needed in the description of the embodiments will be briefly described below, and it is obvious that the drawings in the description below are only some embodiments of the present invention, and that other drawings can be obtained by those skilled in the art without inventive work.
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is the utility model discloses a section structure schematic diagram of retaining wall and fender pile.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without any creative effort belong to the protection scope of the present invention.
As shown in fig. 1 and fig. 2, the utility model discloses an underground pipeline passes through a fender pile structure of embodiment 1, including setting up retaining wall 2 between fender pile 1, form between retaining wall 2 and fender pile 1 and the crown beam 3 and reserve the piping erection mouth, be convenient for the piping erection in this reservation piping erection mouth. The retaining wall 2 and the supporting piles are used for connection construction, and through the reserved pipeline mounting openings, the retaining wall is excavated layer by layer and poured section by section during construction, so that the safety of the foundation pit is guaranteed, the safety of the pipeline can be protected, and the problem of difficult support of the pipeline passing through the foundation pit is solved. The reserved pipe installation opening is provided with a pipe installation grid 4 for supporting and fixing a pipe 5.
Further, the pipe installation grid 4 is connected with the support piles 1 and/or the crown beams 3. Specifically, the pipe installation grid 4 includes a transverse rib anchored into the support pile 1 and a vertical rib connected to the transverse rib. The transverse ribs and the vertical ribs form an installation frame, and the pipeline is fixedly arranged in the installation frame in a penetrating mode.
Further, the upper end of the vertical rib close to the crown beam 3 is also connected with the crown beam 3; the lower ends of the vertical ribs close to the retaining wall 2 are also connected with the retaining wall 2.
Embodiment 2, which is different from embodiment 1 in that the retaining wall 2 includes a top plate and a bottom plate arranged in parallel between the support piles 1, and a pre-embedded bar is provided between the top plate and the bottom plate, and both ends of the pre-embedded bar are anchored in the support piles 1. The embedded ribs are connected with a plurality of longitudinal ribs. And pouring concrete between the top plate and the bottom plate to form the retaining wall 2.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. The utility model provides an underground pipeline passes through a fender pile structure which characterized in that: the retaining wall structure comprises retaining walls (2) arranged among supporting piles (1), and reserved pipeline mounting openings are formed among the retaining walls (2), the supporting piles (1) and crown beams (3); and a pipeline installation grid (4) for supporting a pipeline (5) is arranged in the reserved pipeline installation opening.
2. The underground pipe crossing support pile structure according to claim 1, wherein: the pipeline installation grids (4) are connected with the support piles (1) and/or the crown beams (3).
3. The underground pipe crossing support pile structure according to claim 1 or 2, wherein: the pipeline installation grid (4) comprises transverse ribs anchored into the supporting piles (1) and vertical ribs connected to the transverse ribs.
4. The underground pipe crossing support pile structure according to claim 3, wherein: the transverse ribs and the vertical ribs form an installation frame, and the pipeline is fixedly arranged in the installation frame in a penetrating mode.
5. The underground pipeline crossing support pile structure according to claim 4, wherein: the vertical ribs are also connected with the crown beam (3) or the retaining wall (2).
6. An underground pipe-through support pile structure according to claim 1, 2, 4 or 5, wherein: the retaining wall (2) comprises a top plate and a bottom plate which are arranged between the supporting piles (1) in parallel and embedded bars located between the top plate and the bottom plate, and two ends of each embedded bar are anchored into the supporting piles (1).
7. The underground pipe crossing support pile structure according to claim 6, wherein: the embedded ribs are connected with longitudinal ribs.
8. The underground pipeline crossing support pile structure according to claim 7, wherein: and concrete is poured between the top plate and the bottom plate to form the retaining wall (2).
CN202221293094.2U 2022-05-27 2022-05-27 Underground pipeline passes through a fender pile structure Active CN217352514U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221293094.2U CN217352514U (en) 2022-05-27 2022-05-27 Underground pipeline passes through a fender pile structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221293094.2U CN217352514U (en) 2022-05-27 2022-05-27 Underground pipeline passes through a fender pile structure

Publications (1)

Publication Number Publication Date
CN217352514U true CN217352514U (en) 2022-09-02

Family

ID=83014756

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221293094.2U Active CN217352514U (en) 2022-05-27 2022-05-27 Underground pipeline passes through a fender pile structure

Country Status (1)

Country Link
CN (1) CN217352514U (en)

Similar Documents

Publication Publication Date Title
CN105862930B (en) A kind of protection structure to creating existing tunnel below underground engineering
CN206706772U (en) A kind of double steel sheet pile supporting construction
WO2023213117A1 (en) Widening structure and construction method for existing subgrade embankment wall section near river
CN210127485U (en) Concrete suction type caisson foundation and thin-wall pier stud connecting structure
CN110016919A (en) A kind of aging blocks install the minimally invasive foundation pit structure of elevator and construction method additional
CN214883687U (en) Foundation pit supporting structure
CN213926286U (en) Supporting construction for building foundation engineering
CN214005381U (en) Bridge pier tip bundle and scouring sheet pile protection structure
CN212104111U (en) Foundation pit support next to super deep foundation pit of super high-rise subway
CN217352514U (en) Underground pipeline passes through a fender pile structure
CN212452655U (en) A reinforced structure that is used for SMW worker method stake to strut system
CN208486272U (en) A kind of constructing structure of two-tube diagonal brace deep basal pit
CN217559183U (en) Gas pipeline protection structure next to underground continuous wall
CN213448506U (en) Plugging structure arranged between foundation pit fender posts
CN210737555U (en) Underground pipeline in-situ protection mechanism for foundation pit supporting system
JP6302288B2 (en) Formwork installation method, formwork and underwater structure
CN212452684U (en) Soil body protective structure between foundation ditch supporting construction bored concrete pile
CN214887086U (en) Slope debris flow guide-discharge type open cut tunnel structure
CN213805443U (en) Steel construction, frame beam structure, side slope reinforced structure and reinforcement and support structure
CN212956576U (en) Confined space high fill roadbed side slope foam concrete's reinforced structure
CN211171994U (en) Occlusive pile and diaphragm wall combined foundation pit supporting structure
CN111636439A (en) Soil body protective structure between foundation ditch supporting construction bored concrete pile
CN205742292U (en) A kind of to the protection structure of existing tunnel below newly-built underground engineering
CN108951618B (en) Pile anchor supporting device
CN112095665A (en) Water buoyancy balance construction method applied to subway upper cover

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant