CN217326577U - Temporary plugging device for lifting seam of attached scaffold - Google Patents

Temporary plugging device for lifting seam of attached scaffold Download PDF

Info

Publication number
CN217326577U
CN217326577U CN202122286930.6U CN202122286930U CN217326577U CN 217326577 U CN217326577 U CN 217326577U CN 202122286930 U CN202122286930 U CN 202122286930U CN 217326577 U CN217326577 U CN 217326577U
Authority
CN
China
Prior art keywords
weighing down
pipe frame
punching press
steel pipe
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122286930.6U
Other languages
Chinese (zh)
Inventor
徐劲子
刘扬
王志强
白玉庆
向家良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN202122286930.6U priority Critical patent/CN217326577U/en
Application granted granted Critical
Publication of CN217326577U publication Critical patent/CN217326577U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/25Greenhouse technology, e.g. cooling systems therefor

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to a be used for interim plugging device of inserted scaffold lifting joint, including the punching press steel sheet that is used for the shutoff gap, the edge of punching press steel sheet parcel has square steel pipe frame, the rubber magnetic sheet is installed to the one side of square steel pipe frame outside upright net, the top inside wall of square steel pipe frame is installed and is prevented weighing down the pull ring, prevent weighing down the pull ring and keep away from the one end of square steel pipe frame and install the anti-fall rope, the other end of preventing weighing down the rope is installed and is prevented weighing down fixing device; can make the punching press steel sheet fix the gap department at adjacent outer vertical net under the cooperation of rubber magnetic sheet and square steel pipe frame, when needs promote or dismantle the inserted scaffold, only need stimulate the punching press steel sheet, make the rubber magnetic sheet break away from outer vertical net can, through the dismantlement of counterpunching steel sheet that like this can be quick, increase the availability factor, avoid using the fixed advantage of iron wire, and through preventing weighing down fixing device, prevent weighing down the pull ring and prevent weighing down the phenomenon that the rope can avoid the punching press steel sheet to take place to fall when using.

Description

Temporary plugging device for lifting seam of attached scaffold
Technical Field
The utility model relates to a construction technical field especially relates to a be used for interim plugging device of inserted scaffold lifting joint.
Background
At present, divide into each section unit during the installation of inserted scaffold, each unit needs to promote respectively, and the outer net that stands of each unit can actually have the unequal gap of 100mm to 300mm, in order to reduce on-the-spot construction potential safety hazard, can make the expanded metal fix the gap department of the outer net that stands of each unit with the iron wire, when needs promote or dismantle inserted scaffold, need demolish the iron wire, has increased staff's operating procedure like this, has reduced work efficiency.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's defect, provide a be used for attached scaffold to promote interim plugging device of seam, promote or the in-process of dismantling at the attached scaffold, increase staff's availability factor, avoid using the fixed advantage of iron wire.
The technical scheme for realizing the purpose is as follows:
the utility model provides a be used for interim plugging device of inserted scaffold lifting joint, including the punching press steel sheet that is used for the shutoff gap, the edge department parcel of punching press steel sheet has square steel pipe frame, the rubber magnetic sheet is installed to the outside one side of standing the net of square steel pipe frame face, the top inside wall of square steel pipe frame is installed and is prevented weighing down the pull ring, prevent weighing down the pull ring and keep away from the one end of square steel pipe frame is installed and is prevented weighing down the rope, prevent weighing down the other end of rope and install and prevent weighing down fixing device, just it fixes at the outside department of standing the net to prevent weighing down fixing device.
Preferably, the anti-falling rope comprises a steel wire rope and an aluminum alloy connector, the steel wire rope is wound around the inner side wall of the anti-falling pull ring, and two ends of the steel wire rope are fixed through the aluminum alloy connectors. In order to avoid the steel cable from falling off between the anti-falling pull ring and the fixing ring.
Preferably, prevent weighing down fixing device is including solid fixed ring, fixed plate and nut, wire rope keeps away from solid fixed ring is installed to the one end of preventing weighing down the pull ring, fixed plate and nut are installed to solid fixed ring's lateral wall, just the nut with gu fixed ring threaded connection. In order to fix the steel wire rope connected with the fixing ring conveniently.
Preferably, the fixing plate is of a flat structure. In order to facilitate the fixing of the fixing plate on the surface of the outer vertical frame to be firmer.
Preferably, the stamped steel plate is a stainless steel member. The stainless steel has better sturdiness, can avoid punching press steel sheet to take place to damage in the use.
Preferably, the square steel pipe frame is bonded and fixed with the rubber magnetic sheet. To avoid the step of fixing the rubber magnetic sheet using bolts.
Preferably, the length and width of the stamped steel sheet and the rubber magnet sheet are the same. The phenomenon that the stamped steel plate falls off due to insufficient magnetic force is avoided.
The beneficial effects of the utility model are that: the utility model discloses at the in-process that uses, can make the punching press steel sheet fix the gap department at adjacent outer vertical net under the cooperation of rubber magnetic sheet and square steel pipe frame, when needs promote or dismantle the inserted scaffold frame, only need stimulate the punching press steel sheet, make the rubber magnetic sheet break away from outer vertical net can, through the dismantlement of counterpunching steel sheet that like this can be quick, increase the availability factor, avoid using the fixed advantage of iron wire, and through preventing weighing down fixing device, prevent weighing down the pull ring and prevent weighing down the rope and can avoid the punching press steel sheet because of wind or rock the phenomenon that takes place to fall when using.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged schematic view of the anti-falling rope of FIG. 1 according to the present invention;
FIG. 3 is an enlarged schematic view of the anti-falling fixture of FIG. 1 according to the present invention;
description of the reference numerals:
1. stamping a steel plate; 2. a square steel pipe frame; 3. a rubber magnetic sheet; 4. an anti-falling pull ring; 5. preventing falling of the rope; 51. a wire rope; 52. an aluminum alloy joint; 6. an anti-falling fixing device; 61. a fixing ring; 62. a fixing plate; 63. and a nut.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and specific embodiments.
Referring to fig. 1 to 3, the utility model provides a be used for interim plugging device of inserted scaffold lifting joint, including the punching press steel sheet 1 that is used for the shutoff gap, the corner welding of punching press steel sheet 1 has square steel pipe frame 2, and rubber magnetic sheet 3 is installed to the one side of square steel pipe frame 2 towards the outer vertical net, and the welding of the top inside wall of square steel pipe frame 2 has prevents weighing down pull ring 4, prevents weighing down pull ring 4 and keeps away from the one end of square steel pipe frame 2 and installs and prevent weighing down rope 5, prevents weighing down rope 5's the other end and installs and prevent weighing down fixing device 6, and prevents weighing down fixing device 6 and fix in outer vertical net department.
In this example, can make punching press steel sheet 1 fix the gap department at adjacent outer upright net under the cooperation of rubber magnetic sheet 3 and square steel tube frame 2, when needs promote or dismantle the inserted scaffold, only need stimulate punching press steel sheet 1, make rubber magnetic sheet 3 break away from outer upright net can, through dismantling punching press steel sheet 1 that can be quick like this, increase the availability factor, avoid using the fixed advantage of iron wire, and through preventing weighing down fixing device 6, prevent weighing down pull ring 4 and prevent weighing down rope 5 and can avoid punching press steel sheet 1 because of wind or rock the phenomenon that takes place to fall when using.
Furthermore, as shown in fig. 2, the anti-falling rope 5 includes a steel wire rope 51 and an aluminum alloy joint 52, the steel wire rope 51 is surrounded on the inner side wall of the anti-falling pull ring 4, two ends of the steel wire rope 51 are fixed by the aluminum alloy joint 52, so that the two ends of the steel wire rope 51 are respectively surrounded behind the anti-falling pull ring 4 and the fixing ring 61, and the two ends of the steel wire rope 51 are fixed by the aluminum alloy joint 52, thereby preventing the steel wire rope 51 from falling off between the anti-falling pull ring 4 and the fixing ring 61.
Further, as shown in fig. 3, the anti-falling fixing device 6 includes a fixing ring 61, a fixing plate 62 and a nut 63, the fixing ring 61 is installed at one end of the steel wire rope 51 far away from the anti-falling pull ring 4, the fixing plate 62 and the nut 63 are installed on the outer side wall of the fixing ring 61, and the nut 63 is in threaded connection with the fixing ring 61, so that the fixing plate 62 is placed on one surface of the outer vertical net far away from the steel wire rope 51, and then the nut 63 is screwed to the end of the fixing ring 61, and the steel wire rope 51 connected with the fixing ring 61 can be fixed through the fixing.
Further, as shown in fig. 3, the fixing plate 62 has a flat structure, so that the contact area between the fixing plate 62 and the outer stand can be increased, and the fixing of the fixing plate 62 on the surface of the outer stand can be more firm.
Further, as shown in fig. 1, the stamped steel plate 1 is made of stainless steel, which has a good robustness and can prevent the stamped steel plate from being damaged during use.
Further, as shown in fig. 1, the square steel tube frame 2 and the rubber magnetic sheet 3 are bonded and fixed, so that the rubber magnetic sheet 3 can be fixed on the surface of the square steel tube frame 2 by a worker, and the step of fixing by using bolts is avoided.
Further, as shown in fig. 1, the length and the width of the stamped steel plate 1 are the same as those of the rubber magnet sheet 3, so that the stamped steel plate 1 can be fixed at the gap more firmly, and the phenomenon that the stamped steel plate 1 falls off due to insufficient magnetic force is avoided.
The utility model discloses a theory of operation is: the utility model discloses in the in-process that uses, make punching press steel sheet 1 place the gap department of net outside adjacent, then fix the rubber magnetic sheet 3 that square steel pipe frame 2 is connected on the net outside through magnetic force, through so can make punching press steel sheet 1 fix the gap department of net outside adjacent, and make fixed plate 62 fix the surface of net outside one of them through nut 63, can avoid punching press steel sheet 1 to take place to drop through the pulling of preventing weighing down rope 5, when needs promote or dismantle the inserted scaffold frame, only need stimulate punching press steel sheet 1, make rubber magnetic sheet 3 break away from the net outside can, dismantle punching press steel sheet 1 through can be quick like this, increase the characteristics of availability factor.
The present invention has been described in detail with reference to the embodiments shown in the drawings, and those skilled in the art can make various modifications to the present invention based on the above description. Therefore, certain details of the embodiments should not be construed as limitations of the invention, which is to be interpreted as broadly as the appended claims define the scope of the invention.

Claims (7)

1. The utility model provides a be used for interim plugging device of inserted scaffold lifting joint, a serial communication port, including the punching press steel sheet that is used for the shutoff gap, the edge parcel of punching press steel sheet has square steel pipe frame, the rubber magnetic sheet is installed to the outside one side of standing the net of square steel pipe frame face, the top inside wall of square steel pipe frame is installed and is prevented weighing down the pull ring, prevent weighing down the pull ring and keep away from the one end of square steel pipe frame is installed and is prevented weighing down the rope, prevent weighing down the other end of rope and install and prevent weighing down fixing device, just it fixes in the outer net department to prevent weighing down fixing device.
2. The temporary plugging device for the lifting joint of the attached scaffold as claimed in claim 1, wherein the anti-falling rope comprises a steel wire rope and an aluminum alloy joint, the steel wire rope is wound around the inner side wall of the anti-falling pull ring, and two ends of the steel wire rope are fixed through the aluminum alloy joint.
3. The temporary plugging device for the attached scaffold lifting joint as claimed in claim 2, wherein the anti-falling fixing device comprises a fixing ring, a fixing plate and a nut, the fixing ring is installed at one end of the steel wire rope, which is far away from the anti-falling pull ring, the fixing plate and the nut are installed on the outer side wall of the fixing ring, and the nut is in threaded connection with the fixing ring.
4. The temporary plugging device for the lifting seam of the attached scaffold according to claim 3, wherein the fixing plate is a flat structure.
5. The temporary plugging device for the attached scaffold lifting seam according to claim 1, wherein the stamped steel plate is a stainless steel member.
6. The temporary plugging device for the lifting joint of the attached scaffold as claimed in claim 1, wherein the square steel tube frame is fixedly bonded with the rubber magnetic sheet.
7. The temporary plugging device for the lifting seam of the attached scaffold as claimed in claim 1, wherein the length and width of the stamped steel plate and the rubber magnetic sheet are the same.
CN202122286930.6U 2021-09-22 2021-09-22 Temporary plugging device for lifting seam of attached scaffold Active CN217326577U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122286930.6U CN217326577U (en) 2021-09-22 2021-09-22 Temporary plugging device for lifting seam of attached scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122286930.6U CN217326577U (en) 2021-09-22 2021-09-22 Temporary plugging device for lifting seam of attached scaffold

Publications (1)

Publication Number Publication Date
CN217326577U true CN217326577U (en) 2022-08-30

Family

ID=82944615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122286930.6U Active CN217326577U (en) 2021-09-22 2021-09-22 Temporary plugging device for lifting seam of attached scaffold

Country Status (1)

Country Link
CN (1) CN217326577U (en)

Similar Documents

Publication Publication Date Title
CN217326577U (en) Temporary plugging device for lifting seam of attached scaffold
CN203556678U (en) Straightener for crimping pipe
CN203271102U (en) Fixed hoisting point part for maintenance of outer walls of chimneys
CN204675726U (en) Purlin lifting auxiliary device
CN204597384U (en) Aluminium hydraulic pressed connecting pipe adjuster
CN108360830B (en) On-site construction protector
CN217000827U (en) Connecting assembly for mounting and fixing scaffold steel plate net
CN203531357U (en) Wind load resistance device of attached-type lifting scaffold
CN212772868U (en) Pre-buried bearing structure
CN215954059U (en) External continuous connecting piece for butt joint of tubes for screen frame
CN209799439U (en) Detachable safety rope hangs simple and easy device during steel construction plane installation
CN219364631U (en) Pre-pressure steel pipe internal support anti-falling device
CN104600521A (en) Signal transfer board outside square cabin of equipment
CN106193754A (en) A kind of straight line pole increases bar
CN211056513U (en) Pipeline stone tongs for building
CN205118450U (en) Concrete pump pipe fixing device
CN205960492U (en) Change instrument is assisted to perpendicular telescopic isolator static contact
CN217381170U (en) Corner connecting device for assembled anti-seismic support
CN211388570U (en) Rotor transmission pin pulling device
CN211572503U (en) Face limit safety operation platform equipment
CN210315660U (en) Utility tunnel supporting structure
CN220301834U (en) Detachable spider man suspension device
CN216741509U (en) Installation device suitable for shaft pipeline
CN210195311U (en) Safety rope fixing support
CN205452794U (en) Reinforcing apparatus of lightning rod

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant