CN2455757Y - Prestressed concrete sleeper with strengthened shoulders - Google Patents
Prestressed concrete sleeper with strengthened shoulders Download PDFInfo
- Publication number
- CN2455757Y CN2455757Y CN 00266494 CN00266494U CN2455757Y CN 2455757 Y CN2455757 Y CN 2455757Y CN 00266494 CN00266494 CN 00266494 CN 00266494 U CN00266494 U CN 00266494U CN 2455757 Y CN2455757 Y CN 2455757Y
- Authority
- CN
- China
- Prior art keywords
- sleeper
- steel
- strengthened
- point
- shoulder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to a prestressed concrete sleeper with a strengthened shoulder, comprising a steel fiber concrete sleeper. The point that a sleeper groove which is laid with a steel rail (namely, the shoulder point) is provided with an iron pad. The iron pad has at least 10 round steel bars, and the steel bars are extended into the steel fiber concrete sleeper. Because the shoulder point of the concrete sleeper laid with the steel rails is provided with the iron pad with the round steel bars, partial pressure and impact force stressed by a sleeper supporting groove point can be transferred to the whole sleeper through the steel bars, so that impact force and pressure resistance at the sleeper supporting groove point can be strengthened. Besides, the iron pad can cause the pressure bearing area of the shoulder point of the sleeper supporting groove to be enlarged. Simultaneously, the impact resistance and the pressure resistance of the sleeper can be enhanced, and the service life of the sleeper can be prolonged.
Description
The utility model relates to a kind of sleeper, exactly relates to a kind of strengthened shoulder type prestressed reinforced concrete tie.
The shoulder block place anti-impact force of present concrete sleeper is not strong, usually is subject to damage, and particularly the sweep in the mountain area is little, the place that the gradient is big, and the problems referred to above are more obvious.
The purpose of this utility model overcomes the deficiencies in the prior art exactly, and a kind of strengthened shoulder type prestressed reinforced concrete tie is provided, and it can improve the shock resistance of sleeper, measuring body power energy, thereby has improved the quality of railway, has guaranteed the traffic safety of train.
The purpose of this utility model realizes by following technical proposals, strengthened shoulder type prestressed reinforced concrete tie of the present utility model comprises a steel fibrous concrete pillow, the rail groove position of steel rail laying thereon, promptly be provided with iron gasket at its shoulder block place, described iron gasket has at least 10 round reinforcing bars, and these reinforcing bars are extended to the steel fibrous concrete pillow.
Round reinforcing bar on the above-mentioned iron gasket is a kind of indented bars, and wherein at least 6 round reinforcing bars are perpendicular to and stretch downwards, and at least 4 round reinforcing bars at the iron gasket portion of bending up place is within the oblique concrete crosstie that stretches.
The utility model has the advantages that owing to be arranged at iron gasket with round reinforcing bar at the shoulder block place of the steel rail laying of concrete crosstie, make sleeper rail support groove place be subjected to partial pressure and impact force to be passed to whole sleeper by its reinforcing bar, thereby the anti-impact force and the anti-pressure ability at sleeper rail support groove place have been strengthened, iron chair also makes the pressure-bearing surface at rail support groove shoulder block place increase in addition, the shock resistance and the anti-pressure ability of its sleeper have also been improved simultaneously, the application life of having improved sleeper.
Further describe structure of the present utility model below in conjunction with accompanying drawing, wherein
Fig. 1 is the structural representation of sleeper of the present utility model;
Fig. 2 is the schematic diagram of iron gasket.
Now referring to accompanying drawing 1 and Fig. 2, strengthened shoulder type prestressed reinforced concrete tie of the present utility model comprises a steel fibrous concrete pillow 1, the rail groove place of steel rail laying thereon, promptly be provided with iron gasket 2 at its shoulder block place, described iron gasket 2 has at least 10 round reinforcing bars 3, and these reinforcing bars 3 are extended (burying underground) to steel fibrous concrete and rest the head within 1.In a preferred embodiment, described reinforcing bar 3 is to be provided with like this, and wherein at least 6 reinforcing bars 3 extend vertically downward, and at least 4 reinforcing bars 3 are obliquely extended within the concrete crosstie 1 according to iron gasket 2 portions of bending up place.The reinforcing bar 3 of oblique extension in a preferred embodiment is shorter than the reinforcing bar 3 that extends vertically downward.
Claims (2)
1, a kind of strengthened shoulder type prestressed reinforced concrete tie is characterized in that it comprises a steel fibrous concrete pillow.The rail groove position of steel rail laying promptly is provided with iron gasket at its shoulder block place thereon, and described iron gasket has at least 10 round reinforcing bars, and these reinforcing bars are extended to the steel fibrous concrete pillow.
2, sleeper according to claim 1, it is characterized in that the round reinforcing bar on the above-mentioned iron gasket is a kind of indented bars, wherein at least 6 round reinforcing bars are perpendicular to and stretch downwards, and at least 4 round reinforcing bars at the iron gasket portion of bending up place are within the oblique concrete crosstie that stretches.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 00266494 CN2455757Y (en) | 2000-12-27 | 2000-12-27 | Prestressed concrete sleeper with strengthened shoulders |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 00266494 CN2455757Y (en) | 2000-12-27 | 2000-12-27 | Prestressed concrete sleeper with strengthened shoulders |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2455757Y true CN2455757Y (en) | 2001-10-24 |
Family
ID=33620566
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 00266494 Expired - Fee Related CN2455757Y (en) | 2000-12-27 | 2000-12-27 | Prestressed concrete sleeper with strengthened shoulders |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2455757Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102121214A (en) * | 2011-04-28 | 2011-07-13 | 张强 | Concrete turnout sleeper assembly for metallurgy and industrial and mining enterprises |
CN103726416A (en) * | 2012-10-15 | 2014-04-16 | 中铁十局集团有限公司 | Construction method for improving percent of pass of double-block type concrete sleepers |
-
2000
- 2000-12-27 CN CN 00266494 patent/CN2455757Y/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102121214A (en) * | 2011-04-28 | 2011-07-13 | 张强 | Concrete turnout sleeper assembly for metallurgy and industrial and mining enterprises |
CN103726416A (en) * | 2012-10-15 | 2014-04-16 | 中铁十局集团有限公司 | Construction method for improving percent of pass of double-block type concrete sleepers |
CN103726416B (en) * | 2012-10-15 | 2015-06-24 | 中铁十局集团有限公司 | Construction method for improving percent of pass of double-block type concrete sleepers |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203855866U (en) | Large-span frame bridge overhead roof with beams convenient to construct | |
CN201883346U (en) | Prestressed concrete track slab of slab-type ballastless track | |
CN2455757Y (en) | Prestressed concrete sleeper with strengthened shoulders | |
CN210886769U (en) | Combined composite sleeper structure | |
CN209323266U (en) | A kind of ballastless track long sleeper suitable for urban track traffic | |
CN102102345B (en) | Prestress concrete noise barrier sound absorption inserting plate for high speed railway | |
CN209397607U (en) | A kind of active end structure of tension bracing members | |
CN102605684B (en) | Low assembly type monolithic roadbed with elastic short sleeper and construction method thereof | |
CN214694926U (en) | Lifting deviation rectifying mechanism for ballastless track | |
CN211547092U (en) | Self-adaptive ballast overturning sleeper | |
CN209323269U (en) | A kind of ballastless track long sleeper suitable for tramcar groove profile rail | |
CN203346740U (en) | Draw shaft track installation structure beneficial to reducing sleeper corrosion | |
CN210238167U (en) | A equipment that is used for whole railway roadbed sleeper tip splayed crack to control | |
CN201943017U (en) | Prestress concrete high-speed railway sound barrier sound absorption insertion plate | |
CN219174990U (en) | Light abutment structure | |
CN206109881U (en) | Be fit for whole prestressed concrete long sleeper of tram groove rail | |
CN213867112U (en) | Construction temporary beam of railway track | |
CN109183524A (en) | A kind of ballastless track long sleeper suitable for urban track traffic | |
CN111827012A (en) | Structure and method of combined composite sleeper | |
CN210481906U (en) | Prestressed concrete sleeper suitable for wide-narrow gauge sleeve rail railway | |
CN204435130U (en) | Railway concrete sharp radius curve rail brace fastener | |
CN2173271Y (en) | Preload stress concrete rail sleeper | |
CN211922092U (en) | Double-block sleeper for mounting quick elastic strip fastener | |
CN215441524U (en) | Subway station platform reinforced structure | |
CN217997680U (en) | Long sleeper of urban rail transit elastic fastener prestressed concrete |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |