CN217325440U - Precipitation treatment system for construction site - Google Patents
Precipitation treatment system for construction site Download PDFInfo
- Publication number
- CN217325440U CN217325440U CN202220124831.XU CN202220124831U CN217325440U CN 217325440 U CN217325440 U CN 217325440U CN 202220124831 U CN202220124831 U CN 202220124831U CN 217325440 U CN217325440 U CN 217325440U
- Authority
- CN
- China
- Prior art keywords
- water
- precipitation
- tank
- water tank
- storage tank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/152—Water filtration
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a precipitation processing system for job site, including precipitation well system, blow off pipe, pump body system, storage water tank system and water terminal, precipitation well system passes through pump body headtotail storage water tank system, storage water tank headtotail the water terminal, blow off union coupling precipitation well system, storage water tank system bury storage water tank system for, are provided with the level sensor who is used for the switch pump body in the storage water tank. The utility model adopts a buried water storage tank, which makes the water tank lower than the thickness of the frozen soil layer, realizes the freeze prevention of the water tank and ensures the operation of the precipitation treatment system; the water tank adopts a sensor to dynamically store water, and the operation of the water tank can be guaranteed under the condition of deep burying through the ultrasonic sensor; the water quality is graded through multi-stage sedimentation and is used immediately under the condition of proper water quality, so that the water using rhythm is guaranteed, and long-time siltation is avoided; through the water receiving tank arranged at the pipeline, waste of water generated at the position which is easy to damage can be immediately recycled to the inside of the system.
Description
Technical Field
The utility model relates to a construction field especially relates to a precipitation processing system for job site.
Background
In recent years, urban construction is developed rapidly, a large amount of construction water is required for engineering construction, and a large water load is undoubtedly caused for some cities with serious water shortage. For areas with high underground water level, deep foundation pit construction can be carried out only after precipitation is needed, and if the foundation pit is not subjected to dewatering and drainage work, confined water can soak the foundation pit to cause collapse; the pumped underground water resource is directly discharged into municipal pipelines or open channels without utilization. The construction site has large water consumption, each project needs water resource, most construction water adopts municipal tap water, and water using parts comprise site domestic drinking water, fire-fighting water, site greening sprinkling irrigation water, site dust fall, vehicle washing, toilet washing and building construction water (comprising pile machine slurry preparation, concrete structure construction period maintenance, concrete test block maintenance, masonry plastering, decoration and fitment, pipeline pressing and the like); the waste of water resources at construction sites is serious, and precipitation, rainwater, production and domestic wastewater almost all adopt an outward discharge mode, so that surface water pollution is caused, and the life of residents is influenced. In fact, the construction water has higher requirements on life drinking water, and the water quality requirements of other water are relatively lower, so that the normal water on the site can be completely met by fully utilizing the reclaimed water and the precipitation engineering underground water, the precipitation engineering underground water is used in structural engineering, and the water quality inspection rear can be used.
Nowadays, people actively advocate resource conservation when water resource consumption is more and more serious. The green construction is taken as a direction of the reform of the construction industry, and the water conservation and the water resource utilization are the symbols of the green construction. The construction site water resource utilization is reasonably planned, a perfect construction site water resource comprehensive recovery and utilization system is established, the utilization rate of water is improved, and the problem of construction site water resource waste can be effectively solved.
At present, the treatment method for the precipitation well only extracts water resources, and no reasonable treatment system is arranged during allocation and transportation, so that the water resources in the precipitation well cannot be immediately and efficiently utilized.
There is a need for a precipitation treatment system for a construction site that addresses the above-mentioned problems.
Disclosure of Invention
The utility model relates to a solve among the prior art at present only for extracting the water resource to the processing method of precipitation well, dispatching the arrangement, do not have reasonable processing system for the problem that the water source can't be utilized by the high efficiency immediately in the precipitation well provides a precipitation processing system for job site, through adopting the formula of burying storage water tank, sensor developments retaining, multistage subsides and arranges the water receiving tank, has solved above-mentioned problem.
The utility model provides a precipitation processing system for job site, including precipitation well system, blow off pipe, pump body system, storage water tank system and water terminal, precipitation well system passes through pump body system and connects the storage water tank system, and storage water tank system connects the water terminal, and precipitation well system is connected to the blow off pipe, and storage water tank system buries the storage water tank system for ground, is provided with the level sensor who is used for the switch pump body in the storage water tank, and the connecting line below at water terminal is provided with the water receiving tank, and storage water tank system is connected to the water receiving tank.
A precipitation processing system for job site, as preferred mode, precipitation well system includes precipitation well body, first precipitation water tank, second precipitation water tank and third precipitation water tank, precipitation well body and first precipitation water tank, second precipitation water tank and third precipitation water tank connect gradually, first precipitation water tank and precipitation well body bottom intercommunication, the second subsides water tank and first precipitation water tank middle part intercommunication, the third subsides water tank and second precipitation water tank top intercommunication, the first precipitation water tank of blow off pipe intercommunication.
