CN209686836U - Frame body for attached lifting scaffolding - Google Patents

Frame body for attached lifting scaffolding Download PDF

Info

Publication number
CN209686836U
CN209686836U CN201920078124.XU CN201920078124U CN209686836U CN 209686836 U CN209686836 U CN 209686836U CN 201920078124 U CN201920078124 U CN 201920078124U CN 209686836 U CN209686836 U CN 209686836U
Authority
CN
China
Prior art keywords
frame body
pole
vertical main
frame
mentioned
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920078124.XU
Other languages
Chinese (zh)
Inventor
张帅
陈德学
石海
马驰骋
柳元昌
王强
赖文武
张成云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JUSTREACH SCIENCE & TECHNOLOGY Co LTD(CHENGDU)
Original Assignee
JUSTREACH SCIENCE & TECHNOLOGY Co LTD(CHENGDU)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JUSTREACH SCIENCE & TECHNOLOGY Co LTD(CHENGDU) filed Critical JUSTREACH SCIENCE & TECHNOLOGY Co LTD(CHENGDU)
Priority to CN201920078124.XU priority Critical patent/CN209686836U/en
Application granted granted Critical
Publication of CN209686836U publication Critical patent/CN209686836U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a kind of frame bodies for attachment type raise scaffold, including wall-attached supporting seat, vertical main framework, horizontal truss and frame body framework, above-mentioned frame body framework is between two neighboring vertical main framework, and connection horizontal truss, above-mentioned frame body framework includes more interior upright bars and outer vertical rod corresponding with interior upright bar with vertical main framework, multiple load bearing units are equipped between above-mentioned interior upright bar and outer vertical rod, the interior upright bar lower part of above-mentioned vertical main framework is equipped with lower suspension centre component, and the interior upright bar of above-mentioned vertical main framework is equipped with track close to building side, above-mentioned wall-attached supporting seat and track slide fitting, and it fastens with the anti-fall crosspiece bar on track, it is expected to solve the stability deficiency that similar frame body uses in the prior art, structure is complicated, in-site installation difficulty is big, lifting draws and hangs the technical problems such as inconvenience.

Description

用于附着式升降脚手架的架体Frame body for attached lifting scaffolding

技术领域technical field

本实用新型涉及建筑用施工脚手架,具体涉及一种用于附着式升降脚手架的架体。The utility model relates to a construction scaffold for buildings, in particular to a frame body for an attached lifting scaffold.

背景技术Background technique

附着式升降脚手架是一种安装在建筑物或构筑物外立面上使用的建筑施工用具,主要作用是是为施工人员提供作业平台和临边防护;由于脚手架架体的着力点均在建筑结构上,且能够沿建筑物或构筑物立面上升或下降,因此无需从底部到顶部全部搭设架体,因此更加适于在高层建筑施工中使用;但正是其着力点均在建筑结构上,因此其在使用时对稳定性要求更高,尤其是架体在上升、下降过程中更是如此,目前同类的升降脚手架结构上普遍针对架体防倾、防坠性能进行改进,而对于架体本身的稳定性并未进行实质性改进,大多还沿用的是传统脚手架的固定结构,因而不利于在升降脚手架中使用,因此有必要针对升降脚手架的架体结构进行研究和改进。Attached lifting scaffolding is a kind of building construction equipment installed on the facade of buildings or structures. , and can rise or fall along the facade of a building or structure, so there is no need to build a frame from the bottom to the top, so it is more suitable for use in high-rise building construction; but its focus is on the building structure, so its The stability requirements are higher during use, especially when the frame is rising and falling. At present, the structure of similar lifting scaffolds generally improves the anti-tilting and anti-falling performance of the frame. The stability has not been substantially improved, and most of them still use the fixed structure of traditional scaffolding, which is not conducive to the use in lifting scaffolding. Therefore, it is necessary to study and improve the frame structure of lifting scaffolding.

实用新型内容Utility model content

本实用新型的目的在于提供一种用于附着式升降脚手架的架体,以期望解决现有技术中同类架体使用的稳定性不足,结构复杂、现场安装难度大,升降拉吊不便等技术问题。The purpose of this utility model is to provide a frame body for an attached lifting scaffold, in order to solve technical problems such as insufficient stability of similar frame bodies in the prior art, complex structure, difficult on-site installation, and inconvenient lifting and lifting. .

为解决上述的技术问题,本实用新型采用以下技术方案:In order to solve the above-mentioned technical problems, the utility model adopts the following technical solutions:

一种用于附着式升降脚手架的架体,包括附墙支座、竖向主框架、水平桁架与架体架构,上述架体架构位于相邻两个竖向主框架之间,且连接水平桁架,上述架体架构与竖向主框架均包括多根内立杆及与内立杆相对应的外立杆,上述内立杆与外立杆之间设有多个承载单元,上述竖向主框架的内立杆下部设有下吊点组件,且上述竖向主框架的内立杆靠近建筑物一侧设有轨道,上述附墙支座与轨道滑动套合,并与轨道上的防坠横档杆相卡合,其设计目的是,通过竖向主框架、水平桁架、架体架构形成受力框架,通过安装多个承载单元支撑施工人员站立,通过轨道、附墙支座、内立杆、外立杆使架体上下移动过程中防止架体倾斜和坠落,通过下吊点组件便于使用绳索拉动架体。A frame body for an attached lifting scaffold, comprising a wall-attached support, a vertical main frame, a horizontal truss and a frame structure, the frame structure is located between two adjacent vertical main frames, and is connected to the horizontal truss The frame structure and the vertical main frame both include a plurality of inner uprights and outer uprights corresponding to the inner uprights, a plurality of bearing units are arranged between the inner uprights and the outer uprights, and the above-mentioned vertical main The lower part of the inner pole of the frame is provided with a hanging point assembly, and the inner pole of the above-mentioned vertical main frame is provided with a track on the side close to the building. The crossbars are engaged with each other, and its design purpose is to form a stressed frame through the vertical main frame, horizontal truss, and frame structure, to support the construction personnel to stand by installing multiple load-bearing units, and to Rods and outer poles prevent the frame body from tilting and falling during the up and down movement of the frame body, and the hanging point assembly is used to facilitate the use of ropes to pull the frame body.

作为优选,上述承载单元包括三角支架、脚手板,上述三角支架首端通过C形连接件安装在内立杆上,上述三角支架末端固定安装在外立杆上,上述三角支架上端设有脚手板,上述脚手板的侧面固定在三角支架和外立杆上,上述脚手板相互之间首尾相连,其目的是,通过C形连接件将三角支架与内立杆连接在一起,通过三角支架连接外立杆与内立杆,并作用于脚手板,使脚手板安装更稳定。Preferably, the bearing unit includes a triangular bracket and a scaffolding board, the head end of the triangular bracket is installed on the inner pole through a C-shaped connector, the end of the triangular bracket is fixedly installed on the outer pole, and the upper end of the triangular bracket is provided with a scaffolding board, The sides of the above-mentioned scaffolding boards are fixed on the tripod and the outer pole, and the above-mentioned scaffolding boards are connected end to end with each other. Rods and inner poles act on the scaffolding to make the installation of the scaffolding more stable.

进一步的技术方案是,上述C形连接件包括夹持板、安装板,上述安装板与脚手板螺栓连接,上述夹持板两端均设有安装孔,用于由安装孔将夹持板固定在内立杆上,其目的是,用于由夹持板夹住内立杆,用于由安装板固定脚手板,通过螺栓安装的方式保证连接稳定性,同时易于安装/拆卸。A further technical solution is that the above-mentioned C-shaped connector includes a clamping plate and a mounting plate, and the above-mentioned mounting plate and the scaffolding plate are connected by bolts, and both ends of the above-mentioned clamping plate are provided with mounting holes for fixing the clamping plate through the mounting holes. On the inner pole, its purpose is to clamp the inner pole with the clamping plate, fix the scaffolding plate with the installation plate, ensure the stability of the connection by means of bolt installation, and at the same time, it is easy to install/disassemble.

作为优选,上述外立杆上固定有呈U型的网板连接件,且相邻的两个外立杆之间设有防护网板,上述防护网板通过网板连接件安装在外立杆上,其设计目的是,通过U型的网板连接件便于工作人员拆/装螺栓,通过在两个外立杆之间设置的防护网板有效避免物品意外从外立杆之间的间隙高空坠落。As a preference, a U-shaped net plate connector is fixed on the above-mentioned outer pole, and a protective net plate is arranged between two adjacent outer poles, and the above-mentioned protective net plate is installed on the outer pole through the net plate connector , its design purpose is to facilitate the removal/installation of bolts by the staff through the U-shaped mesh plate connector, and to effectively prevent objects from accidentally falling from the gap between the outer poles through the protective mesh plate set between the two outer poles .

作为优选,上述竖向主框架与架体构架通过水平桁架连接为一体,上述水平桁架连接内立杆和/或外立杆,其目的是,用于由水平桁架连接内立杆和/或外立杆,以提高其竖向主框架与架体构架受力时的稳定性。As a preference, the above-mentioned vertical main frame and the frame frame are connected as a whole through a horizontal truss, and the above-mentioned horizontal truss is connected to the inner pole and/or the outer pole. Pole, to improve the stability of its vertical main frame and frame frame when stressed.

作为优选,上述下吊点组件包括吊点桁架、下吊点,上述吊点桁架安装在内立杆的下部,上述吊点桁架下部安装下吊点,其目的是,通过吊点桁架固定下吊点,进而使下吊点受力时,将受力点均匀作用于内立杆。Preferably, the hanging point assembly includes a hanging point truss and a hanging point, the hanging point truss is installed on the lower part of the inner vertical rod, and the hanging point is installed on the lower part of the hanging point truss, the purpose of which is to fix the hanging point through the hanging point truss point, and then when the hanging point is stressed, the force point will be evenly acted on the inner pole.

作为优选,上述竖向主框架下端设有底部托架,上述底部托架上设有底板,上述底板靠近于内立杆的边沿上设有防护翻板,上述防护翻板通过翻板连接件活动安装在底板上,其目的是,通过底部托架托起过底板,通过翻板连接件转动防护翻板,通过防护翻板阻挡架体与建筑物的立面之间的间隙。As a preference, the lower end of the vertical main frame is provided with a bottom bracket, the bottom bracket is provided with a bottom plate, and the edge of the bottom plate close to the inner pole is provided with a protective flap, and the protective flap is movable through the flap connector Installed on the base plate, its purpose is to support the base plate through the bottom bracket, rotate the protective flap through the flap connector, and block the gap between the frame body and the facade of the building through the protective flap.

更进一步的技术方案是,上述防护翻板通过铰链活动安装在翻板连接件上,且防护翻板通过铰链的最大翻转角度为与上述底板齐平,其目的是,避免防护翻板向下倾斜,发生意外坠物。A further technical solution is that the above-mentioned protective flap is movably installed on the flap connector through a hinge, and the maximum flip angle of the protective flap through the hinge is flush with the above-mentioned bottom plate, the purpose of which is to prevent the protective flap from tilting downward , an accidental drop occurred.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:

本实用新型通过竖向主框架、水平桁架、架体架构承载施工所需载荷,通过安装多个承载单元支撑施工人员站立,其轨道、附墙支座、内立杆、外立杆有效防止架体发生倾斜或坠落,通过下吊点组件便于连接提升系统,进而无需逐层搭建,降低施工过程材料消耗,减少搭建时间。The utility model carries the load required for construction through the vertical main frame, the horizontal truss, and the frame structure, and supports the construction personnel to stand by installing multiple load-bearing units. If the body tilts or falls, it is easy to connect the lifting system through the hanging point assembly, so that it does not need to be built layer by layer, reducing the material consumption in the construction process and reducing the construction time.

本实用新型三角支架连接内立杆与外立杆,并支撑脚手板,其呈三角结构具有良好稳定性,进而保证承载单元的稳固程度,通过C形连接件能够降低三角结构安装后晃动的可能性。The triangular bracket of the utility model connects the inner pole and the outer pole, and supports the scaffold board. Its triangular structure has good stability, thereby ensuring the stability of the bearing unit, and the possibility of shaking after the triangular structure is installed can be reduced through the C-shaped connector. sex.

本实用新型通过安装板固定脚手板,相对稳定的固定在三角支架上,通过夹持板使内立杆被固定夹持板内部,再由螺栓安装的方式保证连接稳定性,利于整体的安装/拆卸,提升架体便捷性。The utility model fixes the scaffolding plate through the mounting plate, and relatively stably fixes it on the triangular bracket. The inner pole is fixed inside the clamping plate through the clamping plate, and then the connection stability is ensured by bolt installation, which is beneficial to the overall installation/ Disassembly improves the convenience of the frame.

本实用新型通过防护网板有效避免物品意外从相邻的两个外立杆之间的间隙坠落,提升施工作业的安全性。The utility model effectively prevents objects from accidentally falling from the gap between two adjacent outer vertical poles through the protective screen plate, thereby improving the safety of construction operations.

本实用新型能够通过竖向主框架与架体构架通过水平桁架连接为一体,使单根内立杆受到的作用力分散到整个装置,尤其是在升降过程中,进而提高装置整体的稳定性。The utility model can integrate the vertical main frame and the frame frame through the horizontal truss, so that the force received by a single inner pole can be distributed to the whole device, especially during the lifting process, thereby improving the overall stability of the device.

本实用新型通过下吊点作为吊装点,当下吊点受力后通过吊点桁架将作用力分散到内立杆多个点位,避免单独内立杆上某一点位受力过度。The utility model uses the lower lifting point as the lifting point, and after the lower lifting point is stressed, the force is distributed to multiple points of the inner vertical rod through the lifting point truss, so as to avoid excessive force on a certain point on the single inner vertical rod.

本实用新型通过翻板连接件连接防护翻板,通过铰链连接的方式使防护翻板能够在底板上放出/收起,使防护翻板能够抵触施工面,有效阻挡架体与建筑物的立面之间的间隙,避免施工过程中意外坠物。The utility model connects the protective flap through the flap connector, and the protective flap can be released/retracted on the bottom plate through the hinge connection, so that the protective flap can touch the construction surface, effectively blocking the frame body and the facade of the building The gap between them to avoid accidental falling objects during construction.

附图说明Description of drawings

图1为本实用新型结构示意图。Fig. 1 is the structural representation of the utility model.

图2为本实用新型正面示意图。Figure 2 is a schematic front view of the utility model.

图3为本实用新型安装示意图。Figure 3 is a schematic diagram of the installation of the utility model.

图4为图1三角支架示意图。Fig. 4 is a schematic diagram of the tripod bracket in Fig. 1 .

图5为图1防护网板安装示意图。Fig. 5 is a schematic diagram of the installation of the protective screen in Fig. 1 .

图6为实用新型底部安装示意图。Fig. 6 is a schematic diagram of installation at the bottom of the utility model.

图7为图6翻板连接件安装示意图。Fig. 7 is a schematic diagram of installation of the flap connector in Fig. 6 .

附图标记说明:Explanation of reference signs:

1-底板、2-内立杆、3-外立杆、4-承载单元、5-下吊点组件、7-三角支架、8-脚手板、9-C形连接件、10-网板连接件、11-防护网板、12-水平桁架、13-竖向主框架、101-防护翻板、102-翻板连接件、103-底部托架、501-吊点桁架、502-下吊点、901-夹持板、601-轨道、602-附墙支座、902-安装板、903-安装孔。1-bottom plate, 2-inner pole, 3-outer pole, 4-carrying unit, 5-hanging point assembly, 7-triangular bracket, 8-screw plate, 9-C-shaped connector, 10-mesh plate connection Components, 11-protective net plate, 12-horizontal truss, 13-vertical main frame, 101-protective flap, 102-flap connector, 103-bottom bracket, 501-hanging point truss, 502-hanging point , 901-clamping plate, 601-track, 602-attached wall support, 902-installation plate, 903-installation hole.

具体实施方式Detailed ways

为了使本实用新型的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本实用新型进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本实用新型,并不用于限定本实用新型。In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model, and are not intended to limit the utility model.

参考图1、图2所示,本实用新型的一个实施例是,一种用于附着式升降脚手架的架体,包括附墙支座602、竖向主框架13、水平桁架12与架体架构,上述架体架构位于相邻两个竖向主框架13之间,且连接水平桁架12,上述架体架构与竖向主框架13均包括多根内立杆2及与内立杆2相对应的外立杆3,上述内立杆2与外立杆3之间设有多个承载单元4,上述竖向主框架的内立杆2下部设有下吊点组件5,且上述竖向主框架的内立杆2靠近建筑物一侧设有轨道601,上述附墙支座602与轨道601滑动套合,并与轨道601上的防坠横档杆相卡合;其竖向主框架13垂直于建筑物外立面,架体架构连接相邻两竖向主框架13,主要作用是在承受架体竖向荷载时,并将竖向荷载传递至附近的竖向主框架,通过竖向主框架13承受竖向和水平荷载;其附墙支座602主要附着轨道601上,承受并传递附着架荷载,其两个内立杆2之间间隙相同,两个外立杆3之间间隙相同,其内立杆2与外立杆3上均设有对应固定孔,通过内立杆2与外立杆3构成受力框架,其承载单元4架设在内立杆2与外立杆3之间,通过安装多个承载单元4支撑施工人员站立,其轨道601安装在内立杆2上,上述附墙支座602用于安装在建筑物的立面上,其轨道601通过常规连接件固定在内立杆2上,附墙支座602与轨道601滑动套合,并与轨道601上的防坠横档杆相卡合,有效防止架体发生倾斜或坠落,也能够使装置主体上下移动,其下吊点组件5固定安装在内立杆2下部,上述附墙支座602用于安装在建筑物的立面上,通过下吊点组件5便于使用绳索拉动整个装置主体。Referring to Fig. 1 and Fig. 2, one embodiment of the present invention is a frame body for an attached lifting scaffold, including a wall support 602, a vertical main frame 13, a horizontal truss 12 and a frame structure , the frame structure is located between two adjacent vertical main frames 13, and connected to the horizontal truss 12, the frame structure and the vertical main frame 13 both include a plurality of inner poles 2 and corresponding to the inner poles 2 The outer pole 3 of the above-mentioned inner pole 2 and the outer pole 3 are provided with a plurality of bearing units 4, the lower part of the inner pole 2 of the above-mentioned vertical main frame is provided with a hanging point assembly 5, and the above-mentioned vertical main frame The inner pole 2 of the frame is provided with a track 601 on the side close to the building, and the above-mentioned wall-attached support 602 slides and fits with the track 601, and engages with the anti-falling crossbar on the track 601; its vertical main frame 13 Vertical to the facade of the building, the frame structure connects two adjacent vertical main frames 13, the main function is to bear the vertical load of the frame body, and transfer the vertical load to the nearby vertical main frame, through The main frame 13 bears vertical and horizontal loads; its attached wall support 602 is mainly attached to the track 601 to bear and transmit the load of the attached frame. The gap between the two inner poles 2 is the same, and the gap between the two outer poles 3 Similarly, the inner pole 2 and the outer pole 3 are provided with corresponding fixing holes, and the inner pole 2 and the outer pole 3 form a stress frame, and the bearing unit 4 is erected on the inner pole 2 and the outer pole 3 Between them, a plurality of bearing units 4 are installed to support the construction personnel to stand, and its track 601 is installed on the inner pole 2. The above-mentioned wall-attached support 602 is used to be installed on the facade of the building, and its track 601 passes through a conventional connector Fixed on the inner pole 2, the attached wall support 602 slides and fits with the track 601, and engages with the anti-fall cross bar on the track 601, which can effectively prevent the frame from tilting or falling, and can also make the main body of the device go up and down Move, its hanging point assembly 5 is fixedly installed in the bottom of the inner pole 2, and the above-mentioned attached wall support 602 is used to be installed on the facade of the building, and it is convenient to use the rope to pull the whole device main body by the hanging point assembly 5.

根据上述实施例,参考图3所示,本实用新型的另一个实施例是,为了保证承载单元4的稳固程度,上述承载单元4包括三角支架7、脚手板8,上述三角支架7首端通过C形连接件9安装在内立杆2上,上述三角支架7末端固定安装在外立杆3上,上述三角支架7上端设有脚手板8,上述脚手板8的侧面固定在三角支架7和外立杆3上,上述脚手板8相互之间首尾相连,其三角支架7呈直角三角形,其三角支架7首端通过C形连接件9安装在内立杆2上,末端通过常规连接件安装在外立杆3上,其脚手板8为钢制脚手板8,脚手板8位于三角支架7上方,在安装过程中脚手板8与三角支架7留有一定间隙,其受力过程中脚手板8可通过抵触三角支架7上端提高承载力,并通过螺栓使脚手板8在三角支架7上锁紧,其三角支架7位于脚手板8下部两端;其三角支架7呈三角结构具有良好结构稳定性,能够提升承载单元4的稳固程度,再通过C形连接件9能够降低三角支架7在安装后晃动的可能性。According to above-mentioned embodiment, with reference to shown in Fig. 3, another embodiment of the present utility model is, in order to guarantee the stability of carrying unit 4, above-mentioned carrying unit 4 comprises triangular support 7, scaffold board 8, and above-mentioned triangular support 7 head ends pass through The C-shaped connector 9 is installed on the inner pole 2, and the end of the above-mentioned triangular bracket 7 is fixedly installed on the outer pole 3. The upper end of the above-mentioned triangular bracket 7 is provided with a scaffolding plate 8, and the side of the above-mentioned scaffolding plate 8 is fixed on the triangular bracket 7 and the outer pole. On the vertical pole 3, the above-mentioned scaffolding boards 8 are connected end to end, and its triangular bracket 7 is a right-angled triangle. On the vertical pole 3, its scaffolding plate 8 is a steel scaffolding plate 8, and the scaffolding plate 8 is located above the triangle bracket 7. During the installation process, there is a certain gap between the scaffolding plate 8 and the triangle bracket 7. During the stress process, the scaffolding plate 8 can be The bearing capacity is improved by contacting the upper end of the triangular bracket 7, and the scaffolding plate 8 is locked on the triangular bracket 7 by bolts, and the triangular bracket 7 is located at both ends of the lower part of the scaffolding plate 8; the triangular bracket 7 has good structural stability in a triangular structure, The stability of the carrying unit 4 can be improved, and the possibility of the tripod bracket 7 shaking after installation can be reduced through the C-shaped connector 9 .

进一步的,参考图4所示,为了保证三角支架7连接的稳定性,上述C形连接件9包括夹持板901、安装板902,上述安装板902与脚手板8螺栓连接,上述夹持板901两端均设有安装孔903,用于由安装孔903将夹持板901固定在内立杆2上,其夹持板901上的安装孔903为通孔,将夹持板901尺寸与内立杆2尺寸相适配,通过将夹持板901卡入内立杆2的外壁,由螺栓穿过安装孔903与内立杆2的固定孔中锁紧,其安装板902两端通孔与脚手板8上的装配孔相适配,通过安装板902固定脚手板8,使脚手板8牢固的固定在三角支架7上,通过夹持板901使内立杆2被固定夹持板901内部,再由螺栓安装的方式保证连接稳定性,利于整体的安装/拆卸,提升架体便捷性。Further, as shown in FIG. 4, in order to ensure the stability of the connection of the tripod 7, the above-mentioned C-shaped connector 9 includes a clamping plate 901 and a mounting plate 902. The above-mentioned mounting plate 902 is connected with the scaffolding plate 8 by bolts, and the above-mentioned clamping plate Both ends of 901 are provided with mounting holes 903, which are used to fix the clamping plate 901 on the inner vertical rod 2 by the mounting holes 903, and the mounting holes 903 on the clamping plate 901 are through holes, and the clamping plate 901 size and The size of the inner pole 2 is suitable. By clamping the clamping plate 901 into the outer wall of the inner pole 2, the bolts pass through the mounting hole 903 and the fixing hole of the inner pole 2 to lock. The through holes at both ends of the mounting plate 902 and the feet The assembly holes on the hand board 8 are matched, and the scaffold board 8 is fixed by the mounting plate 902, so that the scaffold board 8 is firmly fixed on the tripod 7, and the inner vertical rod 2 is fixed inside the clamping board 901 through the clamping board 901, and then the The way of bolt installation ensures the stability of the connection, which is conducive to the overall installation/disassembly and improves the convenience of the frame.

根据上述实施例,参考图5所示,本实用新型的另一个实施例是,为了提升架体安全性,上述外立杆3上固定有呈U型的网板连接件10,且相邻的两个外立杆3之间设有防护网板11,上述防护网板11通过网板连接件10安装在外立杆3上,呈U型的网板连接件10采用钢制,通过U型的网板连接件10便于作业人员站在架体内侧拆装螺栓,其防护网板11表面设有多个透气孔,以便于降低大气流动对装置的阻力,通过防护网板11有效避免物品意外从两个外立杆3之间的间隙高空坠落,进而提升架体安全性。According to the above-mentioned embodiment, with reference to Fig. 5, another embodiment of the present invention is that, in order to enhance the safety of the frame body, a U-shaped net plate connector 10 is fixed on the above-mentioned outer pole 3, and the adjacent A protective screen 11 is provided between the two outer poles 3, and the above-mentioned protective screen 11 is installed on the outer pole 3 through a screen connector 10. The U-shaped screen connector 10 is made of steel, and the U-shaped connector 10 is made of steel. The screen connector 10 is convenient for the operator to stand on the inside of the frame to disassemble and assemble the bolts. The surface of the protective screen 11 is provided with a plurality of air holes to reduce the resistance of the air flow to the device. The gap between the two outer poles 3 falls from a high altitude, thereby improving the safety of the frame.

根据上述实施例,本实用新型的另一个实施例是,为了保证内立杆2工作的稳定性,上述竖向主框架与架体构架通过水平桁架12连接为一体,上述水平桁架12连接内立杆2和/或外立杆3,其水平桁架12通过螺栓连接不同内立杆2,使单根内立杆受到的作用力分散到其他内立杆,尤其是在升降过程中,进而提高内立杆稳定性,其水平桁架12可以单独连接不同内立杆2,也可以分别连接不同内立杆2与外立杆3。According to the above-mentioned embodiment, another embodiment of the present utility model is that, in order to ensure the stability of the work of the inner pole 2, the above-mentioned vertical main frame and the frame frame are connected as a whole through the horizontal truss 12, and the above-mentioned horizontal truss 12 is connected to the inner pole. Rod 2 and/or outer pole 3, its horizontal truss 12 connects different inner poles 2 through bolts, so that the force received by a single inner pole is distributed to other inner poles, especially during the lifting process, thereby improving the internal Pole stability, its horizontal truss 12 can be connected to different inner poles 2 alone, and can also be connected to different inner poles 2 and outer poles 3 respectively.

根据上述实施例,参考图6所示,本实用新型的另一个实施例是,为了避免单独内立杆2上某一点位受力过度,上述下吊点组件5包括吊点桁架501、下吊点502,上述吊点桁架501安装在内立杆2的下部,上述吊点桁架501下部安装下吊点502,其吊点桁架501通过常规连接件固定在单根内立杆2上,其两个吊点桁架501之间间隙相同,通过下吊点502连接钢丝绳作为吊装点,当下吊点502受力后通过吊点桁架501将作用力分散到内立杆2的多个点位上,避免单独内立杆2的某一点位受力过度。According to the above-mentioned embodiment, as shown in FIG. 6, another embodiment of the present invention is that, in order to avoid excessive force on a certain point on the single inner pole 2, the above-mentioned hanging point assembly 5 includes a hanging point truss 501, a hanging point Point 502, the above-mentioned lifting point truss 501 is installed on the lower part of the inner vertical rod 2, the lower part of the above-mentioned lifting point truss 501 is installed with the lower lifting point 502, and its lifting point truss 501 is fixed on a single inner vertical rod 2 through a conventional connector. The gaps between the two lifting point trusses 501 are the same, and the steel wire rope is connected through the lower lifting point 502 as the lifting point. After the lower lifting point 502 is stressed, the force is distributed to multiple points of the inner pole 2 through the lifting point truss 501 to avoid A certain point of the independent inner pole 2 is overstressed.

根据上述实施例,本实用新型的另一个实施例是,为了避免施工过程中意外坠物,上述竖向主框架13下端设有底部托架103,上述底部托架103上设有底板1,上述底板1靠近于内立杆2的边沿上设有防护翻板101,上述防护翻板101通过翻板连接件102活动安装在底板1上,其底部托架103固定安装在竖向主框架13下端,底板1置于底部托架103上方,其翻板连接件102固定安装在底板1上,通过翻板连接件102连接防护翻板101,使其能够在底板1上放出/收起,通过放出防护翻板101,使防护翻板101能够抵触建筑物的立面,有效阻挡架体与建筑物立面之间的间隙,避免施工过程中意外坠物,其底部托架103能够在整体搭建过程中用于接触地面,其底板1受力时,可通过底部托架103将载荷分摊到竖向主框架13,由竖向主框架13承担底板1产生的竖向荷载。According to the above-mentioned embodiment, another embodiment of the present utility model is that, in order to avoid accidental falling objects during the construction process, the bottom bracket 103 is provided at the lower end of the above-mentioned vertical main frame 13, and a bottom plate 1 is provided on the above-mentioned bottom bracket 103, and the above-mentioned The edge of the base plate 1 close to the inner pole 2 is provided with a protective flap 101, the above-mentioned protective flap 101 is movably installed on the base plate 1 through the flap connector 102, and its bottom bracket 103 is fixedly installed on the lower end of the vertical main frame 13 , the bottom plate 1 is placed above the bottom bracket 103, and its flap connector 102 is fixedly installed on the bottom plate 1, and the protective flap 101 is connected through the flap connector 102, so that it can be released/closed on the bottom plate 1, and by releasing The protective flap 101 enables the protective flap 101 to touch the facade of the building, effectively blocking the gap between the frame body and the facade of the building, and avoiding accidental falling objects during the construction process. The bottom bracket 103 can be used during the overall construction process. For contacting the ground, when the bottom plate 1 is stressed, the load can be distributed to the vertical main frame 13 through the bottom bracket 103, and the vertical main frame 13 bears the vertical load generated by the bottom plate 1.

更进一步的,参考图7,上述防护翻板101通过铰链活动安装在翻板连接件102上,且防护翻板101通过铰链的最大翻转角度为与上述底板1齐平,其铰链包括多个,且相邻的两个铰链之间间隙相同,进而避免防护翻板101向下过度倾斜,导致出现坠物情况。Further, referring to FIG. 7, the above-mentioned protection flap 101 is movably installed on the flap connector 102 through a hinge, and the maximum flip angle of the protection flap 101 through the hinge is flush with the above-mentioned bottom plate 1, and the hinges include multiple, And the gaps between two adjacent hinges are the same, so as to prevent the protective flap 101 from tilting downward excessively, resulting in falling objects.

在本说明书中所谈到的“一个实施例”、“另一个实施例”、“实施例”、“优选实施例”等,指的是结合该实施例描述的具体特征、结构或者特点包括在本申请概括性描述的至少一个实施例中。在说明书中多个地方出现同种表述不是一定指的是同一个实施例。进一步来说,结合任一实施例描述一个具体特征、结构或者特点时,所要主张的是结合其他实施例来实现这种特征、结构或者特点也落在本实用新型的范围内。"One embodiment", "another embodiment", "embodiment", "preferred embodiment" and the like mentioned in this specification refer to the specific features, structures or characteristics described in conjunction with the embodiment included in the In at least one embodiment broadly described herein. The appearance of the same expression in multiple places in the specification does not necessarily refer to the same embodiment. Furthermore, when a specific feature, structure or characteristic is described in combination with any embodiment, it should be claimed that realizing such feature, structure or characteristic in combination with other embodiments also falls within the scope of the present invention.

尽管这里参照本实用新型的多个解释性实施例对本实用新型进行了描述,但是,应该理解,本领域技术人员可以设计出很多其他的修改和实施方式,这些修改和实施方式将落在本申请公开的原则范围和精神之内。更具体地说,在本申请公开、附图和权利要求的范围内,可以对主题组合布局的组成部件和/或布局进行多种变型和改进。除了对组成部件和/或布局进行的变形和改进外,对于本领域技术人员来说,其他的用途也将是明显的。Although the invention has been described herein with reference to a number of illustrative embodiments of the invention, it should be understood that many other modifications and implementations can be devised by those skilled in the art which will fall within the scope of this application. within the scope and spirit of the principles disclosed. More specifically, within the scope of the disclosure, drawings and claims of the present application, various modifications and improvements can be made to the components and/or layout of the subject combination layout. In addition to variations and modifications to the component parts and/or layout, other uses will be apparent to those skilled in the art.

Claims (8)

1.一种用于附着式升降脚手架的架体,包括附墙支座(602)、竖向主框架(13)、水平桁架(12)与架体架构,所述架体架构位于相邻两个竖向主框架(13)之间,且连接水平桁架(12),其特征在于:所述架体架构与竖向主框架(13)均包括多根内立杆(2)及与内立杆(2)相对应的外立杆(3),所述内立杆(2)与外立杆(3)之间设有多个承载单元(4),所述竖向主框架的内立杆(2)下部设有下吊点组件(5),且所述竖向主框架的内立杆(2)靠近建筑物一侧设有轨道(601),所述附墙支座(602)与轨道(601)滑动套合,并与轨道(601)上的防坠横档杆相卡合。1. A frame body for an attached lifting scaffold, including a wall-attached support (602), a vertical main frame (13), a horizontal truss (12) and a frame body structure, and the frame body structure is located at two adjacent Between two vertical main frames (13) and connected to horizontal trusses (12), it is characterized in that: the frame structure and the vertical main frame (13) both include a plurality of inner poles (2) and inner vertical The outer pole (3) corresponding to the pole (2), a plurality of bearing units (4) are arranged between the inner pole (2) and the outer pole (3), and the inner pole of the vertical main frame The lower part of the pole (2) is provided with a hanging point assembly (5), and the inner pole (2) of the vertical main frame is provided with a track (601) on the side close to the building, and the wall-attached support (602) Slip fit with the track (601), and engage with the anti-falling cross bar on the track (601). 2.根据权利要求1所述的用于附着式升降脚手架的架体,其特征在于:所述承载单元(4)包括三角支架(7)、脚手板(8),所述三角支架(7)首端通过C形连接件(9)安装在内立杆(2)上,所述三角支架(7)末端固定安装在外立杆(3)上,所述三角支架(7)上端设有脚手板(8),所述脚手板(8)的侧面固定在三角支架(7)和外立杆(3)上,所述脚手板(8)相互之间首尾相连。2. The frame body for an attached lifting scaffold according to claim 1, characterized in that: the bearing unit (4) includes a tripod (7), a scaffolding board (8), and the tripod (7) The head end is installed on the inner pole (2) through a C-shaped connector (9), the end of the triangular bracket (7) is fixedly installed on the outer pole (3), and the upper end of the triangular bracket (7) is provided with a scaffolding board (8), the side of the scaffolding board (8) is fixed on the tripod (7) and the outer pole (3), and the scaffolding boards (8) are connected end to end. 3.根据权利要求2所述的用于附着式升降脚手架的架体,其特征在于:所述C形连接件(9)包括夹持板(901)、安装板(902),所述安装板(902)与脚手板(8)螺栓连接,所述夹持板(901)两端均设有安装孔(903),用于由安装孔(903)将夹持板(901)固定在内立杆(2)上。3. The frame body for an attached lifting scaffold according to claim 2, characterized in that: the C-shaped connector (9) includes a clamping plate (901) and a mounting plate (902), and the mounting plate (902) is bolted to the scaffolding plate (8), and both ends of the clamping plate (901) are provided with mounting holes (903), which are used to fix the clamping plate (901) in the vertical position through the mounting holes (903) on the rod (2). 4.根据权利要求1所述的用于附着式升降脚手架的架体,其特征在于:所述外立杆(3)上固定有呈U型的网板连接件(10),且相邻的两个外立杆(3)之间设有防护网板(11),所述防护网板(11)通过网板连接件(10)安装在外立杆(3)上。4. The frame body for an attached lifting scaffold according to claim 1, characterized in that: a U-shaped mesh panel connector (10) is fixed on the outer pole (3), and the adjacent A protective net (11) is arranged between the two outer poles (3), and the protective net (11) is installed on the outer pole (3) through a net connector (10). 5.根据权利要求1所述的用于附着式升降脚手架的架体,其特征在于:所述竖向主框架与架体构架通过水平桁架(12)连接为一体,所述水平桁架(12)连接内立杆(2)和/或外立杆(3)。5. The frame body for an attached lifting scaffold according to claim 1, characterized in that: the vertical main frame and the frame frame are connected as one through a horizontal truss (12), and the horizontal truss (12) Attach the inner pole (2) and/or the outer pole (3). 6.根据权利要求1所述的用于附着式升降脚手架的架体,其特征在于:所述下吊点组件(5)包括吊点桁架(501)、下吊点(502),所述吊点桁架(501)安装在内立杆(2)的下部,所述吊点桁架(501)下部安装下吊点(502)。6. The frame body for an attached lifting scaffold according to claim 1, characterized in that: the hanging point assembly (5) includes a hanging point truss (501) and a hanging point (502), and the hanging point The point truss (501) is installed at the lower part of the inner vertical pole (2), and the lower part of the lifting point truss (501) is installed with the lowering point (502). 7.根据权利要求1所述的用于附着式升降脚手架的架体,其特征在于:所述竖向主框架(13)下端设有底部托架(103),所述底部托架(103)上设有底板(1),所述底板(1)靠近于内立杆(2)的边沿上设有防护翻板(101),所述防护翻板(101)通过翻板连接件(102)活动安装在底板(1)上。7. The frame body for an attached lifting scaffold according to claim 1, characterized in that: a bottom bracket (103) is provided at the lower end of the vertical main frame (13), and the bottom bracket (103) A bottom plate (1) is provided on it, and a protective flap (101) is provided on the edge of the bottom plate (1) close to the inner pole (2), and the protective flap (101) passes through the flap connector (102) The activity is installed on the base plate (1). 8.根据权利要求7所述的用于附着式升降脚手架的架体,其特征在于:所述防护翻板(101)通过铰链活动安装在翻板连接件(102)上,且防护翻板(101)通过铰链的最大翻转角度为与所述底板(1)齐平。8. The frame body for an attached lifting scaffold according to claim 7, characterized in that: the protective flap (101) is movably installed on the flap connector (102) through a hinge, and the protective flap ( 101) The maximum flip angle through the hinge is flush with the bottom plate (1).
CN201920078124.XU 2019-01-17 2019-01-17 Frame body for attached lifting scaffolding Expired - Fee Related CN209686836U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920078124.XU CN209686836U (en) 2019-01-17 2019-01-17 Frame body for attached lifting scaffolding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920078124.XU CN209686836U (en) 2019-01-17 2019-01-17 Frame body for attached lifting scaffolding

