CN2173271Y - Preload stress concrete rail sleeper - Google Patents
Preload stress concrete rail sleeper Download PDFInfo
- Publication number
- CN2173271Y CN2173271Y CN 93246896 CN93246896U CN2173271Y CN 2173271 Y CN2173271 Y CN 2173271Y CN 93246896 CN93246896 CN 93246896 CN 93246896 U CN93246896 U CN 93246896U CN 2173271 Y CN2173271 Y CN 2173271Y
- Authority
- CN
- China
- Prior art keywords
- sleeper
- rail
- section
- fastener
- cross
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
The utility model relates to a preload stress concrete sleeper whose length is L=2600 mm, height of the cross section below the rail is h 1 =230 mm, upper width of the cross section below the rail is B1 =170 mm, lower width is of the cross section below the rail B2 =300 mm, height of the intermediate cross section is h 2 =185 mm, upper width of the intermediate cross section is b 1 =206 mm, lower width of the intermediate cross section is b 2 =280 mm, lengthwise reinforcing bars are 10 impression steel bars of phi 7 mm and 15 lateral hoops are made of plain reinforcing steel bars of phi 6 mm. When a fastener sleeper without screw bolts are made, the iron part of the fastener is needed to be previously buried in a rail slot without a shoulder block.
Description
The TK-III type prestressed reinforced concrete tie series concrete building unit technical field that is used for heavy duty, high-speed track.
At present, the prestressed reinforced concrete tie that China railways extensively adopts is the II type pillow that shoulder block is arranged, and is provided with the bolt preformed hole in the rail support groove, and its arrangement of reinforcement has two kinds of the steel wire of 44 φ 3mm and 4 φ 10mm reinforcing bars, and the ultimate strength of steel wire and reinforcing bar is 1470N/mm
2, establish 9 lateral ties in the sleeper, be provided with spiral bar around the preformed hole, concrete design strength is No. 600, adopts the prestressing force pre-tensioning system to carry out continuous productive process production.But this class sleeper is applied on heavy type, the high-speed track, the vertical, horizontal crack appears prematurely because bearing capacity is on the low side, bolt hole through crack and other damages not only influence its application life but also have strengthened maintenance load, the needs of obviously incompatible heavy duty and high speed operation condition.
The purpose of this utility model provide a kind of the track bulk strength and stable aspect the new type concrete sleeper that can satisfy Heavy-Haul Railway, at a high speed run needs.
Design of the present utility model is the actual conditions of bearing dynamic load according to sleeper in orbit, adopt comprehensive dynamic load factor to determine the design load of sleeper, carry out the concrete sleeper design in view of the above, its key dimension and technical performance such as subordinate list are listed, compare its supporting capacity with existing II type pillow and are greatly improved.
Appearance and size of the present utility model: the long L=2600mm of sleeper, the high h of rail lower section
1=230mm, the high h in intermediate cross-section
2=185mm, wide B on the rail lower section
1=170mm, following wide B
2=300mm, wide b on the intermediate cross-section
1=206mm, following wide b
2=280mm.It is about 17% that this increases the existing pillow floor space of pillow bottom support area, and resting the head on distolateral area increases by 20%, and weight increases by 28%, can effectively improve the vertical, horizontal resistance of railway roadbed, and the accumulated deformation that slows down railway roadbed improves the resistance to overturning of track.Longitudinal reinforcement of the present utility model adopts the impression reinforcing bar of 10 φ 7mm, and heading is made in its end, and ultimate tensile strength reaches 1570N/mm
2, in the sleeper length range, establish 15 lateral ties, make with the plain steel-bar of φ 6mm.
When the utility model was made non-bolt fastener sleeper, the ironware of its fastener will be embedded in the rail groove of non-shoulder, when having made bolt fastener sleeper, needed prepared screw-bolt hole in the rail groove of shoulder block is arranged.
Project | Unit | TK-III type pillow | Existing II type pillow | Relative ratio (II/III) |
Length of sleeper | cm | 260 | 250 | |
Under the depth of section rail/centre | cm | 23/18.5 | 20/16.5 | |
Under the breadth of section rail/centre | cm | 30/28 | 28/25 | |
Pillow clothing bearing area | cm 2 | 7720 | 6588 | 0.85 |
Rest the head on distolateral area | cm 2 | 590 | 490 | 0.83 |
Weight | kg | 320 | 250 | 0.78 |
The presstressed reinforcing steel consumption | kg | 7.85 | 6.11 | 0.78 |
Design rail power rail is middle down | kN·m kN·m | 19.0 -17.3 | 13.3 —10.5 | 0.70 0.61 |
Provide embodiment below in conjunction with accompanying drawing:
Fig. 1 is a front view; Fig. 2 is a vertical view; Fig. 3 is a bottom view; Fig. 4 is the main sectional view that bolt fastener pillow is arranged; Fig. 5 is the sectional view of bowing that bolt fastener pillow is arranged; Fig. 6 is the cross-section sectional view of sleeper.Among the figure: the pre-buried fastener of 1-; The 2-concrete; The 3-stirrup; The 4-longitudinal reinforcement; The 5-prepared screw-bolt hole.
When the utility model is made, to in punching block, be fixed on the end plate with the longitudinal reinforcement (4) of heading earlier by design attitude, again pre-buried fastener (1) is placed in desired location, tension reinforcing steel bar, concrete perfusion (2) and carry out vibration compacting then, send into the health kiln and add steam curing, when concrete reaches predetermined strength, loosen the reinforcement stresses demoulding and promptly make this kind sleeper.If need erection bolt, only need before the spiral bar and the plug of prepared screw-bolt hole (5) to be placed in desired location and to make the rail groove of shoulder block by mold form, just make the sleeper of bolt fastener at tension reinforcing steel bar (4).
Claims (2)
1, a kind of prestressed reinforced concrete tie that improves track bulk strength and stability is characterized in that: the long L=2600mm of sleeper, the high h of rail lower section
1=230mm goes up wide B
1=170mm, following wide B
2=300mm, the high h in intermediate cross-section
2=185mm goes up wide b
1=206mm, following wide b
2=280mm, longitudinal reinforcement are the impression reinforcing bar of 10 φ 7mm, and heading is made in its end, are provided with 15 lateral ties made from φ 6mm plain steel-bar in the sleeper length range.
2, prestressed reinforced concrete tie according to claim 1, it is characterized in that: when making non-bolt button sleeper, the ironware of its fastener will be embedded in the rail groove of non-shoulder, when being manufactured with bolt fastener sleeper, needs prepared screw-bolt hole in the rail groove of shoulder block is arranged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 93246896 CN2173271Y (en) | 1993-12-10 | 1993-12-10 | Preload stress concrete rail sleeper |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 93246896 CN2173271Y (en) | 1993-12-10 | 1993-12-10 | Preload stress concrete rail sleeper |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2173271Y true CN2173271Y (en) | 1994-08-03 |
Family
ID=33819448
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 93246896 Expired - Fee Related CN2173271Y (en) | 1993-12-10 | 1993-12-10 | Preload stress concrete rail sleeper |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2173271Y (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102439227A (en) * | 2009-03-31 | 2012-05-02 | 金海坤 | H-shaped railroad tie, and mold for manufacturing same |
CN107916597A (en) * | 2017-11-15 | 2018-04-17 | 中冶沈勘秦皇岛工程设计研究总院有限公司 | Novel load-carrying prestressed reinforced concrete sleeper and mine underground track transportation rail structure |
CN109183524A (en) * | 2018-08-30 | 2019-01-11 | 广州地铁设计研究院股份有限公司 | A kind of ballastless track long sleeper suitable for urban track traffic |
-
1993
- 1993-12-10 CN CN 93246896 patent/CN2173271Y/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102439227A (en) * | 2009-03-31 | 2012-05-02 | 金海坤 | H-shaped railroad tie, and mold for manufacturing same |
CN107916597A (en) * | 2017-11-15 | 2018-04-17 | 中冶沈勘秦皇岛工程设计研究总院有限公司 | Novel load-carrying prestressed reinforced concrete sleeper and mine underground track transportation rail structure |
CN109183524A (en) * | 2018-08-30 | 2019-01-11 | 广州地铁设计研究院股份有限公司 | A kind of ballastless track long sleeper suitable for urban track traffic |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201581307U (en) | Longitudinal connecting component of slab type ballastless track for high speed railway | |
CN2173271Y (en) | Preload stress concrete rail sleeper | |
CN211899791U (en) | Prefabricated floor preformed hole adopts and wears steel pull rod to consolidate masonry structure | |
KR101364613B1 (en) | H shaped tie for railroad | |
CN210886769U (en) | Combined composite sleeper structure | |
CN111501428A (en) | Direct-buried fastener and construction method thereof | |
CN1252353C (en) | Concrete sleepers and their making process | |
CN212534125U (en) | Deep foundation pit waist rail construction design template system | |
CN214089520U (en) | Green's foam light soil bridge road changeover portion pouring structure | |
CN2510522Y (en) | II-type prestressed concrete sleeper ribbed by 10X diameter 6.25 mm spiral rib steel-wire | |
CN210315076U (en) | Bamboo-reinforced railway composite sleeper | |
KR100740049B1 (en) | Retaining Wall for using concrete sleepers | |
CN214401220U (en) | Prestressed concrete sleeper | |
CN201459522U (en) | Integral type ballastless track | |
CN210481906U (en) | Prestressed concrete sleeper suitable for wide-narrow gauge sleeve rail railway | |
CN220365039U (en) | Stable installation pile foundation structure for building construction | |
CN218713216U (en) | A building supporting seat for among building engineering | |
CN219568942U (en) | Foundation bolt structure of steel column foot | |
CN111827012A (en) | Structure and method of combined composite sleeper | |
CN203923804U (en) | Rice gauge prestressed reinforced concrete tie | |
CN2455757Y (en) | Prestressed concrete sleeper with strengthened shoulders | |
CN219650232U (en) | Bench for pretensioned prestressing arch bar by long line method | |
CN214572984U (en) | Wide and short enhanced bridge sleeper structure | |
CN211897621U (en) | One-way prestressed prefabricated steel spring floating plate | |
CN217812665U (en) | Independent foundation is consolidated to newly-increased rib girder formula isopachous pterygoid lamina |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |