CN217326537U - Auxiliary equipment for mounting glass curtain wall - Google Patents

Auxiliary equipment for mounting glass curtain wall Download PDF

Info

Publication number
CN217326537U
CN217326537U CN202220400583.7U CN202220400583U CN217326537U CN 217326537 U CN217326537 U CN 217326537U CN 202220400583 U CN202220400583 U CN 202220400583U CN 217326537 U CN217326537 U CN 217326537U
Authority
CN
China
Prior art keywords
glass curtain
curtain wall
fixed plate
fixed
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220400583.7U
Other languages
Chinese (zh)
Inventor
曹建杭
闵琦吉
闵明
周俊
孔赛男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Xiangdu Construction Technology Co ltd
Original Assignee
Zhejiang Xiangdu Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Xiangdu Construction Engineering Co ltd filed Critical Zhejiang Xiangdu Construction Engineering Co ltd
Priority to CN202220400583.7U priority Critical patent/CN217326537U/en
Application granted granted Critical
Publication of CN217326537U publication Critical patent/CN217326537U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses an auxiliary assembly for glass curtain wall installation, two fixed slide rails including the horizontal symmetry setting, first fixed plate and second fixed plate that the interval set up around fixed slide rail includes, form the slide that supplies glass curtain wall process between first fixed plate and the second fixed plate, one side of keeping away from the second fixed plate on the first fixed plate is equipped with a plurality of fixed suction cups. To glass curtain wall there is the technical problem of great potential safety hazard at the in-process of hoist and mount, the utility model provides an auxiliary assembly for glass curtain wall installation, it can improve the security when glass curtain wall high altitude hoist and mount, borrows the power through the glass curtain wall to having installed to avoid glass curtain wall to produce acutely and rock at the in-process of hoist and mount.

Description

Auxiliary equipment for mounting glass curtain wall
Technical Field
The utility model relates to a glass curtain wall erection equipment technical field, concretely relates to an auxiliary assembly for glass curtain wall installation.
Background
The glass curtain wall is formed by combining mirror glass and common glass, the interlayer introduces hollow glass of dry air or inert gas, the hollow glass has two layers and three layers, the glass curtain wall needs to be fixed in the installation process, and the height of the glass is adjusted according to the height of a building.
In the process of suspending the glass curtain wall to high altitude, the glass curtain wall is affected by wind force easily and shakes violently, and even the glass curtain wall which is installed is smashed, so that great potential safety hazards exist.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved by the utility model
To glass curtain wall there is the technical problem of great potential safety hazard at the in-process of hoist and mount, the utility model provides an auxiliary assembly for glass curtain wall installation, it can improve the security when glass curtain wall high altitude hoist and mount, borrows the power through the glass curtain wall to having installed to avoid glass curtain wall to produce acutely and rock at the in-process of hoist and mount.
2. Technical scheme
In order to solve the above problem, the utility model provides a technical scheme does:
the utility model provides an auxiliary assembly for glass curtain wall installation, includes two fixed slide rails that the horizontal symmetry set up, first fixed plate and second fixed plate that fixed slide rail set up including the front and back interval, form the slide that supplies glass curtain wall process between first fixed plate and the second fixed plate, one side of keeping away from the second fixed plate on the first fixed plate is equipped with a plurality of fixed suction cups.
Optionally, a first flexible buffer layer is disposed on one side of the first fixing plate close to the second fixing plate, and a second flexible buffer layer is disposed on one side of the second fixing plate close to the first fixing plate.
Optionally, the opening at the lower end of the slideway is of a flaring structure.
Optionally, the upper end of the fixed slide rail is provided with a plurality of positioning guide posts, and the upper end of the fixed slide rail is provided with a plurality of positioning guide holes.
Optionally, a horizontal fall arrest plate is provided within the ramp, the fall arrest plate being tiltable upwardly relative to the ramp.
Optionally, the fixing device further comprises a connecting structure for adjusting the distance between the first fixing plate and the second fixing plate.
Optionally, the connecting structure includes a plurality of connecting bolts rotatably connected to the first fixing plate, and a connecting nut fixed to the second fixing plate and engaged with the connecting bolts.
Optionally, the water spraying structure is used for spraying foam water to the surfaces of the first flexible buffer layer and the second flexible buffer layer.
3. Advantageous effects
Adopt the technical scheme provided by the utility model, compare with prior art, have following beneficial effect:
this an auxiliary assembly for glass curtain wall installation can improve the security when glass curtain wall high altitude hoist and mount, borrows power through the glass curtain wall to having installed to avoid glass curtain wall to produce acutely and rock at the in-process of hoist and mount, after glass curtain wall installation, fixed slide rail can follow the glass curtain wall and take off on the wall, so that reuse, and can not cause the damage to glass curtain wall.
Drawings
Fig. 1 is a schematic structural diagram of an auxiliary device for installing a glass curtain wall according to an embodiment of the present invention;
fig. 2 is a schematic cross-sectional view of a fixed slide rail in an auxiliary device for installing a glass curtain wall according to an embodiment of the present invention;
1. fixing the slide rail; 1a, a slideway; 2. a first fixing plate; 3. a second fixing plate; 4. fixing the sucker; 5. a first flexible buffer layer; 6. a second flexible buffer layer; 7. positioning a guide post; 8. an anti-falling plate; 9. a connecting bolt; 10. and connecting a nut.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention will be further described in detail with reference to the accompanying drawings and the following detailed description. It should be understood that the detailed description and specific examples, while indicating the scope of the invention, are intended for purposes of illustration only and are not intended to limit the scope of the invention.
It will be understood that when an element is referred to as being "secured to," "disposed on," "secured to," or "disposed on" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. Further, when one element is considered to be "fixedly connected" to another element, the two elements may be fixed by way of detachable connection, or may be fixed by way of non-detachable connection, such as socket connection, snap connection, integrally formed fixation, welding, etc., which can be realized in the prior art, and thus are not cumbersome. When an element is perpendicular or nearly perpendicular to another element, it is desirable that the two elements are perpendicular, but some vertical error may exist due to manufacturing and assembly effects. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only and do not represent the only embodiments.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used herein in the description of the invention is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
The references to "first" and "second" in the present invention do not denote any particular quantity or order, but rather are merely used to distinguish one name from another.
Combine attached 1 and 2, the auxiliary assembly for 5 glass curtain wall installations of this embodiment, including two fixed slide rail 1 that the horizontal symmetry set up, interval setting about two fixed slide rail 1, first fixed plate 2 and the second fixed plate 3 that the interval set up around fixed slide rail 1 includes, form the slide 1a that supplies glass curtain wall to pass through between first fixed plate 2 and the second fixed plate 3, glass curtain wall's side can slide in slide 1a, one side of keeping away from second fixed plate 3 on first fixed plate 2 is equipped with a plurality of fixed suction cups 4, fixed suction cups 4 can be electric suction cups to realize automatically controlled.
This a use method for auxiliary assembly of glass curtain wall installation: be fixed in two fixed slide rail 1 on the curtain wall that has installed, make the distance between two fixed slide rail 1 the same with glass curtain wall's width, later with fixed slide rail 1 of multiunit along vertical direction fixed with other glass curtain walls that have installed, form a slide that extends along building height direction, at this moment, when hoist and mount glass curtain wall, glass curtain wall's both sides are restricted by the fixed slide rail 1 on both sides, thereby avoided glass curtain wall to take place violent rocking at the in-process of hoist and mount, when glass curtain wall hoists to appointed height, install fixed slide rail 1 at this height and can remove the restriction to glass curtain wall, and the glass curtain wall of same height all can hoist through this slide.
This an auxiliary assembly for glass curtain wall installation can improve the security when glass curtain wall high altitude hoist and mount, borrows power through the glass curtain wall to having installed to avoid glass curtain wall to produce acutely and rock at the in-process of hoist and mount, after glass curtain wall installation, fixed slide rail 1 can follow the glass curtain wall and take off on the wall, so that reuse, and can not cause the damage to glass curtain wall.
As the utility model discloses an alternative, one side that is close to second fixed plate 3 on first fixed plate 2 is equipped with first flexible buffer layer 5, one side that is close to first fixed plate 2 on second fixed plate 3 is equipped with second flexible buffer layer 6, first flexible buffer layer 5 and second flexible buffer layer 6 are the rubber material to can cushion the impact force that glass curtain wall rocked the time and produce, on this basis, can increase the frictional force of an easy skid course in order to reduce when contacting with glass curtain wall on the surface of first flexible buffer layer 5 and second flexible buffer layer, this easy skid course can be the rubber material that frictional resistance is less.
As the utility model discloses an alternative, the lower extreme opening part of slide 1a is flaring structure, because there may be certain interval when the installation between two upper and lower fixed slide rails 1, when glass curtain wall was by in the lower supreme slide rail 1's that gets into the fixed slide rail 1 of top slide rail 1, easy and the lower extreme of the fixed slide rail 1 of top bump, through designing into the flaring structure with the lower extreme opening part of slide 1a, the emergence probability of this kind of condition of reduction that can be very big.
As the utility model discloses an alternative, the upper end of fixed slide rail 1 is equipped with a plurality of location guide posts 7, the upper end of fixed slide rail 1 is equipped with a plurality of location guiding holes, location guide posts 7 all extend along fixed slide rail 1's direction of height with the location guiding hole, and through the cooperation of location guide posts 7 and location guiding holes, can make and keep fixed direction between two upper and lower fixed slide rails 1 to connect to make slide 1a between two fixed slide rails 1 form a straight line, glass curtain wall can link up by in the fixed slide rail 1 of the interior to the top of sliding of fixed slide rail 1 of below.
As the utility model discloses an alternative, be equipped with the horizontally in the slide 1a and prevent weighing down board 8, prevent weighing down board 8 and can upwards overturn for slide 1a, upwards slide when preventing weighing down board 8 at glass curtain wall, can upwards push up preventing weighing down board 8 to guarantee that glass curtain wall passes through smoothly, when glass curtain wall fell down because of the pulling force, prevent weighing down board 8 because can not turn down and can play certain effect of blockking to glass curtain wall, even prevent weighing down board 8 and also can take place to damage when receiving great impact, but can cushion glass curtain wall's speed of falling down.
As an alternative of the present invention, a connection structure for adjusting the distance between the first fixing plate 2 and the second fixing plate 3 is further included, because different glass curtain walls have different thicknesses, the connection structure is provided for better limiting the shaking of the glass curtain wall between the first fixing plate 2 and the second fixing plate 3, the connection structure comprises a plurality of connection bolts 9 rotatably connected to the first fixing plate 2, and connection nuts 10 fixedly connected to the second fixing plate 3 and matched with the connection bolts 9, the connection bolts 9 and the connection nuts 10 are provided with a plurality of sets along the height direction of the fixed slide rail 1, the connection bolts 9 can be mounted on the first fixing plate 2 through bearings, the connection bolts 9 cannot move along the axial center direction of the connection bolts 9, and the connection strength between the first fixing plate 2 and the second fixing plate 3 can be ensured through the cooperation of the connection bolts 9 and the connection nuts 10, the adjustment of the distance between the first fixing plate 2 and the second fixing plate 3 can be realized.
As the utility model discloses an alternative still includes the water spray structure that is used for spraying the foam water to first flexible buffer layer 5 and the flexible buffer layer 6 surface of second, through spraying the foam water to first flexible buffer layer 5 and the flexible buffer layer 6 surface of second, the frictional force that reduction glass curtain wall and flexible buffer layer that can be very big contacted, especially under high temperature weather, can also reduce the contact temperature of glass curtain wall and flexible buffer layer, avoid first flexible buffer layer 5 and the flexible buffer layer 6 to melt glass curtain wall surface again because of high temperature.
The present invention and its embodiments have been described above schematically, and the description is not limited thereto, and what is shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. Therefore, if the person skilled in the art receives the teaching of the present invention, without departing from the inventive spirit of the present invention, the person skilled in the art should also design the similar structural modes and embodiments without creativity to the technical solution, and all shall fall within the protection scope of the present invention.

Claims (8)

1. The utility model provides an auxiliary assembly for glass curtain wall installation which characterized in that: two fixed slide rails that set up including the horizontal symmetry, fixed slide rail includes first fixed plate and the second fixed plate that the front and back interval set up, form the slide that supplies glass curtain wall to pass through between first fixed plate and the second fixed plate, the one side of keeping away from the second fixed plate on the first fixed plate is equipped with a plurality of fixed suction cups.
2. An auxiliary device for the installation of glass curtain walls according to claim 1, characterized in that: one side that is close to the second fixed plate on the first fixed plate is equipped with first flexible buffer layer, one side that is close to the first fixed plate on the second fixed plate is equipped with the flexible buffer layer of second.
3. An auxiliary device for installation of glass curtain walls according to claim 2, characterized in that: the opening at the lower end of the slideway is of a flaring structure.
4. An auxiliary device for the installation of glass curtain walls according to claim 1, characterized in that: the upper end of the fixed slide rail is provided with a plurality of positioning guide posts, and the upper end of the fixed slide rail is provided with a plurality of positioning guide holes.
5. An auxiliary device for the installation of glass curtain walls according to claim 1, characterized in that: the horizontal anti-falling plate is arranged in the slide and can be turned upwards relative to the slide.
6. An auxiliary device for installation of glass curtain walls according to any one of claims 1 to 5, wherein: the connecting structure is used for adjusting the distance between the first fixing plate and the second fixing plate.
7. An auxiliary device for installation of glass curtain walls according to claim 6, characterised in that: the connecting structure comprises a plurality of connecting bolts which are rotatably connected on the first fixing plate, and connecting nuts which are fixedly connected on the second fixing plate and matched with the connecting bolts.
8. An auxiliary device for installation of glass curtain walls according to claim 2, characterized in that: the water spraying structure is used for spraying foam water to the surfaces of the first flexible buffer layer and the second flexible buffer layer.
CN202220400583.7U 2022-02-24 2022-02-24 Auxiliary equipment for mounting glass curtain wall Active CN217326537U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220400583.7U CN217326537U (en) 2022-02-24 2022-02-24 Auxiliary equipment for mounting glass curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220400583.7U CN217326537U (en) 2022-02-24 2022-02-24 Auxiliary equipment for mounting glass curtain wall

Publications (1)

Publication Number Publication Date
CN217326537U true CN217326537U (en) 2022-08-30

Family

ID=82999722

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220400583.7U Active CN217326537U (en) 2022-02-24 2022-02-24 Auxiliary equipment for mounting glass curtain wall

Country Status (1)

Country Link
CN (1) CN217326537U (en)

Similar Documents

Publication Publication Date Title
US9382099B2 (en) Motorized height access device for tower cranes
JP2009507146A (en) Lifting system for high-rise buildings
CN108455449A (en) A kind of interior rail type mobile curtain wall Lift-on/Lift-off System
CN217326537U (en) Auxiliary equipment for mounting glass curtain wall
CN209686836U (en) Frame body for attachment type raise scaffold
CN101956452B (en) Multifunctional wall-attached supporting seat of attached lifting scaffold
JP2909413B2 (en) Suspension device for building exterior walls
KR102599944B1 (en) Overhead moving type gondola apparatus
CN216711294U (en) Emergency talkback linkage device of ladder-control car-blocking camera and applied camera
CN215829985U (en) Air pipe hanging basket
CN215666760U (en) Sliding type horizontal wall-attached device for construction elevator
CN210973660U (en) Temporary tower crane passageway of can overturning suitable for whole hoisting frame
CN211729155U (en) Multi-dimensional guide rail hoisting support mechanism suitable for special inspection robot
CN204490295U (en) A kind of gig
CN207016306U (en) A kind of outer elevator hoistways and wall body fixing device
CN220642149U (en) Construction elevator overhauls railing
CN216616821U (en) Suspension bridge frame for climbing frame
CN218541583U (en) Discharging platform
CN218911145U (en) Comprehensive maintenance platform for cable-stayed bridge
CN206367959U (en) Car top guard
CN220564159U (en) Anti-falling device for top-punching side swing
CN215047905U (en) Self-locking sliding type connecting bridge for construction elevator
CN215331355U (en) Lifting frame mechanism of lifting scaffold
CN2303893Y (en) Multifunction pulley-lifting mould rack
CN217148219U (en) Turnover elevator safety door

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Room 303, No. 46, Jinjiadu Middle Road, Liangzhu Street, Yuhang District, Hangzhou City, Zhejiang Province 310000

Patentee after: Zhejiang Xiangdu Construction Technology Co.,Ltd.

Address before: Room 303, No. 46, Jinjiadu Middle Road, Liangzhu Street, Yuhang District, Hangzhou City, Zhejiang Province 310000

Patentee before: Zhejiang Xiangdu Construction Engineering Co.,Ltd.