Publications (1)

Publication Number Publication Date
CN209686836U true CN209686836U (en) 2019-11-26

Family

ID=68599178

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920078124.XU Expired - Fee Related CN209686836U (en) 2019-01-17 2019-01-17 Frame body for attached lifting scaffolding

Country Status (1)

Country Link
CN (1) CN209686836U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111395727A (en) * 2020-04-17 2020-07-10 广西可立德建材租赁有限公司 Outer protection system of attached lifting scaffold
CN111794488A (en) * 2020-08-10 2020-10-20 深圳市江丰工程技术有限公司 Triangular trusses for high-rise building construction
CN111851978A (en) * 2020-08-17 2020-10-30 深圳汇林达科技有限公司 A kind of prefabricated lifting scaffold and its construction method
CN111910905A (en) * 2020-08-26 2020-11-10 恒强(天津)模架有限公司 A vertical main frame of a lifting operation safety protection platform for high-rise building construction
CN111997343A (en) * 2020-08-24 2020-11-27 深圳市焺腾科技发展有限公司 Attached lifting scaffold
CN114704068A (en) * 2022-06-07 2022-07-05 中铁城建集团第一工程有限公司 Attached lifting scaffold system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111395727A (en) * 2020-04-17 2020-07-10 广西可立德建材租赁有限公司 Outer protection system of attached lifting scaffold
CN111794488A (en) * 2020-08-10 2020-10-20 深圳市江丰工程技术有限公司 Triangular trusses for high-rise building construction
CN111851978A (en) * 2020-08-17 2020-10-30 深圳汇林达科技有限公司 A kind of prefabricated lifting scaffold and its construction method
CN111997343A (en) * 2020-08-24 2020-11-27 深圳市焺腾科技发展有限公司 Attached lifting scaffold
CN111910905A (en) * 2020-08-26 2020-11-10 恒强(天津)模架有限公司 A vertical main frame of a lifting operation safety protection platform for high-rise building construction
CN114704068A (en) * 2022-06-07 2022-07-05 中铁城建集团第一工程有限公司 Attached lifting scaffold system
CN114704068B (en) * 2022-06-07 2022-08-19 中铁城建集团第一工程有限公司 Attached lifting scaffold system

Similar Documents

Publication Publication Date Title
CN209686836U (en) Frame body for attached lifting scaffolding
TWI506190B (en) A?high-rise safety construction lifting platform
CN110130626A (en) Quick-loading aluminum alloy scaffolding
CN216305343U (en) A hanging basket structure that can adapt to a roof with a slope
CN205577383U (en) Attached lifting scaffold
CN217557608U (en) Non-vertical outer vertical face curtain wall construction hanging basket
CN110453836A (en) inclined glass curtain wall mounting system and mounting method
CN212406044U (en) Anti-falling climbing frame device for high-rise building construction
CN210337912U (en) Electrified construction ladder car of adjustable level railway
CN104278830A (en) Integral combined scaffold
CN114319820B (en) An external cantilever frame for external curtain wall construction and its installation and construction method
CN215711019U (en) Anti-falling hoisting frame with strong compatibility
CN206158146U (en) Novel building section of thick bamboo well construction operation platform
CN114278071B (en) climbing frame for building construction
CN210563516U (en) Movable edge-facing operation anti-falling device for large-span structure
CN208202504U (en) It is a kind of to facilitate the scaffold for adjusting height
CN210767928U (en) Protection mechanism of safety protection platform
CN210264006U (en) A construction protection frame for a building edge structure column
CN209194539U (en) A kind of railway engineering foundation pit construction bracket
CN111910905A (en) A vertical main frame of a lifting operation safety protection platform for high-rise building construction
CN222276116U (en) Building climbing frame
CN218668433U (en) Operating platform for building construction of anti-video wall of house
CN219261695U (en) A Simple Roof High Support Hanging Basket
CN218861674U (en) Aluminum alloy scaffold
CN223048489U (en) A fire protection corridor construction mechanism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Frame for attached lifting scaffold

Effective date of registration: 20201127

Granted publication date: 20191126

Pledgee: Bank of Chengdu science and technology branch of Limited by Share Ltd.

Pledgor: JUSTREACH SCIENCE & TECHNOLOGY Co.,Ltd. (CHENGDU)

Registration number: Y2020980008550

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20221027

Granted publication date: 20191126

Pledgee: Bank of Chengdu science and technology branch of Limited by Share Ltd.

Pledgor: JUSTREACH SCIENCE & TECHNOLOGY Co.,Ltd. (CHENGDU)

Registration number: Y2020980008550

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191126