A precipitation treatment system for job site, as preferred mode, the storage water tank system includes first storage water tank and second storage water tank, first storage water tank and second storage water tank do not communicate each other.
A precipitation treatment system for job site, as preferred mode, pump body system includes the first pump body and the second pump body, the second is subsided water tank and first storage water tank to the first pump body coupling second, the third is subsided water tank and second storage water tank to the second pump body coupling third, first storage water tank is connected to the water receiving tank.
A precipitation treatment system for job site, as preferred mode, the water terminal includes domestic water terminal and construction water terminal, domestic water end-to-end connection second storage water tank, first storage water tank of construction water end-to-end connection.
A precipitation processing system for job site, as preferred mode, level sensor is ultrasonic wave level sensor.
A precipitation processing system for job site, as preferred mode, be provided with infrared inductive switch between domestic water terminal and the first storage water tank.
The utility model discloses beneficial effect as follows:
(1) the underground water storage tank is adopted, so that the thickness of the water tank is lower than that of a frozen soil layer, the water tank is prevented from freezing, and the operation of a precipitation treatment system is guaranteed;
(2) the water tank adopts a sensor to dynamically store water, and the operation of the water tank can be guaranteed under the condition of deep burying through the ultrasonic sensor;
(3) the water quality is graded through multi-stage sedimentation and is used immediately under the condition of proper water quality, so that the water using rhythm is guaranteed, and long-time siltation is avoided;
(4) through the water receiving tank arranged at the pipeline, waste of water generated at the position which is easy to damage can be immediately recycled to the inside of the system.
Drawings
FIG. 1 is a schematic view of a precipitation treatment system for use at a construction site;
FIG. 2 is a schematic view of a precipitation well system of the precipitation treatment system for construction site;
FIG. 3 is a schematic view of a water storage tank system of a precipitation treatment system for a construction site;
FIG. 4 is a schematic view of a pump system of a precipitation treatment system for a construction site;
fig. 5 is a schematic view of a water terminal of a precipitation treatment system for a construction site.
Reference numerals:
1. a dewatering well system; 11. a dewatering well body; 12. a first settling tank; 13. a second settling water tank; 14. a third settling water tank; 2. a blow-off pipe; 3. a pump body system; 31. a first pump body; 32. a second pump body; 4. a water storage tank system; 41. a first water storage tank; 42. a second water storage tank; 5. a water using terminal; 51. a domestic water terminal; 52. construction water terminal.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Example 1
As shown in figure 1, a precipitation treatment system for construction site, including precipitation well system 1, blow off pipe 2, pump body system 3, storage water tank system 4 and water terminal 5, precipitation well system 1 passes through pump body system 3 and connects storage water tank system 4, storage water tank system 4 connects water terminal 5, blow off pipe 2 connects precipitation well system 1, storage water tank system 4 buries storage water tank system 4 for ground, be provided with the level sensor who is used for the switch pump body in the storage water tank, the connecting line below of water terminal 5 is provided with the water receiving tank, water receiving tank connects storage water tank system 4.
As shown in fig. 2, precipitation well system 1 includes precipitation well body 11, first sedimentation tank 12, second sedimentation tank 13 and third sedimentation tank 14, precipitation well body 11 and first sedimentation tank, second sedimentation tank and third sedimentation tank connect gradually, first sedimentation tank and precipitation well body 11 bottom intercommunication, second sedimentation tank and first sedimentation tank middle part intercommunication, third sedimentation tank and second sedimentation tank top intercommunication, blow off pipe 2 intercommunication first sedimentation tank 12.
As shown in fig. 3, the water storage tank system 4 includes a first water storage tank 41 and a second water storage tank 42, and the first water storage tank 41 and the second water storage tank 42 are not communicated with each other.
As shown in fig. 4, the pump system 3 includes a first pump 31 and a second pump 32, the first pump 31 is connected to the second settling tank and the first water storage tank 41, the second pump 32 is connected to the third settling tank and the second water storage tank 42, and the water receiving tank is connected to the first water storage tank 41.
As shown in fig. 5, the water terminal 5 includes a domestic water terminal 51 and a construction water terminal 52, the domestic water terminal 51 is connected to the second water storage tank 42, and the construction water terminal 52 is connected to the first water storage tank 41.
The liquid level sensor is an ultrasonic liquid level sensor. An infrared induction switch is arranged between the domestic water terminal 51 and the first water storage tank 41.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The utility model provides a precipitation treatment system for job site which characterized in that: the system comprises a precipitation well system (1), a blow-off pipe (2), a pump body system (3), a water storage tank system (4) and a water terminal (5), wherein the precipitation well system (1) is connected with the water storage tank system (4) through the pump body system (3), the water storage tank system (4) is connected with the water terminal (5), the blow-off pipe (2) is connected with the precipitation well system (1), the water storage tank system (4) is a buried water storage tank system (4), a liquid level sensor for opening and closing the pump body is arranged in the water storage tank, a water receiving groove is arranged below a connecting pipeline of the water terminal (5), and the water receiving groove is connected with the water storage tank system (4);
precipitation well system (1) is including precipitation well body (11), first precipitation tank (12), second precipitation tank (13) and third precipitation tank (14), precipitation well body (11) with first precipitation tank second precipitation tank with the third precipitation tank connects gradually, first precipitation tank with precipitation well body (11) bottom intercommunication, the second precipitation tank with first precipitation tank middle part intercommunication, the third precipitation tank with second precipitation tank top intercommunication, blow off pipe (2) intercommunication first precipitation tank (12).
2. The precipitation treatment system for a construction site according to claim 1, wherein: the water storage tank system (4) comprises a first water storage tank (41) and a second water storage tank (42), and the first water storage tank (41) and the second water storage tank (42) are not communicated with each other.
3. The precipitation treatment system for a construction site according to claim 2, wherein: the pump body system (3) comprises a first pump body (31) and a second pump body (32), the first pump body (31) is connected with the second precipitation water tank and the first water storage tank (41), the second pump body (32) is connected with the third precipitation water tank and the second water storage tank (42), and the water receiving tank is connected with the first water storage tank (41).
4. The precipitation treatment system for a construction site according to claim 3, wherein: the water terminal (5) comprises a domestic water terminal (51) and a construction water terminal (52), the domestic water terminal (51) is connected with the second water storage tank (42), and the construction water terminal (52) is connected with the first water storage tank (41).
5. The precipitation treatment system for a construction site according to claim 1, wherein: the liquid level sensor is an ultrasonic liquid level sensor.
6. The precipitation treatment system for a construction site according to claim 4, wherein: an infrared induction switch is arranged between the domestic water terminal (51) and the first water storage tank (41).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220124831.XU CN217325440U (en) | 2022-01-18 | 2022-01-18 | Precipitation treatment system for construction site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220124831.XU CN217325440U (en) | 2022-01-18 | 2022-01-18 | Precipitation treatment system for construction site |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217325440U true CN217325440U (en) | 2022-08-30 |
Family
ID=82992911
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220124831.XU Active CN217325440U (en) | 2022-01-18 | 2022-01-18 | Precipitation treatment system for construction site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217325440U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114541446A (en) * | 2022-01-18 | 2022-05-27 | 中国黄金集团建设有限公司 | Precipitation treatment system for construction site |
-
2022
- 2022-01-18 CN CN202220124831.XU patent/CN217325440U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114541446A (en) * | 2022-01-18 | 2022-05-27 | 中国黄金集团建设有限公司 | Precipitation treatment system for construction site |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201276718Y (en) | Rainwater collecting and recycling system on building roofing | |
CN107542107A (en) | The dome type piping lane built using the pavement underground space | |
CN103374965B (en) | Venturi self-circulation negative-pressure drainage system of refuse landfill | |
CN205804380U (en) | A kind of Deep Foundation Pit Well-Point Dewatering and the wastewater recycling system of pile tube subsoil water | |
CN1920192A (en) | Method for collecting and utilizing rain water | |
CN217325440U (en) | Precipitation treatment system for construction site | |
CN202227456U (en) | Rainwater collection and recycling system for environment-friendly transformer station | |
CN111005429A (en) | Drainage system and method of double-layer coupling structure | |
CN202596175U (en) | Building construction site water recovery system | |
CN214574125U (en) | Construction structure for preventing basement from floating up integrally in use stage | |
CN206368389U (en) | One kind backwash and sewage sucking system | |
CN206346221U (en) | The left and right combined type piping lane built using the pavement underground space | |
CN110093965A (en) | A kind of water discharge method of construction site | |
CN112523239A (en) | Foundation pit gas lift reverse circulation dewatering device and method | |
CN211948651U (en) | Comprehensive recovery and utilization system for green construction water resources in construction site | |
CN114541446A (en) | Precipitation treatment system for construction site | |
CN216240796U (en) | Tunnel construction structure of shunting of decontaminating | |
CN215410517U (en) | Single-well double-line pipe jacking well | |
AU2021101264A4 (en) | A foundation pit drainage system for flood control | |
CN203795512U (en) | Rainwater recycling device | |
CN208633131U (en) | Building foundation pit precipitation recycling device | |
CN212224123U (en) | Building site circulating water utilizes system | |
CN206128253U (en) | Urban drainage pipe network collection yu jiao pond | |
CN219639656U (en) | Municipal administration pipeline rainy season anti-floating device | |
CN214401858U (en) | Construction rainfall drainage structures |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |