CN210315660U - A kind of integrated pipe gallery support structure - Google Patents

A kind of integrated pipe gallery support structure Download PDF

Info

Publication number
CN210315660U
CN210315660U CN201921116555.7U CN201921116555U CN210315660U CN 210315660 U CN210315660 U CN 210315660U CN 201921116555 U CN201921116555 U CN 201921116555U CN 210315660 U CN210315660 U CN 210315660U
Authority
CN
China
Prior art keywords
support frame
horizontal support
plate
clamping block
fixedly installed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921116555.7U
Other languages
Chinese (zh)
Inventor
朱陈根
朱建新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhongyuan General Electrical And Mechanical Co Ltd
Original Assignee
Jiangsu Zhongyuan General Electrical And Mechanical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhongyuan General Electrical And Mechanical Co Ltd filed Critical Jiangsu Zhongyuan General Electrical And Mechanical Co Ltd
Priority to CN201921116555.7U priority Critical patent/CN210315660U/en
Application granted granted Critical
Publication of CN210315660U publication Critical patent/CN210315660U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model provides a utility tunnel supporting structure relates to utility tunnel technical field, include: the device comprises a main support frame, a horizontal support frame, a clamping block, a fastening device, a fastening screw and a support arm; the right side face of the main support frame is fixedly provided with a horizontal support frame, the clamping blocks are slidably arranged on two sides of the interior of the main support frame, the fastening device is inserted into the upper surface of the horizontal support frame and extends to two sides of the interior, one end of the support arm is fixedly arranged on the lower portion of the right side face of the main support frame, and the other end of the support arm is fixedly arranged on the lower surface of the horizontal support frame through a fastening screw and extends to the interior. The utility model discloses a horizontal support frame's structure can effectual improvement whole supporting structure's bearing nature, through the grip block with tightly close the pipeline that the device can be effectual the difference to the pipe diameter and fix the centre gripping, the structure through the support arm just can more effectual improvement main tributary strut's bearing nature to improve whole structure's stability.

Description

Utility tunnel supporting structure
Technical Field
The utility model relates to a utility tunnel technical field, more specifically say, in particular to utility tunnel supporting structure.
Background
Utility tunnel builds a tunnel space in the city underground, with electric power, the communication, gas, multiple engineering pipeline collection such as drainage in an organic whole, implement unified planning and management, be the important infrastructure and "lifeline" of guarantee city operation, current utility tunnel supporting structure is loaded down with trivial details, bearing capacity is limited, the pipeline or the line way of erectting on the supporting structure can take place the displacement when pouring concrete for current utility tunnel supporting structure, thereby can't realize the better fixed problem of pipeline or line way.
SUMMERY OF THE UTILITY MODEL
Problem (A)
To sum up, the utility model provides a utility tunnel supporting structure to solve because the construction is loaded down with trivial details, bearing capacity is limited and when concreting, pipeline or the line way on supporting structure can all take place the unable realization of displacement to pipeline or the better fixed problem of line way.
(II) technical scheme
The utility model provides a utility tunnel supporting structure, include: the device comprises a main support frame, a horizontal support frame, a first clamping block, a fastening screw, a second clamping block, a fastening device, a lower fixing plate, a conical column, a side wing steel plate, an upper fixing block, a steel wire rope, a rubber sleeve, a strong spring, a first fixing bottom plate, an expansion screw, a second fixing plate and a support arm; the right side surface of the main support frame is fixedly provided with a horizontal support frame, the first clamping block and the second clamping block are slidably arranged on two sides of the inside of the horizontal support frame, the tightening device is inserted and arranged on the upper surface of the horizontal support frame and extends to the inside, the tightening device comprises a lower fixing plate, a conical column, a side wing steel plate, an upper fixing block, a steel wire rope, a rubber sleeve and a strong spring, the lower surface of the lower fixing plate is fixedly provided with the conical column, the conical column is inserted and arranged inside the horizontal support frame through the side wing steel plate, the upper fixing block is fixedly connected with the lower fixing plate through a fastening screw, the middle part of the upper surface of the upper fixing block is fixedly provided with the steel wire rope, the rubber sleeve is sleeved and arranged on the outer side of the steel wire rope, one end of the strong spring is arranged on the outer side of the conical column, the other end of the strong spring is, the top is far away from the lower surface of the horizontal support frame, the second fixing plate is fixedly installed on the lower surface of the horizontal support frame through a fastening screw, the fastening screw extends to the inside of the horizontal support frame, one end of the support arm is fixedly installed in the middle of the right side face of the first fixing bottom plate, and the other end of the support arm is fixedly installed in the middle of the lower surface of the second fixing plate.
Preferably, the horizontal support frame is an I-shaped support steel frame, round hole structures are uniformly arranged on the upper surface and the lower surface of the horizontal support frame in an embedded mode and extend to the inner portion, and the diameter of each round hole is larger than that of each conical column.
Preferably, the upper surfaces of the first clamping block and the second clamping block are embedded with threaded hole structures.
Preferably, the lateral wing steel plate is fixedly arranged on the outer side of the upper part of the bottom end of the conical column in an annular mode.
Preferably, at least one fastening device is uniformly arranged and inserted on the upper surface of the horizontal support frame.
(III) advantageous effects
The utility model discloses a horizontal support frame's structure can effectual improvement overall structure's bearing nature, can be to the effectual fixed clamping action of realization of pipeline or line way under the cooperation of the first grip block of the inside both sides of horizontal support frame and the structure of second grip block, position through slidable mounting to can be effectual carry out the centre gripping fixedly to the pipeline of different diameters or line way.
Secondly, through inserting the effective fixed action of realizing fixing the pipeline or the line way of centre gripping in first grip block and the second grip block concave surface outside of installing in the inside tight dress device of horizontal support frame, further, can effectually avoid the wearing and tearing that wire rope caused the pipeline or the line way outside through rubber sleeve.
Moreover, can effectually avoid the not hard up problem on first fixed top through the inflation screw, can effectual improvement horizontal support frame's bearing nature through the support arm to more effectual improvement the stability of whole structure, can effectually prevent not hard up the droing, the problem of second fixed plate through extending to the inside fastening screw of horizontal support frame.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is an enlarged schematic view of the overall structure of the present invention.
Fig. 3 is an enlarged schematic view of the structure of the component 6 of the present invention.
In fig. 1 to 3, the correspondence between the part names or lines and the reference numbers is:
the device comprises a main support frame 1, a horizontal support frame 2, a first clamping block 3, a fastening screw 4, a second clamping block 5, a fastening device 6, a lower fixing plate 61, a conical column 62, a flank steel plate 63, an upper fixing block 64, a steel wire rope 65, a rubber sleeve 66, a strong spring 67, a first fixing base plate 7, an expansion screw 8, a second fixing plate 9 and a support arm 10.
Detailed Description
The following describes embodiments of the present invention in further detail with reference to the accompanying drawings and examples. The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention.
Please refer to fig. 1 to fig. 3:
the utility model provides a utility tunnel supporting structure, include: the device comprises a main support frame 1, a horizontal support frame 2, a first clamping block 3, a fastening screw 4, a second clamping block 5, a fastening device 6, a lower fixing plate 61, a conical column 62, a flank steel plate 63, an upper fixing block 64, a steel wire rope 65, a rubber sleeve 66, a strong spring 67, a first fixing bottom plate 7, an expansion screw 8, a second fixing plate 9 and a support arm 10; the right side surface of the main support frame 1 is fixedly provided with a horizontal support frame 2, a first clamping block 3 and a second clamping block 5 are slidably arranged at two sides of the inner part of the horizontal support frame 2, a fastening device 6 is inserted and arranged on the upper surface of the horizontal support frame 2 and extends to the inner part, the fastening device 6 comprises a lower fixing plate 61, a conical column 62, a flank steel plate 63, an upper fixing block 64, a steel wire rope 65, a rubber sleeve 66 and a strong spring 67, the lower surface of the lower fixing plate 61 is fixedly provided with the conical column 62, the conical column 62 is inserted and arranged in the inner part of the horizontal support frame 2 through the flank steel plate 63, the upper fixing block 64 is fixedly connected with the lower fixing plate 61 through a fastening screw 4, the middle part of the upper surface of the upper fixing block 64 is fixedly provided with the steel wire rope 65, the rubber sleeve 66 is sleeved and arranged at the outer side of the steel wire rope 65, first PMKD 7 passes through expansion screw 8 fixed mounting in main tributary strut 1's right flank lower part, and 2 lower surfaces of horizontal support frame are kept away from at the top, and second fixing plate 9 passes through fastening screw 4 fixed mounting in 2 lower surfaces of horizontal support frame, and fastening screw 4 extends to the inside of horizontal support frame 2, and support arm 10 one end fixed mounting is in the right flank middle part of first PMKD 7, and other end fixed mounting is in the lower surface middle part of second fixing plate 9.
Wherein, horizontal support frame 2 is "worker" word support steelframe, and upper and lower surface align to grid embedding installs the round hole structure, and extends to inside, and the round hole diameter is greater than the diameter of awl post 62.
Wherein, the upper surface embedding of first grip block 3 and second grip block 5 has the screw hole structure.
Wherein, the flank steel plate 63 is fixedly arranged on the outer side of the upper part of the bottom end of the conical column 62 in a ring shape.
Wherein, the upper surface of the horizontal support frame 2 is uniformly provided with at least one fastening device 6 in an inserting way.
The specific use mode and function of the embodiment are as follows: firstly, after the device is assembled, a pipeline or a wire to be erected is stably placed on the upper surface of a horizontal support frame 2, then a first clamping block 3 and a second clamping block 5 are moved towards the outer side of the pipeline or the wire which is stably placed on the upper surface of the horizontal support frame 2, when the concave side surfaces of the first clamping block 3 and the second clamping block 5 are combined with the outer side of the pipeline or the wire which is stably placed on the upper surface of the horizontal support frame 2, the first clamping block 3 and the second clamping block 5 are fixedly arranged on the upper surface of the horizontal support frame 2 through a fastening screw 4, then a side wing steel plate 63 is manually and horizontally pressed towards the outer side of a conical column 62, the side wing steel plate 63 drives a strong spring 67 to horizontally contract towards the outer side direction of the conical column 62, and meanwhile, the conical column 62 is inserted and arranged on the upper surface of the horizontal support frame 2 and close to the inner side hole of the outer side surface of the second clamping block 5, when the bottom end of the conical column 62 is attached to the inner upper surface of the horizontal support frame 2, the strong spring 67 pushes the wing steel plate 63 to move horizontally to the right toward the outer side of the conical column 62 under the structural characteristics of the strong spring 67, then the lower fixing plate 61 is pulled vertically upwards manually, the conical column 62 is fixed inside the horizontal support frame 2 under the action of the wing steel plate 63 while pulling upwards, then the conical column 62 is inserted and mounted on the upper surface of the horizontal support frame 2 in the same way inside the circular hole close to the outer side surface of the first clamping block 3, finally the upper fixing plate 64 is fixedly connected with the lower fixing plate through the fastening screw, the stable fixing and clamping effect on the pipeline or the line placed on the upper surface of the horizontal support frame 2 is effectively realized under the action of the first clamping block 3, the second clamping block 5 and the fastening device 6, and when the pipeline or the line placed on the upper surface of the horizontal support frame 2 needs to be replaced, During the maintenance, manual press flank steel sheet 63 toward awl post 62 outside horizontal direction level, flank steel sheet 63 drives powerful spring 67 and carries out horizontal contraction toward awl post 62 outside direction, next, manual pull bottom plate 61 is perpendicular upwards, in the upwards pulling, because the round hole diameter of embedding installation at 2 upper surfaces of horizontal support frame is greater than the diameter of awl post 62, thereby realize the dismantlement work of awl post 62, and finally, dismantle fastening screw 4 through the nut model assorted loosening and twisting tool with fastening screw 4, when fastening screw 4 dismantles the back, stir first grip block 3 and second grip block 5 manual toward pipeline or the outside direction of line, thereby effectual realization is to the timely change of pipeline or line way.
The embodiments of the present invention have been presented for purposes of illustration and description, and are not intended to be exhaustive or limited to the invention in the form disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiment was chosen and described in order to best explain the principles of the invention and the practical application, and to enable others of ordinary skill in the art to understand the invention for various embodiments with various modifications as are suited to the particular use contemplated.

Claims (5)

1.一种综合管廊支架结构,包括:主支撑架(1),水平支撑架(2),第一夹持块(3),紧固螺钉(4),第二夹持块(5),紧锢装置(6),下固定板(61),锥柱(62),侧翼钢板(63),上固定块(64),钢丝绳(65),橡胶套筒(66),强力弹簧(67),第一固定底板(7),膨胀螺钉(8),第二固定板(9),支撑臂(10);其特征在于:所述主支撑架(1)的右侧面固定安装有水平支撑架(2),所述第一夹持块(3)与第二夹持块(5)滑动安装于水平支撑架(2)的内部两侧,所述紧锢装置(6)插入安装于水平支撑架(2)的上表面,且延伸至内部,所述紧锢装置(6)包括下固定板(61),锥柱(62),侧翼钢板(63),上固定块(64),钢丝绳(65),橡胶套筒(66),强力弹簧(67),所述下固定板(61)的下表面固定安装有锥柱(62),且锥柱(62)通过侧翼钢板(63)插入安装于水平支撑架(2)的内部,所述上固定块(64)通过紧固螺钉(4)与下固定板(61)固定连接,且上固定块(64)的上表面中部固定安装有钢丝绳(65),所述橡胶套筒(66)套接安装于钢丝绳(65)的外侧,所述强力弹簧(67)一端安装于锥柱(62)的外侧,另一端固定安装于侧翼钢板(63)的右侧面中部,所述第一固定底板(7)通过膨胀螺钉(8)固定安装于主支撑架(1)的右侧面下部,顶部远离水平支撑架(2)下表面,所述第二固定板(9)通过紧固螺钉(4)固定安装于水平支撑架(2)的下表面,且紧固螺钉(4)延伸至水平支撑架(2)的内部,所述支撑臂(10)一端固定安装于第一固定底板(7)的右侧面中部,另一端固定安装于第二固定板(9)的下表面中部。1. An integrated pipe gallery support structure, comprising: a main support frame (1), a horizontal support frame (2), a first clamping block (3), a fastening screw (4), and a second clamping block (5) , tightening device (6), lower fixing plate (61), cone column (62), side plate (63), upper fixing block (64), wire rope (65), rubber sleeve (66), strong spring (67) ), the first fixed base plate (7), the expansion screw (8), the second fixed plate (9), the support arm (10); it is characterized in that: the right side of the main support frame (1) is fixedly installed with a horizontal The support frame (2), the first clamping block (3) and the second clamping block (5) are slidably installed on both sides of the interior of the horizontal support frame (2), and the tightening device (6) is inserted and installed in the horizontal support frame (2). The upper surface of the horizontal support frame (2) extends to the inside, and the tightening device (6) includes a lower fixing plate (61), a cone column (62), a side wing steel plate (63), and an upper fixing block (64), A steel wire rope (65), a rubber sleeve (66), a strong spring (67), a tapered column (62) is fixedly installed on the lower surface of the lower fixing plate (61), and the tapered column (62) passes through the side plate (63) The upper fixing block (64) is fixedly connected to the lower fixing plate (61) by means of the fastening screws (4), and the middle part of the upper surface of the upper fixing block (64) is fixedly installed. There is a steel wire rope (65), the rubber sleeve (66) is sleeved and installed on the outside of the steel wire rope (65), one end of the strong spring (67) is installed on the outside of the tapered column (62), and the other end is fixedly installed on the side plate steel plate In the middle of the right side of (63), the first fixed bottom plate (7) is fixedly mounted on the lower part of the right side of the main support frame (1) by means of expansion screws (8), and the top is away from the lower surface of the horizontal support frame (2), The second fixing plate (9) is fixedly installed on the lower surface of the horizontal support frame (2) by means of fastening screws (4), and the fastening screws (4) extend to the interior of the horizontal support frame (2), and the support One end of the arm (10) is fixedly installed on the middle part of the right side of the first fixed bottom plate (7), and the other end is fixedly installed on the middle part of the lower surface of the second fixed plate (9). 2.根据权利要求1所述的一种综合管廊支架结构,其特征在于:所述水平支撑架(2)为“工”字支撑钢架,且上、下表面均匀排列嵌入安装有圆孔结构,且延伸至内部,且圆孔直径大于锥柱(62)的直径。2. A kind of integrated pipe gallery support structure according to claim 1, characterized in that: the horizontal support frame (2) is an "I"-shaped support steel frame, and the upper and lower surfaces are evenly arranged and embedded with circular holes. The structure is extended to the inside, and the diameter of the circular hole is larger than the diameter of the cone column (62). 3.根据权利要求1所述的一种综合管廊支架结构,其特征在于:所述第一夹持块(3)与第二夹持块(5)的上表面嵌入安装有螺纹孔结构。3 . The integrated pipe gallery support structure according to claim 1 , wherein a threaded hole structure is embedded in the upper surfaces of the first clamping block ( 3 ) and the second clamping block ( 5 ). 4 . 4.根据权利要求1所述的一种综合管廊支架结构,其特征在于:所述侧翼钢板(63)呈环状固定安装于锥柱(62)的底端上部外侧。4. a kind of comprehensive pipe gallery support structure according to claim 1, is characterized in that: described flank steel plate (63) is annularly fixed and installed on the outer side of the bottom upper part of the cone column (62). 5.根据权利要求1所述的一种综合管廊支架结构,其特征在于:所述水平支撑架(2)的上表面均匀排列插入安装有不少于一个紧锢装置(6)。5 . The integrated pipe gallery support structure according to claim 1 , wherein the upper surface of the horizontal support frame ( 2 ) is evenly arranged and installed with no less than one tightening device ( 6 ). 6 .
CN201921116555.7U 2019-07-17 2019-07-17 A kind of integrated pipe gallery support structure Expired - Fee Related CN210315660U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921116555.7U CN210315660U (en) 2019-07-17 2019-07-17 A kind of integrated pipe gallery support structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921116555.7U CN210315660U (en) 2019-07-17 2019-07-17 A kind of integrated pipe gallery support structure

Publications (1)

Publication Number Publication Date
CN210315660U true CN210315660U (en) 2020-04-14

Family

ID=70124003

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921116555.7U Expired - Fee Related CN210315660U (en) 2019-07-17 2019-07-17 A kind of integrated pipe gallery support structure

Country Status (1)

Country Link
CN (1) CN210315660U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117071632A (en) * 2023-07-25 2023-11-17 中交一公局集团华中工程有限公司 A lightweight prefabricated comprehensive pipe gallery

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117071632A (en) * 2023-07-25 2023-11-17 中交一公局集团华中工程有限公司 A lightweight prefabricated comprehensive pipe gallery

Similar Documents

Publication Publication Date Title
CN203755640U (en) Slope surface scaffold pedestal device
CN105625621B (en) Waffle beam formwork is fixed and electromechanical pipeline fixes Versatile apparatus and method
CN203531401U (en) Inclined supporting and fixing device between wall template and ground
CN210315660U (en) A kind of integrated pipe gallery support structure
CN104052009A (en) Hoop type cable duct cable support
CN207283099U (en) A kind of wall pre-embedded hydroelectric line case positioning device
CN204391613U (en) A kind of wire support device of auxiliary replacement porcelain pole arm
CN202513536U (en) Cable support for power tunnel
CN204103417U (en) Anchor ear type cable trough cable support
CN107338956A (en) A kind of hole to be provided sleeve pipe and its application method
CN202689671U (en) Lifting type holding rod
CN107504036B (en) Internal support device for casing and construction method thereof
CN206157907U (en) Antidetonation connecting piece
CN204061461U (en) EXPANSION ANCHOR BOLTS embedded part
CN107598824A (en) Hatchcover rubber installation method
CN103452371B (en) Integral sleeve suspension chimney
CN207448355U (en) Hatchcover rubber mounting tool
CN104092150A (en) Hauling rope elastic clamping mechanism for pulley type guide wire block
CN108724477A (en) A kind of convenient vibration damping electric drill support device
CN203794496U (en) Firefighting pipe lifting device
CN111115429B (en) A kind of underwater pipeline pull-out fixture, pull-out device and pull-out method
CN204252496U (en) Convenient installation device for constructional engineering suspender
CN210825317U (en) Angle iron pile auxiliary pulling device
CN202769052U (en) Pipeline movable cradle
CN221683819U (en) Municipal works pipeline components

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200414